CN105907907B - A kind of blast furnace main belt material flow tracing control method and device - Google Patents

A kind of blast furnace main belt material flow tracing control method and device Download PDF

Info

Publication number
CN105907907B
CN105907907B CN201610351914.1A CN201610351914A CN105907907B CN 105907907 B CN105907907 B CN 105907907B CN 201610351914 A CN201610351914 A CN 201610351914A CN 105907907 B CN105907907 B CN 105907907B
Authority
CN
China
Prior art keywords
time point
main belt
control signal
control
computing unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610351914.1A
Other languages
Chinese (zh)
Other versions
CN105907907A (en
Inventor
程志
蒋辉
秦伟
陈连聪
刘浩
程曦
杨志刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Iron and Steel Co Ltd
Original Assignee
Wuhan Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Iron and Steel Co Ltd filed Critical Wuhan Iron and Steel Co Ltd
Priority to CN201610351914.1A priority Critical patent/CN105907907B/en
Publication of CN105907907A publication Critical patent/CN105907907A/en
Application granted granted Critical
Publication of CN105907907B publication Critical patent/CN105907907B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B5/00Making pig-iron in the blast furnace
    • C21B5/006Automatically controlling the process

Abstract

The present invention relates to a kind of blast furnace main belt material flow tracing control method and device, method includes: to calculate first time point, the second time point and third time point.Expect to control the blank of next batch to the main belt filled after tail reaches first time point;Material head controls main belt downstream equipment after the second time point of arrival carries out charging preparation;Whether material head detects main belt downstream equipment charging after arrival third time point prepares to complete, if the equipment charging preparation in main belt downstream is unfinished, carries out shutdown processing.Device is made of the first computing unit, the second computing unit, third computing unit, first processing units, the second processing unit, third processing unit, first stream detection device, second stream detection device and third stream detection device.Blast furnace main belt material flow tracing control method and device provided by the invention can avoid the technical issues of therefore flow detector damage causes equipment malfunction to make, reduce the fault in production because of caused by flow detector failure.

Description

A kind of blast furnace main belt material flow tracing control method and device
Technical field
The present invention relates to technical field of blast furnace process, in particular to a kind of blast furnace main belt material flow tracing control method and dress It sets.
Background technique
In blast furnace iron-making process, the main belt of feeding is the core equipment connected under blast furnace roof and raw material tank, ore and Coke is transported to furnace roof batch can 5 by main belt.Main belt filled stream test point is detected by flow detector, but stream without Method tracking.Since belt regional environment main under slot is severe, dust, iron powder diffuse for a long time, it is easy to cause electrical equipment grounding short Road.There are the following problems in use for flow detector: first, relatively high to environmental requirement, dust, iron powder are sometimes Flow detector can be made to malfunction, it is believed that there is charge to pass through, issue the signal of mistake.Second, due to bad environments, stream detection The damage frequency of device is relatively high, main belt will be caused out of service after damage.Flow detector breaks down, and generally can all cause Main belt is shut down, if cannot quickly handle in time, will cause the decompression of blast furnace checking.
Summary of the invention
The present invention solves and expects in the prior art by providing a kind of blast furnace main belt material flow tracing control method and device Current sensor is easily damaged the technical issues of causing equipment malfunction to make, the production caused by the flow detector failure can be reduced therefore Barrier.
The present invention provides a kind of blast furnace main belt material flow tracing control methods, which comprises
First time point T1 is calculated, the T1=t1+t2+ Δ T1, the t1 are the duration of valve opening of charge can sealing valve, institute Stating t2 is turning-plate chute actuation time, and the Δ T1 is the first delay time;
The second time point T2 is calculated, the T2=T1+ Δ T2, the Δ T2 are the second delay time;
Third time point T3 is calculated, the T3=t3- Δ T3, the t3 run on main belt total for the material head of blank Time, the Δ T3 are the reaction time;
Detect the first time point T1 of blank operation, the material tail of blank, which reaches, issues the after the first time point T1 The blank of one control signal control next batch is to the main belt filled;
Detect the second time point T2 of blank operation, the material head of blank, which reaches, issues the after the second time point T2 The equipment that two control signals control the main belt downstream carries out charging preparatory action;
Detect the third time point T3 of blank operation, the material head of blank, which reaches, issues the after the third time point T3 Whether the equipment charging that three control signal controls detect the main belt downstream prepares to complete, if the equipment in the main belt downstream Charging prepares not completing, then carries out shutdown processing.
Further, the method also includes:
The corresponding first material tail position the first time point T1 is detected by setting first stream detection device, works as detection The 4th control signal is issued when to the first material tail position;
Using the blank of first control signal or the 4th control signal control next batch to the main belt filled.
Further, the method also includes:
The second time point T2 corresponding first material head position is detected by setting second stream detection device, works as detection The 5th control signal is issued when to the first material head position;
It is quasi- that charging is carried out using the equipment that second control signal or the 5th control signal control the main belt downstream It is standby.
Further, the method also includes:
Third time point T3 corresponding second material head position is detected by setting third stream detection device, works as detection The 6th control signal is issued when to the second material head position;
The equipment in signal or the 6th control signal control detection main belt downstream is controlled by using third Whether charging preparatory action is completed, if the charging of the equipment in the main belt downstream prepares not completing, carries out shutdown processing.
Further, the first delay time Δ T1 and the second delay time Δ T2 is 1-3 seconds, when the reaction Between Δ T3 be 10-11 seconds.
The present invention also provides a kind of blast furnace main belt material flow tracing control device, described device includes:
First computing unit, calculates first time point T1, and the T1=t1+t2+ Δ T1, the t1 are charge can sealing valve Duration of valve opening, the t2 be turning-plate chute actuation time, the Δ T1 be the first delay time;
Second computing unit, calculates the second time point T2, and the T2=T1+ Δ T2, the Δ T2 are the second delay time;
Third computing unit, calculates third time point T3, and the T3=t3- Δ T3, the t3 are the material head of blank in master The total time run on belt, the Δ T3 are the reaction time;
First processing units are communicated with first computing unit, detect the first time of the material tail operation of the blank Point T1 issues the blank of first control signal control next batch on the main belt after reaching the first time point T1 Material;
The second processing unit is communicated with second computing unit, detects the second time of the material head operation of the blank The equipment that second control signal controls the main belt downstream, which is issued, after point T2, arrival the second time point T2 carries out charging standard Standby movement;
Third processing unit is communicated with the third computing unit, detects the third time of the material head operation of the blank Point T3 reaches the equipment charging standard in the sending third control signal control detection main belt downstream after the third time point T3 It is standby whether to complete, if the equipment charging in the main belt downstream prepares not completing, carry out shutdown processing.
Further, described device further include:
First stream detection device is communicated with first computing unit, detects the first time point T1 corresponding One material tail position issues the 4th control signal when detecting the first material tail position;
Using the blank of first control signal or the 4th control signal control next batch to the main belt filled.
Further, described device further include:
Second stream detection device is communicated with second computing unit, detects the second time point T2 corresponding the One material head position issues the 5th control signal when detecting the first material head position;
It is quasi- that charging is carried out using the equipment that second control signal or the 5th control signal control the main belt downstream It is standby.
Further, described device further include:
Third stream detection device is communicated with the third computing unit, detects the third time point T3 corresponding Two material head positions issue the 6th control signal when detecting the second material head position;
The equipment in signal or the 6th control signal control detection main belt downstream is controlled by using third Whether charging preparatory action is completed, if the charging of the equipment in the main belt downstream prepares not completing, carries out shutdown processing.
Further, described device further include:
Storage unit is communicated with first computing unit, the second computing unit and the third computing unit, stores institute State the data and blast furnace process data of the first computing unit, the second computing unit and the third computing unit;
Display unit is communicated with first computing unit, the second computing unit and the third computing unit, building master Belt stream picture, the positional relationship of Dynamically Announce stream and the main belt, and the display first time point T1, second The time point T2 and third time point T3.
One or more technical solutions provided by the invention, at least have following beneficial effect or advantage:
1, blast furnace main belt material flow tracing control method and device provided by the invention indicate stream in master using time point Position on belt charges to the making time of next blank, the equipment in main belt downstream by time point control mode The equipment in time and main belt downstream charging preparation detection time carries out Discrete control, and control process is stablized, can The technical issues of therefore flow detector damage causes equipment malfunction to make is avoided, can be reduced because of caused by flow detector failure Fault in production.
2, blast furnace main belt material flow tracing control method and device provided by the invention, using first stream detection device, Second stream detection device and third stream detection device detect the position of blank, by location information to next base The making time of material, main belt downstream equipment carry out charging the preparatory action time and main belt downstream equipment charging prepare Situation detection time is controlled, and carries out auxiliary control to time point control mode, prevents from controlling in time point control mode Signal defect processed causes production accident.
3, blast furnace main belt material flow tracing control method and device provided by the invention, are provided with storage unit, and storage is single Member storage can store the number of the first computing unit, the data of the second computing unit and third computing unit and blast furnace process demand According to realization data backup, convenient for there is progress data recovery after fault in production.
Detailed description of the invention
Fig. 1 is blast furnace main belt material flow tracing control method flow chart provided in an embodiment of the present invention;
Fig. 2 is blast furnace main belt operation schematic diagram described in method shown in Fig. 1.
Specific embodiment
The embodiment of the present invention solves existing skill by providing a kind of blast furnace main belt material flow tracing control method and device Flow detector is easily damaged the technical issues of causing equipment malfunction to make in art, can reduce because of caused by flow detector failure Fault in production.
Referring to Fig. 1 and Fig. 2, the embodiment of the invention provides a kind of blast furnace main belt material flow tracing control method, this method Include:
Step 10 calculates first time point T1, and T1=t1+t2+ Δ T1, t1 are the duration of valve opening of charge can sealing valve 1, t2 For 4 actuation time of turning-plate chute, Δ T1 is the first delay time.
Duration of valve opening t1, the turning-plate chute 4 actuation time t2 and the first delay time Δ T1 of charge can sealing valve 1 are according to reality Border working condition is set.The duration of valve opening t1 of charge can sealing valve 1 can indicate the length of blank 2, from main belt filled (base 2) material starts to the time interval of first time point T1 for guaranteeing that feeding and the movement of turning-plate chute 4 are completed.
Step 20 calculates the second time point T2, and T2=T1+ Δ T2, Δ T2 are the second delay time.
Step 30 calculates third time point T3, T3=t3- Δ T3, and t3 runs on main belt total for the material head of blank Time (i.e. blank 2 time that emptying point is moved to from off-take point), Δ T3 are the reaction time.
Total time t3 that the material head of blank is run on main belt can be according to the length of main belt and the speed of service of blank It is calculated.The first time point T1 that step 40, detection blank 2 are run, when the runing time of the material tail of blank 2 reaches first Between the blank 2 of first control signal control next batch is issued after point T1 to main 3 feeding of belt.
Meanwhile the corresponding first material tail position first time point T1 is also detected by setting first stream detection device, when The 4th control signal is issued when detecting the first material tail position;First control signal or the 4th control signal control next batch Blank 2 is to main 3 feeding of belt.First control signal or the control action of the 4th control signal are identical, using one issued at first Kind is controlled, and using two path control signal, prevents appearance control signal defect in time point control mode from causing production accident.
The second time point T2 that step 50, detection blank 2 are run, when the runing time of the material head of blank 2 reaches second Between issue the equipment that second control signal controls main 3 downstream of belt after point T2 and carry out charging preparation.
Meanwhile the second time point T2 corresponding first material head position is also detected by setting second stream detection device, when The 5th control signal is issued when detecting the second material head position;Main belt is controlled using second control signal or the 5th control signal The equipment in 3 downstreams carries out charging preparation.Second control signal is identical with the control action of the 5th control signal, using issuing at first It is a kind of controlled, using two path control signal, prevent in time point control mode occur control signal defect cause to produce Accident.
The third time point T3 that step 60, detection blank 2 are run, when the runing time of the material head of blank 2 reaches third Between issue third control signal control after point T3 and detect the equipment charging in main 3 downstream of belt and prepare whether to complete, if under main belt 3 The equipment charging of trip prepares not completing, then carries out shutdown processing.
Meanwhile third time point T3 corresponding second material head position is also detected by setting third stream detection device, when The 6th control signal is issued when detecting the second billet location;Signal or the 6th control signal control inspection are controlled by using third Whether the charging preparatory action for the equipment for surveying main 3 downstream of belt is completed, if the charging preparation of the equipment in 3 downstream of main belt is not complete At then carrying out shutdown processing.Third controls signal and the control action of the 6th control signal is identical, using the one kind issued at first It is controlled, using two path control signal, prevents appearance control signal defect in time point control mode from causing production accident.
The value of first delay time Δ T1 and the second delay time Δ T2 are 1-3 seconds, and reaction time Δ T3 is 10-11 Second.
Blast furnace main belt material flow tracing control method provided by the invention is illustrated below with reference to specific embodiment:
Embodiment 1
Referring to Fig. 1 and Fig. 2, the duration of valve opening t1 value of charge can sealing valve 1 is 2s, and turning-plate chute 4 actuation time t2 is 2s, blank 2 move to the time t3 value in emptying point from off-take point as 30s.First delay time Δ T1 be 2s, second delay when Between Δ T2 be 2s, reaction time Δ T3 be 10s.It is 6s that first time point T1, which is calculated, and the second time point T2 is 8s, when third Between point T3 be 20 seconds.
During the work time, first control signal issues before the 4th control signal, is controlled using first control signal The blank 2 of next batch is to main 3 feeding of belt.Second control signal issues before the 5th control signal, passes through the second control The equipment that signal controls main 3 downstream of belt carries out charging preparation.First detection signal issues before the second detection signal, and first Whether the equipment charging that detection signal control detects main 3 downstream of belt prepares to complete, and the equipment in main 3 downstream of belt charges quasi- at this time It is standby not complete, then shutdown processing is carried out, while alarming.
Embodiment 2
Referring to Fig. 1 and Fig. 2, the duration of valve opening t1 value of charge can sealing valve 1 is 2s, and turning-plate chute 4 actuation time t2 is 2s, blank 2 move to the time t3 value in emptying point from off-take point as 28s.First delay time Δ T1 be 2s, second delay when Between Δ T2 be 2s, reaction time Δ T3 be 10s.It is 6s that first time point T1, which is calculated, and the second time point T2 is 8s, when third Between point T3 be 18 seconds.
During the work time, first control signal issues after the 4th control signal, using the 4th control signal control The blank 2 of next batch is to main 3 feeding of belt.Second control signal issues before the 5th control signal, passes through the second control The equipment that signal controls main 3 downstream of belt carries out charging preparation.First detection signal issues after the second detection signal, and second Whether the equipment charging that detection signal control detects main 3 downstream of belt prepares to complete, and the equipment in main 3 downstream of belt charges quasi- at this time It is standby to be completed, then without intervening.
Embodiment 3
Referring to Fig. 1 and Fig. 2, the duration of valve opening t1 value of charge can sealing valve 1 is 3s, and turning-plate chute 4 actuation time t2 is 3s, blank 2 move to the time t3 value in emptying point from off-take point as 25s.First delay time Δ T1 be 2s, second delay when Between Δ T2 be 3s, reaction time Δ T3 be 10s.Obtaining first time point T1 is 8s, and the second time point T2 is 11s, third time Point T3 is 15 seconds.
During the work time, first control signal issues before the 4th control signal, is controlled using first control signal The blank 2 of next batch is to main 3 feeding of belt.Second control signal issues after the 5th control signal, passes through the 5th control The equipment that signal controls main 3 downstream of belt carries out charging preparation.First detection signal issues before the second detection signal, and first Whether the equipment charging that detection signal control detects main 3 downstream of belt prepares to complete, and the equipment in main 3 downstream of belt charges quasi- at this time It is standby not complete, then shutdown processing is carried out, while alarming.
Embodiment 4
Referring to Fig. 1 and Fig. 2, the duration of valve opening t1 value of charge can sealing valve 1 is 3s, and turning-plate chute 4 actuation time t2 is 3s, blank 2 move to the time t3 value in emptying point from off-take point as 26s.First delay time Δ T1 be 2s, second delay when Between Δ T2 be 3s, reaction time Δ T3 be 11s.Obtaining first time point T1 is 8s, and the second time point T2 is 11s, third time Point T3 is 15 seconds.
During the work time, first control signal issues after the 4th control signal, using the 4th control signal control The blank 2 of next batch is to main 3 feeding of belt.Second control signal issues after the 5th control signal, passes through the 5th control The equipment that signal controls main 3 downstream of belt carries out charging preparation.First detection signal issues after the second detection signal, and second Whether the equipment charging that detection signal control detects main 3 downstream of belt prepares to complete, and the equipment in main 3 downstream of belt charges quasi- at this time It is standby to be completed, then without intervening.
The embodiment of the invention also provides blast furnace main belt material flow tracing control device corresponding with above-described embodiment 1-4, The device include: the first computing unit, the second computing unit, third computing unit, first processing units, the second processing unit, Third processing unit, first stream detection device, second stream detection device, third stream detection device, storage unit and aobvious Show unit.
For first computing unit with first time point T1 is calculated, T1=t1+t2+ Δ T1, t1 are the valve opening of charge can sealing valve 1 Time, t2 are 4 actuation time of turning-plate chute, and Δ T1 is the first delay time.Second computing unit is for calculating for the second time point T2, T2=t2+ Δ T2, t2 are charging apparatus time, and Δ T2 is the second delay time.Third computing unit is for calculating the Three time point T3, T3=t3- Δ T3, t3 are the time that blank 2 moves to emptying point from off-take point, and Δ T3 is the reaction time;The One processing unit is communicated with the first computing unit, and the material tail of the first time point T1 that detection blank 2 is run, blank 2 reach first The blank 2 of first control signal control next batch is issued after time point T1 to main belt filled.The second processing unit and second Computing unit communication, the second time point T2 that detection blank 2 is run, the material head of blank 2, which reaches, issues the after the second time point T2 The equipment that two control signals control main belt downstream carries out charging preparation.Third processing unit is communicated with third computing unit, inspection The third time point T3 that blank 2 is run is surveyed, the material head of blank 2 issues first detection signal detection master after reaching third time point T3 Whether the equipment charging in 3 downstream of belt prepares to complete, if the equipment charging in 3 downstream of main belt prepares not completing, is shut down Processing.
First stream detection device is communicated with the first computing unit, the corresponding first material tail position detection first time point T1 It sets, the 4th control signal is issued when detecting the first material tail position;Using first control signal or the 4th control signal control The blank 2 of next batch is to main 3 feeding of belt.Second stream detection device is communicated with the second computing unit, detects for the second time Point T2 corresponding first material head position issues the 5th control signal when detecting the first material head position;Using the second control letter Number or the 5th control signal equipment that controls main belt downstream carry out charging preparation.Third stream detection device and third calculate single Member communication, detects third time point T3 corresponding second material head position, and the 6th control is issued when detecting the second material head position Signal;The charging for the equipment for detecting main 3 downstream of belt by using the one or three control signal or the 6th control signal control prepares Whether movement is completed, if the charging of the equipment in 3 downstream of main belt prepares not completing, carries out shutdown processing.
Storage unit is communicated with the first computing unit, the second computing unit and third computing unit, and storage first calculates single (duration of valve opening t1, the turning-plate chute 4 of such as charge can sealing valve 1 act the data of member, the second computing unit and third computing unit Time t2, charging apparatus time t3, blank 2 from off-take point move to the time t4 in emptying point, the first delay time Δ T1, Second delay time Δ T2, third delay time Δ T3, first time point T1, the second time point T2, third time point T3 etc.) with And data (such as lot number, matrix number, step number, material kind, weight, time, direction, the angle angle position cloth number of blast furnace process demand Etc. parameters).Memory module, using grouping storage, is extracted in storing process convenient for the classification machine of data.Display unit and first Computing unit, the second computing unit and third computing unit communication, construct main belt stream picture, Dynamically Announce stream with The data such as the positional relationship of main belt, and display first time point T1, the second time point T2 and third time point T3.
One or more technical solutions provided by the invention, at least have following beneficial effect or advantage:
One, blast furnace main belt material flow tracing control method and device provided by the invention indicate that stream exists using time point Position on main belt fills the making time of next blank, the equipment in main belt downstream by time point control mode Expect that the equipment charging preparation detection time in time and main belt downstream carries out Discrete control, control process is stablized, It can avoid the technical issues of therefore flow detector damage causes equipment malfunction to make, can reduce and cause because of flow detector failure Fault in production.
Two, blast furnace main belt material flow tracing control method and device provided by the invention, using first stream detection device, Second stream detection device and third stream detection device detect the position of blank, by location information to next base The making time of material, main belt downstream equipment carry out charging time and main belt downstream equipment charging preparation Detection time is controlled, and carries out auxiliary control to time point control mode, prevents occurring control letter in time point control mode Number defect causes production accident.
Three, blast furnace main belt material flow tracing control method and device provided by the invention, are provided with storage unit, and storage is single Member storage can store the number of the first computing unit, the data of the second computing unit and third computing unit and blast furnace process demand According to realization data backup, convenient for there is progress data recovery after fault in production.
It should be noted last that the above specific embodiment is only used to illustrate the technical scheme of the present invention and not to limit it, Although being described the invention in detail referring to example, those skilled in the art should understand that, it can be to the present invention Technical solution be modified or replaced equivalently, without departing from the spirit and scope of the technical solution of the present invention, should all cover In the scope of the claims of the present invention.

Claims (4)

1. a kind of blast furnace main belt material flow tracing control method, which is characterized in that the described method includes:
First time point T1 is calculated, the T1=t1+t2+ Δ T1, the t1 are the duration of valve opening of charge can sealing valve, the t2 For turning-plate chute actuation time, the Δ T1 is the first delay time;
The second time point T2 is calculated, the T2=T1+ Δ T2, the Δ T2 are the second delay time;
Calculate third time point T3, the T3=t3- Δ T3, the t3 be blank material head run on main belt it is total when Between, the Δ T3 is the reaction time;
The first time point T1 of the blank operation is detected, the material tail of blank issues the first control after reaching the first time point T1 The blank of signal processed control next batch is to the main belt filled;
The second time point T2 of the blank operation is detected, the material head of blank issues the second control after reaching the second time point T2 The equipment that signal processed controls the main belt downstream carries out charging preparatory action;
The third time point T3 of the blank operation is detected, the material head of blank issues third control after reaching the third time point T3 Whether the equipment charging that signal control processed detects the main belt downstream prepares to complete, if the equipment in the main belt downstream charges Prepare not completing, then carries out shutdown processing;
The corresponding first material tail position the first time point T1 is detected by setting first stream detection device, when detecting The 4th control signal is issued when stating the first material tail position;
Using the blank of first control signal or the 4th control signal control next batch to the main belt filled;First Control signal issues before the 4th control signal;
The second time point T2 corresponding first material head position is detected by setting second stream detection device, when detecting The 5th control signal is issued when stating the first material head position;
Charging preparation is carried out using the equipment that second control signal or the 5th control signal control the main belt downstream;The Two control signals issue after the 5th control signal;
Third time point T3 corresponding second material head position is detected by setting third stream detection device, when detecting The 6th control signal is issued when stating the second material head position;
The charging of the equipment in signal or the 6th control signal control detection main belt downstream is controlled by using third Whether preparatory action is completed, if the charging of the equipment in the main belt downstream prepares not completing, carries out shutdown processing.
2. blast furnace main belt material flow tracing control method as described in claim 1, which is characterized in that first delay time Δ T1 and the second delay time Δ T2 is 1-3 seconds, and the reaction time Δ T3 is 10-11 seconds.
3. a kind of blast furnace main belt material flow tracing control device, which is characterized in that described device includes:
First computing unit, calculates first time point T1, and the T1=t1+t2+ Δ T1, the t1 are opening for charge can sealing valve Valve time, the t2 are turning-plate chute actuation time, and the Δ T1 is the first delay time;
Second computing unit, calculates the second time point T2, and the T2=T1+ Δ T2, the Δ T2 are the second delay time;
Third computing unit, calculates third time point T3, and the T3=t3- Δ T3, the t3 are the material head of blank in main belt The total time of upper operation, the Δ T3 are the reaction time;
First processing units are communicated with first computing unit, detect the first time point T1 of the material tail operation of the blank, It reaches and issues the blank of first control signal control next batch after the first time point T1 to the main belt filled;
The second processing unit is communicated with second computing unit, detects the second time point T2 of the material head operation of the blank, Reach issue after the second time point T2 the equipment that second control signal controls the main belt downstream carry out charging prepare it is dynamic Make;
Third processing unit is communicated with the third computing unit, detects the third time point T3 of the material head operation of the blank, Reach issue after the third time point T3 third control signal control detect the main belt downstream equipment charging prepare be No completion carries out shutdown processing if the equipment charging in the main belt downstream prepares not completing;
First stream detection device is communicated with first computing unit, detects corresponding first material of the first time point T1 Tail position issues the 4th control signal when detecting the first material tail position;
Using the blank of first control signal or the 4th control signal control next batch to the main belt filled;First Control signal issues before the 4th control signal;
Second stream detection device is communicated with second computing unit, detects corresponding first material of the second time point T2 Head position issues the 5th control signal when detecting the first material head position;
Charging preparation is carried out using the equipment that second control signal or the 5th control signal control the main belt downstream;The Two control signals issue after the 5th control signal;
Third stream detection device is communicated with the third computing unit, detects corresponding second material of the third time point T3 Head position issues the 6th control signal when detecting the second material head position;
The charging of the equipment in signal or the 6th control signal control detection main belt downstream is controlled by using third Whether preparatory action is completed, if the charging of the equipment in the main belt downstream prepares not completing, carries out shutdown processing.
4. blast furnace main belt material flow tracing control device as claimed in claim 3, which is characterized in that described device further include:
Storage unit is communicated with first computing unit, the second computing unit and the third computing unit, stores described the The data and blast furnace process data of one computing unit, the second computing unit and the third computing unit;
Display unit communicates with first computing unit, the second computing unit and the third computing unit, constructs main belt Stream picture, the positional relationship of Dynamically Announce stream and the main belt, and the display first time point T1, the second time The point T2 and third time point T3.
CN201610351914.1A 2016-05-25 2016-05-25 A kind of blast furnace main belt material flow tracing control method and device Active CN105907907B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610351914.1A CN105907907B (en) 2016-05-25 2016-05-25 A kind of blast furnace main belt material flow tracing control method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610351914.1A CN105907907B (en) 2016-05-25 2016-05-25 A kind of blast furnace main belt material flow tracing control method and device

Publications (2)

Publication Number Publication Date
CN105907907A CN105907907A (en) 2016-08-31
CN105907907B true CN105907907B (en) 2019-04-23

Family

ID=56741466

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610351914.1A Active CN105907907B (en) 2016-05-25 2016-05-25 A kind of blast furnace main belt material flow tracing control method and device

Country Status (1)

Country Link
CN (1) CN105907907B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110681307A (en) * 2019-09-27 2020-01-14 首钢京唐钢铁联合有限责任公司 Material mixing method and device
CN113174451A (en) * 2021-04-15 2021-07-27 鞍钢股份有限公司 Control method for pre-loading distribution of blast furnace burden

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203096093U (en) * 2013-01-21 2013-07-31 蒋广宇 Blast furnace feeding control system
CN104962672A (en) * 2014-10-15 2015-10-07 北京金自天正智能控制股份有限公司 Designing method for blast furnace material list
CN104988261A (en) * 2015-06-30 2015-10-21 甘肃酒钢集团宏兴钢铁股份有限公司 Blast furnace belt feeding system and material list setting method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203096093U (en) * 2013-01-21 2013-07-31 蒋广宇 Blast furnace feeding control system
CN104962672A (en) * 2014-10-15 2015-10-07 北京金自天正智能控制股份有限公司 Designing method for blast furnace material list
CN104988261A (en) * 2015-06-30 2015-10-21 甘肃酒钢集团宏兴钢铁股份有限公司 Blast furnace belt feeding system and material list setting method thereof

Also Published As

Publication number Publication date
CN105907907A (en) 2016-08-31

Similar Documents

Publication Publication Date Title
CN105907907B (en) A kind of blast furnace main belt material flow tracing control method and device
CN105486459B (en) Substation's Leakage inspection mobile platform and detection method
CN203203943U (en) On-line continuous product detecting system based on machine vision
CN204892396U (en) Integrated circuit IC test and visual detection all -in -one
CN106501753A (en) A kind of three-phase electric energy meter automated detection method
CN105127107A (en) Detection device for production line products
CN105382368A (en) Welding device for battery microphone
CN103335796B (en) Full-automatic two logical air-tightness detection devices
CN105607662A (en) Intelligent control system loaded with granular materials and control method
CN205246015U (en) Pottery brick plane degree on -line measuring device
CN110080326B (en) Unloading method, controller, excavator, electronic equipment and storage medium
CN102680489B (en) System for on-line detecting holes on surface of strip steel
CN102967844B (en) Automatic detection system with formal detection function of intelligent ammeters
CN103376376A (en) Electrical performance comprehensive detecting equipment for ignitrons
CN108237787A (en) One kind is detected automatically for connector size and laser marking device
CN203544504U (en) Cigarette box shape detection system suitable for case packer
CN206411239U (en) A kind of characteristic automatic detection device of motor
CN102130031B (en) Method for detecting wafer
CN104581609B (en) A kind of magnetic cover goes up frock equipment and its control method automatically
CN104257500B (en) Automatic fault alarm system of CIT capsule production line
CN110793328B (en) Sintering distributor blanking direction calculation system and control method
CN103170460A (en) Automatic detector
CN103894925A (en) Discharge detecting device of bearing double-end-face processing machine tool
CN102896357A (en) Full-automatic numerical control double-ended boring machine system
CN104766294A (en) Automatic alignment system and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20170711

Address after: 430080 Qingshan District stock company of Hubei, Wuhan Province

Applicant after: Wuhan iron and Steel Company Limited

Address before: 430083 Qingshan District, Hubei, Wuhan factory before the door No. 2

Applicant before: WUHAN IRON AND STEEL CORPORATION

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant