CN105841920A - Riverbed bed load vertical section separating model test device and use method thereof - Google Patents

Riverbed bed load vertical section separating model test device and use method thereof Download PDF

Info

Publication number
CN105841920A
CN105841920A CN201610170503.2A CN201610170503A CN105841920A CN 105841920 A CN105841920 A CN 105841920A CN 201610170503 A CN201610170503 A CN 201610170503A CN 105841920 A CN105841920 A CN 105841920A
Authority
CN
China
Prior art keywords
tank
built
external
conveyer belt
bed load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610170503.2A
Other languages
Chinese (zh)
Other versions
CN105841920B (en
Inventor
孟珍珠
孔纲强
李春红
孙学谨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN201610170503.2A priority Critical patent/CN105841920B/en
Publication of CN105841920A publication Critical patent/CN105841920A/en
Application granted granted Critical
Publication of CN105841920B publication Critical patent/CN105841920B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M10/00Hydrodynamic testing; Arrangements in or on ship-testing tanks or water tunnels

Abstract

The invention discloses a riverbed bed load vertical section separating model test device and a use method thereof. The device comprises an external cuboid water tank whose top is provided with an opening; the external water tank is provided with an internal water tank therein; the bottom of the external water tank is provided with a long support and a short support; the upper side of the long support and the short support is provided with a conveyer belt; the internal water tank is placed on the conveyor belt; the internal cuboid water tank is provided with multiple transparent glass marbles with 2 to 3 kinds of different particle sizes therein; the top of the external water tank is provided with a water inlet, and the bottom is provided with a water outlet; the top of the internal water tank is provided with an internal water tank water inlet which passes through the external water tank sidewall; one side surface of the external water tank is provided with a laser and a reflector, and the other side surface is provided with an automatic digital camera which can regularly photograph the laser scanning surface at certain frequency. By means of the device and the method, the problem of failure in long time scale bed load motion simulation due to length limitation of indoor water tank in common indoor long water tank bed load vertical section separating test devices.

