CN104217299A - Ocean engineering equipment project progress monitoring system - Google Patents
Ocean engineering equipment project progress monitoring system Download PDFInfo
- Publication number
- CN104217299A CN104217299A CN201410477057.0A CN201410477057A CN104217299A CN 104217299 A CN104217299 A CN 104217299A CN 201410477057 A CN201410477057 A CN 201410477057A CN 104217299 A CN104217299 A CN 104217299A
- Authority
- CN
- China
- Prior art keywords
- layer
- engineering equipment
- ocean engineering
- client
- equipment project
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention relates to the field of the ocean engineering equipment and specifically relates to an ocean engineering equipment project progress monitoring system. The ocean engineering equipment project progress monitoring system comprises three layers, namely a client, a Web application layer and a data layer, all of which are orderly connected from top to bottom, wherein the client comprises a Web browser and a client downloading tool, the two of which are orderly arranged; the Web application layer comprises an interface presentation layer, a functional logic layer and a platform layer. The ocean engineering equipment project progress monitoring system based on Web is preliminarily designed; the system is well integrated with the ideas of ocean engineering equipment project management and system design, and is capable of effectively performing monitoring and management on the construction progress of the projection construction process, and as a result, the working efficiency is improved; meanwhile, advance control can be realized on the postponing of the projection construction progress or accidents, and therefore, the influence of post-action control on the construction period of the whole ocean engineering equipment project is avoided.
Description
Technical field
The present invention relates to oceanographic engineering device field, be specifically related to a kind of sea dress project process supervisory system.
Background technology
2009, the Ministry of Industry and Information Technology formally issued " shipping industry adjustment and development planning ". for the development of marine engineering equipment manufacturing enterprise of China brings unprecedented opportunities.But the project construction of marine engineering equipment manufacturing enterprise all exists, and scale is large, the cycle long, risk
High, investment amount is huge and the features such as technical sophistication, in project construction process, how to use new type management technology to realize High-efficient Production, effectively management has become the focus of enterprises pay attention.In today that internet height is universal, industry just progressively changes, in order to suitable to information-based, globalization direction
Answer client to the demand of shipbuilding progress and rhythm, marine engineering equipment manufacturing enterprise must propose requirement that is higher, that upgrade to the Schedule monitoring of project, and realizing information-based monitoring is mode the most easily.
Summary of the invention
The present invention is intended to propose a kind of kind sea dress project process supervisory system realizing High-efficient Production, effectively management.
Technical program of the present invention lies in:
A kind of sea dress project process supervisory system, native system comprises three layers, is respectively the client, Web application layer and the data Layer that connect successively up and down; Wherein, client is the Web browser and client downloads instrument that set gradually; Web application layer comprises interface presentation layer, function logic layer and podium level.
Preferably, described function logic layer is Basic Information Management, planning management assembly, task management assembly, actual progress Management Unit and the deviation and early warning assembly that are set up in parallel successively.
Or preferably, described podium level is database processing component, file processing assembly, authority processing components and workflow engine.
Or preferably, described data Layer is database, collection of document and workflow message storehouse.
Technique effect of the present invention is:
Primary design sing on web marine engineering equipment project process supervisory system herein, this system is integrated with the thought of marine engineering equipment project management and system preferably, effectively can carry out monitoring management to project building course progress of implementation, improve work efficiency. can realize building the postponement of progress to project or accident controls in advance simultaneously, efficiently avoid the impact owing to controlling whole marine engineering equipment project construction duration afterwards.
Embodiment
A kind of sea dress project process supervisory system, native system comprises three layers, is respectively the client, Web application layer and the data Layer that connect successively up and down; Wherein, client is the Web browser and client downloads instrument that set gradually; Web application layer comprises interface presentation layer, function logic layer and podium level.Described function logic layer is Basic Information Management, planning management assembly, task management assembly, actual progress Management Unit and the deviation and early warning assembly that are set up in parallel successively.Described podium level is database processing component, file processing assembly, authority processing components and workflow engine.Described data Layer is database, collection of document and workflow message storehouse.
Client is responsible for carrying out alternately with user, mainly provides friendly user interface and Web browser service.User interface can complete the function receiving the service data that user asks and display server returns; For B/S structure, the core that systemic-function realizes is concentrated on the server, and Web browser service function utilizes wide area network to be connected with server exactly, realizes uploading and downloading of user's request packet.Client can be desktop Java application program or wireless mobile apparatus, as PDA etc. apply MVC design pattern here.
Web service layer, comprising service presentation layer and Business Logic 2 levels. it is mutual that the former is mainly used in client, namely send and Business Logic process from client layer receipt message and event and by it, and obtain result from Business Logic and it is sent to client with the form of response; The latter is mainly used in each applied logic to be packaged into intermediate module, provide and serve the mutual of presentation layer and data Layer, namely from service presentation layer obtaining request, it is sent to data Layer process, and obtains result from data Layer and return to service presentation layer.Here DAO Design Mode is applied.
Data Layer, also known as Information Level or resource layer, mainly to the operation layer of raw data, is specially Web application layer and clients providing data service.Data Layer herein mainly comprises database, collection of document and workflow message storehouse.
Claims (4)
1. a sea dress project process supervisory system, is characterized in that: native system comprises three layers, is respectively the client, Web application layer and the data Layer that connect successively up and down; Wherein, client is the Web browser and client downloads instrument that set gradually; Web application layer comprises interface presentation layer, function logic layer and podium level.
2., as claim 1 one kind sea dress project process supervisory system, it is characterized in that: described function logic layer is Basic Information Management, planning management assembly, task management assembly, actual progress Management Unit and the deviation and early warning assembly that are set up in parallel successively.
3., as claim 1 one kind sea dress project process supervisory system, it is characterized in that: described podium level is database processing component, file processing assembly, authority processing components and workflow engine.
4., as claim 1 one kind sea dress project process supervisory system, it is characterized in that: described data Layer is database, collection of document and workflow message storehouse.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410477057.0A CN104217299A (en) | 2014-09-18 | 2014-09-18 | Ocean engineering equipment project progress monitoring system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410477057.0A CN104217299A (en) | 2014-09-18 | 2014-09-18 | Ocean engineering equipment project progress monitoring system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104217299A true CN104217299A (en) | 2014-12-17 |
Family
ID=52098758
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410477057.0A Pending CN104217299A (en) | 2014-09-18 | 2014-09-18 | Ocean engineering equipment project progress monitoring system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104217299A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105760987A (en) * | 2016-04-07 | 2016-07-13 | 北京恒华伟业科技股份有限公司 | Method and system for monitoring power engineer |
-
2014
- 2014-09-18 CN CN201410477057.0A patent/CN104217299A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105760987A (en) * | 2016-04-07 | 2016-07-13 | 北京恒华伟业科技股份有限公司 | Method and system for monitoring power engineer |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Liu et al. | Retracted: Using BIM to improve the design and construction of bridge projects: A case study of a long-span steel-box arch bridge project | |
CN103646154A (en) | Three-dimensional digitization final assembly technology collaborative design system | |
WO2008124216A3 (en) | Method and apparatus for planning air refueling for aircraft | |
WO2014210137A3 (en) | Method, apparatus, and computer program product for providing mobile location based sales lead identification | |
CN108053180A (en) | A kind of finishing project information management-control method and system | |
WO2010075084A3 (en) | User interface tools | |
PE20120932A1 (en) | METHODS AND APPARATUS TO PROVIDE THE DISPOSAL OF PROMOTIONAL OFFERS IN A BETTING ENVIRONMENT | |
CN103336856A (en) | Virtual steel structure pre-assembly method based on visual model | |
WO2014107489A3 (en) | System and method for crowdsourcing map production | |
CN106779476A (en) | A kind of Construction Schedule management platform and method based on BIM IFC technologies | |
WO2015010128A3 (en) | Flexible 3-d character rigging blocks with interface obligations | |
CN103577165A (en) | Form generation method and form generator | |
WO2018022951A3 (en) | Collection of vnf (virtual network function) performance measurements related to virtualized resources | |
CN103631804B (en) | Electronic map cuts drawing method and processing system | |
KR101584575B1 (en) | System for managing manufacturing process of vessel and method thereof | |
CN104036358A (en) | Automated banking operation scheduling system | |
KR101764541B1 (en) | Apparatus and Method for Maintaining Wind Power Generator | |
CN104217299A (en) | Ocean engineering equipment project progress monitoring system | |
CN104991826B (en) | A kind of virtual machine deployment method and device | |
CN104021497A (en) | Train fault overhaul terminal system based on mobile terminal | |
CN105704250A (en) | Cloud manufacture-oriented resource integration management method | |
ATE517479T1 (en) | MESSAGE SEQUENCE MANAGEMENT OF BUSINESS-BASED RELATED EVENTS | |
Lee et al. | Applied technologies in minimizing accidents in construction industry | |
CN102752332A (en) | Service activation method and device | |
KR20180000182A (en) | Mobile Terminal for Maintaining Wind Power Generator and Maintaining Method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20141217 |
|
WD01 | Invention patent application deemed withdrawn after publication |