CN105909256A - 一种采用掌子面预加固留核心土三台阶临时仰拱技术的大跨软弱围岩隧道施工方法 - Google Patents

一种采用掌子面预加固留核心土三台阶临时仰拱技术的大跨软弱围岩隧道施工方法 Download PDF

Info

Publication number
CN105909256A
CN105909256A CN201610343700.XA CN201610343700A CN105909256A CN 105909256 A CN105909256 A CN 105909256A CN 201610343700 A CN201610343700 A CN 201610343700A CN 105909256 A CN105909256 A CN 105909256A
Authority
CN
China
Prior art keywords
core soil
inverted arch
surrounding rock
region
excavated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610343700.XA
Other languages
English (en)
Inventor
王峥峥
李斌
郭翔宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian University of Technology
Original Assignee
Dalian University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian University of Technology filed Critical Dalian University of Technology
Priority to CN201610343700.XA priority Critical patent/CN105909256A/zh
Publication of CN105909256A publication Critical patent/CN105909256A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明提供了一种采用掌子面预加固留核心土三台阶临时仰拱技术的大跨软弱围岩隧道施工方法,属于铁路隧道工程技术领域。采取三台阶分步开挖方式,且各台阶开挖时预留核心土。在开挖前,首先对拱顶上方区域进行注浆小导管超前支护,然后对各台阶分步开挖。开挖前,采用玻璃纤维对掌子面除核心土的区域进行预加固。在各台阶的核心土开挖之后,立即施做对应的临时仰拱。本发明的效果和益处是将施工过程划分为若干阶段,采取相应的临时支护措施,有效的控制了施工过程中围岩的变形,维护了周边近接工程的稳定与安全。

Description

一种采用掌子面预加固留核心土三台阶临时仰拱技术的大跨软弱围岩隧道施工 方法
技术领域
本发明属于铁路隧道工程技术领域,涉及到大跨软弱围岩隧道施工技术,特别涉及到采用掌子面预加固留核心土三台阶临时仰拱技术的大跨软弱围岩隧道施工方法。
背景技术
隧道施工中,特别是大跨软弱围岩隧道施工中,确保施工过程中围岩的稳定性一直是工程的关键内容。然而,往往由于隧道所处地层地质条件较差,或者附近有近接工程,难以维持隧道施工过程中周围岩体的稳定。因此,寻求高效安全的施工技术,确保大跨软弱围岩隧道施工中围岩与支护结构的稳定,尽量减小隧道施工对接近工程的影响,是现代隧道施工技术发展的主流趋势。
发明内容
本发明要解决的技术问题是采用掌子面预加固留核心土三台阶临时仰拱技术的大跨软弱围岩隧道施工方法。
本发明的技术方案:
一种采用掌子面预加固留核心土三台阶临时仰拱技术的大跨软弱围岩隧道施工方法,步骤如下:
1)采用注浆小导管对预定区域进行超前支护;
2)待开挖的隧道掌子面从上到下划分为3个区域,按照从上向下顺序依次对各区域开挖;
3)首先对区域内除设置核心土Ⅰ之外的区域采用玻璃纤维进行预加固,挖除区域内除核心土Ⅰ外的其余土体;
4)在已开挖区域设置初期支护Ⅰ和锁脚锚杆Ⅰ;
5)挖除上述区域内的核心土Ⅰ,设置临时仰拱,形成台阶Ⅰ;
6)重复步骤3)、步骤4)和步骤5)直到3个区域均挖完,最后形成掌子面预加固留核心土三台阶临时仰拱技术的大跨软弱围岩隧道。
本发明的有益效果是传统的大跨软弱围岩隧道施工方法,往往由于其环境复杂,支护措施不到位,而产生过大的围岩变形,影响施工过程中围岩的稳定性以及威胁到周边近接工程的安全。本发明将施工过程划分为若干阶段,采取相应的临时支护措施,有效的控制了施工过程中围岩的变形,维护了周边近接工程的稳定与安全。
附图说明
图1是本发明的隧道立面图。
图2是本发明的隧道剖面图。
图中:1注浆小导管;2土方Ⅰ;3初期支护Ⅰ;4核心土Ⅰ;5锁脚锚杆Ⅰ;6临时仰拱Ⅰ;7土方Ⅱ;8初期支护Ⅱ;9核心土Ⅱ;10锁脚锚杆Ⅱ;11临时仰拱Ⅱ;12土方Ⅲ;13初期支护Ⅲ;14锁脚锚杆Ⅲ;15核心土Ⅲ;16仰拱;17玻璃纤维;18台阶Ⅰ;19台阶Ⅱ;20台阶Ⅲ。
具体实施方式
以下结合技术方案和附图,详细叙述本发明的具体实施方式。
实施例
1.采用注浆小导管对预定区域进行超前支护。
2.待开挖的隧道掌子面从上到下划分为3个区域。
3.采用玻璃纤维对上部区域除核心土Ⅰ外的区域进行预加固,然后开挖土方Ⅰ,施做初期支护Ⅰ及锁脚锚杆Ⅰ。
4.开挖核心土Ⅰ,施做临时仰拱Ⅰ,形成台阶Ⅰ。
5.采用玻璃纤维对中间区域除核心土Ⅱ外的区域进行预加固,然后开挖土方Ⅱ,施做初期支护Ⅱ及锁脚锚杆Ⅱ。
6.开挖核心土Ⅱ,施做临时仰拱Ⅱ,形成台阶Ⅱ。
7.采用玻璃纤维对下部区域除核心土Ⅲ外的区域进行预加固,然后开挖土方Ⅲ,施做初期支护Ⅲ及锁脚锚杆Ⅲ。
8.开挖核心土Ⅲ,施做仰拱,形成台阶Ⅲ。

Claims (1)

1.一种采用掌子面预加固留核心土三台阶临时仰拱技术的大跨软弱围岩隧道施工方法,其特征在于,步骤如下:
1)采用注浆小导管对预定区域进行超前支护;
2)待开挖的隧道掌子面从上到下划分为3个区域,按照从上向下顺序依次对各区域开挖;
3)首先对区域内除设置核心土Ⅰ之外的区域采用玻璃纤维进行预加固,挖除区域内除核心土Ⅰ外的其余土体;
4)在已开挖区域设置初期支护Ⅰ和锁脚锚杆Ⅰ;
5)挖除上述区域内的核心土Ⅰ,设置临时仰拱,形成台阶Ⅰ;
6)重复步骤3)、步骤4)和步骤5)直到3个区域均挖完,最后形成掌子面预加固留核心土三台阶临时仰拱技术的大跨软弱围岩隧道。
CN201610343700.XA 2016-05-19 2016-05-19 一种采用掌子面预加固留核心土三台阶临时仰拱技术的大跨软弱围岩隧道施工方法 Pending CN105909256A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610343700.XA CN105909256A (zh) 2016-05-19 2016-05-19 一种采用掌子面预加固留核心土三台阶临时仰拱技术的大跨软弱围岩隧道施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610343700.XA CN105909256A (zh) 2016-05-19 2016-05-19 一种采用掌子面预加固留核心土三台阶临时仰拱技术的大跨软弱围岩隧道施工方法

Publications (1)

Publication Number Publication Date
CN105909256A true CN105909256A (zh) 2016-08-31

Family

ID=56748467

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610343700.XA Pending CN105909256A (zh) 2016-05-19 2016-05-19 一种采用掌子面预加固留核心土三台阶临时仰拱技术的大跨软弱围岩隧道施工方法

Country Status (1)

Country Link
CN (1) CN105909256A (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107013222A (zh) * 2017-05-28 2017-08-04 中铁五局集团有限公司 一种紧邻既有铁路的滇中红层隧道铣挖施工方法
CN108180018A (zh) * 2017-10-24 2018-06-19 济南城建集团有限公司 一种浅埋湿陷性黄土隧道核心土与玻纤锚杆加固施工方法
CN108571333A (zh) * 2018-04-11 2018-09-25 郭士成 一种城市地铁区间软土隧道机械化全断面开挖方法
CN108571332A (zh) * 2018-04-11 2018-09-25 王晓彤 一种用于城市地铁区间软土隧道超前预支护方法
CN110130927A (zh) * 2019-06-12 2019-08-16 中铁十二局集团有限公司 一种炭质板岩隧道大变形控制施工方法
CN112901208A (zh) * 2021-05-06 2021-06-04 中铁九局集团第七工程有限公司 一种市域铁路矿山法隧道浅埋段综合施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101614125A (zh) * 2009-07-23 2009-12-30 中铁九局集团有限公司 V级围岩隧道施工方法
CN101638987A (zh) * 2009-07-24 2010-02-03 中铁二十一局集团有限公司 用帷幕注浆加止浆墙穿越高压富水断裂带的隧道施工方法
CN101749031A (zh) * 2009-12-24 2010-06-23 北京交通大学 海底隧道穿越富水砂层复合注浆加固方法
CN102562074A (zh) * 2012-02-03 2012-07-11 中铁四局集团第二工程有限公司 大断面隧道上硬下软复合地层的施工方法
CN102900441A (zh) * 2012-09-18 2013-01-30 铁道部经济规划研究院 基于围岩完全变形控制的中国隧道修建方法
CN104314585A (zh) * 2014-10-15 2015-01-28 中国神华能源股份有限公司 隧道全断面预加固方法及结构

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101614125A (zh) * 2009-07-23 2009-12-30 中铁九局集团有限公司 V级围岩隧道施工方法
CN101638987A (zh) * 2009-07-24 2010-02-03 中铁二十一局集团有限公司 用帷幕注浆加止浆墙穿越高压富水断裂带的隧道施工方法
CN101749031A (zh) * 2009-12-24 2010-06-23 北京交通大学 海底隧道穿越富水砂层复合注浆加固方法
CN102562074A (zh) * 2012-02-03 2012-07-11 中铁四局集团第二工程有限公司 大断面隧道上硬下软复合地层的施工方法
CN102900441A (zh) * 2012-09-18 2013-01-30 铁道部经济规划研究院 基于围岩完全变形控制的中国隧道修建方法
CN104314585A (zh) * 2014-10-15 2015-01-28 中国神华能源股份有限公司 隧道全断面预加固方法及结构

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107013222A (zh) * 2017-05-28 2017-08-04 中铁五局集团有限公司 一种紧邻既有铁路的滇中红层隧道铣挖施工方法
CN108180018A (zh) * 2017-10-24 2018-06-19 济南城建集团有限公司 一种浅埋湿陷性黄土隧道核心土与玻纤锚杆加固施工方法
CN108571333A (zh) * 2018-04-11 2018-09-25 郭士成 一种城市地铁区间软土隧道机械化全断面开挖方法
CN108571332A (zh) * 2018-04-11 2018-09-25 王晓彤 一种用于城市地铁区间软土隧道超前预支护方法
CN110130927A (zh) * 2019-06-12 2019-08-16 中铁十二局集团有限公司 一种炭质板岩隧道大变形控制施工方法
CN110130927B (zh) * 2019-06-12 2021-03-23 中铁十二局集团有限公司 一种炭质板岩隧道大变形控制施工方法
CN112901208A (zh) * 2021-05-06 2021-06-04 中铁九局集团第七工程有限公司 一种市域铁路矿山法隧道浅埋段综合施工方法
WO2022122052A1 (zh) * 2021-05-06 2022-06-16 中铁九局集团第七工程有限公司 一种市域铁路矿山法隧道浅埋段综合施工方法

Similar Documents

Publication Publication Date Title
CN105909256A (zh) 一种采用掌子面预加固留核心土三台阶临时仰拱技术的大跨软弱围岩隧道施工方法
CN104612698B (zh) 一种浅埋暗挖隧道上台阶中隔壁施工方法
CN103089275B (zh) 富水极破碎围岩隧道塌方段围岩控制方法
CN102182466B (zh) 隧道双侧壁导坑结合拱部跳挖开挖方法
CN105888703B (zh) 微导洞内施做横向棚盖下超浅埋暗挖地铁车站修建方法
CN103628894B (zh) 一种基于变角伞状超前注浆的富水断层破碎带垮塌巷道巷修方法
CN104047623B (zh) 一种大跨洞室开挖施工方法
CN108278115A (zh) 一种基于管棚预支护的大拱脚三台阶隧道快速施工方法及结构
CN108442943A (zh) 一种渡线段隧道双侧壁导坑法施工方法
CN102071947A (zh) 大跨度隧道洞口软弱围岩段施工方法
CN108487911A (zh) 复杂地质条件下大跨度隧道双侧墙复合十字交叉法施工方法
CN103277106A (zh) 公路隧道三台阶五步开挖施工方法
CN101775988A (zh) 软弱围岩斜井转正洞的施工方法
CN102312672A (zh) 一种适应复杂多变地质条件的大断面隧道快速施工方法
CN102606168B (zh) 防止浅埋暗挖隧道开挖时沉降变形的施工方法
CN106121659B (zh) 一种下穿城市主干道上软下硬地层小断面隧道开挖方法
CN106869969A (zh) 一种软岩超大断面隧道的开挖支护施工方法
CN106121675A (zh) 小型溶洞位于开挖隧道仰拱底时隧道开挖与溶洞处理方法
CN108035733A (zh) 一种岩质超大断面隧道钢架岩墙组合竖撑分部开挖方法
CN110259490B (zh) 一种地铁暗挖车站施工方法
CN104806251A (zh) 一种用于复杂环境下城市地铁车站附属仰挖施工方法
CN107859523A (zh) 一种浅埋偏压隧道非对称支护结构及施工方法
CN107620600A (zh) 一种mjs工法和管幕法联合支护大断面小净距暗挖工法
CN106150508A (zh) 一种岩溶地层中隧道钻探施工方法
CN105863648A (zh) 一种暗挖浅覆大断面隧道施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160831

RJ01 Rejection of invention patent application after publication