CN105751009B - 一种圆形大棒材的定尺控制方法 - Google Patents
一种圆形大棒材的定尺控制方法 Download PDFInfo
- Publication number
- CN105751009B CN105751009B CN201610120450.3A CN201610120450A CN105751009B CN 105751009 B CN105751009 B CN 105751009B CN 201610120450 A CN201610120450 A CN 201610120450A CN 105751009 B CN105751009 B CN 105751009B
- Authority
- CN
- China
- Prior art keywords
- measurement
- big rod
- roller
- movement velocity
- way
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23Q—DETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
- B23Q17/00—Arrangements for observing, indicating or measuring on machine tools
- B23Q17/20—Arrangements for observing, indicating or measuring on machine tools for indicating or measuring workpiece characteristics, e.g. contour, dimension, hardness
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Length Measuring Devices With Unspecified Measuring Means (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
本发明公开了一种圆形大棒材的定尺控制方法,所述方法包括以下步骤:1)标定起始计量点与测距点之间的位置X,设定大棒材定尺长度P,根据辊道的不同运动速度得到可变误差集Δan;2)设定辊道的运动速度为e,根据该运动速度e和可变误差集Δan赋予可变误差Δa;3)测量大棒材端面与测量点之间的距离S,计算实际定尺长度L=X‑S+Δa;4)比较L是否与P相等,当L=P时,开始切割;5)切割完毕后,起始计量点后辊道运动速度给定f=C*e,C为大于等于10的整数;6)设定测量装置保护距离B,继续测量S,比较S是否小于B,当S小于B时,测量装置启动保护动作;7)当保护时间T结束后,测量装置自动升起,返回步骤3),其中T采用下式计算:
Description
技术领域
本发明涉及大棒材生产领域,尤其是涉及一种圆形大棒材的定尺控制方法。
背景技术
目前在钢铁生产领域,定尺法主要有红外摄像定尺法、测量辊定尺法和侧向测距定尺法。其中在大棒材生产领域主要运用测量辊定尺法与侧向测距定尺法。测量辊定尺法主要利用辊子转速n与辊径d的成绩累计计算,由于棒材生产线的测量辊为凹形,棒材在辊面存在相对位移,即辊径计算值d与棒材实际位移点直径D及测量辊磨损带来的误差△d,因此计算过程中会产生n*pi*△d(pi为圆周率)的误差,此误差会随着定尺长度累积。侧向测距法因测量定位点在不同时刻存在横向或纵向位移,其受不同定尺长度的影响较明显,会产生计算可变误差△x,对测量位置的定位较为苛刻。
发明内容
本发明的目的在于提供一种圆形大棒材的定尺控制方法,该方法可解决因凹形测量辊与大棒材间的相对位移带来的定尺计算误差,控制精确,定尺一致。
为达到上述目的,本发明采用了以下的技术方案:
一种圆形大棒材的定尺控制方法,所述方法包括以下步骤:
1)标定起始计量点与测距点之间的位置X,设定大棒材定尺长度P,根据辊道的不同运动速度得到可变误差集△an;
2)设定辊道的运动速度为e,根据该运动速度e和可变误差集△an得到该运动速度e下的可变误差△a;
3)测量大棒材端面与测量点之间的距离S,计算大棒材的实际定尺长度L=X-S+△a;
4)比较L是否与P相等,当L≠P时,返回步骤3)测量S并计算L;当L=P时,开始切割大棒材;
5)切割完毕后,起始计量点后辊道运动速度给定f=C*e,C为大于等于10的整数;
6)设定测量装置保护距离B,并继续测量S,比较S是否小于B;当S小于B时,测量装置启动保护动作使测量装置自动下落至大棒材运动平面以下;
7)当保护时间T结束后,测量装置自动升起,返回步骤3)中继续下一支大棒材的测量切割;其中T采用下式计算:
本发明中步骤3)中测量大棒材端面与测量点之间的距离S时采用实时测量、计算并计算比较实际定尺长度L,间隔时间很短,可在百分之几秒。
本发明中所用单位为本领域的常用单位,比如,X、P、S、B、L为毫米,辊道运动速度为米/分钟;保护时间为秒。
与现有技术相比,本发明具有如下的优点:
①消除了棒材因在凹形测量辊上的左右位置变动引发的计量误差,且效果显著。
②可以有效保护棒材对测距装置正向冲击。
③引入多段速误差集合,消除测量过程因速度波动带来的误差,且效果显著。
④直接消除了侧向测距定尺法因测量夹角引发的计量误差。
本发明不依赖于测距设备的具体形式,可适用于激光、超声波等测距设备进行嵌套复合;如果用于开发软件可无限制易于实施,能够直接消除测量辊凹槽表面与圆形棒材因相对位移而产生的计量误差并且效果显著。
附图说明
图1为本发明方法所采用装置的结构示意图;
图2为本发明方法的流程图。
具体实施方式
下面以附图和具体实施方式对本发明作进一步详细的说明。
如图1和图2所示,一种圆形大棒材的定尺控制方法,所述方法包括以下步骤:
1)标定起始计量点与测距点之间的位置X,设定大棒材定尺长度P,根据辊道的不同运动速度得到可变误差集△an;
2)设定辊道的运动速度为e,根据该运动速度e和可变误差集△an得到该运动速度e下的可变误差△a;
3)测量大棒材端面与测量点之间的距离S,计算大棒材的实际定尺长度L=X-S+△a;
4)比较L是否与P相等,当L≠P时,返回步骤3)测量S并计算L;当L=P时,开始切割大棒材;
5)切割完毕后,起始计量点后辊道运动速度给定f=C*e,C为大于等于10的整数;
6)设定测量装置保护距离B,并继续测量S,比较S是否小于B;当S小于B时,测量装置启动保护动作使测量装置自动下落至大棒材运动平面以下;
7)当保护时间T结束后,测量装置自动升起,返回步骤3)中继续下一支大棒材的测量切割;其中T采用下式计算:
实施例1
1)标定起始计量点与测量点之间的距离X=17030mm,设定大棒材的定尺长度P=5600mm,根据辊道的不同运动速度e={0.25m/min,0.28m/min,0.30m/min,0.33m/min,0.35m/min},分别得到误差集合△an={8mm,10mm,12mm,15mm,18mm};
2)设定辊道速度为e=0.28m/min,则根据误差集合该运动速度下的误差△a=10mm;
3)测量大棒材端面与测量点的距离S,计算棒材定尺长度L=17030-S+10mm;
4)比较L与P的数值,当L=P=5600mm时,开始切割;
5)切割完毕后,起始计量点后的辊道运动速度给定为f=9.8m/min(C=35);
6)设定测量装置的保护距离为B=1500mm,当S<1500mm时,测量装置启动保护动作使测量装置自动下落至大棒材运动平面以下;
7)保护时间当保护时间T结束后,测量装置自动升起,返回步骤3)继续下一支大棒材的测量切割。
最后所应说明的是,以上实施例仅用以说明本发明的技术方案而非限制。尽管参照实施例对本发明进行了详细说明,本领域的普通技术人员应该理解,对本发明的技术方案进行修改或者等同替换,都不脱离本发明技术方案的精神和范围,其均应涵盖在本发明的权利要求范围当中。
Claims (1)
1.一种圆形大棒材的定尺控制方法,所述方法包括以下步骤:
1)标定起始计量点与测量点之间的位置X,设定大棒材定尺长度P,根据辊道的不同运动速度得到可变误差集△an;
2)设定辊道的运动速度为e,根据该运动速度e和可变误差集△an得到该运动速度e下的可变误差△a;
3)测量大棒材端面与测量点之间的距离S,计算大棒材的实际定尺长度L=X-S+△a;
4)比较L是否与P相等,当L≠P时,返回步骤3)测量S并计算L;当L=P时,开始切割大棒材;
5)切割完毕后,起始计量点后的辊道运动速度给定f=C*e,C为大于等于10的整数;
6)设定测量装置保护距离B,并继续测量S,比较S是否小于B;当S小于B时,测量装置启动保护动作使测量装置自动下落至大棒材运动平面以下;
7)当保护时间T结束后,测量装置自动升起,返回步骤3)中继续下一支大棒材的测量切割;其中T采用下式计算:
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610120450.3A CN105751009B (zh) | 2016-03-03 | 2016-03-03 | 一种圆形大棒材的定尺控制方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610120450.3A CN105751009B (zh) | 2016-03-03 | 2016-03-03 | 一种圆形大棒材的定尺控制方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105751009A CN105751009A (zh) | 2016-07-13 |
CN105751009B true CN105751009B (zh) | 2017-11-21 |
Family
ID=56332441
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610120450.3A Active CN105751009B (zh) | 2016-03-03 | 2016-03-03 | 一种圆形大棒材的定尺控制方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105751009B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110497010B (zh) * | 2019-08-08 | 2021-02-02 | 北京科技大学设计研究院有限公司 | 一种铝合金中厚板剪切长度定尺设备及控制方法 |
CN115816164B (zh) * | 2022-12-14 | 2023-08-29 | 苏州休奇自动化科技有限公司 | 一种管件装配机的管件定长裁切系统 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101954512A (zh) * | 2010-09-17 | 2011-01-26 | 重庆钢铁(集团)有限责任公司 | 中厚板定尺剪板方法 |
JP4959060B2 (ja) * | 2001-02-19 | 2012-06-20 | 株式会社ジェイテクト | 加工装置 |
CN103100677A (zh) * | 2012-12-31 | 2013-05-15 | 内蒙古包钢钢联股份有限公司 | 一种连铸切割机用铸坯定尺装置及定尺方法 |
TWI419762B (zh) * | 2010-09-02 | 2013-12-21 | Univ Nat Yunlin Sci & Tech | 工具機工件線上量測方法及其裝置 |
CN104723172A (zh) * | 2015-03-25 | 2015-06-24 | 山东钢铁股份有限公司 | 一种钢板定尺机及其定尺方法 |
CN104874852A (zh) * | 2015-06-18 | 2015-09-02 | 傅昌明 | 铝棒测长和具有双剪功能的热剪设备及其应用 |
-
2016
- 2016-03-03 CN CN201610120450.3A patent/CN105751009B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4959060B2 (ja) * | 2001-02-19 | 2012-06-20 | 株式会社ジェイテクト | 加工装置 |
TWI419762B (zh) * | 2010-09-02 | 2013-12-21 | Univ Nat Yunlin Sci & Tech | 工具機工件線上量測方法及其裝置 |
CN101954512A (zh) * | 2010-09-17 | 2011-01-26 | 重庆钢铁(集团)有限责任公司 | 中厚板定尺剪板方法 |
CN103100677A (zh) * | 2012-12-31 | 2013-05-15 | 内蒙古包钢钢联股份有限公司 | 一种连铸切割机用铸坯定尺装置及定尺方法 |
CN104723172A (zh) * | 2015-03-25 | 2015-06-24 | 山东钢铁股份有限公司 | 一种钢板定尺机及其定尺方法 |
CN104874852A (zh) * | 2015-06-18 | 2015-09-02 | 傅昌明 | 铝棒测长和具有双剪功能的热剪设备及其应用 |
Also Published As
Publication number | Publication date |
---|---|
CN105751009A (zh) | 2016-07-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104520055B (zh) | 用于切割金属薄板胚料的方法 | |
CN104898658B (zh) | 自主移动机器人及其控制方法 | |
CN105057369B (zh) | 一种精轧机侧导板对中精度的标定方法及装置 | |
CN105751009B (zh) | 一种圆形大棒材的定尺控制方法 | |
CN106709193B (zh) | 基于学习算法的航空发动机薄壁叶片加工误差补偿方法 | |
CN105312963B (zh) | 钢板定尺剪切的定位方法 | |
CN105537272B (zh) | 中厚板轧制过程的端部剪切方法 | |
EP2961561B1 (de) | Verfahren zum schneiden einer blechplatine mit einer vorgegebenen kontur | |
CN203231743U (zh) | 一种基于直线度在线检测自动标记合格品的装置 | |
CN107442757A (zh) | 一种连铸坯定重定尺切割方法 | |
US20180047151A1 (en) | Method for correcting a predetermined cutting path for cutting a sheet metal blank | |
CN101666629B (zh) | 测量曲面的系统和方法 | |
CN108393556A (zh) | 一种激光测量板坯定尺的方法 | |
CN103913140A (zh) | 铸坯长度精确测量装置及其方法 | |
CN104950802A (zh) | 热连轧机飞剪动态剪切量控制方法 | |
CN104942652B (zh) | 激光衍射在线对刀检刀系统及方法 | |
CN105834244B (zh) | 一种卷取机助卷辊踏步控制校正方法 | |
CN107827344A (zh) | 一种精确获取玻璃裁切位置的横切装置 | |
CN104511487B (zh) | 浪形钢板长度的检测方法 | |
CN102717044B (zh) | 一种连铸坯射钉过程控制方法 | |
CN110497010A (zh) | 一种铝合金中厚板剪切长度定尺设备及控制方法 | |
FI123806B (fi) | Mittaus- ja työstömenetelmä lasertyöstössä | |
CN103978173A (zh) | 一种用于连铸钢定量切割的新方法 | |
CN104942013B (zh) | 热连轧机精轧入口夹送辊辊径在线控制方法 | |
JP6619205B2 (ja) | 原木の切削制御装置、原木の切削制御方法および原木の切削システム |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |