CN204000779U - Arch dam abutment side slope supporting construction - Google Patents
Arch dam abutment side slope supporting construction Download PDFInfo
- Publication number
- CN204000779U CN204000779U CN201420490102.1U CN201420490102U CN204000779U CN 204000779 U CN204000779 U CN 204000779U CN 201420490102 U CN201420490102 U CN 201420490102U CN 204000779 U CN204000779 U CN 204000779U
- Authority
- CN
- China
- Prior art keywords
- side slope
- dam abutment
- arch dam
- iron sheet
- abutment side
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title abstract description 21
- 230000008093 supporting effect Effects 0.000 title abstract description 16
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims abstract description 65
- 229910052742 iron Inorganic materials 0.000 claims abstract description 33
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 10
- 239000010959 steel Substances 0.000 claims abstract description 10
- 239000004575 stone Substances 0.000 abstract description 7
- 239000011435 rock Substances 0.000 abstract description 5
- 238000005422 blasting Methods 0.000 abstract description 3
- 239000004567 concrete Substances 0.000 description 6
- 238000009412 basement excavation Methods 0.000 description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 5
- 238000005260 corrosion Methods 0.000 description 3
- 230000007797 corrosion Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 230000000903 blocking effect Effects 0.000 description 2
- 238000004870 electrical engineering Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000007921 spray Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000011210 fiber-reinforced concrete Substances 0.000 description 1
- 239000011378 shotcrete Substances 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses an arch dam abutment side slope supporting construction, including arch dam abutment side slope (1), it is in one deck iron sheet (2) have been laid on the surface of arch dam abutment side slope (1) to pierce through in anchor (3) iron sheet (2) anchor and go into arch dam abutment side slope (1), anchor (3) expose nut (6) fastening for the end outside iron sheet (2), be equipped with steel gasket (5) and spring (4) between this nut (6) and iron sheet (2) in proper order. The utility model discloses a set up the iron sheet on arch dam abutment side slope surface, can stabilize and block the tiny rock block of side slope and do not take place to fall the piece, can be about to the bold stone rail that the side slope drops, ensured side slope and dam engineering construction period safety. The anchor rods are anchored into the side slope of the dam abutment of the arch dam, so that large dispersed separated stones in the loosening blasting influence range of the side slope of the dam abutment can be connected in series well, and the safe operation of side slope engineering is ensured.
Description
Technical field
The utility model relates to a kind of novel slope retaining structure, and the especially supporting and protection structure of Arch Dam Abutment side slope belongs to water conservancy project water retaining structure slope retaining structure technical field.
Background technology
At present in domestic water electrical engineering process of construction, especially in the time that Arch Dam Abutment slope excavation is constructed, excavation and supporting sequential have been generally to carry out immediately supporting after the construction of upper level slope excavation, after supporting construction completes, can carry out the excavation construction of next stage side slope.As Arch Dam Abutment side slope, its side slope ROCK CONDITIONS should be better, and rock matter classification is generally 3 classes or more than 3 classes, and rock quality is hard, can bear the thrust of very large dash head.For guaranteeing stability of slope and dam construction phase safety, generally dam abutment side slope is taked to lay the supporting and protection structure measure such as anchor pole and spray steel fibre reinforced concrete, at present as shotcrete linked network structure is taked to established dam abutment side slope conventionally in great Hua water, kind mud slope and trunk ridge etc., to guarantee not occur, side slope surface falls piece to domestic water electrical engineering and localized mass stone break-off occurs, while ensureing that Arch Dam Abutment side slope is down excavated and dam construction phase safety.Because Arch Dam Abutment side slope has the advantages that area is little and narrow, in the time taking to lay anchor pole and the supporting of spray linked network concrete structure, its working procedure complexity, construction period human and material resources resource drops into more, causes slope retaining and excavation construction progress slow simultaneously; Because slope retaining structure is temporary structure, must, by the concrete chisel that is sprayed on side slope surface divided by guaranteeing dam concrete and the intact combination of side slope basement rock, increase engineering construction operation when the later stage when dam construction.Therefore, existing Arch Dam Abutment slope retaining structure or not ideal enough.
Utility model content
The purpose of this utility model is the supporting problem for solving the Arch Dam Abutment side slope existing in prior art, and a kind of supporting and protection structure of novel Arch Dam Abutment side slope is provided.
The technical solution of the utility model is such: it is a kind of structure for Arch Dam Abutment slope retaining, its structure need to comprise the acting in conjunction together of Arch Dam Abutment side slope, it is to be equipped with one deck iron sheet on the surface of Arch Dam Abutment side slope, and penetrate iron sheet with many anchor poles and anchor in Arch Dam Abutment side slope, the termination that anchor pole is exposed at outward outside iron sheet uses nut fastening, between this nut and iron sheet, is provided with steel plate washer.Between steel plate washer and iron sheet, be also provided with spring, this spring housing on anchor pole for iron sheet being pressed on to the surface of described Arch Dam Abutment side slope.
As preferred version, iron sheet is generally zinc-plated structure, possesses compared with strong corrosion resistant, and thickness is 0.8 ~ 2.0mm.The degree of depth that anchor pole anchors into Arch Dam Abutment side slope inside is 3.0 ~ 9.0m, and on Arch Dam Abutment side slope surface, the spacing between adjacent anchor pole is 2.0 ~ 5.0m.
The beneficial effects of the utility model are: adopt, on Arch Dam Abutment side slope surface, iron sheet is set, iron sheet possesses certain pliability, fit in preferably side slope surface, the tiny block of stone of side slope of can firmly and blocking not to fall piece phenomenon, for boulder large and that be about to come off, in the time there is crimp or off-load displacement, iron sheet possesses certain rigidity, under the cushioning effect of the fixing and spring of nut, can, by the boulder fence that is about to come off, bring potential safety hazard to guarantee that boulder does not fall down to lower floor's slope construction and dam construction; Iron sheet possesses compared with strong corrosion resistant while being zinc-plated structure, can guarantee can, because being lost normal function by rainwater corrosion, not guarantee engineering safety operation compared with long construction period.Be 3.0 ~ 9.0m because anchor pole generally anchors into dam abutment length of slope, spacing is 2.0 ~ 5.0m, ensures that major part in dam abutment side slope loosening blasting influence basin is fallen apart can better be cascaded from piece stone, guarantees to form side slope safety operation.Because Arch Dam Abutment side slope has the advantages that area is little and narrow, take iron sheet and combining anchor supporting greatly to simplify side slope supporting construction operation, save human and material resources resource, accelerate side slope supporting construction progress, simultaneously as temporary structure, in the time that dam concrete is built, directly iron sheet is turned on and removed to the nut of corresponding site, Demolishing Technology difficulty is low, and iron sheet can reuse after removing.
brief description of the drawings
Fig. 1 is overall structure schematic diagram of the present utility model;
Description of reference numerals: 1-Arch Dam Abutment side slope, 2-iron sheet, 3-anchor pole, 4-spring, 5-steel plate washer, 6-nut.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is described in further detail.
See Fig. 1, Fig. 1 has shown overall structure of the present utility model, and as we can see from the figure, the utility model is by the surface coverage one deck iron sheet 2 in Arch Dam Abutment side slope 1, then penetrate iron sheet 2 with anchor pole 3 and anchor in Arch Dam Abutment side slope 1, form so a basic supporting and protection structure.Anchor pole 3 exposes termination a nut 6 is set, and nut 6 arranges a steel plate washer 5, and a spring 4 is set between steel plate washer 5 and iron sheet, and steel plate washer 5 and spring 4 are all enclosed within on anchor pole 3.
Iron sheet 2 thickness are generally zinc-plated structure, and thickness is 0.8 ~ 2.0mm, and anchor pole 3 anchors into Arch Dam Abutment side slope 1 length and is generally 3.0 ~ 9.0m, and anchor pole 3 spacing are generally 2.0 ~ 5.0m.
The supporting and protection structure of this Arch Dam Abutment side slope 1 of the present utility model is interim hydraulic structure structure.
When the utility model is implemented, by Arch Dam Abutment side slope 1 side slope surface, iron sheet 2 being set, the tiny block of stone of side slope of can firmly and blocking not to fall piece, and the boulder fence that side slope can be about to come off, has guaranteed side slope and dam engineering construction period safety.Adopt anchor pole 3 to anchor into Arch Dam Abutment side slope 1, ensure that major part in dam abutment side slope loosening blasting influence basin is fallen apart can better be cascaded from piece stone, guarantee slope project safe operation.Compared to existing technology, the utility model is simple in structure, quick construction, supporting effect are easy to ensure, when dam concrete is built simultaneously, remove the iron sheet of corresponding site, difficulty of construction is little, technical security is reliable.
Be more than concrete exemplary applications of the present utility model, the utility model also has other embodiment, and all employings are equal to the technical scheme of replacement or equivalent transformation formation, within all dropping on the desired protection domain of the utility model.
Claims (4)
1. an Arch Dam Abutment slope retaining structure, comprise Arch Dam Abutment side slope (1), it is characterized in that: be equipped with one deck iron sheet (2) on the surface of described Arch Dam Abutment side slope (1), and penetrate iron sheet (2) with anchor pole (3) and anchor in Arch Dam Abutment side slope (1), outside anchor pole (3), be exposed at the outer nut for termination (6) of iron sheet (2) fastening, between this nut (6) and iron sheet (2), be provided with steel plate washer (5).
2. Arch Dam Abutment slope retaining structure according to claim 1, it is characterized in that: between described steel plate washer (5) and iron sheet (2), be also provided with spring (4), it is upper for iron sheet (2) being pressed on to the surface of described Arch Dam Abutment side slope (1) that this spring (4) is enclosed within described anchor pole (3).
3. Arch Dam Abutment slope retaining structure according to claim 2, is characterized in that: described iron sheet (2) is zinc-plated structure, and thickness is 0.8 ~ 2.0mm.
4. Arch Dam Abutment slope retaining structure according to claim 2, is characterized in that: it is 3.0 ~ 9.0m that described anchor pole (3) anchors into the inner degree of depth of Arch Dam Abutment side slope (1), and the spacing between adjacent anchor pole (3) is 2.0 ~ 5.0m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420490102.1U CN204000779U (en) | 2014-08-28 | 2014-08-28 | Arch dam abutment side slope supporting construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420490102.1U CN204000779U (en) | 2014-08-28 | 2014-08-28 | Arch dam abutment side slope supporting construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204000779U true CN204000779U (en) | 2014-12-10 |
Family
ID=52040805
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420490102.1U Active CN204000779U (en) | 2014-08-28 | 2014-08-28 | Arch dam abutment side slope supporting construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204000779U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106121684A (en) * | 2016-08-17 | 2016-11-16 | 国投新集能源股份有限公司 | A kind of jacking coal and rock suspension device and construction method thereof |
CN107396867A (en) * | 2017-09-04 | 2017-11-28 | 宜宾县普安镇揽胜种养殖专业合作社 | A kind of rice field aquatic products breeding fence easy for installation |
CN109989385A (en) * | 2019-03-25 | 2019-07-09 | 王璐 | A kind of hydraulic engineering water and soil conservation structure |
CN110080253A (en) * | 2019-05-13 | 2019-08-02 | 浙江大东吴集团建设有限公司 | A kind of Lin Shan building green construction safeguard structure |
CN111088805A (en) * | 2019-12-12 | 2020-05-01 | 武汉理工大学 | Integrated assembly type supporting device and supporting method thereof |
-
2014
- 2014-08-28 CN CN201420490102.1U patent/CN204000779U/en active Active
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106121684A (en) * | 2016-08-17 | 2016-11-16 | 国投新集能源股份有限公司 | A kind of jacking coal and rock suspension device and construction method thereof |
CN106121684B (en) * | 2016-08-17 | 2018-11-30 | 国投新集能源股份有限公司 | A kind of construction method of jacking coal and rock suspension device |
CN107396867A (en) * | 2017-09-04 | 2017-11-28 | 宜宾县普安镇揽胜种养殖专业合作社 | A kind of rice field aquatic products breeding fence easy for installation |
CN109989385A (en) * | 2019-03-25 | 2019-07-09 | 王璐 | A kind of hydraulic engineering water and soil conservation structure |
CN110080253A (en) * | 2019-05-13 | 2019-08-02 | 浙江大东吴集团建设有限公司 | A kind of Lin Shan building green construction safeguard structure |
CN111088805A (en) * | 2019-12-12 | 2020-05-01 | 武汉理工大学 | Integrated assembly type supporting device and supporting method thereof |
CN111088805B (en) * | 2019-12-12 | 2021-03-16 | 武汉理工大学 | Integrated assembly type supporting device and supporting method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204000779U (en) | Arch dam abutment side slope supporting construction | |
CN108518232A (en) | The anti-rock burst method for protecting support of single-track railway tunnel of corresponding different rock burst intensity grades | |
CN105134216B (en) | Anti- slump structure by the engineering method lane of breaking roof 110 | |
CN106761778A (en) | A kind of underground digging in subway station construction technology suitable for upper-soft lower-hard ground | |
CN103882869A (en) | Inclined supporting pile structure for foundation pit support and construction method thereof | |
CN103899329A (en) | Large-deformation broken surrounding rock roadway management method | |
CN108203983A (en) | A kind of deep foundation pit supporting structure and method | |
CN101487264A (en) | Ecological protection construction method for covering layer accumulation body slope | |
CN104790980A (en) | Method for treating karst caves in tunnel construction | |
CN104895072A (en) | A pre-stressed anchor cable and a pre-stressed anchor cable one-time forming construction method | |
CN103089276A (en) | Deep-shallow hole and high-low pressure coupling grouting technology | |
CN205778903U (en) | A kind of soft-rock tunnel pucking preventing and treating device | |
CN108203984A (en) | A kind of Dangerous Rock Body bolting with wire mesh method | |
CN105649092A (en) | Slope supporting method for crumbly strata | |
CN205712143U (en) | Concrete spraying floating platform structure for mine environment recovery treatment | |
CN205152965U (en) | Utilize reinforced (rfd) environmental protection of plant roots to squeeze into slip casting type soil nail wall | |
CN203768914U (en) | Foundation pit bracing diagonal support pile structure | |
CN104196036B (en) | Foundation pit supporting structure and method based on old underground outdoor wall structure | |
CN205444232U (en) | Stock - gravity type infiltration retaining wall | |
CN205530299U (en) | Ecological slope protection structure in ion type rare earth mine mountain | |
CN110055982A (en) | A kind of novel anchor holding frame lattice miniature steel pipe pile supporting system | |
CN204199296U (en) | Foundation pit supporting structure based on old underground outdoor wall structure | |
CN202417550U (en) | Soft rock roadway supporting structure capable of being grouted repeatedly | |
CN105484791A (en) | Comprehensive tunnel drainage, precipitation and pressure reduction construction method | |
CN208949893U (en) | A kind of oblique suspension device of the auxiliary of foundation pit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |