CN205707187U - Dig fortune integrated ship - Google Patents

Dig fortune integrated ship Download PDF

Info

Publication number
CN205707187U
CN205707187U CN201620371198.9U CN201620371198U CN205707187U CN 205707187 U CN205707187 U CN 205707187U CN 201620371198 U CN201620371198 U CN 201620371198U CN 205707187 U CN205707187 U CN 205707187U
Authority
CN
China
Prior art keywords
guide pile
hull section
storage bin
winch
anchor ear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620371198.9U
Other languages
Chinese (zh)
Inventor
王朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Julong Intelligent Technology Co ltd
Original Assignee
Qingzhou Julong Environmental Protection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingzhou Julong Environmental Protection Technology Co Ltd filed Critical Qingzhou Julong Environmental Protection Technology Co Ltd
Priority to CN201620371198.9U priority Critical patent/CN205707187U/en
Application granted granted Critical
Publication of CN205707187U publication Critical patent/CN205707187U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses one and dig fortune integrated ship, relate to field of ship equipment, including: hull section and excavation portion, described excavation portion is fixedly installed on the front end of described hull section, including excavator main frame, digging arm and bucket;Storage bin, described storage bin is arranged on the upper surface of described hull section;Winch, described winch is arranged on the tail end of described hull section;Guide pile portion, described guide pile portion includes two guide piles, and described guide pile is arranged on two sides of institute's hull section by guide pile anchor ear.The integrally disposed excavation part of hopper and excavator on hull, it is possible to completing self and excavate and load function, save equipment and manpower, tail end arranges guide pile, it is simple to fixing operating position, arranges winch and is capable of transportation function.

Description

Dig fortune integrated ship
Technical field
The present invention relates to engineering ship apparatus field, especially relate to one and dig fortune integrated ship.
Background technology
At present, cleaning work is excavated in waters needs the collaborative work of multiple machinery, such as:
1. excavate cleaning equipment, such as Amphibious type excavator etc.;
2. transporting equipment, such as cargo ship, transport vehicle etc..
By excavating equipment, silt etc. is dug out during work, be then put on cargo ship, then by transport shipping by thing Material transport is to the place specified.Whole process needs equipment and personnel many, and operating cost is bigger.And equipment The most individual bigger integral device, the most inconvenient when equipment transfer and transport.
Summary of the invention
The present invention is to solve above-mentioned technical problem, it is provided that one digs fortune integrated ship, can either complete excavate and Load work and can complete again water transportation work.
To achieve these goals, the present invention adopts the following technical scheme that
Dig fortune integrated ship, including: hull section and excavation portion, described excavation portion is fixedly installed on described hull section Front end, including excavator main frame, digging arm and bucket;
Storage bin, described storage bin is arranged on the upper surface of described hull section;
Winch, described winch is arranged on the tail end of described hull section;
Guide pile portion, described guide pile portion includes two guide piles, and described guide pile passes through guide pile anchor ear It is arranged on two sides of described hull section.
Preferably, described hull section includes that middle Fu Cang and two limits laying respectively at described middle Fu Cang both sides are floated Storehouse.
Preferably, the bottom in described excavation portion by excavator connect seat be arranged on described in the front end in floating storehouse.
Preferably, be fastenedly connected stake including two, described two be fastenedly connected stake cross and fix described in Floating storehouse and described two limit Fu Cang.
Preferably, described guide pile portion includes the oil cylinder of falling stake, guide pile anchor ear hinged seat and the oil cylinder seat of falling stake, Described guide pile anchor ear hinged seat is arranged on described limit and floats the sidewall in storehouse, and described guide pile anchor ear is hinged described fixed Position stake anchor ear hinged seat, one end of the described oil cylinder of falling stake is hinged on described guide pile anchor ear, and the other end cuts with scissors Being connected on the described oil cylinder seat of falling stake, the described oil cylinder seat of falling stake is arranged on the side of described hull section.
Preferably, the both sides of described hull section are provided with down pile frame.Can placement positioning stake
Preferably, described storage bin include two storage bin sidewalls, storage bin rear wall, storage bin antetheca and Rear door.
Preferably, described winch is hydraulic wireline winch.Hydraulic wireline winch pulling force is big, it is possible to better meet power Demand.
Preferably, described guide pile anchor ear is provided with guide pile and rises and put winch, be used for putting guide pile.
Due to the fact that and have employed above-mentioned technical scheme, integrally disposed storage bin and excavator on hull Excavate part, it is possible to completing self and excavate and load function, save equipment and manpower, tail end arranges location Stake, it is simple to fixing operating position, arranges winch and is capable of locomotive function.Fu Cang and two in hull section employing Storehouse split design is floated on individual limit, it is possible to the readily accessible and transport of equipment.Employing is fastenedly connected stake, it is possible to more preferably Increase in Fu Cang and limit float the bonding strength in storehouse, keep the stability of hull.Each sidewall of storage bin is adopted With separable assembled, it is simple to disassembled for transport.Guide pile uses the oil cylinder of falling stake, it is simple to the folding and unfolding of guide pile.Use After such scheme, construction machinery and transporting equipment unite two into one, and reduce operating cost, reduce operational personnel Amount and number of devices, reduce energy resource consumption.Dismount and transport simple and easy to do, it is easy to implementation.
Accompanying drawing explanation
Fig. 1 is the explosive view of the present invention;
Fig. 2 is the general assembly schematic diagram of the present invention;
Fig. 3 is the packed and transported state diagram of the present invention;
Wherein, 1-limit buoyancy module;2-falls pile frame;3-is fastenedly connected stake;The 4-oil cylinder seat of falling stake;5-guide pile is embraced Hoop hinged seat;6-guide pile rises puts winch;7-guide pile anchor ear;8-guide pile;9-storage bin sidewall;10- Storage bin rear wall;Door after 11-;12-hydraulic wireline winch;The 13-oil cylinder of falling stake;14-storage bin antetheca;15-digs Pick machine host;16-digging arm;17-bucket;18-limit buoyancy module;19-excavator connects seat;Buoyancy module in 20-; 21-Hydraulic Elements.
Detailed description of the invention
The invention will be further described with embodiment below in conjunction with the accompanying drawings.
As it is shown in figure 1, one digs fortune integrated ship, hull is divided into three parts be welded, including in floating storehouse 20 He Storehouse 1 is floated on two limits, then by the form of bolt and hook by floating storehouse 20 and two limits float storehouse 1 and be connected as One hull platform.It is fastenedly connected during stake 3 is crossed floating storehouse 20 with two and storehouse 1 is floated on two limits, reinforce, Improve bulk strength.In, the front portion in floating storehouse 20 is welded a mounting flange, and docking excavator connects seat 19 Installing excavator main frame 15, install digging arm 16 and bucket 17, excavator main frame 15 can be with flange center Axle rotates, it is simple to excavate and handling operation.By storing bulkhead each several part, including two storage bin sides Wall 9, storage bin rear wall 10, storage bin antetheca 14 and rear door 11 segmentation manufacture, logical in the middle of each segmentation Cross bolt to connect, then with bolt, storing bulkhead is fixed on hull platform, in the rear side interposition of storage bin Put door 11 after leaving, in order to discharging.Install two guide piles 8 in the both sides of hull section additional, be used for solid Determining the position of ship, with convenient working, guide pile 8 is inserted in guide pile anchor ear 7, and guide pile anchor ear 7 leads to Cross guide pile anchor ear hinged seat 5 and be arranged on two sides of hull section tail end.One end of the oil cylinder of falling stake 13 is hinged On guide pile anchor ear 7, the other end is hinged on the oil cylinder seat of falling stake 4, and the oil cylinder seat of falling stake 4 is arranged on hull section Side.Guide pile is installed on guide pile anchor ear 7 rise and put winch 6, by steel wire rope (not shown) control The hoisting and transferring of guide pile 8 processed, during work, is risen by guide pile and puts winch 6 and be inserted into by guide pile 8 The bottom, fixed hull.Regulated the angle of guide pile 8 by the oil cylinder of falling stake 13, the oil cylinder of falling stake 13 pulls fixed Position stake anchor ear 7 rotates along jointed shaft, and then controls keeping flat or erecting of guide pile 8.Tail at hull Hydraulic wireline winch 12 is laid in portion, is used for pulling integrated ship from mobile.Pile frame 2 is installed in the both sides of hull section, just In disposing guide pile 6, guide pile 6 can be placed at down on pile frame 2 after being put into.
As in figure 2 it is shown, during work, arrive behind assigned work region, first put down two, rear portion guide pile 8 Being fixed by hull, then dug out from working area by material by anterior excavator, the material dug out is put Store in storage bin below, after storage bin is loaded into specified storage capacity by the time, mention guide pile 8, then by Whole ship is drawn to specify discharge position by winch, after arriving discharge zone, opens rear door 9, assists with excavator Material is unloaded, one action can be completed.
As it is shown on figure 3, after the work in a region completes, need equipment conveying to another region.This Time, only the fastening bolt of hull need to be unloaded, setting after dismounting with simple hanging device and extracting tool Standby parts simple light, is lifted in container or on haulage vehicle, can transport easily, significantly Expansion equipment can range and region can be arrived.After arriving a new place of working, use letter equally Single hanging device and installation tool, can be conveniently accomplished installation and construct.
Although the detailed description of the invention of the present invention is described by the above-mentioned accompanying drawing that combines, but not to the present invention The restriction of protection domain, for the technology contents that some are well known to those of ordinary skill in the art, the most no longer Repeating, one of ordinary skill in the art should be understood that on the basis of technical scheme, this area skill Art personnel need not to pay various amendments or deformation that creative work can make still at the protection model of the present invention Within enclosing.

Claims (9)

1. digging fortune integrated ship, it is characterised in that including: hull section and excavation portion, described excavation portion is arranged on the front end of described hull section, including excavator main frame, digging arm and bucket;
Storage bin, described storage bin is arranged on the upper surface of described hull section;
Winch, described winch is arranged on the tail end of described hull section;
Guide pile portion, described guide pile portion includes two guide piles, and described guide pile is arranged on two sides of described hull section by guide pile anchor ear.
The most according to claim 1 dig fortune integrated ship, it is characterised in that described hull section includes middle Fu Cang and two limit Fu Cang laying respectively at described middle Fu Cang both sides.
The most according to claim 2 dig fortune integrated ship, it is characterized in that, described guide pile portion also includes the oil cylinder of falling stake, guide pile anchor ear hinged seat and the oil cylinder seat of falling stake, described guide pile anchor ear hinged seat is arranged on described limit and floats the sidewall in storehouse, the hinged described guide pile anchor ear hinged seat of described guide pile anchor ear, one end of the described oil cylinder of falling stake is hinged on described guide pile anchor ear, and the hinged described oil cylinder seat of falling stake of the other end, the described oil cylinder seat of falling stake is arranged on the side of described hull section.
The most according to claim 2 dig fortune integrated ship, it is characterised in that include that two are fastenedly connected stake, described two be fastenedly connected stake cross and fix described in floating storehouse and described two limit Fu Cang.
The most according to claim 2 dig fortune integrated ship, it is characterised in that the bottom in described excavation portion by excavator connect seat be arranged on described in the front end in floating storehouse.
The most according to claim 1 dig fortune integrated ship, it is characterised in that the both sides of described hull section are provided with down pile frame.
The most according to claim 1 dig fortune integrated ship, it is characterised in that described storage bin includes two storage bin sidewalls, storage bin rear wall, storage bin antetheca and rear door.
The most according to claim 1 dig fortune integrated ship, it is characterised in that described winch is hydraulic wireline winch.
9. according to digging fortune integrated ship described in any one of claim 1-8, it is characterised in that be provided with guide pile on described guide pile anchor ear and rise and put winch.
CN201620371198.9U 2016-04-28 2016-04-28 Dig fortune integrated ship Active CN205707187U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620371198.9U CN205707187U (en) 2016-04-28 2016-04-28 Dig fortune integrated ship

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620371198.9U CN205707187U (en) 2016-04-28 2016-04-28 Dig fortune integrated ship

Publications (1)

Publication Number Publication Date
CN205707187U true CN205707187U (en) 2016-11-23

Family

ID=57291079

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620371198.9U Active CN205707187U (en) 2016-04-28 2016-04-28 Dig fortune integrated ship

Country Status (1)

Country Link
CN (1) CN205707187U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105836059A (en) * 2016-04-28 2016-08-10 青州市巨龙环保科技有限公司 Excavating and transporting integrated ship
CN107757833A (en) * 2017-11-24 2018-03-06 中航威海船厂有限公司 A kind of hull excavator pedestal and fabrication and installation technique

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105836059A (en) * 2016-04-28 2016-08-10 青州市巨龙环保科技有限公司 Excavating and transporting integrated ship
CN107757833A (en) * 2017-11-24 2018-03-06 中航威海船厂有限公司 A kind of hull excavator pedestal and fabrication and installation technique

Similar Documents

Publication Publication Date Title
CN205707187U (en) Dig fortune integrated ship
CN104691390A (en) High-level unloading device for self-dumping vehicle
CN208777343U (en) A kind of dead load test on pile foundation preloading device
JPH0551734B2 (en)
CN106315118A (en) Single chain type earthwork vertical lifting device
US2096773A (en) Drag bucket
CN205894140U (en) Colliery material loading forklift
CN105836059A (en) Excavating and transporting integrated ship
CN205894083U (en) A material promotion transfer device for foundation ditch excavation dregs
CN205638453U (en) Supporting waste rock quick transportation in quick -witted rear portion and processing system of digging is combined to colliery rock gangway
CN102124164B (en) Method for delivering large quantities of under water soil to a reclamation area
CN113323005A (en) Construction method of floating suction barrel foundation and floating suction barrel foundation
KR101861688B1 (en) A Salvage Device of a Crane Bucket
CN208379656U (en) A kind of multifunctional excavator
CN201031404Y (en) Digger carrier
CN105697016B (en) System and method for quickly transporting and disposing gangue matched with rear part of coal mine rock roadway fully-mechanized roadheader
CN205712236U (en) A kind of civil engineering efficient excavator tool
CN214143720U (en) Combined leveling device
CN214940343U (en) Floating suction cylinder foundation
CN213625783U (en) Light folding arm support type onshore cutter-suction machine
JP7107767B2 (en) Dredging station and dredging system
KR20150076480A (en) Support structure for Load-Out of heavy structure
CN212452840U (en) Get-off connecting device and excavator
CN212506472U (en) Grab bucket device of dredger
KR20130092917A (en) Crane excavator apparatus loading weight on the base digging plane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190326

Address after: 262518 Ma Song Village, Huanglou Street Office, Qingzhou City, Weifang City, Shandong Province

Patentee after: SHANDONG KEHAN ENVIRONMENTAL PROTECTION TECHNOLOGY Co.,Ltd.

Address before: 262518 Ma Song Village, Huanglou Town, Qingzhou City, Weifang City, Shandong Province

Patentee before: QINGZHOU JULONG ENVIRONMENTAL PROTECTION TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240710

Address after: No. 66 Changping Street, Zhuangjia Community, Xinchang Street, High tech Zone, Weifang City, Shandong Province, 261044

Patentee after: Shandong Julong Intelligent Technology Co.,Ltd.

Country or region after: China

Address before: 262518 Ma Song Village, Huanglou Street Office, Qingzhou City, Weifang City, Shandong Province

Patentee before: SHANDONG KEHAN ENVIRONMENTAL PROTECTION TECHNOLOGY Co.,Ltd.

Country or region before: China