CN203213124U - 一种钢板桩与水泥搅拌桩联合支护 - Google Patents
一种钢板桩与水泥搅拌桩联合支护 Download PDFInfo
- Publication number
- CN203213124U CN203213124U CN 201320203563 CN201320203563U CN203213124U CN 203213124 U CN203213124 U CN 203213124U CN 201320203563 CN201320203563 CN 201320203563 CN 201320203563 U CN201320203563 U CN 201320203563U CN 203213124 U CN203213124 U CN 203213124U
- Authority
- CN
- China
- Prior art keywords
- steel sheet
- pile
- piles
- cement
- sheet pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
一种钢板桩与水泥搅拌桩联合支护,包括由水泥土搅拌桩排列形成的止水帷幕,所述钢板桩设置于所述止水帷幕的内侧,在钢板桩之间设置预应力锚索。采用水泥土搅拌桩形成完整的止水帷幕,拉森钢板桩设置于水泥搅拌桩止水帷幕内侧,改密扣式钢板桩墙为疏列式或部分密扣式,特别是在设计锚索施工位置,预留一定宽度或取消该条钢板桩,在保证钢板桩墙水平受力的基础上,既满足基坑支护挡土止水完整性,又避免在钢板桩桩身开孔对钢板桩造成损害。
Description
技术领域
本实用新型涉及基坑开挖支护技术,尤其是一种钢板桩与水泥搅拌桩联合支护。
背景技术
珠三角地区是典型的三角洲相松软土层分布区,流塑状淤泥、松散而富水性强的砂土厚度大,工程性质差,基坑开挖时,其自稳高度低,易发生漏水涌砂事故,严重影响基坑周边环境安全,需采用可靠的支护方式进行临时支挡。目前公知的钢板桩用于基坑开挖支护,是仅利用拉森钢板桩作为基坑开挖围护结构,在基坑周边按“单独打入法”或“屏风式打入法”以震动锤将钢板桩打入土层中,钢板桩锁口式密扣排列,起到挡土及止水的双重作用。拉森钢板桩因质量可靠、施工速度快,可重复利用等诸多优点,广泛应用于基坑支护工程。
但是,由于珠三角地区浅部土层条件复杂,在填土中往往存在一些不明障碍物,如石块、碎砖块、旧木桩等,难于清除;且砂层密实度变化较大,钢板桩施工时经常出现“开叉”,特别在基坑转角处,钢板桩难以密扣;且钢板桩多次使用后,磨损较多,两侧锁扣处容易破损,从而导致钢板桩“开叉”现象较常见,开叉宽度最大可达200~400mm。这样钢板桩作为止水帷幕将无法封闭,导致基坑开挖时流土漏水,影响基坑及周边环境安全。另外,对于深基坑,钢板桩需与锚索联合使用控制侧向变形,由于钢板桩密扣连接,锚索施工时,需在已施工好的钢板桩桩身开孔,开孔孔径一般为150mm或180mm,甚至更大,严重破坏钢板桩的完整性和刚度,影响钢板桩的重复利用。
发明内容
本实用新型所要解决的技术问题是提供一种钢板桩与水泥搅拌桩联合支护,解决目前密扣式拉森钢板桩在施工中遇到的上述问题。
为解决上述技术问题,本实用新型的技术方案是:一种钢板桩与水泥搅拌桩联合支护,包括由水泥土搅拌桩排列形成的止水帷幕,所述钢板桩设置于所述止水帷幕的内侧,在钢板桩之间设置预应力锚索。采用水泥土搅拌桩形成完整的止水帷幕,拉森钢板桩设置于水泥搅拌桩止水帷幕内侧,改密扣式钢板桩墙为疏列式或部分密扣式,特别是在设计锚索施工位置,预留一定宽度或取消该条钢板桩,在保证钢板桩墙水平受力的基础上,既满足基坑支护挡土止水完整性,又避免在钢板桩桩身开孔对钢板桩造成损害。
作为改进,所述钢板桩采用疏列式或部分密扣式布置。水泥土搅拌桩墙既具有止水帷幕的功能,又具备一定的力学强度,兼起一定的挡土作用,因此作为水平受力体系的钢板桩可以灵活布置。特别在基坑转角处,钢板桩难以密扣的问题得到有效解决,疏列式钢板桩施工难度亦大大降低。当钢板桩与锚索联合进行支护时,在锚索钻孔相应位置,可以取消该条钢板桩,或预留一定宽度,锚索施工时,不需在钢板桩桩身开孔,避免对钢板桩造成损害。
作为改进,所述水泥土搅拌桩直径为500~600mm,桩与桩之间搭接200mm并连续排列施工形成封闭止水帷幕。在水泥土搅拌桩施工完成后,紧贴止水帷幕内侧打设钢板桩,这样解决了因地下不明障碍物或土层软硬不均或钢板桩“开叉”而出现基坑流土漏水的问题。
本实用新型与现有技术相比所带来的有益效果是:
1、水泥土搅拌桩止水帷幕与钢板桩联合使用作为基坑围护结构体系,保证基坑止水挡土体系的完整性,有效消除因基坑开挖漏水流泥对周边环境造成的不良影响,经济效益和社会效益显著;
2、构成止水帷幕的水泥土搅拌桩具有一定的力学强度,可起到一定的挡土作用,拉森钢板桩作为水平受力构件可以灵活布置,可布置为疏列式或部分密扣式,与完全密扣式钢板桩墙相比,施工难度降低,施工速度加快,钢板桩用量减少,可节约钢板桩租用费用;
3、对周边环境复杂,地质条件较差的基坑支护区段,可采用密扣式钢板桩与水泥土搅拌桩墙形成完整的挡土止水结构,更加有效保护基坑周边环境;
4、在钢板桩与锚索联合使用作为基坑支护体系中,可以避免在钢板桩桩身开孔施工锚索,有利于保护钢板桩,提高重复使用率,节约资金。
附图说明
图1为密扣式拉森钢板桩与水泥土搅拌桩联合支护平面示意图。
图2为拉森钢板桩与水泥土搅拌桩及内支撑联合支护剖面示意图。
图3为疏列式拉森钢板桩与水泥搅拌桩联合支护平面示意图。
图4为部分密扣式拉森钢板桩与水泥搅拌桩联合支护平面示意图。
图5为疏列式及部分密扣式拉森钢板桩与水泥搅拌桩及锚索联合支护剖面示意图。
具体实施方式
下面结合说明书附图对本实用新型作进一步说明。
如图1至5所示,一种拉森钢板桩与水泥土搅拌桩联合支护体系,包括由位于外侧作为止水帷幕的水泥土搅拌桩1,以及处于内侧作为水平受力的拉森钢板桩2组成。在钢板桩与锚索联合支护结构中,在拉森钢板桩之间设置预应力锚索3,三者一起形成基坑支护体系。在具体实施中,先施工直径500~600mm、搭接200mm的水泥土搅拌桩墙,水泥土搅拌桩桩底应穿透软弱土层或透水砂层进入不透水地层,起基坑止水帷幕作用;水泥土搅拌桩墙施工完成后,紧贴其内侧打设拉森钢板桩,根据土质条件和周边环境保护要求,如图1所示,拉森钢板桩可以采用密扣式,如图3所示,也可以采用疏列式,还可采用部分密扣式;如图4所示,在锚索钻孔部位不设钢板桩或预留一定宽度;拉森钢板桩打设完成后,在钢板桩间钻孔施工锚索,架设腰梁,将锚索张拉锁定;如图4、5所示,水泥搅拌桩、拉森钢板桩、预应力锚索及腰梁联合成为基坑支护体系。如图2所示,如设计为内支撑,则架设腰梁及内支撑构成支护结构体系。基坑开挖到底、地下室主体结构施工完成并回填基坑后,可以解除预应力锚索或拆除内支撑,拔除拉森钢板桩进行重复利用。
工程实例一:华凌村小区三期项目位于广州市白云区同和华凌村,拟建多栋7层建筑物,下设一层地下室,基坑周长约210米,基坑开挖深度5.45~6.85m。基坑开挖范围土层从上至下依次为:素填土、淤泥、中粗砂层、残积砂质粘性土,场地内砂层分布广泛,基坑底主要位于流塑~软塑状淤泥(淤泥质土)层中,基坑周边分布有市政道路及天然基础的建筑物等,根据开挖深度及场地地质条件,基坑选用钢板桩加预应力锚索作为受力结构体系,并以单排水泥搅拌桩相互咬合形成止水帷幕,防止基坑施工时坑内降水导致坑外地下水位下降而危害环境。钢板桩采用拉森Ⅳ型,长9米,采用部分密扣式布置,在设置锚索位置,取消该条钢板桩。预应力锚索间距2.0~2.4m,设计拉力300~360KN。止水搅拌桩桩径550mm,桩心距400mm,桩底穿透砂层进入不透水土层1米。目前该工程已竣工。基坑开挖后止水效果良好,累计变形量处于设计允许值范围。
工程实例二:荣盛商业广场位于白云区京溪街犀牛角社区犀牛角大道,拟建建筑物主楼高6层,群楼高3层,地下室一层,基坑总周长约450米,呈“L”形状,基坑开挖深度5.1米,局部承台位置开挖6米,基坑开挖深度范围内土层主要为杂填土、粉质粘土、细纱、淤泥质土及可塑状粉质粘土层。基坑底部大部分位于细、中砂、淤泥质土及粉质粘土中。场地北侧及东侧临近现有道路、地下管线及低层民用建筑物,环境状况复杂,根据场地地质条件及周边环境条件,设计采用拉森钢板桩及预应力锚索进行基坑支护,为确保止水效果,采用单排水泥搅拌桩相互咬合形成止水帷幕。钢板桩采用拉森Ⅲ型,长度分别为10米和11米,采用部分密扣式布置,在设置锚索位置,取消该条钢板桩。预应力锚索间距2.0~2.4m,设计拉力300~400KN。止水搅拌桩桩径550mm,桩心距350mm,桩底穿透砂层进入不透水土层1米。目前该工程已竣工。基坑开挖后止水效果良好,累计变形量处于设计允许值范围。
Claims (4)
1.一种钢板桩与水泥搅拌桩联合支护,其特征在于:包括由水泥土搅拌桩排列形成的止水帷幕,所述钢板桩设置于所述止水帷幕的内侧,在钢板桩之间设置预应力锚索。
2.根据权利要求1所述的一种钢板桩与水泥搅拌桩联合支护,其特征在于:所述钢板桩为拉森钢板桩。
3.根据权利要求1或2所述的一种钢板桩与水泥搅拌桩联合支护,其特征在于:所述钢板桩采用疏列式或部分密扣式布置。
4.根据权利要求1所述的一种钢板桩与水泥搅拌桩联合支护,其特征在于:所述水泥土搅拌桩直径为500~600mm,桩与桩之间搭接200mm并连续排列施工形成封闭止水帷幕。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201320203563 CN203213124U (zh) | 2013-04-19 | 2013-04-19 | 一种钢板桩与水泥搅拌桩联合支护 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201320203563 CN203213124U (zh) | 2013-04-19 | 2013-04-19 | 一种钢板桩与水泥搅拌桩联合支护 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203213124U true CN203213124U (zh) | 2013-09-25 |
Family
ID=49202672
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201320203563 Expired - Lifetime CN203213124U (zh) | 2013-04-19 | 2013-04-19 | 一种钢板桩与水泥搅拌桩联合支护 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203213124U (zh) |
Cited By (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105649090A (zh) * | 2016-03-01 | 2016-06-08 | 江苏东合南岩土科技股份有限公司 | 一种钢板桩结合搅拌桩支护的施工方法 |
| CN106592608A (zh) * | 2016-12-21 | 2017-04-26 | 东南大学 | 一种地下综合管廊新地基与老路基差异沉降控制方法 |
| CN108286255A (zh) * | 2018-01-10 | 2018-07-17 | 上海公路桥梁(集团)有限公司 | 基坑围护结构及其施工方法 |
| CN108842788A (zh) * | 2018-07-26 | 2018-11-20 | 大成科创基础建设股份有限公司 | 劲芯水泥土搅拌桩施工方法 |
| CN110219305A (zh) * | 2019-06-27 | 2019-09-10 | 云南建投第十二建设有限公司 | 支护结构的成桩方法 |
| CN110219304A (zh) * | 2019-06-27 | 2019-09-10 | 云南建投第十二建设有限公司 | 用于软塑土地的基坑开挖方法 |
| CN111764403A (zh) * | 2020-07-21 | 2020-10-13 | 中亿丰建设集团股份有限公司 | 基坑内u型钢板桩及钢管支撑结构的施工方法 |
| CN113622421A (zh) * | 2021-08-04 | 2021-11-09 | 深圳宏业基岩土科技股份有限公司 | 钢板桩护坡区域的锚索布置结构 |
| CN116356840A (zh) * | 2023-03-22 | 2023-06-30 | 浙江大学建筑设计研究院有限公司 | 一种型钢与预制混凝土板组合的基坑支护结构 |
| CN116427443A (zh) * | 2023-04-19 | 2023-07-14 | 中国十九冶集团有限公司 | 高水位淤泥质地基土内旋流井沉井方法 |
| CN116427443B (zh) * | 2023-04-19 | 2026-03-27 | 中国十九冶集团有限公司 | 高水位淤泥质地基土内旋流井沉井方法 |
-
2013
- 2013-04-19 CN CN 201320203563 patent/CN203213124U/zh not_active Expired - Lifetime
Cited By (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105649090A (zh) * | 2016-03-01 | 2016-06-08 | 江苏东合南岩土科技股份有限公司 | 一种钢板桩结合搅拌桩支护的施工方法 |
| CN106592608A (zh) * | 2016-12-21 | 2017-04-26 | 东南大学 | 一种地下综合管廊新地基与老路基差异沉降控制方法 |
| CN108286255A (zh) * | 2018-01-10 | 2018-07-17 | 上海公路桥梁(集团)有限公司 | 基坑围护结构及其施工方法 |
| CN108842788A (zh) * | 2018-07-26 | 2018-11-20 | 大成科创基础建设股份有限公司 | 劲芯水泥土搅拌桩施工方法 |
| CN110219304B (zh) * | 2019-06-27 | 2021-04-06 | 云南建投第十二建设有限公司 | 用于软塑土地的基坑开挖方法 |
| CN110219305A (zh) * | 2019-06-27 | 2019-09-10 | 云南建投第十二建设有限公司 | 支护结构的成桩方法 |
| CN110219304A (zh) * | 2019-06-27 | 2019-09-10 | 云南建投第十二建设有限公司 | 用于软塑土地的基坑开挖方法 |
| CN111764403A (zh) * | 2020-07-21 | 2020-10-13 | 中亿丰建设集团股份有限公司 | 基坑内u型钢板桩及钢管支撑结构的施工方法 |
| CN113622421A (zh) * | 2021-08-04 | 2021-11-09 | 深圳宏业基岩土科技股份有限公司 | 钢板桩护坡区域的锚索布置结构 |
| CN113622421B (zh) * | 2021-08-04 | 2023-01-20 | 深圳宏业基岩土科技股份有限公司 | 钢板桩护坡区域的锚索布置结构 |
| CN116356840A (zh) * | 2023-03-22 | 2023-06-30 | 浙江大学建筑设计研究院有限公司 | 一种型钢与预制混凝土板组合的基坑支护结构 |
| CN116427443A (zh) * | 2023-04-19 | 2023-07-14 | 中国十九冶集团有限公司 | 高水位淤泥质地基土内旋流井沉井方法 |
| CN116427443B (zh) * | 2023-04-19 | 2026-03-27 | 中国十九冶集团有限公司 | 高水位淤泥质地基土内旋流井沉井方法 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203213124U (zh) | 一种钢板桩与水泥搅拌桩联合支护 | |
| CN102094425B (zh) | 采用浅埋深拉森钢板桩作为防护围堰的基坑施工方法 | |
| CN108442382B (zh) | 横穿深基坑的压力管线原位保护及围护挡土结构及施工方法 | |
| CN104264688B (zh) | 人工挖孔变截面桩支护施工工艺 | |
| CN100580190C (zh) | 建筑物基坑支护结构 | |
| CN109797769B (zh) | 一种湿陷性黄土地区地下综合管廊地基结构及其施工方法 | |
| CN103741714A (zh) | 地下工程全盖挖逆作法施工方法 | |
| CN109208545B (zh) | 一种具有消能效果的人工景观溢流坝施工方法 | |
| CN211340808U (zh) | 一种前墙后桩基坑支护结构 | |
| CN103321246A (zh) | 采用地下连续墙的基坑施工方法 | |
| CN102966356A (zh) | 一种地震作用下液化场地运营隧道上浮变形的控制方法 | |
| CN111305282A (zh) | 软弱富水地层地铁车站抗浮体系及其施工方法 | |
| CN104894926B (zh) | 既有铁路高路堤上支挡结构及其施工方法 | |
| CN110004991A (zh) | 基于外凸式翼脚板的地下结构抗浮体系及构建方法 | |
| CN108149692B (zh) | 一种适用于非闭合基坑的支护结构 | |
| CN102787608B (zh) | 真空作用重力式基坑支护体系及施工方法 | |
| CN105672450A (zh) | 平行于既有地铁隧道结构上方大口径排水管道的敷设方法 | |
| CN110055973B (zh) | 施工空间受限时的高铁桥下基坑围护结构与止水方法 | |
| CN104929142B (zh) | 一种组合围堰结构及其建造施工方法 | |
| CN219158994U (zh) | 一种深厚软土区超深大直径圆形顶管工作井基坑支护结构 | |
| CN204898684U (zh) | 一种超深基坑支护系统 | |
| CN104164895A (zh) | 一种不产生水浮力的地下室 | |
| CN204753262U (zh) | 一种既有铁路高路堤上支挡结构 | |
| CN109487793A (zh) | 一种复杂环境下的密排灌注桩内支撑基坑永久支护结构 | |
| CN207176700U (zh) | 一种复杂环境下的密排灌注桩内支撑基坑永久支护结构 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term |
Granted publication date: 20130925 |
|
| CX01 | Expiry of patent term |