CN105735146B - 混凝土斜拉桥的牵索挂篮异索施工方法 - Google Patents
混凝土斜拉桥的牵索挂篮异索施工方法 Download PDFInfo
- Publication number
- CN105735146B CN105735146B CN201610138191.7A CN201610138191A CN105735146B CN 105735146 B CN105735146 B CN 105735146B CN 201610138191 A CN201610138191 A CN 201610138191A CN 105735146 B CN105735146 B CN 105735146B
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- cable
- concrete deck
- suspension
- stayed bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/10—Cantilevered erection
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明涉及一种混凝土斜拉桥的牵索挂篮异索施工方法,在混凝土斜拉桥的逐段挂篮分节浇筑施工过程中,对混凝土斜拉桥的任意一节段梁块施工时,采用下一节段梁块对应的斜拉索作为本节段梁块对应挂篮的锚固用辅助索,待本节段梁块完成混凝土浇筑并等强后,挂设本节段的斜拉索并张拉至设计力;上述施工工艺,是解决当不同梁块上两条斜拉索锚固点间的横桥向距离不同时,需要设计加工结构复杂的挂篮弧形首的问题,与现有技术相比本发明通过采用非本节段斜拉索来锚固本节段挂篮,从而避免了设计加工结构复杂的挂篮弧形首,本发明简单了工艺操作,降低了成本;本发明优化了施工工艺,缩短了节段施工工期。
Description
技术领域
本发明涉及一种桥梁施工方法,尤其是涉及一种混凝土斜拉桥的牵索挂篮施工方法。
背景技术
目前国内预应力混凝土斜拉桥常采用牵索挂篮本索施工工艺,进行悬臂浇筑施工,斜拉索在箱梁上位置较为规则,本索施工比较合理。
随着桥梁结构的不断推陈出新,中央索面超宽幅箱梁结构渐成为常态,此种结构中,由于斜拉索在箱梁上锚固点的横向索距变化较大,采用传统本索施工工艺会让牵索挂篮的弧形首部位面临设计繁琐、结构复杂、受力不明确等诸多问题。
发明内容
本发明的目的就是为了克服上述现有技术存在的缺陷而提供一种混凝土斜拉桥的牵索挂篮异索施工方法,本发明施工工艺能够解决斜拉索在梁端的横向索距变化大问题,并且避免了本索施工所需要的挂篮弧形首结构复杂的问题。
本发明的目的可以通过以下技术方案来实现:
混凝土斜拉桥的牵索挂篮异索施工方法,在混凝土斜拉桥的逐段挂篮分节浇筑施工过程中,对混凝土斜拉桥的任意一节段梁块施工时,采用下一节段梁块对应的斜拉索作为本节段梁块对应挂篮的锚固用辅助索,待本节段梁块完成混凝土浇筑并等强后,挂设本节段的斜拉索并张拉至设计力;所述的斜拉索采用空间索面形式,顺桥向为发散型布置,横桥向为中央双索面,且不同梁块上两条斜拉索锚固点间的横桥向距离不同。
进一步地,所述的本节段梁块对应挂篮的锚固用辅助索上端固定在索塔上的下一节段梁块的斜拉索孔位上,本节段梁块对应挂篮的锚固用辅助索中部从待浇筑本节段梁块前部通过,且与本节段梁块前端有间隔,所述的锚固用辅助索下端锚固在本节段梁块对应挂篮的弧形首前部。
进一步地,所述的斜拉索采用热挤聚乙烯高强钢丝拉索。所述的斜拉索按《斜拉索热挤聚乙烯高强钢丝拉索技术条件》(GB/T18365-200)的要求进行外观、长度、超张拉、弹性模量、静载性能等检测外,其动载性能应满足:应力上限为0.45fpk ,应力幅值为200MPa,经2.0×106 次循环脉冲加载试验,钢丝破断数应不大于斜拉索钢丝总数的5%,斜拉索保护层不应有明显损伤;锚具无明显损坏,锚杯与螺母旋合正常。
进一步地,所述的斜拉索施工过程采用先塔端展开、安装,然后梁上牵引安装,再梁端张拉的施工工艺。
进一步地,所述的锚固用辅助索与挂篮的固定方式为:锚固用辅助索穿过挂篮,并依次通过张拉底座、球形垫圈、第一锚固螺母、锁紧螺母、撑脚、千斤顶、第二锚固螺母固定。
本发明的有益效果:本发明施工工艺,是解决当不同梁块上两条斜拉索锚固点间的横桥向距离不同时,需要设计加工结构复杂的挂篮弧形首的问题,与现有技术相比本发明通过采用非本节段斜拉索来锚固本节段挂篮,从而避免了设计加工结构复杂的挂篮弧形首,本发明简单了工艺操作,降低了成本;本发明优化了施工工艺,缩短了节段施工工期。
附图说明
图1为本发明工艺施工时斜拉索施工示意图;
图2为图1所示局部放大图。
图中:1、锚固用辅助索;2、斜拉索;3、索塔;4、本节段梁块;5、挂篮。
具体实施方式
下面结合附图和具体实施例对本发明进行详细说明。
实施例
参考图1、图2,一种混凝土斜拉桥的牵索挂篮异索施工方法,先施工索塔3,然后由索塔3向两端进行混凝土斜拉桥的逐段挂篮分节浇筑施工,对混凝土斜拉桥的一节段梁块4施工时,采用下一节段梁块对应的斜拉索作为本节段梁块对应挂篮5的锚固用辅助索1,待本节段梁块4完成混凝土浇筑并等强后,挂设并张拉本节段的斜拉索2至设计力,将本节段梁块4对应挂篮5的锚固用辅助索1梁端松开,并将该锚固用辅助索1作为下一节段梁块的斜拉索;所述的斜拉索2采用空间索面形式,顺桥向为发散型布置,横桥向为中央双索面,且不同梁块上两条斜拉索锚固点间的横桥向距离不同。
本节段梁块对应挂篮的锚固用辅助索上端固定在索塔3上的下一节段梁块的斜拉索孔位上,本节段梁块对应挂篮的锚固用辅助索中部从待浇筑本节段梁块前部通过,且与本节段梁块前端有间隔,锚固用辅助索下端锚固在本节段梁块对应挂篮的弧形首前部。
斜拉索采用热挤聚乙烯高强钢丝拉索。斜拉索按《斜拉索热挤聚乙烯高强钢丝拉索技术条件》(GB/T18365-200)的要求进行外观、长度、超张拉、弹性模量、静载性能等检测外,其动载性能应满足:应力上限为0.45fpk ,应力幅值为200MPa,经2.0×106 次循环脉冲加载试验,钢丝破断数应不大于斜拉索钢丝总数的5%,斜拉索保护层不应有明显损伤;锚具无明显损坏,锚杯与螺母旋合正常。
斜拉索施工过程采用先塔端展开、安装,然后梁上牵引安装,再梁端张拉的施工工艺。
锚固用辅助索与挂篮的固定方式为:锚固用辅助索穿过挂篮5,并依次通过张拉底座、球形垫圈、第一锚固螺母、锁紧螺母、撑脚、千斤顶、第二锚固螺母,进行固定。
上述的对实施例的描述是为便于该技术领域的普通技术人员能理解和使用发明。熟悉本领域技术的人员显然可以容易地对这些实施例做出各种修改,并把在此说明的一般原理应用到其他实施例中而不必经过创造性的劳动。因此,本发明不限于上述实施例,本领域技术人员根据本发明的揭示,不脱离本发明范畴所做出的改进和修改都应该在本发明的保护范围之内。
Claims (5)
1.一种混凝土斜拉桥的牵索挂篮异索施工方法,其特征在于,在混凝土斜拉桥的逐段挂篮分节浇筑施工过程中,对混凝土斜拉桥的任一节段梁块施工时,采用下一节段梁块对应的斜拉索作为本节段梁块对应挂篮的锚固用辅助索,待本节段梁块完成混凝土浇筑并等强后,挂设本节段的斜拉索并张拉至设计力;所述的斜拉索采用空间索面形式,顺桥向为发散型布置,横桥向为中央双索面,且不同梁块上两条斜拉索锚固点间的横桥向距离不同。
2.根据权利要求1所述的混凝土斜拉桥的牵索挂篮异索施工方法,其特征在于,本节段梁块对应挂篮的锚固用辅助索上端固定在索塔上的下一节段梁块的斜拉索孔位上,本节段梁块对应挂篮的锚固用辅助索中部从待浇筑本节段梁块前部通过,且与本节段梁块前端有间隔,所述的锚固用辅助索下端锚固在本节段梁块对应挂篮的弧形首前部。
3.根据权利要求1所述的混凝土斜拉桥的牵索挂篮异索施工方法,其特征在于,所述的斜拉索采用热挤聚乙烯高强钢丝拉索。
4.根据权利要求1所述的混凝土斜拉桥的牵索挂篮异索施工方法,其特征在于,所述的斜拉索施工过程采用先塔端展开、安装,然后梁上牵引安装,再梁端张拉的施工工艺。
5.根据权利要求1所述的混凝土斜拉桥的牵索挂篮异索施工方法,其特征在于,所述的锚固用辅助索与挂篮的固定方式为:锚固用辅助索穿过挂篮,并依次通过张拉底座、球形垫圈、第一锚固螺母、锁紧螺母、撑脚、千斤顶、第二锚固螺母。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610138191.7A CN105735146B (zh) | 2016-03-11 | 2016-03-11 | 混凝土斜拉桥的牵索挂篮异索施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610138191.7A CN105735146B (zh) | 2016-03-11 | 2016-03-11 | 混凝土斜拉桥的牵索挂篮异索施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105735146A CN105735146A (zh) | 2016-07-06 |
CN105735146B true CN105735146B (zh) | 2017-11-03 |
Family
ID=56250303
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610138191.7A Active CN105735146B (zh) | 2016-03-11 | 2016-03-11 | 混凝土斜拉桥的牵索挂篮异索施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105735146B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110055904A (zh) * | 2019-06-03 | 2019-07-26 | 核工业长沙中南建设工程集团公司 | 桥梁施工装置及桥梁施工方法 |
CN112942661B (zh) * | 2021-01-15 | 2022-09-06 | 北京市建筑工程研究院有限责任公司 | 一种带有柔性索网边界的斜拉索施工方法 |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1123861A (zh) * | 1995-08-28 | 1996-06-05 | 铁道部大桥工程局 | 预应力混凝土斜拉桥短平台复合型牵索挂篮施工工艺 |
JP3946342B2 (ja) * | 1998-03-09 | 2007-07-18 | 三井住友建設株式会社 | 橋梁架設装置 |
JP4362020B2 (ja) * | 2001-04-24 | 2009-11-11 | 三菱重工鉄構エンジニアリング株式会社 | 吊り橋の耐震構造及び耐震補強方法 |
CN201506952U (zh) * | 2009-04-17 | 2010-06-16 | 四川路桥桥梁工程有限责任公司 | 无支架临时索配合挂篮建筑混凝土斜拉桥 |
CN201952737U (zh) * | 2011-01-30 | 2011-08-31 | 中交三航局第三工程有限公司 | 一种适用于宽幅双索面斜拉桥的牵索挂篮 |
CN103243658B (zh) * | 2013-05-16 | 2015-11-25 | 中交路桥华南工程有限公司 | 斜拉桥牵索挂篮的组拼方法 |
-
2016
- 2016-03-11 CN CN201610138191.7A patent/CN105735146B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN105735146A (zh) | 2016-07-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108374347A (zh) | 一种高速铁路大跨度提篮拱桥钢拱肋扣挂系统施工方法 | |
CN107503283A (zh) | 缓冲耗能型链式桥梁防落梁装置及其施工方法 | |
CN105735146B (zh) | 混凝土斜拉桥的牵索挂篮异索施工方法 | |
CN108505433A (zh) | 一种桥墩结构及其施工方法 | |
CN106099757A (zh) | 一种输电线路绝缘跨越桥架及其施工工艺 | |
CN109914267B (zh) | 预制立柱吊具结构 | |
CN107034785A (zh) | 一种可换式锚碇预应力锚固装置及其安装换索施工方法 | |
CN104577875A (zh) | 一种电力线路的封网跨越架线施工方法 | |
CN110295548A (zh) | 在先拱后梁的桥梁施工工艺下维持力学平衡的临时装置 | |
CN106012834B (zh) | 一种空间扭曲曲线异型反对称钢主塔内支撑及张拉系统 | |
CN107724244A (zh) | 无支座连续刚构边跨梁段组成的临时t构及其施工方法 | |
CN206562753U (zh) | 可调式钢丝绳悬挑脚手架施工装置 | |
CN207775717U (zh) | 公路桥梁施工用预应力锚具 | |
CN106013187A (zh) | 一种主动防护系统 | |
CN107227692B (zh) | 一种斜拉扣挂安装系统 | |
CN203445520U (zh) | 带电跨越装置 | |
CN109113354B (zh) | 一种全程索道式防风实时拉结缆风系统及其施工方法 | |
CN106968178A (zh) | 一种斜拉式吊桥主梁施工方法 | |
CN204355942U (zh) | 用于预制墙板吊装的吊点可调扁担梁构造 | |
CN210458987U (zh) | 一种吊杆更换软性临时兜吊装置 | |
CN105977868B (zh) | 一种y型跨越装置 | |
CN106245530A (zh) | 一种万能杆件缆索吊装系统拆除工法 | |
CN101457516B (zh) | 多层水平拉索的挂设方法 | |
CN202055162U (zh) | 预应力钢绞线扣索锚固及减振装置 | |
CN206693063U (zh) | 一种承重绳串联式结构的悬索桥缆索吊承重系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |