CN105862875A - 一种支护结构及其施工方法 - Google Patents
一种支护结构及其施工方法 Download PDFInfo
- Publication number
- CN105862875A CN105862875A CN201610236155.4A CN201610236155A CN105862875A CN 105862875 A CN105862875 A CN 105862875A CN 201610236155 A CN201610236155 A CN 201610236155A CN 105862875 A CN105862875 A CN 105862875A
- Authority
- CN
- China
- Prior art keywords
- wall
- ground
- concrete pile
- bored concrete
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
本发明公开了一种支护结构,包括数个地连墙和数个灌注桩;所述地连墙是采用搅拌法、旋喷法、压密注浆法形成;每个所述地连墙的两侧分别设置有灌注桩,每个所述地连墙通过所述灌注桩连接形成桩墙支护结构;所述地连墙和灌注桩通过埋设于二者边缘处的预埋件搭接咬合;所述预埋件的两端沿所述地连墙的侧面水平折叠形成与所述预埋件的主体垂直且相互平行的预埋件法兰;所述预埋件上设置有一止水构件;所述地连墙、灌注桩和止水构件形成止水桩墙。本发明还公开了一种支护结构的施工方法,简单方便且节约工程造价。
Description
技术领域
本发明涉及建筑领域,具体涉及一种桩墙结合支护结构及其施工方法。
背景技术
随着经济的发展,土地资源越趋于紧张。建筑工程中基坑开挖的深度也越来越深,很多大型建筑物的深度超过15米,这对于基坑支护结构的要求就越高。在土层条件下开挖地下建构物施工空间一基坑时,其侧壁非常容易向坑内倒塌,必须建构临时加固结构用以挡土支护,才可保证基坑和地下建构物施工安全以及基坑四周已有建构物的安全。
相关技术中存在以下技术问题:地连墙和灌注桩分开,不能成为一个整体,或者现有的可以作为一个整体使用的墙桩支护结构复杂,造价成本高。
发明内容
本发明的目的在于避免现有技术中的上述不足之处而提供一种桩墙结合支护结构及其施工方法。
本发明的目的通过以下技术方案实现:
提供了一种支护结构,其特征在于:包括数个地连墙和数个灌注桩;所述地连墙是采用搅拌法、旋喷法或压密注浆法形成;每个所述地连墙的两侧分别设置有灌注桩,每个所述地连墙通过所述灌注桩连接形成桩墙支护结构;所述地连墙和灌注桩通过埋设于二者边缘处的预埋件搭接咬合;所述预埋件的两端沿所述地连墙的外表面面水平衍生,并折叠形成与所述预埋件的主体垂直且相互平行的预埋件法兰;所述预埋件上设置有一止水构件;所述地连墙、灌注桩和止水构件形成止水桩墙。
优选地,所述预埋件上还连接有沿地连墙方向延伸的锚固件。
优选地,所述止水构件为止水钢板,其通过焊接固定于所述预埋件的中间位置。
优选地,所述止水钢板为5×50止水钢板;所述锚固件包括锚固钢筋和高分子材料制成的构件;所述锚固件对称焊接于所述止水构件的两侧;所述预埋件的主体的长度与地连墙的厚度相适应,所述预埋件法兰的长度大于等于20mm。
优选地,所述支护结构可根据场地条件、地质条件以及施工要求,可形变成折线型和/或拐角型。
优选地,地连墙厚度为700mm~900mm;地连墙墙长为5000mm~7000mm。
优选地,所述地连墙厚度为800mm;所述地连墙墙长为6000mm;地连墙高度与所述灌注桩长度相差的预定值范围大于等于1500mm;灌注桩直径大于等于地连墙厚度+400mm。
优选地,地连墙与灌注桩的咬合段的长度大于等于200mm;相邻所述地连墙与灌注桩的咬合段之间的邻接直径等于1/2灌注桩直径与地连墙和灌注桩的咬合段之差。
优选地,所述地连墙的墙顶和灌注桩的桩顶标高一致。
一种支护结构的施工方法,其特征在于,包括以下步骤:
(1)施工准备,平整施工场地;(2)施工放线:根据施工现场,布设施工测量控制点和水准点,对周边轴线进行精确定位放样;(3)灌注桩施工:按灌注桩的作业方式钻孔,设计底标高,形成用于灌注所述灌注桩的桩孔;(4)灌注桩养护;(5)两桩之间的地连墙施工。
本发明所提供的实施例的有益效果:
(1)本发明的实施例所提供的一种支护结构,其与相关技术中的地连墙支护结构相比,同厚度平面刚度提高18%以上;此外,桩、墙节点合理,施工方便,确保了地连接墙接头质量,有效地消除了地连墙接头的质量通病。
(2)本发明的实施例还提供了一种适用于本发明的施工工艺,由于灌注桩和地连墙具有成熟的施工工艺,故本发明施工简单,采用先施工桩、后施工地连墙,地连墙施工无需跳槽施工,可以连续施工。
(3)本发明灌注桩的造价比地连墙低,桩墙结合支护结构施工总费用较低,可大量的节约人力物力成本,可广泛推广适用。
附图说明
利用附图对发明作进一步说明,但附图中的实施例不构成对本发明的任何限制,对于本领域的普通技术人员,在不付出创造性劳动的前提下,还可以根据以下附图获得其它的附图。
图1是本发明的实施例所提供的一种支护结构的平面图。
图2是本发明的实施例所提供的一种支护结构的立面图。
图3是本发明的实施例所提供的一种支护结构的灌注桩和地连墙咬合段以及预埋件的放大图。
图4是本发明的实施例所提供的一种支护结构的折线型布置图。
图5是本发明的实施例所提供的一种支护结构的拐角型布置图。
其中:1-地连墙,2-灌注桩,3-预埋件,4-止水构件,5-锚固件,6-预埋件法兰,7-墙顶,8-桩顶,B-地连墙厚度,L-地连墙长度,D-灌注桩直径,d-桩墙咬合段直径,D1-邻接直径,H墙-地连墙高度,H桩-灌注桩长度。
具体实施方式
结合以下实施例对本发明作进一步描述。
本发明的实施例所提供的一种支护结构,如图1至图5所示,包括数个地连墙1和数个灌注桩2;所述地连墙1采用搅拌法、旋喷法或压密注浆法形成;每个所述地连墙1的两侧分别设置有灌注桩2,每个所述地连墙1通过所述灌注桩2连接形成桩墙支护结构;所述地连墙1和灌注桩2通过埋设于二者边缘处的预埋件3搭接咬合;所述预埋件3的两端沿所述地连墙的外表面面水平延伸,并折叠形成与所述预埋件的主体垂直且相互平行的预埋件法兰6;所述预埋件3上设置有一止水构件4;所述地连墙1、灌注桩2和止水构件4形成止水桩墙。
作为优选,所述预埋件3上还连接有沿地连墙1方向延伸的锚固件5。在本实施例中,所述止水构件4为止水钢板,其通过焊接固定于所述预埋件3的中间位置。进一步地,所述止水钢板为5×50止水钢板;所述锚固件5包括锚固钢筋和高分子材料制成的构件;所述锚固件5对称焊接于所述止水构件4的两侧;所述预埋件3的主体的长度与地连墙1的厚度相适应,所述预埋件法兰6的长度大于等于20mm。
此外,所述支护结构可根据场地条件、地质条件以及施工要求,可形变成如图4、图5所示的折线型和/或拐角型,在本实施方式中,折线型为人字型,拐角的范围大于等于90°。
作为优选,所述地连墙厚度B为700mm~900mm;所述地连墙墙长L为5000mm~7000mm。
作为优选,所述地连墙厚度B为800mm;所述地连墙墙长L为6000mm;所述地连墙高度H墙与所述灌注桩长度H桩相差的预定值范围大于等于1500mm;所述灌注桩直径D大于等于地连墙厚度+400mm。
作为优选,所述地连墙与灌注桩的咬合段d的长度大于等于200mm;相邻所述地连墙与灌注桩的咬合段之间的邻接直径D1=1/2灌注桩直径D-地连墙与灌注桩的咬合段d。
作为优选,所述地连墙1的墙顶7和灌注桩2的桩顶8标高一致。
一种支护结构的施工方法,包括以下步骤:(1)施工准备,平整施工场地;(2)施工放线:根据施工现场,布设施工测量控制点和水准点,对周边轴线进行精确定位放样;(3)灌注桩2施工:按灌注桩2的作业方式钻孔,设计底标高,形成用于灌注所述灌注桩2的桩孔;(4)灌注桩养护;(5)两桩之间的地连墙施工。
最后应当说明的是,以上实施例仅用以说明本发明的技术方案,而非对本发明保护范围的限制,尽管参照较佳实施例对本发明作了详细地说明,本领域的普通技术人员应当理解,可以对本发明的技术方案进行修改或者等同替换,而不脱离本发明技术方案的实质和范围。
Claims (10)
1.一种支护结构,其特征在于:包括数个地连墙(1)和数个灌注桩(2);所述地连墙(1)采用搅拌法、旋喷法或压密注浆法形成;每个所述地连墙(1)的两侧分别设置有灌注桩(2),每个所述地连墙(1)通过所述灌注桩(2)连接形成桩墙支护结构;所述地连墙(1)和灌注桩(2)通过埋设于二者边缘处的预埋件(3)搭接咬合;所述预埋件(3)的两端沿所述地连墙(1)的外表面水平延伸,并折叠形成与所述预埋件(3)的主体垂直且相互平行的预埋件法兰(6);所述预埋件(3)上设置有一止水构件(4);所述地连墙(1)、灌注桩(2)和止水构件(4)形成止水桩墙。
