CN105894397A - Power transmission line management system based on WeChat platform - Google Patents
Power transmission line management system based on WeChat platform Download PDFInfo
- Publication number
- CN105894397A CN105894397A CN201610265478.6A CN201610265478A CN105894397A CN 105894397 A CN105894397 A CN 105894397A CN 201610265478 A CN201610265478 A CN 201610265478A CN 105894397 A CN105894397 A CN 105894397A
- Authority
- CN
- China
- Prior art keywords
- platform
- icon
- hidden danger
- management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000005540 biological transmission Effects 0.000 title claims abstract description 25
- 230000005611 electricity Effects 0.000 claims description 20
- 229910000831 Steel Inorganic materials 0.000 claims description 4
- 239000010959 steel Substances 0.000 claims description 4
- 239000000463 material Substances 0.000 abstract description 4
- 238000000034 method Methods 0.000 description 12
- 238000012800 visualization Methods 0.000 description 6
- 238000012544 monitoring process Methods 0.000 description 3
- 241001062009 Indigofera Species 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 230000003111 delayed effect Effects 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 230000004069 differentiation Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 239000004020 conductor Substances 0.000 description 1
- 230000008030 elimination Effects 0.000 description 1
- 238000003379 elimination reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000003384 imaging method Methods 0.000 description 1
- 230000000977 initiatory effect Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/29—Geographical information databases
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F3/00—Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
- G06F3/01—Input arrangements or combined input and output arrangements for interaction between user and computer
- G06F3/048—Interaction techniques based on graphical user interfaces [GUI]
- G06F3/0481—Interaction techniques based on graphical user interfaces [GUI] based on specific properties of the displayed interaction object or a metaphor-based environment, e.g. interaction with desktop elements like windows or icons, or assisted by a cursor's changing behaviour or appearance
- G06F3/04817—Interaction techniques based on graphical user interfaces [GUI] based on specific properties of the displayed interaction object or a metaphor-based environment, e.g. interaction with desktop elements like windows or icons, or assisted by a cursor's changing behaviour or appearance using icons
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/50—Network services
- H04L67/55—Push-based network services
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04N—PICTORIAL COMMUNICATION, e.g. TELEVISION
- H04N7/00—Television systems
- H04N7/18—Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast
- H04N7/181—Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast for receiving images from a plurality of remote sources
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02D—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
- Y02D10/00—Energy efficient computing, e.g. low power processors, power management or thermal management
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Databases & Information Systems (AREA)
- Signal Processing (AREA)
- Economics (AREA)
- Public Health (AREA)
- Primary Health Care (AREA)
- Human Computer Interaction (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Multimedia (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Computer Networks & Wireless Communication (AREA)
- Remote Sensing (AREA)
- Data Mining & Analysis (AREA)
- Alarm Systems (AREA)
Abstract
The invention provides a power transmission line management system based on a WeChat platform, and belongs to the field of power cable and tower management systems. The power transmission line management system includes a system management platform and a front-end device. Each tower icon is further linked to an information card. The front-end device includes a shooting device, a column loudspeaker and a sound and light alarm lamp. The shooting device, the column loudspeaker and the sound and light alarm mounted on each tower are linked to each tower icon via a mobile network. The system management platform is provided with a hidden trouble statistics window for recording historical hidden trouble information. The system management platform can automatically adjust the level of hidden troubles displayed by hidden trouble icons according to differences of images shot by the shooting devices, and pops up alarm information. The system management platform pushes the alarm information to a WeChat official account so that the management staff can learn field situations anytime anywhere, allocate human and material resources appropriately and shorten the time for handling the hidden troubles in such a manner that the hidden troubles in a power transmission line can be handled at a first time, and the probability of the occurrence of accidents in the power transmission line is reduced.
Description
Technical field
The present invention provides a kind of Management System of Power Line based on wechat platform, belongs to electric power cable and shaft tower management system regions.
Background technology
Transmission line of electricity safe operation is most important to electrical network reliable power supply.Owing to China is with a vast territory, cause transmission line of electricity to be distributed extensively,
Quantity is many, density is big, in the area that power consumption is more, more has many parallel cablings, and crossing elimination crosses over complexity, is difficult to accomplish
Line inspection work timely, field condition is the most delayed, and present transmission line of electricity hidden danger management system, use papery more
Or the mode of electronic document achieves and inquires about, even if there being online monitoring system, employing is also C/S or B/S structure, administrative man
Member goes on business or during rest, it is impossible to checking monitoring information easily, causes hidden danger information cannot accept the very first time and process so that
When transmission line of electricity has important hidden danger, it is difficult to arrange operations staff nearby to go to process in time, it is delayed hidden danger and processes the time, add
The probability that transmission line of electricity accident occurs.
Summary of the invention
Present invention aim at providing a kind of Management System of Power Line based on wechat platform, make management personnel the most timely
Recognize field conditions, reasonable distribution human and material resources, shorten the time that hidden danger processes, enable transmission line of electricity hidden danger first
Time is processed, and reduces the probability that transmission line of electricity accident occurs.
Management System of Power Line based on wechat platform of the present invention, including system management platform and headend equipment, system
Management stage+module is in background server, and system management platform includes GIS map, and in GIS map, the position according to shaft tower is believed
Breath is labeled with shaft tower icon, and the circuit icon connected between shaft tower, and shaft tower icon and circuit icon side are provided with hidden danger icon,
Shaft tower icon and circuit icon chain respectively are connected to shaft tower information management window and line information management window, and shaft tower icon also chain is connected to
Release, headend equipment includes capture apparatus, sound column and audible-visual alarm lamp, on each shaft tower install capture apparatus, sound column and
Audible-visual annunciator is linked to each shaft tower icon by mobile network's correspondence respectively, and system management platform is provided with hidden danger statistical window,
Log history hidden danger information, system management platform can automatically adjust hidden danger icon according to the picture difference of capture apparatus shooting and show
The grade of hidden danger, and eject warning message, system management platform by alarm information pushing to wechat public number.
Described Management System of Power Line based on wechat platform, carries out live video communication by capture apparatus at the scene, logical
Cross sound column to propaganda directed to communicate to scene, reported to the police at the scene by audible-visual alarm lamp, it is possible to make staff in master control room
Carry out the control concentrated, can be very clear to on-the-spot situation by capture apparatus, it is possible to by sound column and audible-visual alarm lamp
Field condition is processed, if cannot process, it is also possible to circuit and shaft tower to ging wrong process, greatly targetedly
Big saves manpower, improves the efficiency of personnel, reduces workload, processes targetedly and the very first time pinpoints the problems,
The problem very first time on circuit can be made to be processed, shorten the time that hidden danger processes, with GIS map form, by shaft tower and
Transmission line of electricity, according to the corresponding display in GIS map of its geographical position, when pin tower or circuit break down, can clearly be known
Road shaft tower or the position of circuit, open shaft tower information management window by operation shaft tower icon or circuit icon, can know shaft tower
Or the construction information of circuit and status information, can according to shaft tower or the construction information of circuit and status information understand each shaft tower and
The information of circuit, it is possible to open release by another way operation shaft tower icon, understand the real time fail situation of shaft tower with
And the reason of initiating failure, staff can be made to be managed collectively the state of each shaft tower, simultaneity factor management platform stores each
Shaft tower is at properly functioning and without potential safety hazard picture, and determines interval shooting live-pictures and properly functioning and nothing by capture apparatus
The picture of potential safety hazard contrasts, and according to the difference of picture, shows hidden danger grade by hidden danger icon, can allow work people
Member predicts in advance, and is propagandaed directed to communicate to scene by sound column, can predict hidden danger in advance, it is possible to eliminated before fault occurs,
Simultaneously when management personnel leave background server, occur that during hidden danger, system management platform can push alarm signal from trend wechat platform
Breath, makes management personnel can know hidden danger timely by mobile phone, and processes in time, make hidden danger just eliminate when not occurring.
Described Management System of Power Line based on wechat platform, wechat public number is provided with historical query button, and historical query is pressed
Button is linked to hidden danger statistical window, is had access to the history hidden danger information of record by wechat public number.Management personnel are by paying close attention to wechat
Public number, and configure the authority in corresponding area, thus ensure that the accuracy and confidentiality that shaft tower manages by management personnel.
Described Management System of Power Line based on wechat platform, line information management window be provided with transmission line of electricity title, grade,
The information such as steel tower quantity, person liable, circuit initial address.
Described Management System of Power Line based on wechat platform, system management platform is provided with push-type handover module, pushes
Type can switch to: alarm pushing, timing push, all push or stop pushing, and system management platform is according to pushing away of selecting
Send type, the picture that scene is captured is pushed in wechat public number in the way of wechat message, and indicates propelling movement reason.Management
Personnel oneself select push-type, including: alarm pushing, timing push, all push, stop pushing, and are captured at scene
Picture is pushed in wechat public number in the way of wechat message, and indicates that propelling movement reason such as timing is captured or alarm is captured, shaft tower
The information such as essential information, picture candid photograph time.
Described Management System of Power Line based on wechat platform, system management platform is provided with priority assignation module, passes through authority
Arranging the authority in the corresponding area of module configuration, system management platform only pushes its authority by wechat public number to this authority account
In the range of information.Management personnel are by paying close attention to wechat public number, and configure the authority in corresponding area, thus ensure that management
Accuracy that shaft tower is managed by personnel and confidentiality.
Described Management System of Power Line based on wechat platform, wechat public number is provided with intelligent patrol button, clicks on intelligence and patrols
Can send tour information to system management platform depending on wechat public number after button, system management platform can be automatically by authority region
The up-to-date picture of all capture machines of shaft tower is pushed to wechat public number.After management personnel open wechat public number, click on intelligent patrol
Button, a key is inquired about the up-to-date picture of all capture machines of institute's concern shaft tower, and is indicated shaft tower essential information, picture candid photograph time etc.
Information, makes management personnel understand on-the-spot latest development the most in time.
Described Management System of Power Line based on wechat platform, capture machine was captured once every 0.5-1 hour, and the photo that will capture
Being sent to system management platform, shooting photo is contrasted by system management platform with original photo, if difference occur in two photos
Then automatic spring alarm prompt window.Photo comparison's system is prior art, can be by this system embedment system management platform, will
Original image is contrasted by the picture of capture apparatus shooting, has analysed whether hidden danger, and the grade of hidden danger.
Described Management System of Power Line based on wechat platform, alarm prompt window is communicated with capture apparatus, sound column and
The start button of audible-visual alarm lamp, by capture apparatus viewing field condition, propagandaed directed to communicate to scene by sound column, audible-visual alarm lamp is sent out
Go out to report to the police.After ejecting alarm prompt window, staff can directly pass through the button on alarm prompt window at once to hidden danger
Process, it is not necessary to inquiring about and finding, be greatly improved efficiency, also improve convenience.
Described Management System of Power Line based on wechat platform, hidden danger icon can switch color, and hidden danger icon is according to fault
Grade switching hidden danger Icon Color.The differentiation of color is the distinctest, and wherein danger is red, notes for orange, generally indigo plant
Color, be normally green, makes the staff can be very clear to the hidden danger grade of each shaft tower in GIS map, convenient operates
Personnel's regulation and control to all circuits entirety.
Described Management System of Power Line based on wechat platform, release has editting function, and operator can be according to existing
The change amendment release content that there is something special.Staff can revise release content according to the performance of shaft tower, makes each
Individual shaft tower can have real time status information to be recorded.
The present invention compared with prior art has the beneficial effect that
The invention provides Management System of Power Line based on wechat platform, use this system, make management personnel whenever and wherever possible and
Time recognize field conditions, reasonable distribution human and material resources, shorten the time that hidden danger processes, enable transmission line of electricity hidden danger the
One time was processed, and reduced the probability that transmission line of electricity accident occurs.
Accompanying drawing explanation
Fig. 1 is flow chart of the present invention;
Fig. 2 is system management platform flow chart.
Detailed description of the invention
Below in conjunction with the present invention, the embodiment of the present invention is described further:
Embodiment 1: as depicted in figs. 1 and 2, Management System of Power Line based on wechat platform of the present invention, including
System management platform and headend equipment, system management platform is arranged in background server, and system management platform includes GIS map,
In GIS map, the positional information according to shaft tower is labeled with shaft tower icon, and the circuit icon connected between shaft tower, shaft tower icon
It is provided with hidden danger icon, shaft tower icon and circuit icon chain respectively with circuit icon side and is connected to shaft tower information management window and circuit letter
Breath management window, shaft tower icon also chain is connected to release, and headend equipment includes capture apparatus, sound column and audible-visual alarm lamp, each
Capture apparatus, sound column and the audible-visual annunciator installed on shaft tower is linked to each shaft tower icon by mobile network is corresponding respectively, is
Platform under the overall leadership is provided with hidden danger statistical window, log history hidden danger information, and system management platform can be according to capture apparatus shooting
Picture difference adjusts the grade of hidden danger icon display hidden danger automatically, and ejects warning message, and warning message is pushed away by system management platform
Deliver to wechat public number.
Described Management System of Power Line based on wechat platform, wechat public number is provided with historical query button, and historical query is pressed
Button is linked to hidden danger statistical window, is had access to the history hidden danger information of record by wechat public number.Management personnel are by paying close attention to wechat
Public number, and configure the authority in corresponding area, thus ensure that the accuracy and confidentiality that shaft tower manages by management personnel.
Described Management System of Power Line based on wechat platform, line information management window be provided with transmission line of electricity title, grade,
The information such as steel tower quantity, person liable, circuit initial address.
Described Management System of Power Line based on wechat platform, system management platform is provided with push-type handover module, pushes
Type can switch to: alarm pushing, timing push, all push or stop pushing, and system management platform is according to pushing away of selecting
Send type, the picture that scene is captured is pushed in wechat public number in the way of wechat message, and indicates propelling movement reason.Management
Personnel oneself select push-type, including: alarm pushing, timing push, all push, stop pushing, and are captured at scene
Picture is pushed in wechat public number in the way of wechat message, and indicates that propelling movement reason such as timing is captured or alarm is captured, shaft tower
The information such as essential information, picture candid photograph time.
Described Management System of Power Line based on wechat platform, system management platform is provided with priority assignation module, passes through authority
Arranging the authority in the corresponding area of module configuration, system management platform only pushes its authority by wechat public number to this authority account
In the range of information.Management personnel are by paying close attention to wechat public number, and configure the authority in corresponding area, thus ensure that management
Accuracy that shaft tower is managed by personnel and confidentiality.
Described Management System of Power Line based on wechat platform, wechat public number is provided with intelligent patrol button, clicks on intelligence and patrols
Can send tour information to system management platform depending on wechat public number after button, system management platform can be automatically by authority region
The up-to-date picture of all capture machines of shaft tower is pushed to wechat public number.After management personnel open wechat public number, click on intelligent patrol
Button, a key is inquired about the up-to-date picture of all capture machines of institute's concern shaft tower, and is indicated shaft tower essential information, picture candid photograph time etc.
Information, makes management personnel understand on-the-spot latest development the most in time.
Described headend equipment includes capture machine, intelligent sphere machine, sound column, audible-visual alarm lamp etc., and it is installed on shaft tower, right
The contingent region of quasi-hidden danger;Capture machine can arrange candid photograph time interval according to customer demand, and the timing carrying out photo site is grabbed
Clap, intelligent sphere machine provide live video displaying live view, the remote speech of audible and visual alarm lamp and sound column propaganda directed to communicate the very first time stop scene
The generation of hidden danger.
The present invention carries out picture retrieval to being provided with capture machine shaft tower, facilitates hidden danger history picture in checking monitoring region, pushes away in time
Survey line road operation state, also can collect evidence to having an accident.
Described visualization transmission line of electricity hidden danger management system based on GIS, system management platform is integrated in the main interface of web, is
Platform under the overall leadership includes GIS map, and in GIS map, the positional information according to shaft tower is labeled with shaft tower icon, and between shaft tower
The circuit icon connected, shaft tower icon and circuit icon side are provided with hidden danger icon, shaft tower icon and circuit icon chain respectively and are connected to
Shaft tower information management window and line information management window, shaft tower icon also chain is connected to release, the shooting that each shaft tower is installed
Equipment, sound column and audible-visual annunciator correspondence respectively is linked to each shaft tower icon, and system management platform is provided with hidden danger statistical window,
Record hidden danger information, system management platform can adjust hidden danger icon display hidden danger automatically according to the picture difference of capture apparatus shooting
Grade.
Described visualization transmission line of electricity hidden danger management system based on GIS, hidden danger all to area under one's jurisdiction carry out details list system
Meter, and can retrieve for different conditions such as hidden danger classification, level of interest, place circuit, electric pressures, facilitate hidden danger fast
Speed classification and location.
Described visualization transmission line of electricity hidden danger management system based on GIS, line information management window be provided with transmission line of electricity title,
The information such as grade, steel tower quantity, person liable, circuit initial address.
Described visualization transmission line of electricity hidden danger management system based on GIS, shaft tower information management window shaft tower title, type,
Material, level of interest, loop quantity, conductor cross-section, design height above sea level, basic wind speed, Design ice thickness, installed date, put into operation
Date, exhale height, positional information, owner information.
Described visualization transmission line of electricity hidden danger management system based on GIS, the electric pressure of release shaft tower, line name,
Shaft tower number, affiliated area, hidden danger owner, telephone number, level of interest, hidden danger classification, discovery time, hidden danger describe, locate
Reason measure, possession are protected line person, are protected line person's phone, the personnel that keep a close safeguard, keep a close safeguard personnel's phone, uplink time, real time imaging.
Described visualization transmission line of electricity hidden danger management system based on GIS, capture apparatus is intelligent sphere machine or capture machine.
Described Management System of Power Line based on wechat platform, capture machine every 0.5-1 hour capture once, and by capture
Photo is sent to system management platform, and shooting photo is contrasted by system management platform with original photo, if two photos occur
Distinguish then automatic spring alarm prompt window.Photo comparison's system is prior art, can by this system embedment system management platform,
Original image is contrasted by the picture that capture apparatus shoots, has analysed whether hidden danger, and the grade of hidden danger.
Described Management System of Power Line based on wechat platform, alarm prompt window is communicated with capture apparatus, sound column and
The start button of audible-visual alarm lamp, by capture apparatus viewing field condition, propagandaed directed to communicate to scene by sound column, audible-visual alarm lamp is sent out
Go out to report to the police.After ejecting alarm prompt window, staff can directly pass through the button on alarm prompt window at once to hidden danger
Process, it is not necessary to inquiring about and finding, be greatly improved efficiency, also improve convenience.
Described Management System of Power Line based on wechat platform, hidden danger icon can switch color, and hidden danger icon is according to fault
Grade switching hidden danger Icon Color.The differentiation of color is the distinctest, and wherein danger is red, notes for orange, generally indigo plant
Color, be normally green, makes the staff can be very clear to the hidden danger grade of each shaft tower in GIS map, convenient operates
Personnel's regulation and control to all circuits entirety.
Described Management System of Power Line based on wechat platform, release has editting function, and operator can be according to existing
The change amendment release content that there is something special.Staff can revise release content according to the performance of shaft tower, makes each
Individual shaft tower can have real time status information to be recorded.
Claims (10)
1. a Management System of Power Line based on wechat platform, it is characterised in that include that system pipes pats
Platform and headend equipment, system management platform is arranged in background server, and system management platform includes GIS ground
Figure, in GIS map, the positional information according to shaft tower is labeled with shaft tower icon, and the circuit connected between shaft tower
Icon, shaft tower icon and circuit icon side are provided with hidden danger icon, shaft tower icon and circuit icon chain respectively and are connected to
Shaft tower information management window and line information management window, shaft tower icon also chain is connected to release, headend equipment bag
Include capture apparatus, sound column and audible-visual alarm lamp, capture apparatus, sound column and the sound and light alarm that each shaft tower is installed
Device is linked to each shaft tower icon by mobile network's correspondence respectively, and system management platform is provided with hidden danger statistic window
Mouthful, log history hidden danger information, system management platform can be adjusted automatically according to the picture difference of capture apparatus shooting
The grade of whole hidden danger icon display hidden danger, and eject warning message, alarm information pushing is arrived by system management platform
Wechat public number.
Management System of Power Line based on wechat platform the most according to claim 1, it is characterised in that
Wechat public number is provided with historical query button, and historical query button is linked to hidden danger statistical window, public by wechat
The many numbers history hidden danger information having access to record.
Management System of Power Line based on wechat platform the most according to claim 2, it is characterised in that
Line information management window is provided with transmission line of electricity title, grade, steel tower quantity, person liable, circuit initial address
Etc. information.
Management System of Power Line based on wechat platform the most according to claim 3, it is characterised in that
System management platform is provided with push-type handover module, and push-type can switch to: alarm pushing, timing push away
Sending, all push or stop to push, system management platform is according to the push-type selected, the figure captured at scene
Sheet is pushed in wechat public number in the way of wechat message, and indicates propelling movement reason.
Management System of Power Line based on wechat platform the most according to claim 4, it is characterised in that
System management platform is provided with priority assignation module, by the authority in the corresponding area of priority assignation module configuration, is
Platform under the overall leadership only pushes the information in its extent of competence by wechat public number to this authority account.
Management System of Power Line based on wechat platform the most according to claim 5, it is characterised in that
Wechat public number is provided with intelligent patrol button, and after clicking on intelligent patrol button, wechat public number can pat to system pipes
Platform sends tour information, and system management platform can be automatically by the up-to-date figure of all capture machines of the shaft tower in authority region
Sheet is pushed to wechat public number.
Management System of Power Line based on wechat platform the most according to claim 6, it is characterised in that
Capture machine was captured once every 0.5-1 hour, and the photo of candid photograph is sent to system management platform, system pipes
Shooting photo is contrasted by platform with original photo, if distinguishing occur in two photos, automatic spring alarm carries
Show window.
Management System of Power Line based on wechat platform the most according to claim 7, it is characterised in that
It is communicated with the start button of capture apparatus, sound column and audible-visual alarm lamp on alarm prompt window, is set by shooting
Standby viewing field condition, propagandaed directed to communicate to scene by sound column, audible-visual alarm lamp sends warning.
Management System of Power Line based on wechat platform the most according to claim 8, it is characterised in that
Hidden danger icon can switch color, and hidden danger icon switches hidden danger Icon Color according to fault level.
Management System of Power Line based on wechat platform the most according to claim 9, it is characterised in that
Release has editting function, and operator can revise release content according to the change of existing situation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610265478.6A CN105894397A (en) | 2016-04-26 | 2016-04-26 | Power transmission line management system based on WeChat platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610265478.6A CN105894397A (en) | 2016-04-26 | 2016-04-26 | Power transmission line management system based on WeChat platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105894397A true CN105894397A (en) | 2016-08-24 |
Family
ID=56704664
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610265478.6A Pending CN105894397A (en) | 2016-04-26 | 2016-04-26 | Power transmission line management system based on WeChat platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105894397A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106254838A (en) * | 2016-09-22 | 2016-12-21 | 国家电网公司 | A kind of preventing damage to power transmission line caused by external force intelligent early-warning system |
CN106372173A (en) * | 2016-08-31 | 2017-02-01 | 广西德高仕安全技术有限公司 | File management method based on wechat public service platform |
CN106570588A (en) * | 2016-10-26 | 2017-04-19 | 国网江苏省电力公司南京市高淳区供电公司 | WeChat official platform-based electric power monitoring and alarm system |
CN106686315A (en) * | 2017-01-24 | 2017-05-17 | 王亚鲁 | Intelligent monitoring shooting method and device capable of automatically adjusting image definition |
CN107358562A (en) * | 2017-07-18 | 2017-11-17 | 海南电网有限责任公司 | For the electric network emergency repairing flattening command system and method under Rainfall Disaster |
CN107491816A (en) * | 2017-07-07 | 2017-12-19 | 江苏华电仪征热电有限公司 | A kind of hidden danger shares management method and system |
CN108682215A (en) * | 2018-04-27 | 2018-10-19 | 广西医科大学 | A kind of system and its mobile learning method based on wechat platform |
CN109000636A (en) * | 2018-06-07 | 2018-12-14 | 广东电网有限责任公司 | A method of transmission tower is positioned using photographic intelligence |
CN111130009A (en) * | 2019-12-26 | 2020-05-08 | 智洋创新科技股份有限公司 | Method for determining running state of visual image equipment of power transmission line channel |
CN111553493A (en) * | 2020-04-27 | 2020-08-18 | 广东电网有限责任公司韶关供电局 | Method and system for managing potential safety hazard of user equipment |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102055243A (en) * | 2010-12-15 | 2011-05-11 | 北京交通大学 | High-voltage transmission line/ tower long-distance video on-line monitoring system |
CN102136162A (en) * | 2010-12-25 | 2011-07-27 | 江西九江供电公司 | Power transmission line polling system |
CN104954235A (en) * | 2015-05-28 | 2015-09-30 | 国家电网公司 | WeChat platform based interactive intelligent monitoring method for transmission line passage ways |
-
2016
- 2016-04-26 CN CN201610265478.6A patent/CN105894397A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102055243A (en) * | 2010-12-15 | 2011-05-11 | 北京交通大学 | High-voltage transmission line/ tower long-distance video on-line monitoring system |
CN102136162A (en) * | 2010-12-25 | 2011-07-27 | 江西九江供电公司 | Power transmission line polling system |
CN104954235A (en) * | 2015-05-28 | 2015-09-30 | 国家电网公司 | WeChat platform based interactive intelligent monitoring method for transmission line passage ways |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106372173A (en) * | 2016-08-31 | 2017-02-01 | 广西德高仕安全技术有限公司 | File management method based on wechat public service platform |
CN106254838A (en) * | 2016-09-22 | 2016-12-21 | 国家电网公司 | A kind of preventing damage to power transmission line caused by external force intelligent early-warning system |
CN106254838B (en) * | 2016-09-22 | 2019-04-09 | 国家电网公司 | A kind of preventing damage to power transmission line caused by external force intelligent early-warning system |
CN106570588A (en) * | 2016-10-26 | 2017-04-19 | 国网江苏省电力公司南京市高淳区供电公司 | WeChat official platform-based electric power monitoring and alarm system |
CN106686315A (en) * | 2017-01-24 | 2017-05-17 | 王亚鲁 | Intelligent monitoring shooting method and device capable of automatically adjusting image definition |
CN107491816A (en) * | 2017-07-07 | 2017-12-19 | 江苏华电仪征热电有限公司 | A kind of hidden danger shares management method and system |
CN107358562A (en) * | 2017-07-18 | 2017-11-17 | 海南电网有限责任公司 | For the electric network emergency repairing flattening command system and method under Rainfall Disaster |
CN108682215A (en) * | 2018-04-27 | 2018-10-19 | 广西医科大学 | A kind of system and its mobile learning method based on wechat platform |
CN109000636A (en) * | 2018-06-07 | 2018-12-14 | 广东电网有限责任公司 | A method of transmission tower is positioned using photographic intelligence |
CN109000636B (en) * | 2018-06-07 | 2021-12-17 | 广东电网有限责任公司 | Method for positioning transmission tower by using photo information |
CN111130009A (en) * | 2019-12-26 | 2020-05-08 | 智洋创新科技股份有限公司 | Method for determining running state of visual image equipment of power transmission line channel |
CN111553493A (en) * | 2020-04-27 | 2020-08-18 | 广东电网有限责任公司韶关供电局 | Method and system for managing potential safety hazard of user equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105894397A (en) | Power transmission line management system based on WeChat platform | |
CN106936933B (en) | A kind of LED screen intelligent remote monitoring control system | |
CN115348247A (en) | Forest fire detection early warning and decision-making system based on sky-ground integration technology | |
CN103745579B (en) | A kind of safety defense monitoring system | |
CN201270070Y (en) | Electric cable intelligent anti-theft system for highway | |
CN111683126A (en) | City safety wisdom management and control system | |
CN101783970B (en) | Methods, devices and systems for automatically detecting and managing fault of camera | |
CN100466002C (en) | Intelligent interlink warning and monitor system | |
CN100527178C (en) | Automatic tracking display system for warn | |
CN107672625B (en) | Perimeter intrusion alarm system for high-speed railway | |
CN101404094A (en) | Video monitoring and warning method and system | |
CN103760865B (en) | Remote monitoring platform based on MSTP special communication network | |
CN109444336A (en) | Environment real time monitoring early warning and method for tracking and managing and system | |
CN105657380A (en) | Substation image monitoring system | |
CN105869366A (en) | Security alarm system based on street lamp Internet of Things | |
CN103472803A (en) | Indoor zone location system | |
CN109446290A (en) | A kind of intelligent three-dimensional virtual visualization meteorological equipment comprehensive coverage method | |
CN101511003B (en) | Method for implementing alarm condition report combining video monitoring system and command scheduling system | |
KR20220108257A (en) | Internet of Thing multifunction integration module system and method for Smart city | |
CN107590935A (en) | Digital camera intrusion detection and defence system | |
KR101944217B1 (en) | Life crime prevention system using bus information terminal and method for processing thereof | |
CN106297105A (en) | A kind of emergency command system | |
CN212133871U (en) | Infrared temperature measurement warning and data processing system of transformer substation | |
CN101178835A (en) | Safety monitoring centralised arrangement | |
CN202042025U (en) | Monitoring terminal |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160824 |