CN105863023B - A kind of sponge urban construction ground water recharging well and quick well formation method - Google Patents

A kind of sponge urban construction ground water recharging well and quick well formation method Download PDF

Info

Publication number
CN105863023B
CN105863023B CN201610370063.5A CN201610370063A CN105863023B CN 105863023 B CN105863023 B CN 105863023B CN 201610370063 A CN201610370063 A CN 201610370063A CN 105863023 B CN105863023 B CN 105863023B
Authority
CN
China
Prior art keywords
hard foam
well
layer
sand
urban construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610370063.5A
Other languages
Chinese (zh)
Other versions
CN105863023A (en
Inventor
张保祥
张鹏云
徐运海
张超
黄继文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Water Resources Research Institute of Shandong Province
Original Assignee
Water Resources Research Institute of Shandong Province
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Water Resources Research Institute of Shandong Province filed Critical Water Resources Research Institute of Shandong Province
Priority to CN201610370063.5A priority Critical patent/CN105863023B/en
Publication of CN105863023A publication Critical patent/CN105863023A/en
Application granted granted Critical
Publication of CN105863023B publication Critical patent/CN105863023B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F1/00Methods, systems, or installations for draining-off sewage or storm water
    • E03F1/002Methods, systems, or installations for draining-off sewage or storm water with disposal into the ground, e.g. via dry wells

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Sewage (AREA)
  • Road Paving Structures (AREA)

Abstract

A kind of sponge urban construction ground water recharging well, it is related to pumping equipment technical field, including the drilling for penetrating aquiclude and aquifer sand layer, one hard foam is installed in the drilling, sandy gravel stratum loaded filter is provided between the hard foam and foot of hole, there are one layer of geotextiles in hard foam external sheath, distance to ground 1 at the top of hard foam is to be placed with one layer of layer of sand loaded filter at 20 30cm extremely to flush with road surface, present invention also offers the inverted well quick well formation method, punched using rig, sand gravel loaded filter is laid in foot of hole;Hard foam is placed with sand gravel loaded filter, geotextiles are coated with the outside of the hard foam;Layer of sand loaded filter is laid in geotextiles again, flushed with ground, forms ground water recharging well.The present invention can solve the problem that underground water infiltrates the problems such as complicated, cost is high, the time is long of being constructed present in facility in existing sponge urban construction.

Description

A kind of sponge urban construction ground water recharging well and quick well formation method
Technical field
The present invention relates to pumping equipment technical field, specifically a kind of sponge urban construction ground water recharging well and fast Fast well completion method.
Background technology
At present, generally set in sponge Process of Urban Development by porous pavement, the infiltration pool, seepage well, the wet pool, Rain-fed wetland etc. Apply and oozed under making a part of rainwater after confluxing, purifying, but other facilities enter because not cutting through overlying aquiclude in addition to seepage well It is bad to ooze effect, seepage well generally use heavy caliber shaft drilling and machine dig a well and backfill sand gravel loaded filter, construction is complicated, cost is high, Construction area is more, the time is relatively long.
The content of the invention
It is directed to underground water in existing sponge urban construction and infiltrates constructed present in facility complicated, cost height, time length The problems such as, the present invention provides a kind of sponge urban construction ground water recharging well, can avoid the generation of above mentioned problem.
The technical scheme adopted by the invention to solve the technical problem is that:
A kind of sponge urban construction ground water recharging well, including the drilling for penetrating aquiclude and aquifer sand layer, in institute State in drilling and a hard foam is installed, sandy gravel stratum loaded filter is provided between the hard foam and foot of hole, in hard Sponge external sheath has one layer of geotextiles, and the distance to ground 1 at the top of hard foam is to be placed with one layer of layer of sand at 20-30cm Loaded filter extremely flushes with road surface.
Further, the diameter of the hard foam is more than boring aperture, and the hard foam be divided into some sections and according to It is secondary to be arranged in the drilling.
Further, the hole month is arranged to back taper, and road gradient is 3%-5%, at the oblique drilling hole of road surface.
Further, in addition to a wellhead connection device, the wellhead connection device include inverted well joint, permeable time Well lid, sponge strip and interface channel are filled, an inverted well joint is provided with the top of the hard foam, in the inverted well joint Upper spiral is provided with permeable recharge well lid, is provided with interface channel on hard foam periphery, sea is placed with the interface channel Continuous bar, the shape of the sponge strip and interface channel match.
Further, the interface channel be U-lag, deep-slotted chip breaker or other there is the cell body of connection ability.
Further, a steel wire is coated with the outside of interface channel, spongy layer is provided with the inside of the steel wire.
Further, a road side stone is provided with above the hard foam, is provided with the road side stone for rainwater The L-shaped passage of water conservancy diversion.
Further, a vertical passage, the vertical passage are provided with the middle part of the hard foam of filling in the middle part of the drilling For cross scarfing, circular port or other shapes hole.
Further, a wire is provided with the vertical passage, is connected with to monitor level of ground water on the wire The sensor of water quality, water temperature.
Further, an outer tube is provided with the middle part of the hard foam of filling in the middle part of the drilling, is provided with the outer tube Some flushing holes, the water pipe for drawing water is nested with the outer tube or the wire of sensor is installed.
Present invention also offers a kind of sponge urban construction ground water recharging well quick well formation method, comprise the following steps:
(a) punched using rig, bore diameter selects according to actual conditions;
(b) sand gravel loaded filter is laid in foot of hole;
(c) hard foam is placed with sand gravel loaded filter, the hard foam outside is coated with geotextiles or will Wrap geotextiles hard foam be fitted into after permeable metal hose or rigid plastics flexible pipe again under into drilling;
(d) one layer of geotextiles are placed with the top of hard foam, then layer of sand loaded filter is laid in geotextiles, with ground Face flushes, and forms ground water recharging well.More serious area is polluted on road surface or roof, can suitably increase top anti-filter layer of sand Thickness or the infiltration that initial polluted rain water is avoided with permeable well lid above ground level.
The beneficial effects of the invention are as follows:
The present invention can solve the problem that underground water infiltrates complicated, cost of being constructed present in facility in existing sponge urban construction High, the problems such as time is long.And directly using the well completion method of rig punching, filled with high-density sponge, easy to process, backfill side Just, avoiding common seepage well needs to buy a variety of backfilling materials, the shortcomings that wasting time and energy.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are the present invention Part preferred embodiment, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is the structural representation of first embodiment;
Fig. 2 is the structural representation of first embodiment when there is a lawn inclination and side;
Fig. 3 is the structural representation of second embodiment;
Fig. 4 is the structural representation of the second embodiment of longitudinal direction and lateral connection;
Fig. 5 is the structural representation of 3rd embodiment;
Fig. 6 is the structural representation of fourth embodiment;
Fig. 7 is the structural representation of the 5th embodiment.
In figure:1 road surface, 2 drillings, 3 layer of sand loaded filters, 4 hard foams, 5 aquicludes, 6 aquifer sand layers, 7 sand gravels are anti- Filtering layer, 8 lawns, 9 permeable recharge well lids, 10 inverted well joints, 11 hard foam bars, 12 interface channels, 13 road side stones, 14L shapes Passage, 15 vertical passages, 16 water pipes, 17 outer tubes, 18 flushing holes.
Embodiment
Below in conjunction with specific embodiment and accompanying drawing, the technical scheme in the embodiment of the present invention is carried out clearly and completely Description, it is clear that described embodiment is only a part of preferred embodiment of the present invention, rather than whole embodiments.This Art personnel can do similar deformation in the case of without prejudice to intension of the present invention, therefore the present invention is not by following public The limitation of specific embodiment.
First embodiment
As depicted in figs. 1 and 2, the sponge urban construction ground water recharging well includes a drilling 2, and the drilling 2 is settable Roadside, lawn, parking lot, below porous pavement, the place such as in cell or unit institute, also can the infiltration pool, seepage well, the wet pool, Used inside Rain-fed wetland etc..
As described in Figure 2, the drilling 2 is arranged on road surface 1 at lawn 8 or in lawn 8.The road surface 1 can be built for city If common horizontal slope is 1.5%-2% road surface in, also can further be optimized for gradient 3%-5% road surface 1, not change original Road structure, when there is precipitation generation, rain (or snow melt) water will be quickly flow into drilling 2 along slightly-inclined road surface 1.
It is first anti-in the 2 bottoms laying 20-30cm sand gravels that drill after drilling 2 cuts through aquiclude 5 to aquifer sand layer 6 into well Filtering layer 7, then by hard foam 4 on the sand gravel loaded filter 7 of bottom.
A kind of more excellent design, the external sheath of the hard foam 4 have one layer of geotextiles.
A kind of more excellent design, the diameter of the hard foam 4 are more than boring aperture.When so installing sponge and the borehole wall it Between space is not present.
The hard foam 4 can be sized for one section or several sections (can make one section of 5-10 rice) by drilling depth, firmly Distance of the top of matter sponge 4 to ground 1 is 20-30cm, places one layer bigger than orifice area of geotextiles, Ran Houzai again thereon Layer of sand loaded filter 3 mat formation to being flushed with road surface 1 or lower slightly (can mat formation common soil layer above again when lower slightly), forms underground water and returns Fill well.
This inverted well, first is directly punched using rig, is filled with high-density sponge, easy to process, and backfill is convenient, and Avoiding common seepage well needs to buy a variety of backfilling materials, the shortcomings that wasting time and energy.
Although also there is similar seepage well to carry out backfill operation, need to support using wall casing, this well is in rain Easily cause blocking during Water Spreading, dangerous if well head is open type, night or other cas fortuits are easy Fall into wherein, cause casualties.And the inverted well in the application, using hard foam, hard foam first plays support and made With, borehole collapse or sinking of ground will not be caused, even if can occur drill local deformation situation, as sponge buffering make With not influenceing rain infiltration, more will not cause injures and deaths to personnel.
Compared with common seepage well, because water is immersion liquid, and sponge has absorption, permeable and filtration, in sponge The infiltration of current can be rapidly carried out under suction-operated, effect is infiltrated in enhancing, while can filter out the impurity in rainwater.Simultaneously The improvement project of the drilling is more convenient, and his use is done as that need to change, it is not necessary to secondary punching, it is time saving and energy saving.
Second embodiment
As shown in Figure 3 and Figure 4, it is to be added with wellhead connection device, the well head with the difference of first embodiment Attachment means include an inverted well joint 10, permeable recharge well lid 9, sponge strip 11 and interface channel 12.In the hard foam 4 Top be provided with an inverted well joint 10, spiral is provided with permeable recharge well lid 9 on the inverted well joint 10, and well lid omits It is above the ground level, this design can avoid early-stage rainwater pollution problem, and later stage clean rainwater can be by having chemosmotic permeable time Well lid 9 is filled to penetrate into.
The side of hard foam 4 is provided with interface channel 12, as described in Figure 4, some connections are provided with hard foam periphery Passage 12, the interface channel 12 can be U-lag, deep-slotted chip breaker or other there is the cell body of connection ability, in the interface channel Sponge strip 11 is placed with 12, the shape of the sponge strip 11 and interface channel 12 matches.Vertical or horizontal connection is set Passage 12, can the intercommunication between different inverted wells, the rainwater for having little time to infiltrate can be oriented to other inverted wells.
A kind of more excellent design, a steel wire is coated with the outside of interface channel, sponge is provided with the inside of the steel wire Layer, this design steel wire provide certain support force, and spongy layer can rapidly carry out the infiltrating to interface channel of moisture In, beneficial to the water conservancy diversion of rainwater.
3rd embodiment
As shown in figure 5, it is the top of hard foam 4 is provided with a road side stone with the difference of first embodiment 13, the L-shaped passage for rainwater diversion is provided with the road side stone.
A kind of more excellent design, layer of sand loaded filter is provided between hard foam and road side stone.
It is this to be designed on the basis of existing road is not destroyed, transformed, cost is low, and and can carries out rain well The infiltration of water.
Fourth embodiment
It is with the difference of above-mentioned first three embodiment, is provided with the middle part of the hard foam of the middle part of drilling 2 filling One vertical passage, this vertical passage are cross scarfing, circular port, or other shapes hole.
This design, can be when needing moisture, by going deep into water pipe or other water drawing devices with the vertical passage to enter Row water intaking uses or detection, chemical examination.
This design, the inverted well can be also converted into a detection well or monitoring well, be provided with the vertical passage One wire, sensor is connected with the wire, to detect or monitor level of ground water, water quality, water temperature or other specification.It is described Sensor is level sensor, water quality sensor or temperature sensor.
5th embodiment is as shown in Figure 7.
Part unlike the embodiments above is, the middle part of hard foam 4 of the middle part of drilling 2 filling is provided with an outer tube 17, some flushing holes 18 are provided with the outer tube 17, can be in the outer of hard foam 4 after rainwater etc. is by multiple recharge Side remains dust impurity or other articles, these impurity can be washed from into hard to the bath of hard foam 4 by flushing hole 18 The outside of sponge 4, be advantageous to more preferable progress recharge work faster.
Also it is nested with the outer tube 17 for drawing water or the water pipe of water sampling 16, or leading for sensor is installed Line.
The invention also discloses a kind of sponge urban construction ground water recharging well quick well formation method, comprise the following steps:
(a) punched using rig, bore diameter selects according to actual conditions;
(b) sand gravel loaded filter is laid in foot of hole;
(c) hard foam is placed with sand gravel loaded filter, the hard foam outside is coated with geotextiles or will Wrap geotextiles hard foam be fitted into after permeable metal hose or rigid plastics flexible pipe again under into drilling;
(d) one layer of geotextiles are placed with the top of hard foam, then layer of sand loaded filter is laid in geotextiles, with Ground flushes, and forms ground water recharging well.More serious area is polluted on road surface or roof, can suitably increase top anti-filter layer of sand Thickness or the infiltration of initial polluted rain water is avoided with permeable well lid above ground level.
It is the known technology of those skilled in the art in addition to the technical characteristic described in specification.

Claims (7)

1. a kind of sponge urban construction ground water recharging well, it is characterized in that, including a brill for penetrating aquiclude and aquifer sand layer Hole, a hard foam is installed in the drilling, sandy gravel stratum loaded filter is provided between the hard foam and foot of hole, There are one layer of geotextiles in hard foam external sheath, the distance to road surface (1) at the top of hard foam is to be placed with 20-30cm One layer of layer of sand loaded filter with road surface to flushing, and the diameter of the hard foam is more than boring aperture, and the hard foam is divided into Some sections and it is sequentially arranged in the drilling, the hole month is arranged to back taper, and road gradient is 3%-5%, road At the oblique drilling hole of face, in addition to a wellhead connection device, the wellhead connection device include inverted well joint, permeable inverted well Lid, sponge strip and interface channel, are provided with an inverted well joint, the spiral shell on the inverted well joint at the top of the hard foam Rotation is provided with permeable recharge well lid, is provided with interface channel on hard foam periphery, sponge strip is placed with the interface channel, The shape of the sponge strip and interface channel matches.
2. a kind of sponge urban construction ground water recharging well according to claim 1, it is characterized in that, the interface channel is U-lag, deep-slotted chip breaker or other there is the cell body of connection ability, a steel wire, the steel wire are coated with the outside of interface channel Inner side is provided with spongy layer.
3. a kind of sponge urban construction ground water recharging well according to claim 1, it is characterized in that, on the hard foam Side is provided with a road side stone, and the L-shaped passage for rainwater diversion is provided with the road side stone.
4. a kind of sponge urban construction ground water recharging well according to claim 1, it is characterized in that, filled out in the middle part of the drilling A vertical passage is provided with the middle part of the hard foam filled, the vertical passage is cross scarfing, circular port or other shapes Hole.
5. a kind of sponge urban construction ground water recharging well according to claim 4, it is characterized in that, in the vertical passage A wire is provided with, is connected with to monitor the sensor of level of ground water water quality, water temperature on the wire.
6. a kind of sponge urban construction ground water recharging well according to claim 1, it is characterized in that, filled out in the middle part of the drilling An outer tube is provided with the middle part of the hard foam filled, some flushing holes are provided with the outer tube, use is nested with the outer tube In the water pipe to draw water or the wire for being provided with sensor.
7. a kind of sponge urban construction ground water recharging well quick well formation method, comprises the following steps:
(a) punched using rig, bore diameter selects according to actual conditions;
(b) sand gravel loaded filter is laid in foot of hole;
(c) hard foam is placed with sand gravel loaded filter, geotextiles is coated with the outside of the hard foam or will wrap The hard foam of geotextiles be fitted into after permeable metal hose or rigid plastics flexible pipe again under into drilling;
(d) one layer of geotextiles are placed with the top of hard foam, then layer of sand loaded filter is laid in geotextiles, it is neat with ground It is flat, ground water recharging well is formed, more serious area is polluted on road surface or roof, can suitably increase the thickness of top anti-filter layer of sand Or the infiltration of initial polluted rain water is avoided with permeable well lid above ground level.
CN201610370063.5A 2016-05-30 2016-05-30 A kind of sponge urban construction ground water recharging well and quick well formation method Expired - Fee Related CN105863023B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610370063.5A CN105863023B (en) 2016-05-30 2016-05-30 A kind of sponge urban construction ground water recharging well and quick well formation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610370063.5A CN105863023B (en) 2016-05-30 2016-05-30 A kind of sponge urban construction ground water recharging well and quick well formation method

Publications (2)

Publication Number Publication Date
CN105863023A CN105863023A (en) 2016-08-17
CN105863023B true CN105863023B (en) 2017-12-15

