CN105735146A - 混凝土斜拉桥的牵索挂篮异索施工方法 - Google Patents

混凝土斜拉桥的牵索挂篮异索施工方法 Download PDF

Info

Publication number
CN105735146A
CN105735146A CN201610138191.7A CN201610138191A CN105735146A CN 105735146 A CN105735146 A CN 105735146A CN 201610138191 A CN201610138191 A CN 201610138191A CN 105735146 A CN105735146 A CN 105735146A
Authority
CN
China
Prior art keywords
cable
hanging basket
anchoring
stayed bridge
suspension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610138191.7A
Other languages
English (en)
Other versions
CN105735146B (zh
Inventor
周游
谭海雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Changda Highway Engineering Co Ltd
Original Assignee
Guangdong Changda Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Changda Highway Engineering Co Ltd filed Critical Guangdong Changda Highway Engineering Co Ltd
Priority to CN201610138191.7A priority Critical patent/CN105735146B/zh
Publication of CN105735146A publication Critical patent/CN105735146A/zh
Application granted granted Critical
Publication of CN105735146B publication Critical patent/CN105735146B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明涉及一种混凝土斜拉桥的牵索挂篮异索施工方法,在混凝土斜拉桥的逐段挂篮分节浇筑施工过程中,对混凝土斜拉桥的任意一节段梁块施工时,采用下一节段梁块对应的斜拉索作为本节段梁块对应挂篮的锚固用辅助索,待本节段梁块完成混凝土浇筑并等强后,挂设本节段的斜拉索并张拉至设计力;上述施工工艺,是解决当不同梁块上两条斜拉索锚固点间的横桥向距离不同时,需要设计加工结构复杂的挂篮弧形首的问题,与现有技术相比本发明通过采用非本节段斜拉索来锚固本节段挂篮,从而避免了设计加工结构复杂的挂篮弧形首,本发明简单了工艺操作,降低了成本;本发明优化了施工工艺,缩短了节段施工工期。

Description

混凝土斜拉桥的牵索挂篮异索施工方法
技术领域
本发明涉及一种桥梁施工方法,尤其是涉及一种混凝土斜拉桥的牵索挂篮施工方法。
背景技术
目前国内预应力混凝土斜拉桥常采用牵索挂篮本索施工工艺,进行悬臂浇筑施工,斜拉索在箱梁上位置较为规则,本索施工比较合理。
随着桥梁结构的不断推陈出新,中央索面超宽幅箱梁结构渐成为常态,此种结构中,由于斜拉索在箱梁上锚固点的横向索距变化较大,采用传统本索施工工艺会让牵索挂篮的弧形首部位面临设计繁琐、结构复杂、受力不明确等诸多问题。
发明内容
本发明的目的就是为了克服上述现有技术存在的缺陷而提供一种混凝土斜拉桥的牵索挂篮异索施工方法,本发明施工工艺能够解决斜拉索在梁端的横向索距变化大问题,并且避免了本索施工所需要的挂篮弧形首结构复杂的问题。
本发明的目的可以通过以下技术方案来实现:
混凝土斜拉桥的牵索挂篮异索施工方法,在混凝土斜拉桥的逐段挂篮分节浇筑施工过程中,对混凝土斜拉桥的任意一节段梁块施工时,采用下一节段梁块对应的斜拉索作为本节段梁块对应挂篮的锚固用辅助索,待本节段梁块完成混凝土浇筑并等强后,挂设本节段的斜拉索并张拉至设计力;所述的斜拉索采用空间索面形式,顺桥向为发散型布置,横桥向为中央双索面,且不同梁块上两条斜拉索锚固点间的横桥向距离不同。
进一步地,所述的本节段梁块对应挂篮的锚固用辅助索上端固定在索塔上的下一节段梁块的斜拉索孔位上,本节段梁块对应挂篮的锚固用辅助索中部从待浇筑本节段梁块前部通过,且与本节段梁块前端有间隔,所述的锚固用辅助索下端锚固在本节段梁块对应挂篮的弧形首前部。
进一步地,所述的斜拉索采用热挤聚乙烯高强钢丝拉索。所述的斜拉索按《斜拉索热挤聚乙烯高强钢丝拉索技术条件》(GB/T18365-200)的要求进行外观、长度、超张拉、弹性模量、静载性能等检测外,其动载性能应满足:应力上限为0.45fpk,应力幅值为200MPa,经2.0×106次循环脉冲加载试验,钢丝破断数应不大于斜拉索钢丝总数的5%,斜拉索保护层不应有明显损伤;锚具无明显损坏,锚杯与螺母旋合正常。
进一步地,所述的斜拉索施工过程采用先塔端展开、安装,然后梁上牵引安装,再梁端张拉的施工工艺。
进一步地,所述的锚固用辅助索与挂篮的固定方式为:锚固用辅助索穿过挂篮,并依次通过张拉底座、球形垫圈、第一锚固螺母、锁紧螺母、撑脚、千斤顶、第二锚固螺母固定。
本发明的有益效果:本发明施工工艺,是解决当不同梁块上两条斜拉索锚固点间的横桥向距离不同时,需要设计加工结构复杂的挂篮弧形首的问题,与现有技术相比本发明通过采用非本节段斜拉索来锚固本节段挂篮,从而避免了设计加工结构复杂的挂篮弧形首,本发明简单了工艺操作,降低了成本;本发明优化了施工工艺,缩短了节段施工工期。
附图说明
图1为本发明工艺施工时斜拉索施工示意图;
图2为图1所示局部放大图。
图中:1、锚固用辅助索;2、斜拉索;3、索塔;4、本节段梁块;5、挂篮。
具体实施方式
下面结合附图和具体实施例对本发明进行详细说明。
实施例
参考图1、图2,一种混凝土斜拉桥的牵索挂篮异索施工方法,先施工索塔3,然后由索塔3向两端进行混凝土斜拉桥的逐段挂篮分节浇筑施工,对混凝土斜拉桥的一节段梁块4施工时,采用下一节段梁块对应的斜拉索作为本节段梁块对应挂篮5的锚固用辅助索1,待本节段梁块4完成混凝土浇筑并等强后,挂设并张拉本节段的斜拉索2至设计力,将本节段梁块4对应挂篮5的锚固用辅助索1梁端松开,并将该锚固用辅助索1作为下一节段梁块的斜拉索;所述的斜拉索2采用空间索面形式,顺桥向为发散型布置,横桥向为中央双索面,且不同梁块上两条斜拉索锚固点间的横桥向距离不同。
本节段梁块对应挂篮的锚固用辅助索上端固定在索塔3上的下一节段梁块的斜拉索孔位上,本节段梁块对应挂篮的锚固用辅助索中部从待浇筑本节段梁块前部通过,且与本节段梁块前端有间隔,锚固用辅助索下端锚固在本节段梁块对应挂篮的弧形首前部。
斜拉索采用热挤聚乙烯高强钢丝拉索。斜拉索按《斜拉索热挤聚乙烯高强钢丝拉索技术条件》(GB/T18365-200)的要求进行外观、长度、超张拉、弹性模量、静载性能等检测外,其动载性能应满足:应力上限为0.45fpk,应力幅值为200MPa,经2.0×106次循环脉冲加载试验,钢丝破断数应不大于斜拉索钢丝总数的5%,斜拉索保护层不应有明显损伤;锚具无明显损坏,锚杯与螺母旋合正常。
斜拉索施工过程采用先塔端展开、安装,然后梁上牵引安装,再梁端张拉的施工工艺。
锚固用辅助索与挂篮的固定方式为:锚固用辅助索穿过挂篮5,并依次通过张拉底座、球形垫圈、第一锚固螺母、锁紧螺母、撑脚、千斤顶、第二锚固螺母,进行固定。
上述的对实施例的描述是为便于该技术领域的普通技术人员能理解和使用发明。熟悉本领域技术的人员显然可以容易地对这些实施例做出各种修改,并把在此说明的一般原理应用到其他实施例中而不必经过创造性的劳动。因此,本发明不限于上述实施例,本领域技术人员根据本发明的揭示,不脱离本发明范畴所做出的改进和修改都应该在本发明的保护范围之内。

Claims (5)

1.一种混凝土斜拉桥的牵索挂篮异索施工方法,其特征在于,在混凝土斜拉桥的逐段挂篮分节浇筑施工过程中,对混凝土斜拉桥的任意一节段梁块施工时,采用下一节段梁块对应的斜拉索作为本节段梁块对应挂篮的锚固用辅助索,待本节段梁块完成混凝土浇筑并等强后,挂设本节段的斜拉索并张拉至设计力;所述的斜拉索采用空间索面形式,顺桥向为发散型布置,横桥向为中央双索面,且不同梁块上两条斜拉索锚固点间的横桥向距离不同。
2.根据权利要求1所述的混凝土斜拉桥的牵索挂篮异索施工方法,其特征在于,本节段梁块对应挂篮的锚固用辅助索上端固定在索塔上的下一节段梁块的斜拉索孔位上,本节段梁块对应挂篮的锚固用辅助索中部从待浇筑本节段梁块前部通过,且与本节段梁块前端有间隔,所述的锚固用辅助索下端锚固在本节段梁块对应挂篮的弧形首前部。
3.根据权利要求1所述的混凝土斜拉桥的牵索挂篮异索施工方法,其特征在于,所述的斜拉索采用热挤聚乙烯高强钢丝拉索。
4.根据权利要求1所述的混凝土斜拉桥的牵索挂篮异索施工方法,其特征在于,所述的斜拉索施工过程采用先塔端展开、安装,然后梁上牵引安装,再梁端张拉的施工工艺。
5.根据权利要求1所述的混凝土斜拉桥的牵索挂篮异索施工方法,其特征在于,所述的锚固用辅助索与挂篮的固定方式为:锚固用辅助索穿过挂篮,并依次通过张拉底座、球形垫圈、第一锚固螺母、锁紧螺母、撑脚、千斤顶、第二锚固螺母。
CN201610138191.7A 2016-03-11 2016-03-11 混凝土斜拉桥的牵索挂篮异索施工方法 Active CN105735146B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610138191.7A CN105735146B (zh) 2016-03-11 2016-03-11 混凝土斜拉桥的牵索挂篮异索施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610138191.7A CN105735146B (zh) 2016-03-11 2016-03-11 混凝土斜拉桥的牵索挂篮异索施工方法

Publications (2)

Publication Number Publication Date
CN105735146A true CN105735146A (zh) 2016-07-06
CN105735146B CN105735146B (zh) 2017-11-03

Family

ID=56250303

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610138191.7A Active CN105735146B (zh) 2016-03-11 2016-03-11 混凝土斜拉桥的牵索挂篮异索施工方法

Country Status (1)

Country Link
CN (1) CN105735146B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110055904A (zh) * 2019-06-03 2019-07-26 核工业长沙中南建设工程集团公司 桥梁施工装置及桥梁施工方法
CN112942661A (zh) * 2021-01-15 2021-06-11 北京市建筑工程研究院有限责任公司 一种带有柔性索网边界的斜拉索施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1123861A (zh) * 1995-08-28 1996-06-05 铁道部大桥工程局 预应力混凝土斜拉桥短平台复合型牵索挂篮施工工艺
JPH11256521A (ja) * 1998-03-09 1999-09-21 Sumitomo Constr Co Ltd 橋梁架設装置
JP2002322611A (ja) * 2001-04-24 2002-11-08 Mitsubishi Heavy Ind Ltd 吊り橋の耐震構造及び耐震補強方法
CN201506952U (zh) * 2009-04-17 2010-06-16 四川路桥桥梁工程有限责任公司 无支架临时索配合挂篮建筑混凝土斜拉桥
CN201952737U (zh) * 2011-01-30 2011-08-31 中交三航局第三工程有限公司 一种适用于宽幅双索面斜拉桥的牵索挂篮
CN103243658A (zh) * 2013-05-16 2013-08-14 中交路桥华南工程有限公司 斜拉桥牵索挂篮及其组拼方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1123861A (zh) * 1995-08-28 1996-06-05 铁道部大桥工程局 预应力混凝土斜拉桥短平台复合型牵索挂篮施工工艺
JPH11256521A (ja) * 1998-03-09 1999-09-21 Sumitomo Constr Co Ltd 橋梁架設装置
JP2002322611A (ja) * 2001-04-24 2002-11-08 Mitsubishi Heavy Ind Ltd 吊り橋の耐震構造及び耐震補強方法
CN201506952U (zh) * 2009-04-17 2010-06-16 四川路桥桥梁工程有限责任公司 无支架临时索配合挂篮建筑混凝土斜拉桥
CN201952737U (zh) * 2011-01-30 2011-08-31 中交三航局第三工程有限公司 一种适用于宽幅双索面斜拉桥的牵索挂篮
CN103243658A (zh) * 2013-05-16 2013-08-14 中交路桥华南工程有限公司 斜拉桥牵索挂篮及其组拼方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
卜骄: "牵索挂篮在斜拉桥主梁悬浇施工中的应用", 《公路交通科技(应用技术版)》 *
李然: "斜拉桥超宽挂篮施工安全风险分析与控制", 《交通科技》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110055904A (zh) * 2019-06-03 2019-07-26 核工业长沙中南建设工程集团公司 桥梁施工装置及桥梁施工方法
CN112942661A (zh) * 2021-01-15 2021-06-11 北京市建筑工程研究院有限责任公司 一种带有柔性索网边界的斜拉索施工方法

Also Published As

Publication number Publication date
CN105735146B (zh) 2017-11-03

Similar Documents

Publication Publication Date Title
US8627530B2 (en) Constructing method of cable-stayed bridge and temporary cable therefor
US8695142B2 (en) Partially and fully earth-anchored cable-stayed bridges using main-span prestressing unit and method of constructing the same
CN103437296B (zh) 钢管拱桥无塔扣挂三段式双肋合拢吊装施工方法
CN108374347A (zh) 一种高速铁路大跨度提篮拱桥钢拱肋扣挂系统施工方法
CN108505433A (zh) 一种桥墩结构及其施工方法
CN102296829B (zh) 三向索网幕墙施工方法
CN108999088A (zh) 一种斜拉桥的施工方法
CN105735146A (zh) 混凝土斜拉桥的牵索挂篮异索施工方法
CN106099757A (zh) 一种输电线路绝缘跨越桥架及其施工工艺
CN103236656A (zh) 一种立柱悬索式跨越架及其作业方法
CN209128888U (zh) 一种悬索桥背索后锚头牵引装置
CN106120573A (zh) 跨海多跨提篮拱桥自平衡扣挂施工方法
CN103835238A (zh) 一种高墩斜拉桥0号块无支架施工方法及施工中的结构
CN104085832B (zh) 一种柔性构件提升装置的提升方法
CN106968178B (zh) 一种斜拉式吊桥主梁施工方法
CN210458987U (zh) 一种吊杆更换软性临时兜吊装置
CN109113354B (zh) 一种全程索道式防风实时拉结缆风系统及其施工方法
CN108442230B (zh) 一种拱桥吊杆结构
CN204062152U (zh) 高压泵管固定装置
CN204079226U (zh) 一种能增加管桁架吊装时刚度的活动式张弦梁吊装装置
CN201459604U (zh) 一种适用于钢箱梁悬索桥施工中主缆间的横撑结构
CN106245530A (zh) 一种万能杆件缆索吊装系统拆除工法
CN101457516B (zh) 多层水平拉索的挂设方法
CN208201613U (zh) 一种非对称主缆铁路悬索桥结构
CN204753343U (zh) 一种非对称平面折线布置桥面的单塔斜拉桥

Legal Events

Date Code Title Description