CN105863639A - 松散煤层的采煤方法 - Google Patents

松散煤层的采煤方法 Download PDF

Info

Publication number
CN105863639A
CN105863639A CN201610383028.7A CN201610383028A CN105863639A CN 105863639 A CN105863639 A CN 105863639A CN 201610383028 A CN201610383028 A CN 201610383028A CN 105863639 A CN105863639 A CN 105863639A
Authority
CN
China
Prior art keywords
coal
mining
water injection
water
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610383028.7A
Other languages
English (en)
Other versions
CN105863639B (zh
Inventor
李家卓
朱传奇
李传明
马海峰
史文豹
庞冬冬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui University of Science and Technology
Original Assignee
Anhui University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui University of Science and Technology filed Critical Anhui University of Science and Technology
Priority to CN201610383028.7A priority Critical patent/CN105863639B/zh
Publication of CN105863639A publication Critical patent/CN105863639A/zh
Application granted granted Critical
Publication of CN105863639B publication Critical patent/CN105863639B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D19/00Provisional protective covers for working space
    • E21D19/02Provisional protective covers for working space for use in longwall working

Abstract

一种松散煤层的采煤方法,该方法包括下述步骤:首先,在轨道平巷、运输平巷中沿煤层走向超前采煤工作面120m处,每隔两个湿润半径r设置一个注水点,在各注水点向煤体中静压注水,注水点随采煤工作面的推进顺序前移。同时,在壁处沿煤层倾向向工作面煤体注入高压水至水自动渗出,然后开始割煤,割煤时液压支架上方铺设金属网,所述金属网隔离整个顶板,使得整个回采工作在所述金属网下进行,保证破碎的顶板不涌入到回采空间;割煤后,迅速推移液压支架的前探梁,前探梁行程L大于采煤机截深,之后,推移刮板输送机和液压支架,尽可能的缩短顶板的暴露时间;本发明松散煤层的采煤方法,安全高效,可避免煤体片帮。

Description

松散煤层的采煤方法
技术领域
本发明涉及一种煤矿井工开采技术领域,具体说涉及一种适用于深井煤体含水率低、煤体坚固系数0.7以下的综采工作面的采煤方法。
背景技术
煤炭是我国的主要能源,随着开采强度的增加,浅部煤炭资源已经枯竭,然而,埋深超过1000m的煤炭储量高达2.64万亿吨,约为未开采煤炭储量的47.4%。深井开采中经常遇到含水率不足4%、坚固系数小于0.7的松散煤体,如我国的两淮矿区、大同矿区、兖州矿区、阜新矿区等。在这种恶劣的煤层赋存条件下,采用什么样的开采方法安全、高效开采始终困扰着现场工程技术人员;煤矿机械化程度的提高和人们对煤体物理力学性质的揭示,为回采低含水率松散煤体提供了可能,综合机械化开采这部分煤体资源是今后煤炭开采的重要发展趋势。
现有的综合机械化开采多针对坚硬煤层,特别是煤体坚固系数1.0以上的煤体。相应的液压支架、刮板输送机、采煤机也都未考虑工作面煤体的软硬程度。煤体未经过相应的处理、液压支架未特殊设计的情况下,松散煤体在回采过程中经常出现煤体大面积片帮事故,极易出现安全问题,导致工作面频繁停止生产,严重制约了矿井的安全高效开采。
发明内容
本发明的目的是提供一种松散煤层的采煤方法,其安全高效,可避免煤体片帮。
为了实现上述目的,本发明的技术解决方案为:一种松散煤层的采煤方法,该方法包括下述步骤:
(一)在轨道平巷煤层中部打注水孔静压注水,在注水孔周边打若干个考察孔,各所述考察孔依次远离所述注水孔,检测各考察孔的含水率,含水率大于7%的点到所述注水孔的中心的距离为所述注水孔的湿润半径r,确定所述注水孔的湿润半径;
(二)在轨道平巷、运输平巷中超前回采工作面120m处,每隔两个湿润半径r设置一个注水点,在各注水点向煤体中静压注水,增加松散煤体的抗剪强度,注水点随采煤工作面的推进顺序前移;
(三)沿煤层倾向向煤壁中注入高压水至煤壁处煤体中水自动渗出;
(四)开始割煤,割煤时液压支架上方铺设金属网,所述金属网隔离整个顶板,使得整个回采工作在所述金属网下进行,保证破碎的顶板不涌入到回采空间;
(五)割煤后,迅速推移液压支架的前探梁,前探梁行程L大于采煤机截深,然后使一级护帮板及时有力支撑最新暴露出来的煤体,之后打开二级护帮板保护煤壁下方煤体,之后,推移刮板输送机和液压支架,尽可能的缩短顶板的暴露时间;
(六)重复以上步骤,完成整个区段的回采工作。
本发明松散煤层的采煤方法,其中,相邻两所述考察孔之间的间距为2m。
本发明松散煤层的采煤方法,其中,在所述步骤(三)中采用人工方式注水,并且每次注水宽度为4m,注水位置随割煤进度前移。
本发明松散煤层的采煤方法,其中,在所述步骤(五)中,所述前探梁行程L大于采煤机截深20cm。
采用上述方案后,与现有技术相比由于本发明松散煤层的采煤方法中先通过工作面运输平巷、轨道平巷内静压预先长时间注水和工作面煤壁高压及时二次注水增加了煤体的抗剪切强度,改变了传统上坚硬煤层注水弱化煤体强度的认识,从煤体本身物理性能上增加了煤壁的稳定性,采煤过程更安全高效,可避免煤体片帮;
采用液压支架前探梁行程大于采煤机截深的“不匹配”设计,改变了传统意义上刮板输送机、液压支架、采煤机滚筒截深“三机配套”的观点,使工作面煤壁暴露出来后能在推移刮板输送机和液压支架前及时打开前探梁,稳定处于单向受力状态有片帮可能的煤壁,从外部条件上改变了煤壁的稳定性;
采煤机割煤后顶板及时铺设金属网,将采场和顶板、采空区相隔离,隔断了采场与破碎顶板、采空区冒落矸石的直接接触,从根本上杜绝了作业环境内顶板和煤壁片帮后破碎煤岩体涌入采场的可能,采煤过程更安全高效,能最大程度的回采出深井松散煤炭资源,并且该方法操作简单,具有非常高的应用推广价值。
附图说明
图1是本发明松散煤层的采煤方法中确定超前工作面煤层静压预先注水孔间距的结构示意图;
图2是本发明松散煤层的采煤方法中采场设备布置的结构示意图。
具体实施方式
本发明一种松散煤层的采煤方法包括下述步骤:
(一)在轨道平巷煤层11中部打注水孔12,向注水孔12中持续静压注水24小时,然后在注水孔12周边打若干个考察孔13,各考察孔13依次远离注水孔12,相邻两考察孔13之间的间距为1m,检测各考察孔13的含水率,含水率大于7%的点到注水孔12的中心之间的距离为注水孔12的湿润半径,确定注水孔12的湿润半径r;
(二)在轨道平巷、运输平巷中超前回采工作面120m处,每隔两个湿润半径r设置一个注水点,在各注水点向煤体中静压注水,增加松散煤体的抗剪强度,从煤体本身增加了煤壁的稳定性,注水点随煤体开采的推进而依次前移;
(三)采用人工的方式手持注水设备,沿煤层倾向向煤壁中注入高压水,直至煤壁的煤体中有水自动渗出为止;
(四)开始割煤,割煤时在液压支架14上方铺设金属网15,金属网15将整个顶板16及采空区与回采工作区隔离,使得整个回采工作在金属网15下方进行,保证破碎的顶板16不涌入到回采空间;
(五)割煤后,迅速推移液压支架14的前探梁141,前探梁141行程L大于采煤机截深20cm,然后使一级护帮板17及时有力支撑住最新暴露出来的煤体,之后打开二级护帮板18保护煤壁下方煤体,之后,推移刮板输送机和液压支架,尽可能的缩短顶板的暴露时间;
(六)重复以上步骤,完成整个区段的回采工作。
在步骤(三)中采用人工方式注水,并且每次注水宽度为4m,注水位置随割煤进度逐渐前移。
以上所述实施例仅仅是对本发明的优选实施方式进行描述,并非对本发明的范围进行限定,在不脱离本发明设计精神的前提下,本领域普通工程技术人员对本发明的技术方案作出的各种变形和改进,均应落入本发明的权利要求书确定的保护范围内。

Claims (4)

1.一种松散煤层的采煤方法,其特征在于:该方法包括下述步骤:
(一)在轨道平巷煤层中部打注水孔静压注水,在注水孔周边打若干个考察孔,各所述考察孔依次远离所述注水孔,检测各考察孔的含水率,含水率大于7%的点到所述注水孔中心的距离为所述注水孔的湿润半径r,确定所述注水孔的湿润半径r;
(二)在轨道平巷、运输平巷中超前回采工作面120m处,每隔两个湿润半径r设置一个注水点,在各注水点向煤体中静压注水,增加松散煤体的抗剪强度,注水点随采煤工作面的推进而依次前移;
(三)沿煤层倾向向煤壁中注入高压水至煤壁处煤体中水自动渗出;
(四)开始割煤,割煤时液压支架上方铺设金属网,所述金属网隔离整个顶板,使得整个回采工作在所述金属网下进行,保证破碎的顶板不涌入到回采空间;
(五)割煤后,迅速推移液压支架的前探梁,前探梁行程L大于采煤机截深,然后使一级护帮板及时有力支撑最新暴露出来的煤体,之后打开二级护帮板保护煤壁下方煤体,之后,推移刮板输送机和液压支架,尽可能的缩短顶板的暴露时间;
(六)重复以上步骤,完成整个区段的回采工作。
2.根据权利要求1所述的松散煤层的采煤方法,其特征在于:相邻两所述考察孔之间的间距为2m。
3.根据权利要求2所述的松散煤层的采煤方法,其特征在于:在所述步骤(三)中采用人工方式注水,并且每次注水宽度为4m,注水位置随割煤进度前移。
4.根据权利要求3所述的松散煤层的采煤方法,其特征在于:在所述步骤(五)中,所述前探梁行程L大于采煤机截深20cm。
CN201610383028.7A 2016-05-27 2016-05-27 松散煤层的采煤方法 Expired - Fee Related CN105863639B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610383028.7A CN105863639B (zh) 2016-05-27 2016-05-27 松散煤层的采煤方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610383028.7A CN105863639B (zh) 2016-05-27 2016-05-27 松散煤层的采煤方法

Publications (2)

Publication Number Publication Date
CN105863639A true CN105863639A (zh) 2016-08-17
CN105863639B CN105863639B (zh) 2018-01-16

Family

ID=56676487

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610383028.7A Expired - Fee Related CN105863639B (zh) 2016-05-27 2016-05-27 松散煤层的采煤方法

Country Status (1)

Country Link
CN (1) CN105863639B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106401623A (zh) * 2016-11-09 2017-02-15 安徽理工大学 一种类土质煤工作面全封闭采煤装置及其采煤方法
WO2018086328A1 (zh) * 2016-11-09 2018-05-17 安徽理工大学 一种类土质煤工作面全封闭掩护支架装置
CN110130926A (zh) * 2019-05-24 2019-08-16 翟文 一种煤矿综采工作面综合支护方法
CN110646583A (zh) * 2019-10-09 2020-01-03 中煤科工集团重庆研究院有限公司 一种煤层注水相似模拟试验的方法及装置
CN112879073A (zh) * 2021-03-22 2021-06-01 北京天地玛珂电液控制系统有限公司 井下煤矿开采煤层或岩层的注水方法
CN113914856A (zh) * 2021-09-26 2022-01-11 北京天玛智控科技股份有限公司 煤层注水装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101936164A (zh) * 2010-08-17 2011-01-05 天地科技股份有限公司 极软厚煤层超前支护抱采放顶煤采煤法与液压支架结构
CN102155249A (zh) * 2011-03-11 2011-08-17 中国矿业大学 一种采空区下方巷道顶板支护方法
CN103291304A (zh) * 2013-06-28 2013-09-11 中国矿业大学 一种综采工作面超采高顶煤的回收方法
CN103362509A (zh) * 2013-07-15 2013-10-23 中国矿业大学 煤矿近松散含水层开采上限评价及开采危险性评价方法
CN104912557A (zh) * 2015-05-06 2015-09-16 四川达竹煤电(集团)有限责任公司小河嘴煤矿 高效薄煤层成套采煤设备及采煤方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101936164A (zh) * 2010-08-17 2011-01-05 天地科技股份有限公司 极软厚煤层超前支护抱采放顶煤采煤法与液压支架结构
CN102155249A (zh) * 2011-03-11 2011-08-17 中国矿业大学 一种采空区下方巷道顶板支护方法
CN103291304A (zh) * 2013-06-28 2013-09-11 中国矿业大学 一种综采工作面超采高顶煤的回收方法
CN103362509A (zh) * 2013-07-15 2013-10-23 中国矿业大学 煤矿近松散含水层开采上限评价及开采危险性评价方法
CN104912557A (zh) * 2015-05-06 2015-09-16 四川达竹煤电(集团)有限责任公司小河嘴煤矿 高效薄煤层成套采煤设备及采煤方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
何风强等: "大倾角松散厚煤层高压深孔注水围岩控制技术优化实践", 《中国煤炭》 *
王东攀等: "大倾角松散厚煤层高压深孔注水技术研究与应用", 《煤炭工程》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106401623A (zh) * 2016-11-09 2017-02-15 安徽理工大学 一种类土质煤工作面全封闭采煤装置及其采煤方法
WO2018086328A1 (zh) * 2016-11-09 2018-05-17 安徽理工大学 一种类土质煤工作面全封闭掩护支架装置
WO2018086327A1 (zh) * 2016-11-09 2018-05-17 安徽理工大学 一种类土质煤工作面全封闭采煤装置及其采煤方法
CN110130926A (zh) * 2019-05-24 2019-08-16 翟文 一种煤矿综采工作面综合支护方法
CN110646583A (zh) * 2019-10-09 2020-01-03 中煤科工集团重庆研究院有限公司 一种煤层注水相似模拟试验的方法及装置
CN110646583B (zh) * 2019-10-09 2022-02-22 中煤科工集团重庆研究院有限公司 一种煤层注水相似模拟试验的方法及装置
CN112879073A (zh) * 2021-03-22 2021-06-01 北京天地玛珂电液控制系统有限公司 井下煤矿开采煤层或岩层的注水方法
CN112879073B (zh) * 2021-03-22 2024-01-26 北京天玛智控科技股份有限公司 井下煤矿开采煤层或岩层的注水方法
CN113914856A (zh) * 2021-09-26 2022-01-11 北京天玛智控科技股份有限公司 煤层注水装置

Also Published As

Publication number Publication date
CN105863639B (zh) 2018-01-16

Similar Documents

Publication Publication Date Title
CN105863639A (zh) 松散煤层的采煤方法
CN109763822A (zh) 大倾角厚煤层多区段无煤柱错层护巷及段间煤柱充填方法
CN105134286B (zh) L型井采空区瓦斯抽采方法
CN103016047B (zh) 综放工作面顶板走向长钻孔抽放采空区瓦斯方法
CN103557000B (zh) 利用抽帮充填防治沿空巷道冲击地压的方法
CN110344831B (zh) 切顶卸压无煤柱沿空自成巷留巷方法
CN103104259A (zh) 倾斜破碎矿体分段顶板再造中深孔落矿充填采矿法
US20180195386A1 (en) Parallel digging, mining and filling operation coal mining method for controlling overlaying strata fracture and surface subsidence
CN108868833A (zh) 一种在u型钢支护巷道内进行切顶卸压巷内沿空留巷的方法
AU2021106168A4 (en) High-gas Coal Seam Group Pressure Relief Mining Method Based on Gob-side Entry Retaining in the First Mining Whole Rock Pressure Relief Working Face
CN103899350A (zh) 综放工作面架载顶煤瓦斯抽采系统
CN102418525B (zh) 软煤层长壁大采高综合机械化采煤末采方法
CN103899348A (zh) 一种采煤工作面瓦斯快速抽采方法
CN102943690A (zh) 采煤工作面顶板离层水的防治方法
CN108843354A (zh) 一种倾斜特厚煤层巷顶沿空掘巷非对称锚秆支护方法
CN103485786A (zh) 一种急倾斜煤层走向长壁机械化开采方法
CN102966359A (zh) 工作面过风氧化带区顶板控制方法
CN104088638A (zh) 大倾角煤层长壁大采高工作面煤壁片帮及冒顶控制技术
CN106703808A (zh) 厚煤层综放面回采巷道钻孔预裂提高端部顶煤放出率的方法
CN104727847B (zh) 充填墙体自消除的无煤柱沿空留巷方法
CN112302704A (zh) 一种采煤工作面裂隙带瓦斯抽采方法
CN105888664A (zh) 极厚硬煤开采方法
CN105240012A (zh) 一种实现煤柱同采的f型区段采煤方法
CN104594943A (zh) 一种用于瓦斯治理的地面复合l型钻井和瓦斯治理方法
CN105134212B (zh) 一种三软厚煤层巷道沿顶掘进综放开采保证回采率的方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180116

Termination date: 20190527

CF01 Termination of patent right due to non-payment of annual fee