Family

ID=56641672

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610370063.5A Expired - Fee Related CN105863023B (en) 2016-05-30 2016-05-30 A kind of sponge urban construction ground water recharging well and quick well formation method

Country Status (1)

Country Link
CN (1) CN105863023B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106436728B (en) * 2016-11-07 2019-04-09 天津城建大学 High molecular material tubulose seepage well and construction method
CN106758668A (en) * 2016-12-01 2017-05-31 北京东方凌云科技有限公司 A kind of new method of recharge underground water
CN106522306A (en) * 2016-12-17 2017-03-22 山东省水利科学研究院 Riverside underground water recharging system with composite functions of charging and pumping
CN109208690A (en) * 2017-07-06 2019-01-15 天津大学 A kind of urban green space rapid construction and cheap rainwater collection utilization unit
CN108999262B (en) * 2018-09-12 2021-02-12 广州园林建筑规划设计研究总院 Sunken greenbelt structure for sponge city
CN111677082A (en) * 2020-06-17 2020-09-18 西北综合勘察设计研究院 Automatic infiltrating irrigation system for reducing urban inland inundation
CN113585436B (en) * 2021-08-13 2023-07-18 中国一冶集团有限公司 Water permeable pipe pile system
CN115369984B (en) * 2022-09-22 2023-10-31 江苏龙腾工程设计股份有限公司 Annular sponge seepage well and construction method thereof

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7041213B1 (en) * 2003-07-14 2006-05-09 Quiktrip Corporation Stormwater pretreatment and disposal system
CN202099866U (en) * 2011-06-01 2012-01-04 洛阳市淼泉给水排水设计院 Road rain underground recharge device
JP6152988B2 (en) * 2014-06-20 2017-06-28 加藤商事株式会社 Drainage equipment repair device and repair method
CN204530361U (en) * 2015-04-21 2015-08-05 葛洲坝集团试验检测有限公司 One can rebuild city spongy structure
CN204919383U (en) * 2015-08-26 2015-12-30 衡水宝丰橡塑制品有限公司 Plastics french drain
CN105507365A (en) * 2016-01-18 2016-04-20 济南大学 Circular inverted filter well mouth device with two purposes of recharging and pumping
CN205822409U (en) * 2016-05-30 2016-12-21 山东省水利科学研究院 A kind of sponge urban construction ground water recharging well

Also Published As

Publication number Publication date
CN105863023A (en) 2016-08-17

Similar Documents

Publication Publication Date Title
CN105863023B (en) A kind of sponge urban construction ground water recharging well and quick well formation method
CN103590425B (en) A kind of Peaty soft soil stratum subway station construction technology
US6382237B1 (en) Wide area water collection type underground water tank
KR100593786B1 (en) The construction of waterway for tunnel
LU500273B1 (en) New comprehensive dewatering and drainage method and drainage device for mudstone subway station
JP2009179945A (en) Well conduit for road and its construction method
CN103088836A (en) Sedimentation control method for pumping water and performing reinjection in well casing simultaneously
CN111139852A (en) Water-rich sandy gravel stratum high-permeability ultra-deep foundation pit dewatering construction method
CN205822409U (en) A kind of sponge urban construction ground water recharging well
CN114606964A (en) Foundation pit dewatering method used under complex geological condition
CN213805707U (en) Road enhancement mode infiltration well and sleeve based on sponge city construction
CN211172034U (en) Water-rich basement falls drainage structures
JP4465029B1 (en) Rainwater infiltration mine excavator, rainwater infiltration pipe laying method and rainwater infiltration structure
TWI328061B (en) Three-dimensional drainage process and structure in the gravity field
CN203066092U (en) Pumping and recharging dual-purpose well casing
JP4648991B1 (en) Rainwater infiltration mine drilling equipment
CN217325725U (en) Desert area sponge city construction-based groundwater recharge well
CN109630192A (en) A kind of precipitation method suitable for the construction of half diagenesis bored tunnel
CN108570998A (en) The construction method of lowering of watertable during a kind of subgrade construction
JP2004218308A (en) Construction method for rainwater permeating pot
TWI494484B (en) Deep injection structure of permeable pavement and construction method thereof
CN221167881U (en) Foundation pit hydrophobic structure suitable for under rich water stratum condition
US20060171781A1 (en) Pipeline trench system and method of construction
CN217839567U (en) Asphalt pavement structure permeates water
JP7345165B2 (en) Non-overflow type infiltration system and its construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171215

Termination date: 20210530