CN105760987A - Method and system for monitoring power engineer - Google Patents

Method and system for monitoring power engineer Download PDF

Info

Publication number
CN105760987A
CN105760987A CN201610059988.8A CN201610059988A CN105760987A CN 105760987 A CN105760987 A CN 105760987A CN 201610059988 A CN201610059988 A CN 201610059988A CN 105760987 A CN105760987 A CN 105760987A
Authority
CN
China
Prior art keywords
engineering project
project
monitoring
implementation phase
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610059988.8A
Other languages
Chinese (zh)
Inventor
陈显龙
陈晓龙
方文
江春华
罗新伟
陈少坤
王晓玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Forever Technology Co Ltd
Original Assignee
Beijing Forever Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Forever Technology Co Ltd filed Critical Beijing Forever Technology Co Ltd
Priority to CN201610059988.8A priority Critical patent/CN105760987A/en
Publication of CN105760987A publication Critical patent/CN105760987A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The invention discloses a method of monitoring a power engineer. The method comprises steps: according to a project type of an engineer project, a monitoring cycle corresponding to the engineer project is determined; execution data for each execution stage in each monitoring cycle in the engineer project are displayed; and according to the real-time data, each execution stage of the engineer project is monitored. According to the method of monitoring the power engineer provided by the embodiment of the invention, the execution data for each execution stage of each engineer project are displayed according to the monitoring cycle, a user can intuitively know and monitor the particular execution condition of each stage, project construction can be timely adjusted, and the project execution efficiency is enhanced.

Description

A kind of power engineering monitoring method and system
Technical field
The application relates to power engineering field, particularly to a kind of power engineering monitoring method and system.
Background technology
In the power engineering project implementation process, put into practice through multiple implementation managements, for way to manage being changed by " extensive, empirical " to " lean, standardization, informationization ", do a large amount of exploration and work targetedly, also form many standardization, information-based achievement.But, these achievements do not play maximum efficiency in Process of Engineering Construction: carry out under engineering management work is mostly online, work actual effect is difficult to control, current check is carried out according to working experience, standardization achievement can not get application, inspection result lacks persuasion, and is difficult to duty fulfillment to people in management process, and job duty does not find full expression in management process.
The monitoring of existing engineering project, only carries out engineering major event and relevant real-time percentage ratio control, Item Detail is not monitored, therefore cannot understand the concrete progress of project, have impact on the efficiency of the project implementation.
Summary of the invention
Technical problems to be solved in this application are to provide a kind of power engineering monitoring method, it is possible to each detail in power engineering implementation process is displayed, allows users to get more information about project progress, the efficiency of the project implementation.
In order to solve the problems referred to above, this application discloses a kind of power engineering monitoring method, including:
Item types according to engineering project, it is determined that the monitoring cycle that described engineering project is corresponding;
Enforcement data in each monitoring cycle implementation phase of showing in described engineering project each;
According to described real time data, it is monitored the implementation phase of to each of engineering project.
Above-mentioned method, it is preferred that when the item types of described engineering project is critical path construction unit, the monitoring cycle of described engineering project monthly carries out;
The monitoring of described engineering project is divided into station electricity consumption is charged, AC system is charged, bipolar low side is charged and bipolar high-end puts into operation.
Above-mentioned method, it is preferred that when the item types of described engineering project is part-to-item project, the monitoring cycle of described engineering project presses Zhou Jinhang.
Above-mentioned method, it is preferred that when the item types of described engineering project is operation matrix management and control table, the monitoring cycle of described engineering project daily carries out.
Above-mentioned method, it is preferred that when the item types of described engineering project is key element management and control check table, according to total factor Controlling principle, described engineering project is monitored.
Above-mentioned method, it is preferred that in described display engineering project each implementation phase enforcement data in each monitoring cycle enforcement data include:
Receive user input engineering project in each implementation phase real time data;
Determine chart display type corresponding implementation phase of this;
According to described icon display type, call corresponding icon and described real time data is displayed.
Above-mentioned method, it is preferred that also include:
The enforcement data of display are compared with the progress data preset;
When not met schedule requirement, send prompting message.
A kind of power engineering monitoring system, including:
Determine unit, for the item types according to engineering project, it is determined that the monitoring cycle that described engineering project is corresponding;
Display unit, the enforcement data in each monitoring cycle implementation phase of for showing in described engineering project each;
Monitoring unit, for according to described real time data, is monitored the implementation phase of to each of engineering project.
Above-mentioned system, it is preferred that described display unit includes:
Receive subelement, for receive user input engineering project in each implementation phase real time data;
Determine subelement, for determining chart display type corresponding implementation phase of this;
Call subelement, for according to described icon display type, calling corresponding icon and described real time data is displayed.
Above-mentioned system, it is preferred that also include:
Comparing unit, for comparing the enforcement data of display with the progress data preset;
Transmitting element, for when not met schedule requirement, sending prompting message.
Compared with prior art, the application includes advantages below:
Disclosed in this application a kind of power engineering monitoring method, including: according to the item types of engineering project, it is determined that the monitoring cycle that described engineering project is corresponding;Enforcement data in each monitoring cycle implementation phase of showing in described engineering project each;According to described real time data, it is monitored the implementation phase of to each of engineering project.The power engineering monitoring method that the embodiment of the present application provides, by the monitoring cycle to each engineering project each implementation phase enforcement data display, make user can carry out the situation that is embodied as in each stage intuitively understanding monitoring, such that it is able to adjusted iterm construction timely, improve project implementation efficiency.
Accompanying drawing explanation
In order to be illustrated more clearly that the technical scheme in the embodiment of the present application, below the accompanying drawing used required during embodiment is described is briefly described, apparently, accompanying drawing in the following describes is only some embodiments of the application, for those of ordinary skill in the art, under the premise not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the method flow diagram of a kind of power engineering monitoring method that the embodiment of the present application provides;
Fig. 2 is the another method flow diagram of a kind of power engineering monitoring method that the embodiment of the present application provides;
Fig. 3 is the another method flow diagram of a kind of power engineering monitoring method that the embodiment of the present application provides;
Fig. 4 is the structural representation of a kind of power engineering monitoring system that the embodiment of the present application provides;
Fig. 5 is a detailed construction schematic diagram of a kind of power engineering monitoring system that the embodiment of the present application provides;
Fig. 6 is the another detailed construction schematic diagram of a kind of power engineering monitoring system that the embodiment of the present application provides.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present application, the technical scheme in the embodiment of the present application is clearly and completely described, it is clear that described embodiment is only some embodiments of the present application, rather than whole embodiments.Based on the embodiment in the application, the every other embodiment that those of ordinary skill in the art obtain under not making creative work premise, broadly fall into the scope of the application protection.
A kind of error code convert file transmission power engineering monitoring method below the application provided carries out detailed description:
With reference to Fig. 1, illustrate the flow chart of a kind of power engineering monitoring method of method the application of a kind of document transmission method of the application, it is applied to browser end, its executive agent can be the controller in browser end, it can also be software program, its concrete execution process includes: it is as follows that it specifically performs process, including:
Step S101: according to the item types of engineering project, it is determined that the monitoring cycle that described engineering project is corresponding;
In the application, in project implementing process, relating to the disparity items progress of many aspects, different projects all has the item types of its correspondence, according to the monitoring cycle that the item types of project is identified project;
Step S102: the enforcement data in each monitoring cycle implementation phase of showing in described engineering project each;
In each engineering project, the implementation phase of having again different, the enforcement data to each implementation phase gradually are shown.
Step S103: according to described real time data, is monitored the implementation phase of to each of engineering project.
By the real time data shown, it is possible to the concrete progress implementation phase of recognizing each timely, understand timely thus the performance of overall engineering project is had.
From such scheme, in a kind of power engineering monitoring method that the embodiment of the present application provides, for different engineering projects, formulate different cycle monitorings, for in each monitoring cycle, the data specifically mode implementation phase of timely by each of this project design displays, thus allowing users to the progress in each stage is had understand timely, understand timely such that it is able to the progress of project is had, improve project implementation efficiency.
In the embodiment of the present application, for critical path construction unit, monthly control principle carries out management and control, divides station electricity consumption is charged, AC system is charged, bipolar low side is charged and bipolar high-end put into operation.
Put into operation associated path for bipolar low side, in concrete implementation process, have the construction stage, the debugging stage, acceptance phase and putting into operation the stage, the management that the different stages is corresponding different, as the construction stage can corresponding one-level management, sequentially it can be seen that the stage of putting into operation can corresponding level Four management.
In bipolar end systems, in each stage, the schedule of unit of display engineering in chronological order, schedule is once monitored by every month.Thus the concrete progress in each stage can be had an overall understanding by user.
When the item types of described engineering project is part-to-item project, the monitoring cycle of described engineering project presses Zhou Jinhang.
For part-to-item project, according to " week " Controlling principle, click low side converter valve is installed, and ejects and part-to-item project week controls interface, including cold in valve, outer cold, the DC fields equipment installation of valve.Management and control situation state, such as same month control.Diode is managed, also corresponding its respective implementation phase, including construction stage, debugging stage, acceptance phase and put into operation the stage.
The data in each stage are shown timely.
When the item types of described engineering project is operation matrix management and control table, the monitoring cycle of described engineering project daily carries out.
Operation matrix management and control table: according to " my god " Controlling principle, click converter valve and install, eject converter valve installation procedure matrix management and control table.Wherein converter valve is installed and is proposed two set operation matrix management and control tables for different technologies route converter valve (big assembly (Siemens technique) is installed with modularity, widgets ABB technology path is installed with general frame).
When the item types of described engineering project is key element management and control check table, according to total factor Controlling principle, described engineering project is monitored.
Key element management and control check table: according to total factor Controlling principle,
Click the technology management and control matrix of valve arrester and interlayer radome installation procedure, eject key element management and control check table.
In the method that the application provides, show with the form that system shows, the points for attention that each stage is needed, and project progress, for each stage of the project implementation is recorded.Including finished item and be not fully complete project etc., user is made intuitively each stage to be monitored.
With reference to Fig. 2, in the embodiment of the present application, in described display engineering project each implementation phase enforcement data in each monitoring cycle enforcement data include:
Step S201: receive user input engineering project in each implementation phase real time data;
Step S202: determine chart display type corresponding implementation phase of this;
Step S203: according to described icon display type, calls corresponding icon and described real time data is displayed.
In the embodiment of the present application, display in the way of chart or progress bar, make monitoring more directly perceived, accurately.
On the basis of Fig. 1, as it is shown on figure 3, in the monitoring method of the application offer, also include:
Step S104: the enforcement data of display are compared with the progress data preset;
Step S105: when not met schedule requirement, sends prompting message.
In the embodiment of the present application, in the specified period, it is not fully complete predetermined set progress, it will send prompting message, supervises each project to complete in time.
Monitoring method with the power engineering shown in Fig. 1 corresponding, the embodiment of the present application provides a kind of power engineering monitoring system, its structural representation as shown in Figure 4, including:
Determine unit 301, for the item types according to engineering project, it is determined that the monitoring cycle that described engineering project is corresponding;
In the application, in project implementing process, relating to the disparity items progress of many aspects, different projects all has the item types of its correspondence, according to the monitoring cycle that the item types of project is identified project;
Display unit 302, the enforcement data in each monitoring cycle implementation phase of for showing in described engineering project each;
In each engineering project, the implementation phase of having again different, the enforcement data to each implementation phase gradually are shown.
Monitoring unit 303, for according to described real time data, is monitored the implementation phase of to each of engineering project.
By the real time data shown, it is possible to the concrete progress implementation phase of recognizing each timely, understand timely thus the performance of overall engineering project is had.
From such scheme, in a kind of power engineering monitoring service system that the embodiment of the present application provides, for different engineering projects, formulate different cycle monitorings, for in each monitoring cycle, the data specifically mode implementation phase of timely by each of this project design displays, thus allowing users to the progress in each stage is had understand timely, understand timely such that it is able to the progress of project is had, improve project implementation efficiency.
On the basis of Fig. 4, in Fig. 5, described display unit 302 includes:
Receive subelement 304, for receive user input engineering project in each implementation phase real time data;
Determine subelement 305, for determining chart display type corresponding implementation phase of this;
Call subelement 306, for according to described icon display type, calling corresponding icon and described real time data is displayed.
On the basis of Fig. 5, in Fig. 6, in the monitoring system that the embodiment of the present application provides, also include:
Comparing unit 307, for comparing the enforcement data of display with the progress data preset;
Transmitting element 308, for when not met schedule requirement, sending prompting message.
It should be noted that each embodiment in this specification all adopts the mode gone forward one by one to describe, what each embodiment stressed is the difference with other embodiments, between each embodiment identical similar part mutually referring to.For device class embodiment, due to itself and embodiment of the method basic simlarity, so what describe is fairly simple, relevant part illustrates referring to the part of embodiment of the method.
Finally, it can further be stated that, in this article, the relational terms of such as first and second or the like is used merely to separate an entity or operation with another entity or operating space, and not necessarily requires or imply the relation that there is any this reality between these entities or operation or sequentially.And, term " includes ", " comprising " or its any other variant are intended to comprising of nonexcludability, so that include the process of a series of key element, method, article or equipment not only include those key elements, but also include other key elements being not expressly set out, or also include the key element intrinsic for this process, method, article or equipment.When there is no more restriction, statement " including ... " key element limited, it is not excluded that there is also other identical element in including the process of described key element, method, article or equipment.
For convenience of description, it is divided into various unit to be respectively described with function when describing apparatus above.Certainly, the function of each unit can be realized in same or multiple softwares and/or hardware when implementing the application.
As seen through the above description of the embodiments, those skilled in the art is it can be understood that can add the mode of required general hardware platform by software to the application and realize.Based on such understanding, the part that prior art is contributed by the technical scheme of the application substantially in other words can embody with the form of software product, this computer software product can be stored in storage medium, such as ROM/RAM, magnetic disc, CD etc., including some instructions with so that a computer equipment (can be personal computer, server, or the network equipment etc.) perform the method described in some part of each embodiment of the application or embodiment.
Above a kind of power engineering monitoring method and system provided herein are described in detail, principle and the embodiment of the application are set forth by specific case used herein, and the explanation of above example is only intended to help and understands the present processes and core concept thereof;Simultaneously for one of ordinary skill in the art, according to the thought of the application, all will change in specific embodiments and applications, in sum, this specification content should not be construed as the restriction to the application.

Claims (10)

1. a power engineering monitoring method, it is characterised in that including:
Item types according to engineering project, it is determined that the monitoring cycle that described engineering project is corresponding;
Enforcement data in each monitoring cycle implementation phase of showing in described engineering project each;
According to described real time data, it is monitored the implementation phase of to each of engineering project.
2. method according to claim 1, it is characterised in that when the item types of described engineering project is critical path construction unit, the monitoring cycle of described engineering project monthly carries out;
The monitoring of described engineering project is divided into station electricity consumption is charged, AC system is charged, bipolar low side is charged and bipolar high-end puts into operation.
3. method according to claim 1, it is characterised in that when the item types of described engineering project is part-to-item project, the monitoring cycle of described engineering project presses Zhou Jinhang.
4. method according to claim 1, it is characterised in that when the item types of described engineering project is operation matrix management and control table, the monitoring cycle of described engineering project daily carries out.
5. method according to claim 1, it is characterised in that when the item types of described engineering project is key element management and control check table, according to total factor Controlling principle, described engineering project is monitored.
6. the method according to claim 1,2,3,4 or 5, it is characterised in that in described display engineering project each implementation phase enforcement data in each monitoring cycle enforcement data include:
Receive user input engineering project in each implementation phase real time data;
Determine chart display type corresponding implementation phase of this;
According to described icon display type, call corresponding icon and described real time data is displayed.
7. method according to claim 1, it is characterised in that also include:
The enforcement data of display are compared with the progress data preset;
When not met schedule requirement, send prompting message.
8. a power engineering monitoring system, it is characterised in that including:
Determine unit, for the item types according to engineering project, it is determined that the monitoring cycle that described engineering project is corresponding;
Display unit, the enforcement data in each monitoring cycle implementation phase of for showing in described engineering project each;
Monitoring unit, for according to described real time data, is monitored the implementation phase of to each of engineering project.
9. system according to claim 8, it is characterised in that described display unit includes:
Receive subelement, for receive user input engineering project in each implementation phase real time data;
Determine subelement, for determining chart display type corresponding implementation phase of this;
Call subelement, for according to described icon display type, calling corresponding icon and described real time data is displayed.
10. system according to claim 8, it is characterised in that also include:
Comparing unit, for comparing the enforcement data of display with the progress data preset;
Transmitting element, for when not met schedule requirement, sending prompting message.
CN201610059988.8A 2016-04-07 2016-04-07 Method and system for monitoring power engineer Pending CN105760987A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610059988.8A CN105760987A (en) 2016-04-07 2016-04-07 Method and system for monitoring power engineer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610059988.8A CN105760987A (en) 2016-04-07 2016-04-07 Method and system for monitoring power engineer

Publications (1)

Publication Number Publication Date
CN105760987A true CN105760987A (en) 2016-07-13

Family

ID=56342645

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610059988.8A Pending CN105760987A (en) 2016-04-07 2016-04-07 Method and system for monitoring power engineer

Country Status (1)

Country Link
CN (1) CN105760987A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1567313A (en) * 2003-06-14 2005-01-19 鸿富锦精密工业(深圳)有限公司 Project management control system and method
US20050144057A1 (en) * 2003-12-26 2005-06-30 Luo Sheng-Chi Work item displaying system and method
CN102799966A (en) * 2012-06-29 2012-11-28 厦门易用软件技术有限公司 Monitoring and early-warning system of enterprise project executing schedule
CN103136636A (en) * 2013-03-15 2013-06-05 中广核工程有限公司 Nuclear power project progress measuring method and system
CN104217299A (en) * 2014-09-18 2014-12-17 陕西高新实业有限公司 Ocean engineering equipment project progress monitoring system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1567313A (en) * 2003-06-14 2005-01-19 鸿富锦精密工业(深圳)有限公司 Project management control system and method
US20050144057A1 (en) * 2003-12-26 2005-06-30 Luo Sheng-Chi Work item displaying system and method
CN102799966A (en) * 2012-06-29 2012-11-28 厦门易用软件技术有限公司 Monitoring and early-warning system of enterprise project executing schedule
CN103136636A (en) * 2013-03-15 2013-06-05 中广核工程有限公司 Nuclear power project progress measuring method and system
CN104217299A (en) * 2014-09-18 2014-12-17 陕西高新实业有限公司 Ocean engineering equipment project progress monitoring system

Similar Documents

Publication Publication Date Title
CN101268427B (en) Aggregation of asset use indices within a process plant
US8589198B2 (en) Methods and systems involving power system grid management
Mori et al. Remote monitoring and maintenance system for CNC machine tools
CN103176892B (en) A kind of page monitoring method and system
CN103477326A (en) Infrastructure control fabric system and method
CN110086697A (en) Household electrical appliances fault handling method and device
CN102183935B (en) Capacity monitoring method of robot spot-welding production line
CN106502235B (en) Test method and system of automobile controller
JP2012143138A (en) Method and system for outage restoration
CN103577165A (en) Form generation method and form generator
KR20150043170A (en) System and Method for Managing Energy
WO2022205948A1 (en) Sensitivity analysis and equipment failure rate-based electrical grid accident level pre-determination system and method
CN101493764A (en) Business events flow path visual dynamic model building and functional operations linkage method
EP2747001A1 (en) A method and a system for granting an access to MES functionalities
CN105404530B (en) It is a kind of to realize easy deployment and the system and method using private clound
CN106354507A (en) Enterprise-level application management system and method for operating same
CN110535670B (en) NFV capacity planning method and electronic equipment
CN108737543B (en) Distributed Internet of things middleware and working method
CN105938490A (en) Intelligent switching method and system for connecting web application system with data source
CN101527012A (en) Flow template generation method, flow mission executor determining method and devices thereof
CN105760987A (en) Method and system for monitoring power engineer
KR20140028163A (en) Management system for industrial robot
JP6221715B2 (en) Upper management apparatus, lower management apparatus, power consumption management system, power consumption management method, and power consumption management program
CN106533788A (en) Network anomaly monitoring method and system
CN105761015B (en) Intelligent error preventing method and system suitable for operation ticket

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160713

RJ01 Rejection of invention patent application after publication