CN205712143U CN201620568873.7U CN201620568873U CN205712143U CN 205712143 U CN205712143 U CN 205712143U CN 201620568873 U CN201620568873 U CN 201620568873U CN 205712143 U CN205712143 U CN 205712143U
Authority
CN
China
Prior art keywords
anchor pole
layer
concrete
side slope
platform structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620568873.7U
Other languages
Chinese (zh)
Inventor
刘永
郑思光
刘庆民
董国明
王腾飞
浦志
孙学亮
张立刚
果健
唐绍金
刘国栋
姜淼
许金凤
孟莉
徐福生
刘亚溪
赵志杰
刘宪国
冯士广
尹春播
苏春雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Geological Brigade Of Hebei Bureau Of Geology And Mineral Resources
Original Assignee
Second Geological Brigade Of Hebei Bureau Of Geology And Mineral Resources
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Geological Brigade Of Hebei Bureau Of Geology And Mineral Resources filed Critical Second Geological Brigade Of Hebei Bureau Of Geology And Mineral Resources
Priority to CN201620568873.7U priority Critical patent/CN205712143U/en
Application granted granted Critical
Publication of CN205712143U publication Critical patent/CN205712143U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The utility model relates to a mine environment resumes spouting concrete platform structure that wafts of administering belongs to environmental protection technical field. The technical scheme is as follows: the support of the floating platform foundation is fixed on the side slope surrounding rock (1), the bottom of the support of the floating platform foundation is arranged in a concrete pouring layer (5), and the concrete pouring layer is adjacent to the side slope surrounding rock; a reinforced mesh (9) is arranged on the floating platform foundation support, and a concrete spraying layer (2) is arranged around the reinforced mesh; the corrugated template (3) is arranged on the inner side of the concrete spraying layer and is positioned above the concrete pouring layer; a floating platform structure is formed among the concrete pouring layer, the corrugated template and the side slope surrounding rock, a drain hole (8) is formed in the bottom of the floating platform structure, and medium coarse sand (6), geotextile (7) and nutrient planting soil (4) are sequentially arranged in the floating platform structure from bottom to top. The utility model provides a mine and quarry ecological restoration administer the difficult problem of crow's steep side slope construction, reduce ecological environment's further destruction, simple and easy rapid construction, it is fast to take effect, also carries out effectual improvement to geological disasters hidden danger.

Description

The spray concrete of a kind of mine environment restoration harness wafts platform structure
Technical field
This utility model relates to the spray concrete of a kind of mine environment restoration harness and wafts platform structure, is primarily adapted for use in mine, quarrying The relatively steep side slope ecological restoration and managements such as field, belong to environmental technology field.
Background technology
The nearly more than ten years, along with the nonstandard exploitation of mineral resources and stone pit, cause that massif is exposed, vegetation deterioration, water and soil stream Mistake, airborne dust Rolling Stone, and there is the potential safety hazards such as geological disaster.Country and local governments at all levels all pay much attention to the ecology in mine Recovering, the common traditional administering method of high gradient slope formed because of exploitation in recovery of ecologic environment in a mine is administered is for cutting slope, by upper Downstairs formula completes domatic whittling, then carries out platform and slope greening.Background technology there is the problem that above-mentioned construction method By the mining effect lack of standardization in mine, there is certain difficulty of construction, construction work amount is relatively big, simultaneously can be further to ecology Environment destroys.And toe is planted, and that domatic time is completely covered is longer for green plants.
Utility model content
This utility model purpose is to provide the spray concrete of a kind of mine environment restoration harness and wafts platform structure, solves mine and quarrying The technical problem that in the ecological restoration and management of field, high gradient slope construction is difficult, thus reduce the further destruction of ecological environment, the most fast The construction of speed, instant effect, it is also carried out effectively administering to geology Hidden hazrads simultaneously.
The technical solution of the utility model is:
The spray concrete of a kind of mine environment restoration harness wafts platform structure, comprise side slope country rock, the platform base rack that wafts, spray concrete layer, Waveform template, nutrient planting soil, concrete placings layer, medium coarse sand, geotextiles, osculum and bar-mat reinforcement, the platform base rack that wafts is fixed on On side slope country rock, the bottom of the platform base rack that wafts is arranged in concrete placings layer, and concrete placings layer is adjacent with side slope country rock;Waft stylobate plinth Support is provided with bar-mat reinforcement, bar-mat reinforcement be provided around spray concrete layer;Described waveform template is arranged on the inner side of spray concrete layer, is positioned at concrete The top of LIFT;Constituting platform structure of wafing between concrete placings layer, waveform template and side slope country rock, platform structural base of wafing is provided with draining Hole, is sequentially provided with medium coarse sand, geotextiles and nutrient planting soil from bottom to top in platform structure of wafing.
The described platform base rack that wafts comprises horizontal anchor pole one, horizontal anchor pole two, oblique anchor pole one and oblique anchor pole two, horizontal anchor pole one, horizontal stroke One end of anchor pole two and oblique anchor pole one is fixed on side slope country rock the most from top to bottom, and the other end is to away from side slope country rock Direction is stretched out;Described oblique anchor pole two is arranged between horizontal anchor pole one and oblique anchor pole one, and one end is connected with the external part of horizontal anchor pole one Connecing, the other end is connected with the external part of horizontal anchor pole two and oblique anchor pole one;Described oblique anchor pole two and horizontal anchor pole two and oblique anchor pole one Junction point be positioned at concrete placings layer.
Described horizontal anchor pole one, horizontal anchor pole two, oblique anchor pole one, oblique anchor pole two are the screw-thread steel not less than φ 20mm.
Described bar-mat reinforcement is made up of reinforcing bar transverse and longitudinal interlacing, and transverse and longitudinal spacing is 150mm, a diameter of 10mm of reinforcing bar.
The thickness of described medium coarse sand is not less than 15cm.
Described osculum is square osculum, and long and width is 10cm.
The beneficial effects of the utility model are: solve high gradient slope construction difficulty in mine and stone pit ecological restoration and management Technical problem, thus reduce the further destruction of ecological environment, simple construction rapidly, instant effect, simultaneously hidden to geological disaster Suffer from and be also carried out effectively administering.
Accompanying drawing explanation
Fig. 1 is this utility model cross-sectional view;
In figure: side slope country rock 1, spray concrete layer 2, waveform template 3, nutrient planting soil 4, concrete placings layer 5, medium coarse sand 6, geotextiles 7, osculum 8, bar-mat reinforcement 9, horizontal anchor pole 1, horizontal anchor pole 2 11, oblique anchor pole 1, oblique anchor pole 2 13.
Detailed description of the invention
Below in conjunction with accompanying drawing, by example, the utility model is described in further detail.
The spray concrete of a kind of mine environment restoration harness wafts platform structure, comprises side slope country rock 1, the platform base rack that wafts, spray concrete layer 2, waveform template 3, nutrient planting soil 4, concrete placings layer 5, medium coarse sand 6, geotextiles 7, osculum 8 and bar-mat reinforcement 9, the stylobate plinth that wafts props up Frame is fixed on side slope country rock 1, and the bottom of the platform base rack that wafts is arranged in concrete placings layer 5, concrete placings layer 5 and side slope country rock 1 Adjacent;The platform base rack that wafts is provided with bar-mat reinforcement 9, bar-mat reinforcement 9 be provided around spray concrete layer 2;Described waveform template 3 is arranged on spray The inner side of concrete layer 2, is positioned at the top of concrete placings layer 5;The platform knot that wafts is constituted between concrete placings layer 5, waveform template 3 and side slope country rock 1 Structure, platform structural base of wafing is provided with osculum 8, is sequentially provided with medium coarse sand 6, geotextiles 7 and nutrition kind in platform structure of wafing from bottom to top Plant soil 4.
The described platform base rack that wafts comprises horizontal anchor pole 1, horizontal anchor pole 2 11, oblique anchor pole 1 and oblique anchor pole 2 13, horizontal anchor One end of bar 1, horizontal anchor pole 2 11 and oblique anchor pole 1 is fixed on side slope country rock 1 the most from top to bottom, the other end to Direction away from side slope country rock 1 is stretched out;Tiltedly anchor pole 2 13 is arranged between horizontal anchor pole 1 and oblique anchor pole 1, one end and horizontal anchor The external part of bar 1 is connected, and the other end is connected with the external part of horizontal anchor pole 2 11 and oblique anchor pole 1;Tiltedly anchor pole 2 13 It is positioned at concrete placings layer 5 with the junction point of horizontal anchor pole 2 11 and oblique anchor pole 1.
Described horizontal anchor pole 1, horizontal anchor pole 2 11, oblique anchor pole 1, oblique anchor pole 2 13 are the screw-thread steel of φ 20mm.
Described bar-mat reinforcement 9 is made up of reinforcing bar transverse and longitudinal interlacing, and transverse and longitudinal spacing is 150mm, a diameter of 10mm of reinforcing bar.
The thickness of described medium coarse sand 6 is 15cm.
Described osculum 8 is square osculum, and long and width is 10cm.
Installation process of the present utility model is: staff's electric hammer selects complete rock-boring on top, high gradient slope slope After, pour into cement mortar, insert reinforced anchor bolt, as the fixing point of the safety rope of labor cleaning's domatic danger stone danger stone.(bolt diameter 18mm, length L=50cm);
After fastening seat belts in top, high gradient slope slope, after first the risk of breakage stone of high gradient slope slope edges being removed, then Dangerous rock is removed from top to bottom, it is ensured that the construction safety in later stage along high gradient slope is domatic.
Select steel pipe for building, on high gradient slope is domatic, sets up double-pole scaffold.Interior row's scaffold and high gradient slope slope The spacing in face is more than 1.5 meters, and the spacing of two row's scaffolds is 2 meters.Scaffold is laid fixing wood scaffold board, and and top, slope Fixing anchor bar connect, to guarantee construction safety.
For convenience of operation, this utility model the most successively performs.First anchor pole is carried out at corresponding side slope country rock 1 Boring, installs the platform base rack that wafts after slip casting.Horizontal anchor pole 1, horizontal anchor pole 2 11, oblique anchor pole 1, oblique anchor pole 2 13 use φ The screw-thread steel of 20mm, horizontal anchor pole 1, horizontal anchor pole 2 11 and oblique anchor pole 1 enter rock degree of depth L=1.5 rice.Waft platform base rack After the concrete placings of bottom, bar-mat reinforcement (reinforcing bar is diameter 10mm, and bar-mat reinforcement transverse and longitudinal spacing is 150mm) is installed in side.
Installing waveform template inside bar-mat reinforcement, the protective layer of 20mm reserved by waveform template and bar-mat reinforcement, and reserved long and wide It is the osculum of 10cm.
The waft side of platform base rack carries out spraying concrete.Spray is after concrete reaches some strength, waveform template and side slope country rock 1 it Between first lay medium coarse sand (thickness is 15cm), then lay geotextiles, then the nutrient planting soil mixed tamped and planting plants.

Claims (2)

1. the spray concrete of a mine environment restoration harness wafts platform structure, it is characterised in that: comprise side slope country rock (1), waft stylobate plinth Support, spray concrete layer (2), waveform template (3), nutrient planting soil (4), concrete placings layer (5), medium coarse sand (6), geotextiles (7), draining Hole (8) and bar-mat reinforcement (9), described in the platform base rack that wafts be fixed on side slope country rock (1), the bottom of the platform base rack that wafts is arranged on In concrete placings layer (5), concrete placings layer (5) is adjacent with side slope country rock (1);The platform base rack that wafts is provided with bar-mat reinforcement (9), bar-mat reinforcement (9) be provided around spray concrete layer (2);Described waveform template (3) is arranged on the inner side of spray concrete layer (2), is positioned at concrete placings layer (5) Top;Constituting platform structure of wafing between described concrete placings layer (5), waveform template (3) and side slope country rock (1), platform structural base of wafing sets There is osculum (8), in platform structure of wafing, be sequentially provided with medium coarse sand (6), geotextiles (7) and nutrient planting soil (4) from bottom to top.
The spray concrete of a kind of mine environment restoration harness the most according to claim 1 wafts platform structure, it is characterised in that waft described in: Platform base rack comprises horizontal anchor pole one (10), horizontal anchor pole two (11), oblique anchor pole one (12) and oblique anchor pole two (13), horizontal anchor pole one (10), one end of horizontal anchor pole two (11) and oblique anchor pole one (12) be fixed on the most from top to bottom on side slope country rock (1), another End stretches out to the direction away from side slope country rock (1);Described oblique anchor pole two (13) is arranged on horizontal anchor pole one (10) and oblique anchor pole one (12) between, one end is connected with the external part of horizontal anchor pole one (10), the other end and horizontal anchor pole two (11) and oblique anchor pole one (12) External part be connected;Described oblique anchor pole two (13) is positioned at concrete placings with the junction point of horizontal anchor pole two (11) and oblique anchor pole one (12) In layer (5).
CN201620568873.7U 2016-06-15 2016-06-15 Concrete spraying floating platform structure for mine environment recovery treatment Active CN205712143U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620568873.7U CN205712143U (en) 2016-06-15 2016-06-15 Concrete spraying floating platform structure for mine environment recovery treatment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620568873.7U CN205712143U (en) 2016-06-15 2016-06-15 Concrete spraying floating platform structure for mine environment recovery treatment

Publications (1)

Publication Number Publication Date
CN205712143U true CN205712143U (en) 2016-11-23

Family

ID=57302938

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620568873.7U Active CN205712143U (en) 2016-06-15 2016-06-15 Concrete spraying floating platform structure for mine environment recovery treatment

Country Status (1)

Country Link
CN (1) CN205712143U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869131A (en) * 2017-02-21 2017-06-20 浙江水利水电学院 A kind of construction method of stone surface spray shield concrete
CN108104141A (en) * 2018-01-22 2018-06-01 云南新创新交通建设股份有限公司 A kind of highway Rock High Slope anchor pole pregroove marks safeguard structure and its engineering method
CN109083161A (en) * 2018-08-02 2018-12-25 浙江交工集团股份有限公司 Wide ecological slope protection structure and its construction method are spelled suitable for long and narrow space
CN109306701A (en) * 2018-09-21 2019-02-05 深圳市源远水利设计有限公司 A kind of rule rock slope V-groove planting technique construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869131A (en) * 2017-02-21 2017-06-20 浙江水利水电学院 A kind of construction method of stone surface spray shield concrete
CN106869131B (en) * 2017-02-21 2018-10-09 成龙建设集团有限公司 A kind of construction method of stone surface spray shield concrete
CN108104141A (en) * 2018-01-22 2018-06-01 云南新创新交通建设股份有限公司 A kind of highway Rock High Slope anchor pole pregroove marks safeguard structure and its engineering method
CN109083161A (en) * 2018-08-02 2018-12-25 浙江交工集团股份有限公司 Wide ecological slope protection structure and its construction method are spelled suitable for long and narrow space
CN109306701A (en) * 2018-09-21 2019-02-05 深圳市源远水利设计有限公司 A kind of rule rock slope V-groove planting technique construction method

Similar Documents

Publication Publication Date Title
CN101929340B (en) Coal mine underground flat inclined tunnel pipe shed pre-grouting advance support construction process
CN100577986C (en) Goaf surrounding rock around gob-side supporting method under three soft geological condition
CN205712143U (en) Concrete spraying floating platform structure for mine environment recovery treatment
CN103696803B (en) Be used for mine underground tailings cemented filling barricade device
CN102021911B (en) Side slope reinforcing method and structure
CN104032758B (en) Extra-high reinforced construction method in discarded pit
CN104533453A (en) Substep dynamic coupling support method for roadway fault fracture zone
CN109209389B (en) Construction method for entering semi-open and semi-closed tunnel
CN104612713B (en) Buried section of method for tunnel construction of an ultra shallow
CN204253054U (en) Mountain tunnel stake arch cap excavation method comprehensive support structure
CN105155550B (en) Construction method for digging deep foundation pit in large-thickness highly weathered sandstone stratum in combined supporting mode
CN106013171B (en) A kind of semi-rigid supporting construction semi-flexible and method of deep-foundation side wall
CN205314115U (en) High steep side slope combined supporting greening structure of highway
CN109594568B (en) Rock slope ecological protection structure and method thereof
CN104653198B (en) Method for filling and constructing foam concrete in coal mine soft rock largely-deformed roadway supporter
CN101487264A (en) Ecological protection construction method for covering layer accumulation body slope
CN102061923A (en) Tunnel construction method capable of protecting existing building
CN107201908A (en) A kind of construction method of the regional buried Central drain in tunnel of bitter cold
CN107575268A (en) One kind is made the return trip empty tunnel lightweight concrete building block wall observed pattern
CN108049417A (en) A kind of high-locality landslide body reinforces method of disposal
CN109736334A (en) A kind of collapsible loess slope supporting construction device and method
CN102155249A (en) Method for supporting tunnel roof below mined-out area
CN204283438U (en) Portal supporting and protection structure
CN105544562A (en) Jet anchor net protection construction process for renovating rock heaps on high and steep slope
CN107939419A (en) A kind of tunnel U-shaped steel covers canopy supporting construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model