2.根据权利要求1所述的一种支护结构,其特征在于,所述预埋件(3)上还连接有沿地连墙方向延伸的锚固件(5)。
3.根据权利要求1所述的一种支护结构,其特征在于,所述止水构件(4)为止水钢板,其通过焊接固定于所述预埋件(3)的中间位置。
4.根据权利要求1所述的一种支付结构,其特征在于,所述止水钢板为5×50止水钢板;所述锚固件(5)包括锚固钢筋和高分子材料制成的构件;所述锚固件(5)对称焊接于所述止水构件(4)的两侧;所述预埋件(3)的主体的长度与地连墙的厚度相适应,所述预埋件法兰(6)的长度大于等于20mm。
5.根据权利要求1所述的一种支护结构,其特征在于,所述支护结构可根据场地条件、地质条件以及施工要求,可形变成折线型和/或拐角型。
6.根据权利要求1所述的一种支护结构,其特征在于,地连墙厚度(B)为700mm~900mm;地连墙墙长(L)为5000mm~7000mm。
7.根据权利要求6所述的一种支护结构,其特征在于,所述地连墙厚度(B)为800mm;所述地连墙墙长(L)为6000mm;地连墙高度(H墙)与灌注桩长度(H桩)相差的预定值范围大于等于1500mm;灌注桩直径(D)大于等于地连墙厚度(B)+400mm。
8.根据权利要求1所述的一种支护结构,其特征在于,地连墙与灌注桩的咬合段(d)的长度大于等于200mm;相邻所述地连墙与灌注桩的咬合段之间的邻接直径(D1)=1/2灌注桩直径(D)-地连墙与灌注桩的咬合段(d)。
9.根据权利要求1所述的一种支护结构,其特征在于,所述地连墙(1)的墙顶(7)和灌注桩(2)的桩顶(8)标高一致。
10.用于权利要求1所述的一种支护结构的施工方法,其特征在于,包括以下步骤:
(1)施工准备,平整施工场地;(2)施工放线:根据施工现场,布设施工测量控制点和水准点,对周边轴线进行精确定位放样;(3)灌注桩施工:按灌注桩的作业方式钻孔,设计底标高,形成用于灌注所述灌注桩的桩孔;(4)灌注桩养护;(5)两桩之间的地连墙施工。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610236155.4A CN105862875A (zh) | 2016-04-15 | 2016-04-15 | 一种支护结构及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610236155.4A CN105862875A (zh) | 2016-04-15 | 2016-04-15 | 一种支护结构及其施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105862875A true CN105862875A (zh) | 2016-08-17 |
Family
ID=56632383
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610236155.4A Pending CN105862875A (zh) | 2016-04-15 | 2016-04-15 | 一种支护结构及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105862875A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110331727A (zh) * | 2019-07-11 | 2019-10-15 | 江西建工第二建筑有限责任公司 | 灌注桩和地下连续墙相结合的支护结构及施工方法 |
CN110409511A (zh) * | 2019-07-24 | 2019-11-05 | 中铁二十局集团第四工程有限公司 | 一种咬合桩与地连墙接缝处止水方法 |
WO2021013200A1 (zh) * | 2019-07-24 | 2021-01-28 | 青岛理工大学 | 一种咬合桩与地连墙联合基坑支护结构及方法 |
CN112609708A (zh) * | 2020-12-14 | 2021-04-06 | 上海市基础工程集团有限公司 | 地下连续墙与咬合桩优化连接方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0941363A (ja) * | 1995-08-02 | 1997-02-10 | Kajima Corp | 簡易地下構築工法 |
JPH09242089A (ja) * | 1996-03-12 | 1997-09-16 | Fujita Corp | 山留め壁を利用した地下外壁 |
CN101503882A (zh) * | 2009-02-25 | 2009-08-12 | 中煤第三建设(集团)有限责任公司 | 逆作法施工的具有连体钢筋笼的地下连续墙的施工方法 |
CN101818496A (zh) * | 2009-02-25 | 2010-09-01 | 中煤第三建设(集团)有限责任公司 | 逆作法施工的具有连体钢筋笼的地下连续墙 |
CN101881033A (zh) * | 2009-05-08 | 2010-11-10 | 杨双来 | 地下工程逆向施工方法及装置 |
CN203530959U (zh) * | 2013-10-29 | 2014-04-09 | 肖金贵 | 一种高强度的地下连续墙 |
CN203821412U (zh) * | 2014-04-17 | 2014-09-10 | 广东省基础工程公司 | 一种疏排桩连续墙支护结构 |
CN104499489A (zh) * | 2013-06-14 | 2015-04-08 | 孔志坚 | 一种基坑施工方法 |
-
2016
- 2016-04-15 CN CN201610236155.4A patent/CN105862875A/zh active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0941363A (ja) * | 1995-08-02 | 1997-02-10 | Kajima Corp | 簡易地下構築工法 |
JPH09242089A (ja) * | 1996-03-12 | 1997-09-16 | Fujita Corp | 山留め壁を利用した地下外壁 |
CN101503882A (zh) * | 2009-02-25 | 2009-08-12 | 中煤第三建设(集团)有限责任公司 | 逆作法施工的具有连体钢筋笼的地下连续墙的施工方法 |
CN101818496A (zh) * | 2009-02-25 | 2010-09-01 | 中煤第三建设(集团)有限责任公司 | 逆作法施工的具有连体钢筋笼的地下连续墙 |
CN101881033A (zh) * | 2009-05-08 | 2010-11-10 | 杨双来 | 地下工程逆向施工方法及装置 |
CN104499489A (zh) * | 2013-06-14 | 2015-04-08 | 孔志坚 | 一种基坑施工方法 |
CN203530959U (zh) * | 2013-10-29 | 2014-04-09 | 肖金贵 | 一种高强度的地下连续墙 |
CN203821412U (zh) * | 2014-04-17 | 2014-09-10 | 广东省基础工程公司 | 一种疏排桩连续墙支护结构 |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110331727A (zh) * | 2019-07-11 | 2019-10-15 | 江西建工第二建筑有限责任公司 | 灌注桩和地下连续墙相结合的支护结构及施工方法 |
CN110331727B (zh) * | 2019-07-11 | 2024-04-02 | 江西建工第二建筑有限责任公司 | 灌注桩和地下连续墙相结合的支护结构及施工方法 |
CN110409511A (zh) * | 2019-07-24 | 2019-11-05 | 中铁二十局集团第四工程有限公司 | 一种咬合桩与地连墙接缝处止水方法 |
WO2021013200A1 (zh) * | 2019-07-24 | 2021-01-28 | 青岛理工大学 | 一种咬合桩与地连墙联合基坑支护结构及方法 |
CN110409511B (zh) * | 2019-07-24 | 2021-10-08 | 中铁二十局集团第四工程有限公司 | 一种咬合桩与地连墙接缝处止水方法 |
CN112609708A (zh) * | 2020-12-14 | 2021-04-06 | 上海市基础工程集团有限公司 | 地下连续墙与咬合桩优化连接方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101768961B (zh) | 一种型钢三轴水泥土搅拌桩的施工方法 | |
CN103572755B (zh) | 预应力混凝土预制桩 | |
CN101864773B (zh) | 一种深基坑支护工艺 | |
CN105155554B (zh) | 一种拱形支护体系的深基坑 | |
CN105133620B (zh) | 局部流塑状淤泥质土体坑中坑支护结构及其施工方法 | |
CN101597904B (zh) | 一种防水板桩围堰及其施工方法 | |
CN204253056U (zh) | 一种盾构机进出洞洞口加固结构 | |
CN105862875A (zh) | 一种支护结构及其施工方法 | |
KR102011321B1 (ko) | 변단면 각관을 이용한 환형 기초의 시공방법 및 그 기초 | |
CN203213124U (zh) | 一种钢板桩与水泥搅拌桩联合支护 | |
CN206916753U (zh) | 一种地下连续墙及其接缝处的止水结构 | |
CN110158649A (zh) | 一种沉井下沉施工时邻近地下管线的施工方法 | |
CN102966110A (zh) | 垂向组合式防渗止水帷幕结构及其施工方法 | |
CN206928305U (zh) | 一种刚性被动区扶壁式支护结构 | |
CN102134853A (zh) | Ct式锁口钢管桩基坑止水支护装置及工法 | |
CN103321246A (zh) | 采用地下连续墙的基坑施工方法 | |
CN113718820A (zh) | 一种海上风电钢管桩联合加固装置及加固方法 | |
CN109371980A (zh) | 喷锚逆作与冲孔桩组合的深基坑围护施工方法 | |
KR101021915B1 (ko) | 흙막이 공사용 차수 가시설 시공방법 | |
CN108149682A (zh) | 一种注浆护筒装置及采用该护筒装置的桩基成孔施工方法 | |
CN108570996B (zh) | 浅水淤泥条件下筑坝围堰方法 | |
CN202954371U (zh) | 垂向组合式防渗止水帷幕结构 | |
CN201943077U (zh) | Ct式锁口钢管桩止水帷幕 | |
CN110055973A (zh) | 施工空间受限时的高铁桥下基坑围护结构与止水方法 | |
CN105804090B (zh) | 一种室内桩墙支护结构及其施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C41 | Transfer of patent application or patent right or utility model | ||
CB03 | Change of inventor or designer information |
Inventor after: Wang Zhilong Inventor before: Xiao Rui |
|
COR | Change of bibliographic data | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20170117 Address after: 330001 Jianshe Road, Jiangxi Province, No. 173, Applicant after: JIANGXI THE SECOND CONSTRUCTION CO., LTD. Address before: Zhenhai District 315202 Zhejiang city of Ningbo Province Rong Luo Road No. 372 Applicant before: Xiao Rui |
|
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160817 |