CN105836059A - Excavating and transporting integrated ship - Google Patents
Excavating and transporting integrated ship Download PDFInfo
- Publication number
- CN105836059A CN105836059A CN201610272442.0A CN201610272442A CN105836059A CN 105836059 A CN105836059 A CN 105836059A CN 201610272442 A CN201610272442 A CN 201610272442A CN 105836059 A CN105836059 A CN 105836059A
- Authority
- CN
- China
- Prior art keywords
- guide pile
- stake
- storage bin
- integrated ship
- anchor ear
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/16—Tying-up; Shifting, towing, or pushing equipment; Anchoring using winches
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/50—Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B43/00—Improving safety of vessels, e.g. damage control, not otherwise provided for
- B63B43/02—Improving safety of vessels, e.g. damage control, not otherwise provided for reducing risk of capsizing or sinking
- B63B43/10—Improving safety of vessels, e.g. damage control, not otherwise provided for reducing risk of capsizing or sinking by improving buoyancy
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F5/00—Dredgers or soil-shifting machines for special purposes
- E02F5/28—Dredgers or soil-shifting machines for special purposes for cleaning watercourses or other ways
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Ocean & Marine Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The invention discloses an excavating and transporting integrated ship and relates to the field of ship equipment. The excavating and transporting integrated ship comprises a hull part, an excavating part, a storage bin, a winch and a gauge pile part. The excavating part is fixedly arranged at the front end of the hull part and comprises an excavator machine engine, an excavating arm and an excavator bucket. The storage bin is arranged on the upper surface of the hull part. The winch is arranged at the tail end of the hull part. The gauge pile part comprises two gauge piles, and the gauge piles are arranged on two side faces of the hull part through gauge pile hoops. A hull is integrally provided with a hopper and the excavating part of an excavator, the ship can finish the excavating and loading functions, and equipment and manpower are saved; the gauge piles are arranged at the tail end, and the working position can be fixed conveniently; the winch can achieve the transporting function.
Description
Technical field
The present invention relates to engineering ship apparatus field, especially relate to one and dig fortune integrated ship.
Background technology
At present, cleaning work is excavated in waters needs the collaborative work of multiple machinery, such as:
1. excavate cleaning equipment, such as Amphibious type excavator etc.;
2. transporting equipment, such as cargo ship, transport vehicle etc..
By excavating equipment, silt etc. is dug out during work, be then put on cargo ship, then by transport shipping by thing
Material transport is to the place specified.Whole process needs equipment and personnel many, and operating cost is bigger.And equipment
The most individual bigger integral device, the most inconvenient when equipment transfer and transport.
Summary of the invention
The present invention is to solve above-mentioned technical problem, it is provided that one digs fortune integrated ship, can either complete excavate and
Load work and can complete again water transportation work.
To achieve these goals, the present invention adopts the following technical scheme that
Dig fortune integrated ship, including: hull section and excavation portion, described excavation portion is fixedly installed on described hull section
Front end, including excavator main frame, digging arm and bucket;
Storage bin, described storage bin is arranged on the upper surface of described hull section;
Winch, described winch is arranged on the tail end of described hull section;
Guide pile portion, described guide pile portion includes two guide piles, and described guide pile passes through guide pile anchor ear
It is arranged on two sides of described hull section.
Preferably, described hull section includes that middle Fu Cang and two limits laying respectively at described middle Fu Cang both sides are floated
Storehouse.
Preferably, the bottom in described excavation portion by excavator connect seat be arranged on described in the front end in floating storehouse.
Preferably, be fastenedly connected stake including two, described two be fastenedly connected stake cross and fix described in
Floating storehouse and described two limit Fu Cang.
Preferably, described guide pile portion includes the oil cylinder of falling stake, guide pile anchor ear hinged seat and the oil cylinder seat of falling stake,
Described guide pile anchor ear hinged seat is arranged on described limit and floats the sidewall in storehouse, and described guide pile anchor ear is hinged described fixed
Position stake anchor ear hinged seat, one end of the described oil cylinder of falling stake is hinged on described guide pile anchor ear, and the other end cuts with scissors
Being connected on the described oil cylinder seat of falling stake, the described oil cylinder seat of falling stake is arranged on the side of described hull section.
Preferably, the both sides of described hull section are provided with down pile frame.Can placement positioning stake
Preferably, described storage bin include two storage bin sidewalls, storage bin rear wall, storage bin antetheca and
Rear door.
Preferably, described winch is hydraulic wireline winch.Hydraulic wireline winch pulling force is big, it is possible to better meet power
Demand.
Preferably, described guide pile anchor ear is provided with guide pile and rises and put winch, be used for putting guide pile.
Due to the fact that and have employed above-mentioned technical scheme, integrally disposed storage bin and excavator on hull
Excavate part, it is possible to completing self and excavate and load function, save equipment and manpower, tail end arranges location
Stake, it is simple to fixing operating position, arranges winch and is capable of locomotive function.Fu Cang and two in hull section employing
Storehouse split design is floated on individual limit, it is possible to the readily accessible and transport of equipment.Employing is fastenedly connected stake, it is possible to more preferably
Increase in Fu Cang and limit float the bonding strength in storehouse, keep the stability of hull.Each sidewall of storage bin is adopted
With separable assembled, it is simple to disassembled for transport.Guide pile uses the oil cylinder of falling stake, it is simple to the folding and unfolding of guide pile.Use
After such scheme, construction machinery and transporting equipment unite two into one, and reduce operating cost, reduce operational personnel
Amount and number of devices, reduce energy resource consumption.Dismount and transport simple and easy to do, it is easy to implementation.
Accompanying drawing explanation
Fig. 1 is the explosive view of the present invention;
Fig. 2 is the general assembly schematic diagram of the present invention;
Fig. 3 is the packed and transported state diagram of the present invention;
Wherein, 1-limit buoyancy module;2-falls pile frame;3-is fastenedly connected stake;The 4-oil cylinder seat of falling stake;5-guide pile is embraced
Hoop hinged seat;6-guide pile rises puts winch;7-guide pile anchor ear;8-guide pile;9-storage bin sidewall;10-
Storage bin rear wall;Door after 11-;12-hydraulic wireline winch;The 13-oil cylinder of falling stake;14-storage bin antetheca;15-digs
Pick machine host;16-digging arm;17-bucket;18-limit buoyancy module;19-excavator connects seat;Buoyancy module in 20-;
21-Hydraulic Elements.
Detailed description of the invention
The invention will be further described with embodiment below in conjunction with the accompanying drawings.
As it is shown in figure 1, one digs fortune integrated ship, hull is divided into three parts be welded, including in floating storehouse 20 He
Storehouse 1 is floated on two limits, then by the form of bolt and hook by floating storehouse 20 and two limits float storehouse 1 and be connected as
One hull platform.It is fastenedly connected during stake 3 is crossed floating storehouse 20 with two and storehouse 1 is floated on two limits, reinforce,
Improve bulk strength.In, the front portion in floating storehouse 20 is welded a mounting flange, and docking excavator connects seat 19
Installing excavator main frame 15, install digging arm 16 and bucket 17, excavator main frame 15 can be with flange center
Axle rotates, it is simple to excavate and handling operation.By storing bulkhead each several part, including two storage bin sides
Wall 9, storage bin rear wall 10, storage bin antetheca 14 and rear door 11 segmentation manufacture, logical in the middle of each segmentation
Cross bolt to connect, then with bolt, storing bulkhead is fixed on hull platform, in the rear side interposition of storage bin
Put door 11 after leaving, in order to discharging.Install two guide piles 8 in the both sides of hull section additional, be used for solid
Determining the position of ship, with convenient working, guide pile 8 is inserted in guide pile anchor ear 7, and guide pile anchor ear 7 leads to
Cross guide pile anchor ear hinged seat 5 and be arranged on two sides of hull section tail end.One end of the oil cylinder of falling stake 13 is hinged
On guide pile anchor ear 7, the other end is hinged on the oil cylinder seat of falling stake 4, and the oil cylinder seat of falling stake 4 is arranged on hull section
Side.Guide pile is installed on guide pile anchor ear 7 rise and put winch 6, by steel wire rope (not shown) control
The hoisting and transferring of guide pile 8 processed, during work, is risen by guide pile and puts winch 6 and be inserted into by guide pile 8
The bottom, fixed hull.Regulated the angle of guide pile 8 by the oil cylinder of falling stake 13, the oil cylinder of falling stake 13 pulls fixed
Position stake anchor ear 7 rotates along jointed shaft, and then controls keeping flat or erecting of guide pile 8.Tail at hull
Hydraulic wireline winch 12 is laid in portion, is used for pulling integrated ship from mobile.Pile frame 2 is installed in the both sides of hull section, just
In disposing guide pile 6, guide pile 6 can be placed at down on pile frame 2 after being put into.
As in figure 2 it is shown, during work, arrive behind assigned work region, first put down two, rear portion guide pile 8
Being fixed by hull, then dug out from working area by material by anterior excavator, the material dug out is put
Store in storage bin below, after storage bin is loaded into specified storage capacity by the time, mention guide pile 8, then by
Whole ship is drawn to specify discharge position by winch, after arriving discharge zone, opens rear door 9, assists with excavator
Material is unloaded, one action can be completed.
As it is shown on figure 3, after the work in a region completes, need equipment conveying to another region.This
Time, only the fastening bolt of hull need to be unloaded, setting after dismounting with simple hanging device and extracting tool
Standby parts simple light, is lifted in container or on haulage vehicle, can transport easily, significantly
Expansion equipment can range and region can be arrived.After arriving a new place of working, use letter equally
Single hanging device and installation tool, can be conveniently accomplished installation and construct.
Although the detailed description of the invention of the present invention is described by the above-mentioned accompanying drawing that combines, but not to the present invention
The restriction of protection domain, for the technology contents that some are well known to those of ordinary skill in the art, the most no longer
Repeating, one of ordinary skill in the art should be understood that on the basis of technical scheme, this area skill
Art personnel need not to pay various amendments or deformation that creative work can make still at the protection model of the present invention
Within enclosing.
Claims (9)
1. digging fortune integrated ship, it is characterised in that including: hull section and excavation portion, described excavation portion is arranged on
The front end of described hull section, including excavator main frame, digging arm and bucket;
Storage bin, described storage bin is arranged on the upper surface of described hull section;
Winch, described winch is arranged on the tail end of described hull section;
Guide pile portion, described guide pile portion includes two guide piles, and described guide pile passes through guide pile anchor ear
It is arranged on two sides of described hull section.
The most according to claim 1 dig fortune integrated ship, it is characterised in that described guide pile portion also wraps
Including the oil cylinder of falling stake, guide pile anchor ear hinged seat and the oil cylinder seat of falling stake, described guide pile anchor ear hinged seat is arranged on
Float the sidewall in storehouse on described limit, the hinged described guide pile anchor ear hinged seat of described guide pile anchor ear, described stake
One end of oil cylinder is hinged on described guide pile anchor ear, the hinged described oil cylinder seat of falling stake of the other end, described stake
Oil cylinder seat is arranged on the side of described hull section.
The most according to claim 1 dig fortune integrated ship, it is characterised in that during described hull section includes
Fu Cang and two limit Fu Cang laying respectively at described middle Fu Cang both sides.
The most according to claim 3 dig fortune integrated ship, it is characterised in that include that two are fastenedly connected stake,
Described two be fastenedly connected stake cross and fix described in floating storehouse and described two limit Fu Cang.
The most according to claim 3 dig fortune integrated ship, it is characterised in that the bottom in described excavation portion
By excavator connect seat be arranged on described in the front end in floating storehouse.
The most according to claim 1 dig fortune integrated ship, it is characterised in that the both sides of described hull section
It is provided with down pile frame.
The most according to claim 1 dig fortune integrated ship, it is characterised in that described storage bin includes two
Individual storage bin sidewall, storage bin rear wall, storage bin antetheca and rear door.
The most according to claim 1 dig fortune integrated ship, it is characterised in that described winch is hydraulic pressure strand
Car.
9. according to digging fortune integrated ship described in any one of claim 1-8, it is characterised in that described location
It is provided with guide pile on stake anchor ear to rise and put winch.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610272442.0A CN105836059A (en) | 2016-04-28 | 2016-04-28 | Excavating and transporting integrated ship |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610272442.0A CN105836059A (en) | 2016-04-28 | 2016-04-28 | Excavating and transporting integrated ship |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105836059A true CN105836059A (en) | 2016-08-10 |
Family
ID=56589524
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610272442.0A Pending CN105836059A (en) | 2016-04-28 | 2016-04-28 | Excavating and transporting integrated ship |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105836059A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114411669A (en) * | 2022-02-18 | 2022-04-29 | 南通亚华船舶制造集团有限公司 | Self-elevating multifunctional ocean platform and operation method thereof |
CN114703884A (en) * | 2022-04-29 | 2022-07-05 | 中国人民解放军陆军工程大学 | Rotary pile leg mechanism |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2316249Y (en) * | 1997-11-24 | 1999-04-28 | 象山设备安装公司 | Bucket submersible mud pump dredge boat |
CN201095413Y (en) * | 2007-08-20 | 2008-08-06 | 刘登华 | Tidal flat cultivating ship hull |
CN101705704A (en) * | 2009-11-20 | 2010-05-12 | 合肥振宇工程机械股份有限公司 | Telescopic mechanism of wetland excavator walking device |
CN103669450A (en) * | 2013-12-19 | 2014-03-26 | 苏州华顺环保船舶科技有限公司 | Watercourse dredging vessel |
CN203583546U (en) * | 2013-11-18 | 2014-05-07 | 青州市巨龙矿沙机械有限公司 | Trolley and dredger connecting structure |
CN204096049U (en) * | 2014-07-21 | 2015-01-14 | 山东海领船舶机械有限公司 | A kind of split type strand inhales ship |
JP2015101104A (en) * | 2013-11-21 | 2015-06-04 | 株式会社高知丸高 | Self-propulsion type work ship equipped with heavy machine |
CN205098421U (en) * | 2015-11-10 | 2016-03-23 | 青州市黄楼永利矿沙机械制造有限公司 | Chain bucket type panning ship |
CN205707187U (en) * | 2016-04-28 | 2016-11-23 | 青州市巨龙环保科技有限公司 | Dig fortune integrated ship |
-
2016
- 2016-04-28 CN CN201610272442.0A patent/CN105836059A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2316249Y (en) * | 1997-11-24 | 1999-04-28 | 象山设备安装公司 | Bucket submersible mud pump dredge boat |
CN201095413Y (en) * | 2007-08-20 | 2008-08-06 | 刘登华 | Tidal flat cultivating ship hull |
CN101705704A (en) * | 2009-11-20 | 2010-05-12 | 合肥振宇工程机械股份有限公司 | Telescopic mechanism of wetland excavator walking device |
CN203583546U (en) * | 2013-11-18 | 2014-05-07 | 青州市巨龙矿沙机械有限公司 | Trolley and dredger connecting structure |
JP2015101104A (en) * | 2013-11-21 | 2015-06-04 | 株式会社高知丸高 | Self-propulsion type work ship equipped with heavy machine |
CN103669450A (en) * | 2013-12-19 | 2014-03-26 | 苏州华顺环保船舶科技有限公司 | Watercourse dredging vessel |
CN204096049U (en) * | 2014-07-21 | 2015-01-14 | 山东海领船舶机械有限公司 | A kind of split type strand inhales ship |
CN205098421U (en) * | 2015-11-10 | 2016-03-23 | 青州市黄楼永利矿沙机械制造有限公司 | Chain bucket type panning ship |
CN205707187U (en) * | 2016-04-28 | 2016-11-23 | 青州市巨龙环保科技有限公司 | Dig fortune integrated ship |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114411669A (en) * | 2022-02-18 | 2022-04-29 | 南通亚华船舶制造集团有限公司 | Self-elevating multifunctional ocean platform and operation method thereof |
CN114703884A (en) * | 2022-04-29 | 2022-07-05 | 中国人民解放军陆军工程大学 | Rotary pile leg mechanism |
CN114703884B (en) * | 2022-04-29 | 2023-09-08 | 中国人民解放军陆军工程大学 | Rotary pile leg mechanism |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101926593B1 (en) | Barge with bonded hull and dredging method using barge | |
CN205707187U (en) | Dig fortune integrated ship | |
CN103967061A (en) | Excavating, crushing and scraper conveying belt reversed loading integrated machine | |
JPH0551734B2 (en) | ||
CN104691390A (en) | High-level unloading device for self-dumping vehicle | |
CN105836059A (en) | Excavating and transporting integrated ship | |
US2096773A (en) | Drag bucket | |
CN205894083U (en) | A material promotion transfer device for foundation ditch excavation dregs | |
CN205638453U (en) | Supporting waste rock quick transportation in quick -witted rear portion and processing system of digging is combined to colliery rock gangway | |
CN102124164B (en) | Method for delivering large quantities of under water soil to a reclamation area | |
CN113323005A (en) | Construction method of floating suction barrel foundation and floating suction barrel foundation | |
CN208379656U (en) | A kind of multifunctional excavator | |
CN105697016B (en) | System and method for quickly transporting and disposing gangue matched with rear part of coal mine rock roadway fully-mechanized roadheader | |
CN205712236U (en) | A kind of civil engineering efficient excavator tool | |
JP7107767B2 (en) | Dredging station and dredging system | |
WO2020100586A1 (en) | Mining system | |
KR20150108667A (en) | Counter weight type built-in gas tank of heavy equipment | |
KR20150076480A (en) | Support structure for Load-Out of heavy structure | |
CN211646532U (en) | Pipe loading and plugging device of cutter suction dredger | |
CN212452840U (en) | Get-off connecting device and excavator | |
CN214143720U (en) | Combined leveling device | |
CN220828253U (en) | TBM transfer device | |
CN217998237U (en) | Under-deck pump dredging dredger | |
CA3233906A1 (en) | Optimal energy storage utilization | |
CN219078188U (en) | Feeding machine for earth and stone transfer system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160810 |
|
RJ01 | Rejection of invention patent application after publication |