CN105863665A - Disposing method for dross of stone tunnel invert - Google Patents

Disposing method for dross of stone tunnel invert Download PDF

Info

Publication number
CN105863665A
CN105863665A CN201610214708.6A CN201610214708A CN105863665A CN 105863665 A CN105863665 A CN 105863665A CN 201610214708 A CN201610214708 A CN 201610214708A CN 105863665 A CN105863665 A CN 105863665A
Authority
CN
China
Prior art keywords
inverted arch
ditch
tunnel
silica frost
scum silica
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610214708.6A
Other languages
Chinese (zh)
Other versions
CN105863665B (en
Inventor
姜曙光
杨方方
马玉薇
李刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shihezi University
Original Assignee
Shihezi University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shihezi University filed Critical Shihezi University
Priority to CN201610214708.6A priority Critical patent/CN105863665B/en
Publication of CN105863665A publication Critical patent/CN105863665A/en
Application granted granted Critical
Publication of CN105863665B publication Critical patent/CN105863665B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/12Devices for removing or hauling away excavated material or spoil; Working or loading platforms

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention relates to a disposing method for dross of a stone tunnel invert. The method comprises the steps that firstly, the invert is excavated according to drawing and standard requirements; then a central ditch is formed in the position of the center line of the bottom surface of the invert; a sump is formed in the lowest position of the design elevation of the center line of the excavated bottom surface of a tunnel; the dross is flushed into the central ditch; then water in the sump is pumped through a pump; sediments in the central ditch and the sump are removed; then a layer of cement paste is sprayed to the excavated surface of the clean invert; and finally the ditch and the sump are filled with spray anchor materials or plain concrete. The disposing method has the advantages that the ditch is directly formed in the excavated surface of the invert, operation is convenient, controlling is easy, the project quality is guaranteed, the construction cost is low, and stress concentration is prevented.

Description

A kind of processing method of stone matter tunnel inverted arch scum silica frost
Technical field
The present invention relates to the processing method of a kind of inverted arch scum silica frost, be specifically related to a kind of stone matter tunnel and face upward The processing method of arch scum silica frost.
Background technology
Scum silica frost affects concrete and the bonding of tunnel inverted arch and occlusion, directly affects the engineering in tunnel Quality and safety;It is the most all direct casting concrete after artificial besom cleans inverted arch, And besom is difficult to remove inverted arch scum silica frost neatly, the scum silica frost that especially granule is little is stayed in inverted arch, very Interlayer may be formed between the scar of inverted arch and concrete, have a strong impact on construction quality.
Summary of the invention
It is an object of the invention to for deficiency of the prior art, it is provided that a kind of stone simple to operate The processing method of matter tunnel inverted arch scum silica frost, the method does not interferes with tunnel inverted arch and poured coagulation The bonding of soil.
For achieving the above object, the invention discloses following technical scheme:
The processing method of a kind of stone matter tunnel inverted arch scum silica frost, the method is first to want by drawing and specification Seek excavation inverted arch, then set one central authorities ditch in inverted arch bottom surface midline, at the bottom of tunnel excavation Face centrage design altitude lowest part arranges catch pit;Scum silica frost is flushed to central authorities ditch, then uses Pumping walks the water in catch pit, the sediment in cleaning central authorities ditch and catch pit;Then in cleaning Good inverted arch excavation face spreads one layer of cement mortar;Finally with spray anchor material or plain concrete fill ditch and Catch pit.
As a kind of preferred version, when scum silica frost is flushed to central authorities ditch, use giant conduct Wash away the instrument of scum silica frost.
As a kind of preferred version, when clearing up the sediment in central authorities ditch and catch pit, use people Work concentrates cleaning.
As a kind of preferred version, described plain concrete is with the plain concrete of label with inverted arch.
As a kind of preferred version, described central authorities ditch be wide * deeply=15cm*15cm.
As a kind of preferred version, described central authorities ditch is to low along the eminence of tunnel floor design Place's excavation, catch pit is arranged on this circulation tunnel inverted arch excavation face design altitude lowest part.
The processing method of a kind of stone matter tunnel disclosed by the invention inverted arch scum silica frost, with existing construction party Method is compared, and directly arranges ditch in inverted arch excavation face, have easy to operate, control simple, Ensure construction quality, perform low cost, the advantage preventing stress from concentrating.
Accompanying drawing explanation
Fig. 1 is the schematic cross-section of the processing method of the present invention a kind of stone matter tunnel inverted arch scum silica frost.
Fig. 2 is the schematic top plan view of the processing method of the present invention a kind of stone matter tunnel inverted arch scum silica frost.
Description of reference numerals:
1. inverted arch, 2. central authorities ditch, 3. catch pit.
Detailed description of the invention
Below in conjunction with embodiment and referring to the drawings the invention will be further described.
Refer to Fig. 1-Fig. 2.
The processing method of a kind of stone matter tunnel inverted arch scum silica frost, the method is first to want by drawing and specification Seek excavation inverted arch 1, then set one central authorities ditch 2 in inverted arch 1 bottom surface midline, in tunnel Excavation bottom center line design altitude lowest part arranges catch pit 3;Scum silica frost is flushed to central authorities ditch 2, then walk the water in catch pit 3, in cleaning central authorities ditch 2 and catch pit 3 by pumping Sediment;Then one layer of cement mortar is spread in inverted arch 1 excavation face cleared up;Finally with spray anchor material or Plain concrete fills ditch and catch pit 3.Finally just can perform inverted arch by conventional construction method Fill and the concreting of abutment wall with crown.
Central authorities ditch 2 have easy to operate, control simple feature, performing pre-test technology The setting-out of personnel elder generation goes out the position of tunnel center line, and both sides are respectively stretched out 7.5cm and started out the most to the midline Digging ditch 2, ditch size is less, hands air drill can be used to add spade and manually perform;Collection Puddle 3 manually can perform with the excavator cooperation of band drill bit.
Compared to existing technology, the present invention directly arranges central authorities ditch 2 in inverted arch 1 excavation face, Have easy to operate, control simple, ensure construction quality, the advantage performing low cost.
As specific embodiment, when scum silica frost is flushed to central authorities ditch 2, use giant conduct Wash away the instrument of scum silica frost, inverted arch scum silica frost can be enable more thoroughly to clean out, giant Pressure to meet the requirements, and can the most directly clear up for bigger scum silica frost.
As specific embodiment, when the granule sediment inside central authorities ditch 2 is difficult to clear up, can To be flushed to catch pit 3 with giant, after stand-by water pump exhausts the water in catch pit, execute Workman person puts on galosh and clears up the sediment of relatively small particle in the catch pit 3 that space is bigger;Then One layer of cement mortar is spread in the inverted arch excavation face cleared up;The concrete with label is filled with inverted arch Ditch 2 set by filling and catch pit 3, prevent stress from concentrating;Finally the most traditionally execute Do other operations ensuing.
As specific embodiment, described plain concrete is with the plain concrete of label with inverted arch.
As specific embodiment, described central authorities ditch 2 be wide * deeply=15cm*15cm.
As specific embodiment, described central authorities ditch 2 is to low along the eminence of tunnel floor design Place's excavation, catch pit 3 is arranged on this circulation tunnel inverted arch excavation face design altitude lowest part.
The above is only the preferred embodiment of the present invention, is not intended to limit;It should be pointed out that, Although the present invention being described in detail with reference to the various embodiments described above, the ordinary skill of this area Personnel should be appreciated that the technical scheme described in the various embodiments described above still can be repaiied by it Change, or the most some or all of technical characteristic is carried out equivalent;And these are revised and replace Change, do not make the essence of corresponding technical scheme depart from the model of various embodiments of the present invention technical scheme Enclose.

Claims (6)

1. the processing method of a stone matter tunnel inverted arch scum silica frost, it is characterised in that the method is First press drawing and code requirement excavation inverted arch, then set one central water in inverted arch bottom surface midline Ditch, arranges catch pit at tunnel excavation bottom center line design altitude lowest part;Scum silica frost is flushed to Central authorities ditch, then walks the water in catch pit, in cleaning central authorities ditch and catch pit by pumping Sediment;Then one layer of cement mortar is spread in the inverted arch excavation face cleared up;Finally with spray anchor material or element Concrete Filled ditch and catch pit.
The processing method of a kind of stone matter tunnel the most according to claim 1 inverted arch scum silica frost, its It is characterised by, when scum silica frost is flushed to central authorities ditch, uses giant as the work washing away scum silica frost Tool.
The processing method of a kind of stone matter tunnel the most according to claim 1 inverted arch scum silica frost, its It is characterised by, when clearing up the sediment in central authorities ditch and catch pit, uses and manually concentrate cleaning.
The scum treatment method of a kind of stone matter tunnel the most according to claim 1 inverted arch, It is characterized in that, described plain concrete is with the plain concrete of label with inverted arch.
The processing method of a kind of stone matter tunnel the most according to claim 1 inverted arch scum silica frost, its Be characterised by, described central authorities ditch be wide * deeply=15cm*15cm.
The processing method of a kind of stone matter tunnel the most according to claim 1 inverted arch scum silica frost, its Be characterised by, described central authorities ditch be along tunnel floor design eminence to lower excavate, catchment Hole is arranged on this circulation tunnel inverted arch excavation face design altitude lowest part.
CN201610214708.6A 2016-04-07 2016-04-07 A kind of processing method of stone matter tunnel inverted arch scum silica frost Expired - Fee Related CN105863665B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610214708.6A CN105863665B (en) 2016-04-07 2016-04-07 A kind of processing method of stone matter tunnel inverted arch scum silica frost

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610214708.6A CN105863665B (en) 2016-04-07 2016-04-07 A kind of processing method of stone matter tunnel inverted arch scum silica frost

Publications (2)

Publication Number Publication Date
CN105863665A true CN105863665A (en) 2016-08-17
CN105863665B CN105863665B (en) 2018-05-08

Family

ID=56637035

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610214708.6A Expired - Fee Related CN105863665B (en) 2016-04-07 2016-04-07 A kind of processing method of stone matter tunnel inverted arch scum silica frost

Country Status (1)

Country Link
CN (1) CN105863665B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111155474A (en) * 2020-02-26 2020-05-15 山东省路桥集团有限公司 Tunnel is pressed down and is encircleed virtual sediment cleaning device
CN113123802A (en) * 2021-04-22 2021-07-16 中铁十一局集团有限公司 Tunnel inverted arch virtual slag mechanized cleaning method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08170486A (en) * 1994-12-16 1996-07-02 Okumura Corp Tunnel excavated muck carry-out gantry
CN103410062A (en) * 2013-08-16 2013-11-27 中铁二十一局集团有限公司 Method for constructing monolithic roadbed by using single railway tunnel bracket type steel rail way
CN203999009U (en) * 2014-07-23 2014-12-10 北京城市排水集团有限责任公司 A kind of portable dross removing device
CN104612698A (en) * 2015-01-24 2015-05-13 杭州天恒投资建设管理有限公司 Method for constructing upper step middle partition wall of shallow-buried excavation tunnel
CN104817307A (en) * 2015-04-28 2015-08-05 中铁工程设计咨询集团有限公司 Tunnel central ditch, single body thereof and method for manufacturing single body

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08170486A (en) * 1994-12-16 1996-07-02 Okumura Corp Tunnel excavated muck carry-out gantry
CN103410062A (en) * 2013-08-16 2013-11-27 中铁二十一局集团有限公司 Method for constructing monolithic roadbed by using single railway tunnel bracket type steel rail way
CN203999009U (en) * 2014-07-23 2014-12-10 北京城市排水集团有限责任公司 A kind of portable dross removing device
CN104612698A (en) * 2015-01-24 2015-05-13 杭州天恒投资建设管理有限公司 Method for constructing upper step middle partition wall of shallow-buried excavation tunnel
CN104817307A (en) * 2015-04-28 2015-08-05 中铁工程设计咨询集团有限公司 Tunnel central ditch, single body thereof and method for manufacturing single body

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111155474A (en) * 2020-02-26 2020-05-15 山东省路桥集团有限公司 Tunnel is pressed down and is encircleed virtual sediment cleaning device
CN113123802A (en) * 2021-04-22 2021-07-16 中铁十一局集团有限公司 Tunnel inverted arch virtual slag mechanized cleaning method
CN113123802B (en) * 2021-04-22 2023-10-24 中铁十一局集团有限公司 Tunnel inverted arch virtual slag mechanized cleaning method

Also Published As

Publication number Publication date
CN105863665B (en) 2018-05-08

Similar Documents

Publication Publication Date Title
CN101122130B (en) Construction method of drilling follow casting pile used for building or bridge foundation
KR101051965B1 (en) Panel joint for underground continuous wall construction and underground continuous wall construction method
CN107676107A (en) Tunnel reinforcement crack treatment method
CN204371354U (en) The compound supporting and protection structure of a kind of Karst Tunnel
CN107574834A (en) A kind of old basic transformation reinforcement means of power machine
CN105863665A (en) Disposing method for dross of stone tunnel invert
CN102677702A (en) Precipitation blocking method for post-cast strip of basement baseplate
CN204676714U (en) Water-stopping steel strip and construction joint structure
CN204000779U (en) Arch dam abutment side slope supporting construction
CN102031876A (en) Method for newly adding upright column for building
CN106088124A (en) A kind of deep basal pit base plate exterior wall blind drainage secondary utilization method and structure
CN106087761A (en) A kind of genuine bridge construction seam sealing system construction method
CN106638993A (en) Basement outer wall screw hole anti-seepage plugging construction method
CN207260082U (en) Active service refutes bank revetment and increases structure
CN102535493B (en) Method for constructing inverted type foundation beam
CN110206561A (en) Disease in Tunnel Base point processing method
CN206233236U (en) One kind is intercepted opens daraf(reciprocal of farad) chisel pile driving construction device
CN206034946U (en) Structure is handled to large -scale pressure vertical shaft concrete defect based on slipform technology
CN104452813B (en) A kind of underground power house gate shaft protected against the effects of immersion method
CN210439278U (en) Rubber water stop structure at top of impervious wall
CN104988981B (en) A kind of well construction method of riding on present situation operation shield method drainage pipeline
CN104500108B (en) Method for treating tunnel base water return point
CN208056066U (en) A kind of shearing slot structure for underwater concrete back cover
CN102797262B (en) The construction treating methods of cast-in-situ triangular compound foundation pile
CN206604235U (en) A kind of new preliminary sedimentation tank

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180508

Termination date: 20190407