CN105908988A - 一种用竹筋水泥砂浆面层加固砌体墙的方法 - Google Patents
一种用竹筋水泥砂浆面层加固砌体墙的方法 Download PDFInfo
- Publication number
- CN105908988A CN105908988A CN201610248700.1A CN201610248700A CN105908988A CN 105908988 A CN105908988 A CN 105908988A CN 201610248700 A CN201610248700 A CN 201610248700A CN 105908988 A CN105908988 A CN 105908988A
- Authority
- CN
- China
- Prior art keywords
- bamboo
- wall
- surface layer
- reinforcement
- mortar surface
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
- E04G23/0222—Replacing or adding wall ties
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
一种用竹筋水泥砂浆面层加固砌体墙的方法,采取竹筋水泥砂浆面层不仅施工速度快、影响范围小,且能保证砌体墙的承载力和变形满足后续使用要求。竹材为可再生天然速生材料,采用竹席加固既有建筑可有效减少对资源能源的消耗,提高既有建筑改造业的可持续性。
Description
技术领域
本发明涉及建筑工程领域,具体讲就是涉及一种用竹筋水泥砂浆面层加固砌体墙的方法,用于既有建筑的加固修复。
背景技术
砌体结构建筑在建筑行业得到了大范围推广应用。经过多年使用后,砌体结构普遍存在一定程度的老化或损伤,且由于部分建筑使用功能调整使其使用荷载增加,安全储备明显下降,需通过合理的加固方法提高其承载力,保证安全使用。
中国专利ZL201210282611.0公开了公开了一种钢结构加固砌体墙的方法,其包括以下步骤:1)在圈梁两端分别钻孔,分别采用高强螺栓对穿,将普通砖墙两侧的两块加固钢板与上端的圈梁可靠相连;2)在底部两侧分别采用化学螺栓将连接件与构造柱相连;3)将加固钢板的下端通过高强螺栓连接到连接件的翼缘处,背面加固钢板连接方法与此相同;4)在加固砌体墙上钻孔,插入钢筋卡扣,弯曲并焊接形成回形扣,紧固两侧的钢板;5)在墙体表面涂抹素水泥或其它遮盖物后,即完成对墙体的加固。增强了墙体的变形能力,延长了墙体由开裂到破坏的时间,墙体的耗能能力也显著增强。但是该巩固结构利用钢结构加固成本过高,同时容易对砌体墙产生破坏。
发明内容
本发明的目的是针对上述现有的无构造柱砌体墙加固结构需要破坏现有砌体墙结构的技术缺陷,提供一种用竹筋水泥砂浆面层加固砌体墙的方法,采取竹筋水泥砂浆面层不仅施工速度快、影响范围小,且能保证砌体墙的承载力和变形满足后续使用要求。竹材为可再生天然速生材料,采用竹席加固既有建筑可有效减少对资源能源的消耗,提高既有建筑改造业的可持续性。
技术方案
为了实现上述技术目的,本发明设计的一种竹筋水泥砂浆面层加固砌体墙的方法,其特征在于,它包括以下步骤:
(1)在砌体墙墙面上标出穿墙拉结筋位置,并钻孔;
(2)在砌体墙底梁放置竹筋处钻孔,预埋竖向竹筋;
(3)绑扎水平竹筋,在墙端部将两侧水平竹筋绑扎在一起,并绑扎拉结竹筋;
(4)在砌体墙墙面涂抹水泥砂浆面层,之后浇水养护至少28天,避免暴晒或受冻。
进一步,所述步骤(3)中竹筋在绑扎前竹筋周围涂抹环氧砂浆作为防水层。
进一步,所述步骤(2)中底梁中预埋竹筋深度为100~200mm。
进一步,所述竹筋宽10~25mm,厚5~12mm,水平向竹筋两端弯起90度,弯起长度为150~200mm。
进一步,所述拉结竹筋选择当年新竹,将竹青劈成细条,用生石灰腌制1个月。
进一步,所述步骤(4)中水泥砂浆面层厚35~60mm。
有益效果
本发明提供的一种用竹筋水泥砂浆面层加固砌体墙的方法,能保证砌体墙的承载力和变形满足后续使用要求;加固后的砌体墙,其承载力比加固前提高40%以上。并且采用竹材作为加固材料,竹材为可再生天然速生材料,采用竹席加固既有建筑可有效减少对资源能源的消耗,提高既有建筑改造业的可持续性。
附图说明
附图1为本发明实施例的平面示意图;
附图2为附图1中A-A方向的剖视图;
附图3为本发明实施例中竹筋布置图。
具体实施方式
下面结合附图好实施例,对本发明做进一步说明。
实施例
如附图1和2所示,一种用竹筋水泥砂浆面层加固砌体墙的方法,它包括以下几个步骤:
第一步,将原竹加固为宽14mm,厚10mm的竹筋;水平向竹筋两端弯起90度,弯起长度为180mm;在竹筋周围涂抹环氧砂浆作为防水层;提前一个月用生石灰腌制拉结竹筋,先对砌体墙2承受的荷载进行卸载,然后在砌体墙2墙面上标出穿墙拉结筋位置,并钻孔;
第二步,在底梁放置竹筋处钻孔,预埋竖向竹筋;
第三步,绑扎水平竹筋,在墙端部将两侧水平竹筋绑扎在一起,并绑扎拉结竹筋;
第四步,涂抹40mm厚的水泥砂浆面层,之后浇水养护28天,避免暴晒或受冻。
本发明提供的一种用竹筋水泥砂浆面层加固砌体墙的方法,能保证砌体墙的承载力和变形满足后续使用要求;加固后的砌体墙,其承载力比加固前提高40%以上。并且采用竹材作为加固材料,竹材为可再生天然速生材料,采用竹席加固既有建筑可有效减少对资源能源的消耗,提高既有建筑改造业的可持续性。
本实施例所附图式所绘示的结构、比例、大小等,均仅用以配合说明书所揭示的内容,以供熟悉此技术的人士了解与阅读,并非用以限定本发明可实施的限定条件,故不具技术上的实质意义,任何结构的修饰、比例关系的改变或大小的调整,在不影响本发明所能产生的功效及所能达成的目的下,均应仍落在本发明所揭示的技术内容得能涵盖的范围内。同时,本说明书中所引用的如“上”、“下”、“左”、“右”、“中间”、“顺时针”、“逆时针”等的用语,亦仅为便于叙述的明了,而非用以限定本发明可实施的范围,其相对关系的改变或调整,在无实质变更技术内容下,当亦视为本发明可实施的范畴。
Claims (6)
1.一种竹筋水泥砂浆面层加固砌体墙的方法,其特征在于,它包括以下步骤:
(1)在砌体墙墙面上标出穿墙拉结筋位置,并钻孔;
(2)在砌体墙底梁放置竹筋处钻孔,预埋竖向竹筋;
(3)绑扎水平竹筋,在墙端部将两侧水平竹筋绑扎在一起,并绑扎拉结竹筋;
(4)在砌体墙墙面涂抹水泥砂浆面层,之后浇水养护至少28天,避免暴晒或受冻。
2.如权利要求1所述的一种竹筋水泥砂浆面层加固砌体墙的方法,其特征在于:所述步骤(3)中竹筋在绑扎前竹筋周围涂抹环氧砂浆作为防水层。
3.如权利要求1所述的一种竹筋水泥砂浆面层加固砌体墙的方法,其特征在于:所述步骤(2)中底梁中预埋竹筋深度为100~200mm。
4.如权利要求1所述的一种竹筋水泥砂浆面层加固砌体墙的方法,其特征在于:所述竹筋宽10~25mm,厚5~12mm,水平向竹筋两端弯起90度,弯起长度为150~200mm。
5.如权利要求1所述的一种竹筋水泥砂浆面层加固砌体墙的方法,其特征在于:所述拉结竹筋选择当年新竹,将竹青劈成细条,用生石灰腌制1个月。
6.如权利要求1所述的一种竹筋水泥砂浆面层加固砌体墙的方法,其特征在于:所述步骤(4)中水泥砂浆面层厚35~60mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610248700.1A CN105908988A (zh) | 2016-04-20 | 2016-04-20 | 一种用竹筋水泥砂浆面层加固砌体墙的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610248700.1A CN105908988A (zh) | 2016-04-20 | 2016-04-20 | 一种用竹筋水泥砂浆面层加固砌体墙的方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105908988A true CN105908988A (zh) | 2016-08-31 |
Family
ID=56746437
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610248700.1A Pending CN105908988A (zh) | 2016-04-20 | 2016-04-20 | 一种用竹筋水泥砂浆面层加固砌体墙的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105908988A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108999424A (zh) * | 2018-09-28 | 2018-12-14 | 浙江省东阳市横店园林古典建筑公司 | 加强墙体结构强度的构造方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011169099A (ja) * | 2011-02-03 | 2011-09-01 | Tatsuhiko Komura | 未耐震の建物全体を箍締めの原理で耐震する全体工法 |
CN102493672A (zh) * | 2011-11-29 | 2012-06-13 | 上海市第四建筑有限公司 | 既有砌体结构的双侧加筋抗震加固方法 |
CN102926552A (zh) * | 2012-11-22 | 2013-02-13 | 上海市建筑科学研究院(集团)有限公司 | 钢绞线聚合物砂浆加固空斗墙的方法 |
CN102926553A (zh) * | 2012-11-22 | 2013-02-13 | 上海市建筑科学研究院(集团)有限公司 | 铁丝网水泥砂浆加固空斗墙的方法 |
CN103835521A (zh) * | 2012-11-20 | 2014-06-04 | 贵阳铝镁设计研究院有限公司 | 一种砖墙的加固方法及结构 |
-
2016
- 2016-04-20 CN CN201610248700.1A patent/CN105908988A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011169099A (ja) * | 2011-02-03 | 2011-09-01 | Tatsuhiko Komura | 未耐震の建物全体を箍締めの原理で耐震する全体工法 |
CN102493672A (zh) * | 2011-11-29 | 2012-06-13 | 上海市第四建筑有限公司 | 既有砌体结构的双侧加筋抗震加固方法 |
CN103835521A (zh) * | 2012-11-20 | 2014-06-04 | 贵阳铝镁设计研究院有限公司 | 一种砖墙的加固方法及结构 |
CN102926552A (zh) * | 2012-11-22 | 2013-02-13 | 上海市建筑科学研究院(集团)有限公司 | 钢绞线聚合物砂浆加固空斗墙的方法 |
CN102926553A (zh) * | 2012-11-22 | 2013-02-13 | 上海市建筑科学研究院(集团)有限公司 | 铁丝网水泥砂浆加固空斗墙的方法 |
Non-Patent Citations (1)
Title |
---|
华东水利学院: "《钢筋混凝土结构及砖石结构(下册)》", 31 October 1961 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108999424A (zh) * | 2018-09-28 | 2018-12-14 | 浙江省东阳市横店园林古典建筑公司 | 加强墙体结构强度的构造方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106758743B (zh) | 一种改善钢混组合多箱连续梁桥负弯矩区受力性能的方法 | |
Cuenca | On shear behavior of structural elements made of steel fiber reinforced concrete | |
Halvonik et al. | The maximum punching shear resistance of flat slabs | |
Lantsoght et al. | Transition from one-way to two-way shear in slabs under concentrated loads | |
CN107327063A (zh) | 一种预制带肋底板混凝土叠合板 | |
CN105908988A (zh) | 一种用竹筋水泥砂浆面层加固砌体墙的方法 | |
CN206784638U (zh) | 内含钢板的预制叠合剪力墙 | |
CN206829461U (zh) | 后浇齿槽连接装配式预制混凝土板 | |
CN109372009A (zh) | 一种高层钢结构建筑埋入式柱脚及其使用方法 | |
CN205475857U (zh) | 一种建筑节能抗震墙 | |
CN207775947U (zh) | 一种设有防水板的独立基础结构 | |
Nwoji et al. | Comparative Study of BS 8110 and Eurocode 2 in structural design and analysis | |
CN206053123U (zh) | 一种内置缓粘结预应力钢筋的人防工程用槽型板 | |
Derkowski et al. | Influence of concrete topping on behaviour of prestressed Hollow Core floor slabs on flexible supports | |
CN108677716A (zh) | 一种带波纹套筒的群钉连接装置 | |
CN110118698A (zh) | 一种组合混凝土结构的构建方法 | |
CN207092382U (zh) | 一种钢板‑混凝土组合加固钢筋混凝土梁抗疲劳性能结构 | |
CN105863291A (zh) | 涂抹高延性水泥基复合材料加固无构造柱砌体墙的方法 | |
CN206681258U (zh) | 一种内置软钢的高耗能混凝土连梁 | |
DE602007008518D1 (de) | Verfahren zur Fundamentverstärkung, das eine in den Boden eingelassene Fundamentplatte umfasst, insbesondere für Fundamente von Masten, und so erhaltene Konstruktion | |
CN106760176A (zh) | 一种自保温预应力砼双t板 | |
Lau et al. | Shear transfer between ribbed slab and internal column | |
CN102926552A (zh) | 钢绞线聚合物砂浆加固空斗墙的方法 | |
CN107905438A (zh) | 一种钢竹复合抗震墙板 | |
CN208777519U (zh) | 一种高强压型钢板-纤维增强再生混凝土组合板 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160831 |