Description

Bed load vertical cross section sorting model test apparatus and using method thereof
Technical field
The invention belongs to river dynamics and Bed Load Movement basic research field, particularly to bed load vertical cross section Sorting model test apparatus and using method thereof.It is primarily adapted for use in the technical fields such as grain sorting test such as river bed load, And can be extended to the grain sorting research field of other solid-liquid two phase flows.
Background technology
In river dynamics research field, river bed cross section Characteristics of Vertical Distribution is that sediment transport is theoretical, bed configuration is ground Study carefully, the important foundation of river engineering detail design and key element.Bed load vertically sort model test be understand with Grasp one of the most effective of riverbed vertical cross section feature in river course and most important means;The most conventional bed load is vertical Section screening test device realizes often by interior length flume test.Due to the length limitation by indoor water tank, Conventional flume test device is only capable of the sectional distribution after simulating the Bed Load Movement in moment or short time, it is impossible to have Effect simulation bed load vertical cross section variation characteristic of prolonged exercise in river course, and cannot be carried out real-time tunneling boring sight Survey, it is impossible to carry out long time scale Bed Load Movement simulation.Therefore, seek a kind of visual bed load to transport for a long time During Dong, the model test apparatus of vertical cross section sorting, is the directions that lay siege to of engineers and technicians, is also to passage The matter characteristics of motion and the essential condition of river bed cross section forming process research.
Summary of the invention
Goal of the invention: in order to overcome the deficiencies in the prior art, the present invention provides a kind of bed load vertical cross section Sorting model test apparatus and using method thereof, solve the long tank of conventional chambers and carry out bed load vertical cross section screening test In device, the problem that long time scale Bed Load Movement simulation can not be carried out due to the length limitation by indoor water tank.
Technical scheme: for solving above-mentioned technical problem, the present invention includes the external tank of open-topped cuboid, cuboid Being provided with the built-in tank of open-topped cuboid in external tank, the external bottom of gullet of cuboid is provided with long stent and short Support, long stent and short support are provided above the conveyer belt controlled by two conveyer belt rotating shafts, place above conveyer belt Have the built-in tank of open-topped cuboid, the built-in tank of cuboid be internally provided with several 2~3 kind of particle diameter inconsistent Clear glass ball;External sink top is provided with the outlet being provided with band valve bottom the water inlet of band valve, built-in water Groove top is provided through the built-in tank water inlet of external basin sidewall, and built-in tank water inlet passes through Valve controlling;Outward Put the relatively wide side of tank be provided with the side of laser device relative narrower be provided with laser device scanning plane can be carried out fixed Time, determine the automatic digital camera that frequency is taken pictures, laser device homonymy is provided with and adjusts the laser device vertical section of scanning glass ball Illuminator.The present invention utilizes the relative motion principle rotating conveyer belt with static current, and inverse analog static state riverbed is with dynamic Bed load Interaction between particles relation in water movement, and the granule vertical cross section Changing Pattern relevant to time scale, A kind of indoor bed load sorting visible model testing device based on riverbed with current relative motion principle is provided, with Different-grain diameter granule vertical profile in the vertical cross section of observation bed load long time scale.By foreign minister in utilizing Embedding tank, conveyer belt, support and lift valve, laser device, the model test apparatus of automatic digital camera composition, visualization , in real time monitoring bed load vertical cross section different-grain diameter Interaction between particles and time size distribution rule.
Further, described long stent is provided with the lift valve of scalable long stent height.Can be free by lift valve The height of regulation upper bracket, thus adjust the most built-in tank of conveyer belt and external tank bottom surface angulation further, therefore Can preferably simulate the motor process of bed load in true environment.
Further, described external tank and built-in tank are transparent organic glass or transparent toughened glass is made, external Tank width is 35cm~45cm, a length of 150cm~200cm, height be 80~120cm, wall thickness be 1cm~ 2cm, the sidewall of external tank relative narrower is provided above the water inlet by Valve controlling, at the bottom of water inlet opposite side wall Portion is provided with the outlet of Valve controlling;Built-in tank width is 15cm~25cm, a length of 100cm~150cm, Be highly 30~40cm, wall thickness be 1cm~2cm, wherein between the built-in basin sidewall in one end and external basin sidewall between Away from for 20cm~30cm, the spacing between the built-in basin sidewall of the other end and external basin sidewall is 10cm~15cm, Built-in bottom of gullet and flat face and non-tight on conveyer belt.Certain by arranging between built-in tank and external tank Distance values can not only prevent built-in tank in experimentation from contacting with external tank, more can be in simulating reality environment The relative motion of bed load bottom riverbed.Described water inlet and outlet are plastic cement or aluminum material is made, a diameter of 4cm~6cm, water inlet and outlet install current meter at valve, the design feed water flow of built-in tank and external tank Speed is 0~0.1m3/ s, external tank Water discharge flow speed is 0~0.2m3/s.Flow rate of water flow is controlled, more preferably by effusion meter Reduction real life in the current nowed forming in riverbed so that the verity of experiment is higher, it is thus achieved that experimental data more There is reference value more accurate.
Further, described clear glass ball is that transparent organic glass is made, and diameter range is the spherical of 1mm~20mm.
Further, described conveyer belt is aluminum or plastic material is made, and described conveyer belt rotating shaft is rustless steel or aluminum system Become, conveyer belt shaft diameter is 10cm~20cm, two rotating shaft center of circle spacing and built-in tank length be all mutually 100cm~ 150cm, conveyer belt rotating shaft is driven by the motor of 3kW~6kW, and described motor is placed between conveyer belt two plane Or conveyer belt rotating shaft is internal and connects, by water-proof wire, the external power source that voltage is 220V.
Further, the cylinder of 4cm~7cm that described long stent and short support are aluminum or stainless steel material is made or length For 4cm~7cm, the cuboid of a width of 4cm~7cm, short support height is fixed as 20cm~30cm, on long stent Lift valve is set and adjusts built-in tank angle of inclination by lift valve, long stent height adjustment range be 20cm~ 100cm。
Further, described automatic digital camera, is fixed on external tank relative narrower lateral outer and camera lens is perpendicular to swash Photoscanning face, filming frequency is that shooting per minute four shot one to every five minutes, and shooting timing is 5~2880 minutes, Automatically digital camera is connected with computer storage, can automatically store photographed data to computer.
Further, the using method of bed load vertical cross section described above sorting model test apparatus, including following Step:
Step one: with the shape and size of built-in tank and conveyer belt as foundation, scales in conjunction with bed load actual ratio, in advance The clear glass ball of 1mm~5mm particle diameter processed, and selected 2~3 kind of clear glass spherolite footpath as simulation bed load material;
Step 2: long stent and short support are fixed on external bottom of gullet, conveyer belt and built-in tank are placed in and draw money on credit On frame and short support;The height of long stent is changed lift valve on regulation long stent so that conveyer belt and interior The angle of inclination putting tank reaches specified angle, and the most built-in tank angle of inclination adjusting range is 0~15 °;
Step 3: the clear glass ball of selected 2~3 kind of particle diameter is put in built-in tank;
Step 4: arranging laser device and illuminator in external tank side, opposite side arranges automatic digital camera, and regulates The relative position of laser device, illuminator and automatically digital camera so that digital camera can photograph clear glass ball automatically Cross section;
Step 5: the water inlet valve opening external tank carries out water filling so that built-in tank is whole to be immersed in the water;
Step 6: open laser device and automatic digital camera, the filming frequency adjusting automatic digital camera is shooting per minute Shooting one for 4 to every 5 minutes, timing is 5~2880 minutes;
Step 7: conveyer belt is accessed power supply, opens built-in tank water inlet, built-in water after opening conveyer belt switch simultaneously Groove water inlet water inlet flow velocity 0~0.1m3/ s, the velocity of rotation of regulation conveyer belt rotating shaft, control the rotation speed of conveyer belt rotating shaft Degree scope is 0.5m/s~5m/s;When simulating flow velocity more than 5m/s, regulate external sink outlet valve, make external Water level in tank keeps constant;
Step 8: the image information photographed based on observation, utilizes image processing software to obtain bed load vertical cross section Different-grain diameter Interaction between particles, and time dependent distribution characteristics.
Wherein, concretely comprising the following steps of step 4: at external tank relatively wide side arrangement laser device and illuminator, adjust The angles and positions that laser device and illuminator are placed, the scanning plane making laser device is that the clear glass ball within built-in tank cuts Face;Outside external tank relative narrower side, arrange automatic digital camera, adjust automatic digital camera support height and phase Machine angle so that it is camera lens is perpendicular to laser device scanning plane.
The present invention compared with prior art, has the advantages that
1, utilizing the relative motion principle rotating conveyer belt with static current, inverse analog static state riverbed is transported with dynamic current Disorder of internal organs bed load Interaction between particles relation, and the granule vertical cross section Changing Pattern relevant to time scale, it is provided that one Plant indoor bed load sorting visible model testing device based on riverbed with current relative motion principle, to observe river Different-grain diameter granule vertical profile in the vertical cross section of bed bed load long time scale.By the embedding water of foreign minister in utilizing Groove, conveyer belt, support and lift valve, laser device, the model test apparatus of automatic digital camera composition, visual, Monitoring bed load vertical cross section different-grain diameter Interaction between particles and time size distribution rule in real time.
2, the present invention can be with visual Simulation different-grain diameter bed load, the granule vertical direction of prolonged exercise in river course Sorting motion feature, effectively simulation bed load granule vertical cross section variation characteristic of prolonged exercise in river course, and carry out Real-time monitored;To research riverbed vertical cross section particle distribution characteristics, correlation engineering design is instructed to have important reference value. Meanwhile, assay device is simple to operate, it is easy to accomplish.
3, passing through, lift valve is set on upper bracket and can freely regulate the height of upper bracket, thus adjust transmission further The most built-in tank of band and external tank bottom surface angulation, therefore, it is possible to preferably simulate bed load in true environment Motor process.
4, pass through between built-in tank and external tank, arrange certain distance values can not only prevent in experimentation Built-in tank contacts with external tank, more can the relative motion of bed load bottom riverbed in simulating reality environment.
5, effusion meter is set at water inlet and water outlet, controls flow rate of water flow by effusion meter, preferably reduce reality The current nowed forming in riverbed in the life of border so that the verity of experiment is higher, it is thus achieved that experimental data have more reference price It is worth more accurate.
Accompanying drawing explanation
Fig. 1 is the structural representation of assay device of the present invention;
Fig. 2 is the top view of assay device of the present invention.
1, external tank, 2, built-in tank, 3, clear glass ball, 4, automatic digital camera, 5, conveyer belt rotating shaft, 6, outlet, 7, short support, 8, illuminator, 9, laser device, 10, long stent, 11, lift valve, 12, built-in Tank water inlet, 13, electric power connection line, 14, water inlet, 15, conveyer belt.
Detailed description of the invention
Below in conjunction with the accompanying drawings patent of the present invention is further described.
Embodiment 1: the bed load sorting rule experimental study under different channel gradients
With the shape and size of built-in tank 2 and conveyer belt 15 as foundation, scale in conjunction with bed load actual ratio, selected Two kinds of clear glass ball 3 grain size specification, clear glass ball 3 diameter is respectively 1.5mm and 4mm, and prefabricated clear glass Ball 3.Prefabricated external tank 1, external tank 1 is the bottom sealing of transparent toughened glass, the length of upper opening for material Cube, width is 35cm, a length of 150cm, height are 1.5cm for 80cm, wall thickness.Prefabricated built-in tank 2, its Material is transparent toughened glass, and its width is 15cm, a length of 100cm, height are the top of 1cm for 30cm, wall thickness The cuboid of opening.The cylinder conveyer belt long stent 10 of prefabricated aluminum and short support 7, its diameter of section is 4cm, short Support height is fixed as 20cm, and long stent 10 height adjustment range is 20cm~80cm.Being provided with on long stent 10 can The lift valve 11 of regulation long stent 10 height.The height of upper bracket 10 can be freely regulated by lift valve 11, thus Adjust that is built-in tank of conveyer belt 15 2 and external tank 1 bottom surface angulation further, therefore, it is possible to preferably simulate The motor process of bed load in true environment.Assembling conveyer belt 15, conveyer belt 15 surface track material is that plastic cement is put down Face, conveyer belt rotating shaft 5 material is aluminum, a diameter of 10cm of conveyer belt rotating shaft 5, and conveyer belt rotating shaft 5 center of circle spacing is with built-in Tank 2 length is all 100cm mutually, power set be rated power be the motor of 5kW, be placed in upside conveyer belt turn Axle 5 is internal, then connects, by electric power connection line 13, the external power source that voltage is 220V.
Conveyer belt long stent 10 and short support 7 are fixed on bottom external tank 1, assemble conveyer belt 15 and built-in tank 2, and be placed on long stent 10 and short support 7, it should be noted that built-in tank 2 and external tank 1 liang are narrow in installation process Sidewall two ends respectively arrange 25cm spacing, and broad side walls two ends respectively arrange 10cm spacing.Battery of tests fixes long stent height For 25cm, and according to long stent 10 and short support 7 difference in height and conveyer belt 15 length computation built-in tank 2 inclination angle. Arrange laser device 9 at external tank 1 broad side surface, adjust laser device 9 angles and positions so that it is scan built-in tank 2 tail The section of the clear glass ball 3 of side;At the external tank 1 automatic digital camera of narrow side arrangement 4, adjust the most digital phase The height of machine 4 and angle, camera lens is perpendicular to laser device 9 scanning plane.Prefabricated clear glass ball 3 is put into built-in water In groove 2, opening external tank water inlet 14 and valve carries out water filling, in making external tank 1, water level should cover built-in Tank 2 overhead height.Conveyer belt 15 being accessed power supply, opens conveyer belt 15 and switch, regulation conveyer belt 15 rotates speed Degree, speed controlling is 2m/s.Opening laser device 9 and automatic digital camera 4, laser device 9 scans built-in tank 2 afterbody Section, automatic digital camera 4 filming frequency is shooting per minute 1, and camera shooting timing is 30 minutes.Observation river Bed bed load vertical cross section different-grain diameter Interaction between particles and time dependent distribution characteristics.After shooting time terminates, Close laser device 9, automatic digital camera 4 and conveyer belt 15, open external sink outlet 6 and water is discharged.
Second group of test, adjusts conveyer belt 15 long stent height to 30cm, and according to two stands difference in height and conveyer belt 15 The inclination angle of the built-in tank of length computation 2.The position of laser device 9 and automatic digital camera 4 all keeps constant.By two kinds The clear glass ball 3 of particle diameter takes out after being sufficiently mixed and is reentered into built-in tank 2.Water pump is utilized to be temporarily stored in water tank Water is reintroduced back in external tank 1 by external tank water inlet 12, and keeps external tank 1 water level and first group of examination Test identical.Open laser device 9 and automatic digital camera 4, conveyer belt 15 accessed power supply, opens conveyer belt 15 and switch, Regulation conveyer belt 15 velocity of rotation, speed controlling is 2m/s.Open laser device 9 and automatic digital camera 4, laser device 9 Scanning built-in tank 2 afterbody section, automatic digital camera 4 filming frequency is shooting per minute 1, automatic digital camera 4 shooting timings are 30 minutes.After shooting time terminates, close laser device 9, automatic digital camera 4 and conveyer belt 15, Open external sink outlet 6, water is discharged.
3rd group to the tenth battery of tests, respectively adjust conveyer belt long stent height to 35cm, 40cm, 45cm, 50cm, 55cm, 60cm, 65cm, 70cm, 75cm, other are with second group of test.
Embodiment 2: bed load time scale sorting rule experimental study
With the shape and size of built-in tank 2 and conveyer belt 15 as foundation, scale in conjunction with bed load actual ratio, selected 2 Planting clear glass ball 3 grain size specification, clear glass ball 3 diameter is respectively 1mm and 5mm, and prefabricated clear glass ball 3. Prefabricated external tank 1, external tank 1 material is that (the present embodiment is transparent steel for transparent organic glass or transparent toughened glass Change glass) bottom sealing, the cuboid of upper opening, width is 45cm, a length of 200cm, height for 100cm, Wall thickness is 2cm.Prefabricated built-in tank 2, its material is transparent toughened glass, width is 25cm, a length of 150cm, Highly for the cuboid of upper opening that 35cm, wall thickness are 1cm.Prefabricated Aluminum cylindrical body conveyer belt long stent 10 and short Support 7, diameter of section is 5cm, and short support height is fixed as 20cm, and long stent height adjustment range is 20cm~80cm. Purchasing and assemble conveyer belt 15, its surface track material is plastic cement, and conveyer belt rotating shaft 5 material is aluminum, conveyer belt rotating shaft 5 A diameter of 15cm, two conveyer belt rotating shaft 5 center of circle spacing are all 150cm mutually with built-in tank 2 length, and power set are volume Determine the motor that power is 6kW, be placed in upside conveyer belt rotating shaft 5 internal, and connect voltage by electric power connection line 13 External power source for 220V.
Conveyer belt long stent 10 and short support 7 are fixed on bottom external tank 1, assemble conveyer belt 15 and built-in tank 2, and be placed on conveyer belt long stent 10 and short support 7, it should be noted that built-in tank 2 and external tank in installation process 1 liang narrow sidewall two ends respectively arrange 25cm spacing, and broad side walls two ends respectively arrange 10cm spacing.Long stent height is fixed as 45cm, and according to two long stents 10 and short support 7 difference in height and the inclination angle of the built-in tank of conveyer belt 15 length computation 2. Arrange laser device 9 at external tank 1 broad side surface, adjust laser device 9 angles and positions so that it is scan built-in tank 2 tail Clear glass ball 3 section of side;At the external tank 1 automatic digital camera of narrow side arrangement 4, adjust automatic digital camera The height of 4 and angle, camera lens is perpendicular to laser device 9 scanning plane.Prefabricated clear glass ball 3 is put into built-in tank In 2, opening external tank water inlet 14 and valve carries out water filling, in making external tank 1, water level covers built-in tank 2 Overhead height.Conveyer belt 15 is accessed power supply, opens conveyer belt 15 and switch, regulate conveyer belt 15 velocity of rotation, speed Degree controls as 3m/s.Opening laser device 9 and automatic digital camera 4, laser device 9 scans built-in tank 2 afterbody section, Automatically digital camera 4 filming frequency is shooting per minute 3, and the shooting timing of automatic digital camera 4 is 48 hours.See Survey the bed load vertical cross section time dependent distribution characteristics of different-grain diameter granule.After shooting time terminates, close and swash Light instrument 9, automatic digital camera 4 and conveyer belt 15, open external sink outlet 6, is discharged by water.
Embodiment 3: bed load sorting model investigation in mountain torrents
With the shape and size of built-in tank 2 and conveyer belt 15 as foundation, scale in conjunction with bed load actual ratio, selected 2 Planting clear glass ball 3 grain size specification, clear glass ball 3 diameter is respectively 1.5mm and 4mm, and prefabricated clear glass ball 3.Prefabricated external tank 1, external tank 1 is the bottom sealing of transparent toughened glass, the cuboid of upper opening for material, Width is 35cm, a length of 150cm, height are 1.5cm for 80cm, wall thickness.Prefabricated built-in tank 2, its material is Transparent toughened glass, the length that width is 15cm, a length of 100cm, height are upper opening that 30cm, wall thickness are 1cm Cube.Prefabricated Aluminum cylindrical body conveyer belt long stent 10 and short support 7, its diameter of section 4cm, short support height is fixed For 20cm, long stent height adjustment range is 20cm~80cm.Purchasing and assemble conveyer belt 15, track material is plastic cement Plane, conveyer belt rotating shaft 5 material is aluminum, a diameter of 10cm of conveyer belt rotating shaft 5, two conveyer belt rotating shaft 5 center of circle spacing with Built-in tank 2 length is all 100cm mutually, power set be rated power be the motor of 5kW, be placed in upside transmit Band rotating shaft 5 is internal, and connects, by electric power connection line 13, the external power source that voltage is 220V.
Conveyer belt long stent 10 and short support 7 are fixed on bottom external tank 1, assemble conveyer belt 15 and built-in tank 2, and be placed on conveyer belt long stent 10 and short support 7, it should be noted that built-in tank 2 and external tank in installation process 1 liang narrow sidewall two ends respectively arrange 25cm spacing, and broad side walls two ends respectively arrange 10cm spacing.Long stent height is fixed as 65cm, and according to two stands difference in height and the inclination angle of the built-in tank of conveyer belt 15 length computation 2.At external tank 1 Broad side surface arranges laser device 9, adjusts laser device 9 angles and positions so that it is scan the clear glass of built-in tank 2 caudal Ball 3 section;At the automatic digital camera in the external narrow side of tank 14, adjust height and the angle of automatic digital camera 4, Camera lens is perpendicular to laser device 9 scanning plane.Prefabricated clear glass ball 3 is put into built-in tank 2, opens external water Groove water inlet 14 and valve thereof carry out water filling, and in making external tank 1, water level covers built-in tank 2 overhead height.To pass Sending band 15 access power supply, open conveyer belt 15 and switch, regulate conveyer belt 15 velocity of rotation, speed controlling is 5m/s. Open built-in tank 2 water inlet, this water inlet water inlet flow velocity 0.05m3/ s, regulates external sink outlet valve 13, makes Water level in external tank 1 keeps constant.Opening laser device 9 and automatic digital camera 4, laser device 9 scans built-in water Groove 2 afterbody section, automatic digital camera 4 filming frequency is shooting per minute 4~one (this reality of shooting in every 5 minutes Executing example is 1/minute), the shooting timing of automatic digital camera 4 is 48 minutes.Observation bed load vertical cross section is not Interact and time dependent distribution characteristics with particles.After shooting time terminates, close laser device 9, automatically Digital camera 4 and conveyer belt 15, open external sink outlet 6, is discharged by water.
Embodiment 4: bed load tunneling boring sorting model investigation
With the shape and size of built-in tank 2 and conveyer belt 15 as foundation, scale in conjunction with bed load actual ratio, selected 2 Planting clear glass ball 3 grain size specification, clear glass ball 3 diameter is respectively 1mm and 5mm, and prefabricated clear glass ball 3. Prefabricated external tank 1, external tank 1 material is that (the present embodiment is transparent steel for transparent organic glass or transparent toughened glass Change glass) bottom sealing, the cuboid of upper opening, width is 45cm, a length of 200cm, height for 100cm, Wall thickness is 2cm.Prefabricated built-in tank 2, its material is transparent toughened glass, width is 25cm, a length of 150cm, Highly for the cuboid of upper opening that 35cm, wall thickness are 1cm.Prefabricated Aluminum cylindrical body conveyer belt long stent 10 and short Support 7, its diameter of section 5cm, its short support height is fixed as 20cm, and long stent height adjustment range is 20cm~80cm. Purchasing and assemble conveyer belt 15, its track material is plastic cement plane, and conveyer belt rotating shaft 5 material is aluminum, conveyer belt rotating shaft 5 A diameter of 15cm, its two conveyer belts rotating shaft 5 center of circle spacing is all 150cm mutually with built-in tank 2 length, and power set are Rated power is the motor of 6kW, is placed between crawler belt two plane or conveyer belt rotating shaft 5 is internal, and by power supply even Wiring 13 connects the external power source that voltage is 220V.
Conveyer belt long stent 10 and short support 7 are fixed on bottom external tank 1, assemble conveyer belt 15 and built-in tank 2, and be placed on conveyer belt long stent 10 and short support 7, it should be noted that built-in tank 2 and external tank in installation process 1 liang narrow sidewall two ends respectively arrange 25cm spacing, and broad side walls two ends respectively arrange 10cm spacing.Long stent height is fixed as 40cm, and according to two stands difference in height and the inclination angle of the built-in tank of conveyer belt length computation 2.In the wide side of external tank 1 Laser device 9 is arranged in face, adjusts laser device 9 angles and positions, and in battery of tests, it is interior for adjusting laser device 9 scanning plane Put tank 2 tail side section;At the external tank 1 automatic digital camera of narrow side arrangement 4, adjust automatic digital camera 4 Height and angle, camera lens is perpendicular to laser device 9 scanning plane.Prefabricated clear glass ball 3 is put into built-in tank 2 In, open external tank water inlet 12 valve and carry out water filling, in making external tank 1, water level covers built-in tank 2 top Highly.Conveyer belt 15 is accessed power supply, opens conveyer belt 15 and switch, regulate conveyer belt 15 velocity of rotation, speed control Scope processed can be 3m/s.Opening laser device 9 and automatic digital camera 4, laser device 9 scans built-in tank 2 afterbody and breaks Face, automatic digital camera 4 filming frequency is shooting per minute 2, and the shooting timing of automatic digital camera 4 is 48 hours. The observation bed load vertical cross section time dependent distribution characteristics of different-grain diameter granule.After shooting time terminates, close Laser device 9, automatic digital camera 4 and conveyer belt 15.
Second group of test, upper shifting laser device 9 scanning plane, adjust height and the angle of automatic digital camera 4, camera lens is vertical In laser device 9 scanning plane.The clear glass ball 3 of two kinds of particle diameters is taken out and after being sufficiently mixed, is reentered into built-in tank 2. Opening laser device 9 and automatic digital camera 4, conveyer belt 15 is accessed power supply, opens conveyer belt 15 and switch, regulation passes Sending band 15 velocities of rotation, speed controlling is 3m/s.Open laser device 9 and automatic digital camera 4, adjust illuminator 8 Position so that laser device 9 scans built-in tank 2 afterbody section, and automatic digital camera 4 filming frequency is bat per minute Taking the photograph one (the present embodiment is 3/minute) of 4~every 5 minutes shootings, the shooting timing of automatic digital camera 4 is 48 Hour.The observation bed load vertical cross section time dependent distribution characteristics of different-grain diameter granule.After shooting time terminates, Close laser device 9, automatic digital camera 4 and conveyer belt 15.
Three to five group test, successively upper shifting laser device 9 scanning plane, other steps are identical with second group of test.
The above is only the preferred embodiment of the present invention, it should be pointed out that: for those skilled in the art For, under the premise without departing from the principles of the invention, it is also possible to make some improvements and modifications, these improvements and modifications are also Should be regarded as protection scope of the present invention.

Claims (9)

1. bed load vertical cross section sorting model test apparatus, including the external tank of open-topped cuboid, its It is characterised by: in the external tank of cuboid, be provided with the built-in tank of open-topped cuboid, the external bottom of gullet of cuboid Being provided with long stent and short support, long stent and short support are provided above the transmission controlled by two conveyer belt rotating shafts Band, is placed with the built-in tank of open-topped cuboid above conveyer belt, the built-in tank of cuboid is internally provided with several 2~the inconsistent clear glass ball of 3 kind of particle diameter;External sink top is provided with bottom the water inlet of band valve and is provided with band valve The outlet of door, built-in sink top is provided through the built-in tank water inlet of external basin sidewall, and built-in tank enters water Mouth passes through Valve controlling;The relatively wide side of external tank is provided with that the side of laser device relative narrower is provided with can be to swashing Light instrument scanning plane is timed, determines the automatic digital camera that frequency is taken pictures, and laser device homonymy is provided with adjustment laser device scanning The illuminator of the vertical section of glass bead.
Bed load vertical cross section the most according to claim 1 sorting model test apparatus, it is characterised in that: The lift valve of scalable long stent height it is provided with on described long stent.
Bed load vertical cross section the most according to claim 1 sorting model test apparatus, it is characterised in that: Described external tank and built-in tank are transparent organic glass or transparent toughened glass is made, and external tank width is 35cm~45cm, a length of 150cm~200cm, height are 80~120cm, wall thickness is 1cm~2cm, external water The sidewall of groove relative narrower is provided above the water inlet by Valve controlling, is provided with bottom water inlet opposite side wall The outlet of Valve controlling;Built-in tank width is 15cm~25cm, a length of 100cm~150cm, height be 30~ 40cm, wall thickness are 1cm~2cm, wherein the spacing between the built-in basin sidewall in one end and external basin sidewall be 20cm~ 30cm, the spacing between the built-in basin sidewall of the other end and external basin sidewall is 10cm~15cm, at the bottom of built-in tank Portion and flat face and non-tight on conveyer belt;Described water inlet and outlet are plastic cement or aluminum material is made, a diameter of 4cm~6cm, water inlet and outlet install current meter at valve, the design feed water flow of built-in tank and external tank Speed is 0~0.1m3/ s, external tank Water discharge flow speed is 0~0.2m3/s。
Bed load vertical cross section the most according to claim 1 sorting model test apparatus, it is characterised in that: Described clear glass ball is that transparent organic glass is made, and diameter range is the spherical of 1mm~20mm.
Bed load vertical cross section the most according to claim 1 sorting model test apparatus, it is characterised in that: Described conveyer belt is aluminum or plastic material is made, and described conveyer belt rotating shaft is rustless steel or aluminum is made, conveyer belt rotating shaft A diameter of 10cm~20cm, two rotating shaft center of circle spacing are all 100cm~150cm, conveyer belt mutually with built-in tank length Rotating shaft is driven by the motor of 3kW~6kW, and described motor is placed between conveyer belt two plane or conveyer belt rotating shaft Inside also connects, by water-proof wire, the external power source that voltage is 220V.
Bed load vertical cross section the most according to claim 2 sorting model test apparatus, it is characterised in that: The cylinder of 4cm~7cm that described long stent and short support are aluminum or stainless steel material is made or a length of 4cm~7cm, width For the cuboid of 4cm~7cm, short support height is fixed as 20cm~30cm, long stent arranges lift valve and passes through Lift valve adjusts built-in tank angle of inclination, and long stent height adjustment range is 20cm~100cm.
Bed load vertical cross section the most according to claim 1 sorting model test apparatus, it is characterised in that: Described automatic digital camera, is fixed on external tank relative narrower lateral outer and camera lens is perpendicular to laser scanning face, shooting Frequency is that shooting per minute four shot one to every five minutes, and shooting timing is 5~2880 minutes, automatic digital camera It is connected with computer storage, can automatically store photographed data to computer.
8. the using method of the bed load vertical cross section sorting model test apparatus as described in one of claim 1-7, It is characterized in that, comprise the following steps:
Step one: with the shape and size of built-in tank and conveyer belt as foundation, scales in conjunction with bed load actual ratio, in advance The clear glass ball of 1mm~5mm particle diameter processed, and selected 2~3 kind of clear glass spherolite footpath as simulation bed load material;
Step 2: long stent and short support are fixed on external bottom of gullet, conveyer belt and built-in tank are placed in and draw money on credit On frame and short support;The height of long stent is changed lift valve on regulation long stent so that conveyer belt and interior The angle of inclination putting tank reaches specified angle, and the most built-in tank angle of inclination adjusting range is 0~15 °;
Step 3: the clear glass ball of selected 2~3 kind of particle diameter is put in built-in tank;
Step 4: arranging laser device and illuminator in external tank side, opposite side arranges automatic digital camera, and regulates The relative position of laser device, illuminator and automatically digital camera so that digital camera can photograph clear glass ball automatically Cross section;
Step 5: the water inlet valve opening external tank carries out water filling so that built-in tank is whole to be immersed in the water;
Step 6: open laser device and automatic digital camera, the filming frequency adjusting automatic digital camera is shooting per minute Shooting one for 4 to every 5 minutes, timing is 5~2880 minutes;
Step 7: conveyer belt is accessed power supply, opens built-in tank water inlet, built-in water after opening conveyer belt switch simultaneously Groove water inlet water inlet flow velocity 0~0.1m3/ s, the velocity of rotation of regulation conveyer belt rotating shaft, control the rotation speed of conveyer belt rotating shaft Degree scope is 0.5m/s~5m/s;When simulating flow velocity more than 5m/s, regulate external sink outlet valve, make external Water level in tank keeps constant;
Step 8: the image information photographed based on observation, utilizes image processing software to obtain bed load vertical cross section Different-grain diameter Interaction between particles, and time dependent distribution characteristics.
The using method of bed load vertical cross section the most according to claim 8 sorting model test apparatus, its It is characterised by: concretely comprising the following steps of described step 4: at external tank relatively wide side arrangement laser device and illuminator, Adjusting laser device and the angles and positions of illuminator placement, the scanning plane making laser device is the clear glass within built-in tank Ball cross section;Outside external tank relative narrower side, arrange automatic digital camera, adjust automatic digital camera support height And camera angle so that it is camera lens is perpendicular to laser device scanning plane.
CN201610170503.2A 2016-03-23 2016-03-23 Bed load vertical cross section sorts model test apparatus and its application method Active CN105841920B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610170503.2A CN105841920B (en) 2016-03-23 2016-03-23 Bed load vertical cross section sorts model test apparatus and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610170503.2A CN105841920B (en) 2016-03-23 2016-03-23 Bed load vertical cross section sorts model test apparatus and its application method

Publications (2)

Publication Number Publication Date
CN105841920A true CN105841920A (en) 2016-08-10
CN105841920B CN105841920B (en) 2018-06-19

Family

ID=56583009

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610170503.2A Active CN105841920B (en) 2016-03-23 2016-03-23 Bed load vertical cross section sorts model test apparatus and its application method

Country Status (1)

Country Link
CN (1) CN105841920B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108489874A (en) * 2018-06-08 2018-09-04 浙江工业大学 A kind of drum-type irregular shape sediment sorting three dimensional taest device and its test method
CN108918361A (en) * 2018-07-27 2018-11-30 国家电网有限公司 Bed load deposits simulation test device and method
CN109001083A (en) * 2018-06-08 2018-12-14 浙江工业大学 A kind of drum-type nonuniform scanning grain sorting experimental rig and its test method
CN109141984A (en) * 2018-09-27 2019-01-04 中国水利水电科学研究院 A kind of adaptive bed load sampler and silt discharge measurement method
CN109506882A (en) * 2018-11-22 2019-03-22 浙江大学 The experimental provision and method that a kind of slip boundary condition density current and salt wedge generate
CN114739333A (en) * 2022-03-14 2022-07-12 中国长江三峡集团有限公司 Real-time measuring and testing system and method for bed surface shape of load bed on water tank

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1397773A1 (en) * 1986-04-16 1988-06-15 Институт Проблем Прочности Ан Усср Bed for gas-hydraulic simulation of two-dimensional gas flow
SU1508119A1 (en) * 1987-12-28 1989-09-15 Тихоокеанский океанологический институт Дальневосточного отделения АН СССР Hydrodynamic chute
JPH06134078A (en) * 1992-10-23 1994-05-17 Mitsui Eng & Shipbuild Co Ltd Controlling method of stream of water
CN102147325A (en) * 2011-02-28 2011-08-10 浙江工业大学 Experimental apparatus for non-constant debris flow
CN102680204A (en) * 2012-05-11 2012-09-19 河海大学 Method and device for simulating bottom sludge erosion and transmission feature in rectangular trough
CN203011668U (en) * 2012-12-25 2013-06-19 河海大学 Slope-adjustable rectangular sink device for simulating bottom bud corrosion and transmission characteristics
CN104142223A (en) * 2013-05-10 2014-11-12 华北水利水电学院 Small-scale solidified cohesive sediment incipient motion measuring system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1397773A1 (en) * 1986-04-16 1988-06-15 Институт Проблем Прочности Ан Усср Bed for gas-hydraulic simulation of two-dimensional gas flow
SU1508119A1 (en) * 1987-12-28 1989-09-15 Тихоокеанский океанологический институт Дальневосточного отделения АН СССР Hydrodynamic chute
JPH06134078A (en) * 1992-10-23 1994-05-17 Mitsui Eng & Shipbuild Co Ltd Controlling method of stream of water
CN102147325A (en) * 2011-02-28 2011-08-10 浙江工业大学 Experimental apparatus for non-constant debris flow
CN102680204A (en) * 2012-05-11 2012-09-19 河海大学 Method and device for simulating bottom sludge erosion and transmission feature in rectangular trough
CN203011668U (en) * 2012-12-25 2013-06-19 河海大学 Slope-adjustable rectangular sink device for simulating bottom bud corrosion and transmission characteristics
CN104142223A (en) * 2013-05-10 2014-11-12 华北水利水电学院 Small-scale solidified cohesive sediment incipient motion measuring system

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108489874A (en) * 2018-06-08 2018-09-04 浙江工业大学 A kind of drum-type irregular shape sediment sorting three dimensional taest device and its test method
CN109001083A (en) * 2018-06-08 2018-12-14 浙江工业大学 A kind of drum-type nonuniform scanning grain sorting experimental rig and its test method
CN108918361A (en) * 2018-07-27 2018-11-30 国家电网有限公司 Bed load deposits simulation test device and method
CN108918361B (en) * 2018-07-27 2020-09-11 国家电网有限公司 Bed load deposition simulation test device and method
CN109141984A (en) * 2018-09-27 2019-01-04 中国水利水电科学研究院 A kind of adaptive bed load sampler and silt discharge measurement method
CN109141984B (en) * 2018-09-27 2023-08-15 中国水利水电科学研究院 Self-adaptive bed load sampling device and sand conveying rate measuring method
CN109506882A (en) * 2018-11-22 2019-03-22 浙江大学 The experimental provision and method that a kind of slip boundary condition density current and salt wedge generate
CN114739333A (en) * 2022-03-14 2022-07-12 中国长江三峡集团有限公司 Real-time measuring and testing system and method for bed surface shape of load bed on water tank

Also Published As

Publication number Publication date
CN105841920B (en) 2018-06-19

Similar Documents

Publication Publication Date Title
CN105841920A (en) Riverbed bed load vertical section separating model test device and use method thereof
CN108020489B (en) Packed type karst seepage failure Whole Process Simulation pilot system and method
CN105841919A (en) Device for testing movement of solid matter in viscous non-Newtonian fluid and use method thereof
CN102348794B (en) Cell culture method, cell culture device, method for counting subject matters to be counted in container and device for counting
US10748278B2 (en) Organism evaluation system and method of use
CN104520436B (en) Microorganism evaluation system
CN102539644A (en) Generator for simulating pollution release process of aquatic plants to sediments and use method
US11446660B2 (en) Organism evaluation system and method of use
CN206573438U (en) Particles in liquid is counted automatically, IMAQ and configuration measurement mechanism
CN104459071A (en) Simulation system for algal bloom emergency regulation and control under changing environment and operation method of simulation system
CN107179265A (en) Flco dynamic feature coefficient extraction system and method during Coagulation of Coal Slime Water
CN107121364A (en) The multifunction measuring set that a kind of particle system influences on laser signal
CN104677592A (en) Three-dimensional dynamic simulation test stand for regional underground water flow field
CN109526814A (en) Fish are temporarily supported, structure is tested in swimming behavior observation and Burden-Swimming Ability of KM
CN105010210A (en) Device for automatically and precisely feeding bait into multiple fishponds in fish culture plant
CN208270377U (en) A kind of drum-type irregular shape sediment sorting three dimensional taest device
CN109574237A (en) A kind of devices, systems, and methods for long term monitoring stain disease comprehensive ecological toxicity up to standard
CN109001083A (en) A kind of drum-type nonuniform scanning grain sorting experimental rig and its test method
CN209456163U (en) A kind of device and system for long term monitoring stain disease comprehensive ecological toxicity up to standard
CN108489874B (en) Roller type irregular-shaped sediment sorting three-dimensional test device and test method thereof
CN207457081U (en) Solid-fluid Two-phase Flow observation system
CN208383654U (en) A kind of drum-type nonuniform scanning grain sorting experimental rig
CN106205332A (en) A kind of plate tectonice physical simulation experiment device
CN206523135U (en) A kind of pressure dissolved air floatation bubble size size and rate of climb measurement apparatus
CN208239051U (en) A kind of experimental rig of simulation and observation Cohesive Sediment starting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant