CN105714699A - 一种宽幅箱梁桥主梁顶板加固结构及该结构的施工方法 - Google Patents

一种宽幅箱梁桥主梁顶板加固结构及该结构的施工方法 Download PDF

Info

Publication number
CN105714699A
CN105714699A CN201610227961.5A CN201610227961A CN105714699A CN 105714699 A CN105714699 A CN 105714699A CN 201610227961 A CN201610227961 A CN 201610227961A CN 105714699 A CN105714699 A CN 105714699A
Authority
CN
China
Prior art keywords
girder
top board
crossbeam
top plate
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610227961.5A
Other languages
English (en)
Other versions
CN105714699B (zh
Inventor
薛兴伟
孙聚阳
张海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU ZHANYA CIVIL ENGINEERING TECHNOLOGY CO., LTD.
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN201610227961.5A priority Critical patent/CN105714699B/zh
Publication of CN105714699A publication Critical patent/CN105714699A/zh
Application granted granted Critical
Publication of CN105714699B publication Critical patent/CN105714699B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Abstract

一种针对发生下挠变形和开裂的宽幅箱梁桥主梁顶板加固结构,在顶板底面沿顺桥向间隔设置顶板加厚横梁,顶板加厚横梁之间间隔设置顶纵梁;置于顶板加厚横梁中的预应力钢筋穿过主梁腹板后两端锚固在主梁腹板的两外侧面上,顶板加厚横梁和顶纵梁的高度及预应力钢筋的根数按公式求得。该加固结构通过顶板加厚横梁和顶纵梁提高顶板的刚度,改善车辆荷载作用下顶板局部受力状态,避免顶板在恒载及车辆荷载作用下继续下挠变形;通过预应力钢筋可在顶板加厚横梁中部下缘处产生压应力,平衡车辆荷载双后轴作用在该部位的拉应力,改善该部位的应力状态,提高顶板的强度,避免主梁顶板再发生开裂。

Description

一种宽幅箱梁桥主梁顶板加固结构及该结构的施工方法
技术领域
本发明涉及公路桥梁,特别是针对主梁顶板发生变形和开裂的宽幅箱梁桥提供的一种主梁顶板加固结构及该结构的施工方法。
背景技术
本发明所述宽幅箱梁桥是指主梁顶板厚度d1为主梁腹板两内侧面间的宽度K的1/70~1/30的单箱单室普通钢筋混凝土连续梁桥、单箱单室预应力混凝土连续梁桥和单箱单室预应力混凝土连续刚构桥。
这种宽幅箱梁桥在施工完成投入运营后,由于宽幅箱梁桥主梁顶板厚度(一般为25cm~35cm)与主梁顶板宽度之比过小,使主梁顶板刚度不足,在车辆荷载作用下主梁顶板呈下挠状态,在收缩和徐变的共同影响下常产生过大变形;又因主梁顶板厚度较小,可提供结构抗裂的截面有效高度较小,主梁顶板的强度和抗裂性能不足,使主梁顶板的下缘常产生大量裂缝。
主梁顶板下挠变形和大量裂缝的产生严重影响主梁的耐久性及安全性;同时桥面铺装会出现大面积网裂和下陷,使桥面防水层被破坏,桥面水渗入主梁顶板,加速主梁顶板钢筋锈蚀,进一步影响主梁顶板的耐久性。
目前对发生上述病害的宽幅箱梁桥主梁顶板尚无好的解决方法。
发明内容
本发明的目的是对发生上述病害的宽幅箱梁桥主梁顶板提供一种主梁顶板加固结构及该结构的施工方法。
本发明提供的宽幅箱梁桥主梁顶板加固结构,在主梁顶板的底面沿顺桥向增设间隔布置的顶板加厚横梁,在顶板加厚横梁之间有沿横桥向间隔设置的顶纵梁;顶板加厚横梁中有通过塑料波纹管布置的预应力钢筋,预应力钢筋的两端通过主梁腹板由锚具锚固在主梁腹板的两外侧面上。
所述顶板加厚横梁沿顺桥向的相互间距sv为:1200mm≤sv≤K/4,式中K为主梁腹板两内侧面间的宽度(mm);
顶板加厚横梁的宽度b2=300mm;
顶板加厚横梁的高度d2按下式计算得出:
d 2 = 0.15 [ 1.4 × 10 7 K 2 E c - s v d 1 3 ] 1 3 ( m m )
式中
K:主梁腹板两内侧面间的宽度(mm),
Ec:主梁混凝土的弹性模量(MPa),
sv:顶板加厚横梁沿顺桥向的相互间距(mm),
d1:主梁顶板厚度(mm),
d2的计算结果按照10mm为模数取用(例如,计算结果为408mm时,取d2=410mm;计算结果为402mm时,取d2=400mm);
顶纵梁的高度d3为:d2/3≤d3≤d2/2;
顶纵梁之间、顶纵梁与主梁腹板之间的横向间距K1相等,为主梁顶板厚度d1的8~12倍;
在单个顶板加厚横梁中配置的预应力钢筋根数n按下式计算:
式中
int:取整函数,按四舍五入法则进行取整,
K:主梁腹板两内侧面间的宽度(mm),
σcon:预应力钢筋的张拉控制应力设计值(MPa),
Ap1:单根预应力钢筋的截面面积(mm2),
d2:顶板加厚横梁的中心高度(mm),
sv:顶板加厚横梁沿顺桥向的布置间距(mm),
d1:主梁顶板厚度(mm),
ap:预应力钢筋重心至顶板加厚横梁底面的距离(mm)。
上述主梁顶板加固结构的施工方法包括以下步骤:
步骤1、修补主梁顶板
对裂缝宽度小于0.15mm的斜裂缝,用环氧树脂进行表面封闭;对裂缝宽度大于0.15mm的斜裂缝,用环氧树脂进行注胶;
步骤2、在主梁腹板两侧面沿顺桥向间隔钻孔,钻孔位置和下述顶板加厚横梁中预埋的塑料波纹管相对应;
步骤3、浇筑顶板加厚横梁和顶纵梁
对主梁顶板底面将布置顶板加厚横梁和顶纵梁的部位进行表面处理,凿毛使骨料外露;植顶板加厚横梁钢筋和顶纵梁钢筋;清除浮尘后对植筋周围表面涂刷环氧树脂;然后架设模板,采用钢纤维混凝土浇筑顶板加厚横梁和顶纵梁,浇筑时将塑料波纹管通过主梁腹板的钻孔置于顶板加厚横梁中;浇筑完成后在塑料波纹管中穿送预应力钢筋;
步骤4、张拉预应力钢筋
待步骤3的混凝土强度达到90%设计强度时,张拉预应力钢筋,张拉结束后将预应力钢筋的两端通过锚具锚固在主梁腹板的两外侧面上,完成锚固后在预应力钢筋和塑料波纹管的间隙中灌注水泥砂浆,主梁顶板加固结构的施工即告完成。
本发明的有益效果是:
(1)通过设置高度按公式求得的顶板加厚横梁和顶纵梁,可提高主梁顶板的刚度,改善车辆荷载作用下主梁顶板的局部受力状态,避免主梁顶板在恒载及车辆荷载作用下继续发生下挠变形。
(2)通过在顶板加厚横梁中布置预应力钢筋,且预应力钢筋根数按公式求得,可在顶板加厚横梁的中部下缘处产生压应力,该压应力可平衡车辆荷载双后轴作用在顶板加厚横梁中部下缘处的拉应力,改善顶板加厚横梁该部位的应力状态,提高主梁顶板的强度,避免主梁顶板继续发生开裂。
附图说明
图1为本发明主梁顶板加固结构的局部立面示意图;
图2为图1中A-A断面图;
图3为图1中B-B断面图;
图4为图1中C-C剖视图;
图中:1–主梁,2–主梁顶板,3–顶纵梁,4–主梁腹板,5–预应力钢筋,6–塑料波纹管,7–锚具,8–顶板加厚横梁。
具体实施方式
以下结合附图和实施例对本发明做进一步说明。
本实施例为采用本发明对主梁顶板发生变形和开裂的图1所示单箱单室预应力混凝土连续梁桥主梁进行加固。
该梁桥的主梁1采用C50混凝土浇筑,其弹性模量Ec=34500(MPa)。主梁1的跨度为180m,跨中梁高4.5m,中支点处梁高10.8m,主梁腹板4两内侧面间的宽度K=1200cm,主梁顶板2的厚度d1=30cm=K/40,属于宽幅箱梁桥。
该桥梁投入运营后不到一年,中间跨的跨中主梁顶板出现下挠变形和开裂,跨中主梁顶板最大下挠值达到4cm,宽度大于0.15mm的斜裂缝有73条,宽度小于0.15mm的斜裂缝有132条,为防止变形和开裂继续扩大,需对该段主梁顶板进行修复加固。
如图1至图4所示,发生变形和开裂的该段主梁顶板的加固结构为:在主梁顶板2底面增设沿顺桥向相互间距sv=1.3m的顶板加厚横梁8,顶板加厚横梁的截面呈矩形,宽度b2=300mm,高度d2根据计算公式按照10mm为模数取用,d2=430mm。在每个顶板加厚横梁的下部置有一横向布置的Φ70塑料波纹管6,塑料波纹管中置有n根预应力钢筋5,单根预应力钢筋为截面面积Ap1=140mm2的Φs15.20-1x7型钢绞线,预应力钢筋的张拉控制应力设计值σcon=1395MPa,预应力钢筋重心至顶板加厚横梁底面的垂直距离ap=50mm。预应力钢筋穿过主梁腹板4后两端由锚具7锚固在主梁腹板的两外侧面上。顶板加厚横梁之间沿横桥向设置有5道高度d3=250mm、相互间距K1=200cm的顶纵梁3。
所述布置在每个顶板加厚横梁下部的塑料波纹管中的预应力钢筋根数n由下式计算为:
上述主梁顶板结构的施工方法,包括以下步骤:
步骤1、修补主梁顶板
对裂缝宽度小于0.15mm的斜裂缝,用环氧树脂进行表面封闭;对裂缝宽度大于0.15mm的斜裂缝,用环氧树脂进行注胶;
步骤2、在主梁腹板两侧面沿顺桥向间隔钻孔,钻孔位置和下述顶板加厚横梁中预埋的塑料波纹管相对应。
步骤3、浇筑顶板加厚横梁和顶纵梁
对主梁顶板底面将布置顶板加厚横梁和顶纵梁的部位进行表面处理,凿毛使骨料外露;植顶板加厚横梁钢筋和顶纵梁钢筋;用压缩空气清除浮尘后在植筋周围表面涂刷环氧树脂;然后架设模板,采用C50钢纤维混凝土浇筑顶板加厚横梁和顶纵梁,浇筑时将塑料波纹管通过主梁腹板的钻孔置于顶板加厚横梁中,浇筑完成后在塑料波纹管中穿送6根Φs15.20-1x7型钢绞线作为预应力钢筋;
步骤4、张拉预应力钢筋
待步骤3的钢纤维混凝土强度达到90%设计强度时,张拉预应力钢筋,张拉结束后将预应力钢筋的两端通过锚具锚固在主梁腹板的两外侧面上,完成锚固后在预应力钢筋和塑料波纹管的间隙中灌注水泥砂浆,主梁顶板加固结构施工即告完成。
该宽幅箱梁桥采用上述结构加固后,经过一年的实际考验,主梁顶板未再出现下挠和开裂病害,说明该加固方法合理、有效。

Claims (3)

1.一种宽幅箱梁桥主梁顶板加固结构,其特征在于:
在主梁顶板(2)的底面沿顺桥向增设间隔布置的顶板加厚横梁(8),在顶板加厚横梁(8)之间有沿横桥向间隔设置的顶纵梁(3);顶板加厚横梁中有通过塑料波纹管(6)布置的预应力钢筋(5),预应力钢筋的两端通过主梁腹板(4)由锚具(7)锚固在主梁腹板的两外侧面上。
2.根据权利要求1所述的宽幅箱梁桥主梁顶板加固结构,其特征在于:
所述顶板加厚横梁沿顺桥向的相互间距sv为:1200mm≤sv≤K/4,式中K为主梁腹板两内侧面间的宽度;
顶板加厚横梁的宽度b2=300mm;
顶板加厚横梁的高度d2按下式计算得出:
d 2 = 0.15 [ 1.4 × 10 7 K 2 E c - s v d 1 3 ] 1 3
式中
K:主梁腹板两内侧面间的宽度,
Ec:主梁混凝土的弹性模量,
sv:顶板加厚横梁沿顺桥向的相互间距,
d1:主梁顶板厚度,
d2的计算结果按照10mm为模数取用;
顶纵梁的高度d3为:d2/3≤d3≤d2/2;
顶纵梁之间、顶纵梁与主梁腹板之间的横向间距K1相等,为主梁顶板厚度d1的8~12倍;
在单个顶板加厚横梁中配置的预应力钢筋根数n按下式计算:
n = int [ 70000 K σ c o n A p 1 ( 150 d 2 2 + s v d 1 2 + ( s v + 450 ) d 1 d 2 s v d 1 + 300 d 2 - a p ) ]
式中
int:取整函数,按四舍五入法则进行取整,
K:主梁腹板两内侧面间的宽度,
σcon:预应力钢筋的张拉控制应力设计值,
Ap1:单根预应力钢筋的截面面积,
d2:顶板加厚横梁的中心高度,
sv:顶板加厚横梁沿顺桥向的布置间距,
d1:主梁顶板厚度,
ap:预应力钢筋重心至顶板加厚横梁底面的距离。
3.权利要求1所述宽幅箱梁桥主梁顶板加固结构的施工方法,其特征在于包括以下步骤:
步骤1、修补主梁顶板
对裂缝宽度小于0.15mm的斜裂缝,用环氧树脂进行表面封闭;对裂缝宽度大于0.15mm的斜裂缝,用环氧树脂进行注胶;
步骤2、在主梁腹板两侧面沿顺桥向间隔钻孔,钻孔位置和下述顶板加厚横梁中预埋的塑料波纹管相对应;
步骤3、浇筑顶板加厚横梁和顶纵梁
对主梁顶板底面将布置顶板加厚横梁和顶纵梁的部位进行表面处理,凿毛使骨料外露;植顶板加厚横梁钢筋和顶纵梁钢筋;清除浮尘后对植筋周围表面涂刷环氧树脂;然后架设模板,采用钢纤维混凝土浇筑顶板加厚横梁和顶纵梁,浇筑时将塑料波纹管通过主梁腹板的钻孔置于顶板加厚横梁中;浇筑完成后在塑料波纹管中穿送预应力钢筋;
步骤4、张拉预应力钢筋
待步骤3的混凝土强度达到90%设计强度时,张拉预应力钢筋,张拉结束后将预应力钢筋的两端通过锚具锚固在主梁腹板的两外侧面上,完成锚固后在预应力钢筋和塑料波纹管的间隙中灌注水泥砂浆,主梁顶板加固结构的施工即告完成。
CN201610227961.5A 2016-04-12 2016-04-12 一种宽幅箱梁桥主梁顶板加固结构及该结构的施工方法 Active CN105714699B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610227961.5A CN105714699B (zh) 2016-04-12 2016-04-12 一种宽幅箱梁桥主梁顶板加固结构及该结构的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610227961.5A CN105714699B (zh) 2016-04-12 2016-04-12 一种宽幅箱梁桥主梁顶板加固结构及该结构的施工方法

Publications (2)

Publication Number Publication Date
CN105714699A true CN105714699A (zh) 2016-06-29
CN105714699B CN105714699B (zh) 2017-05-03

Family

ID=56160980

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610227961.5A Active CN105714699B (zh) 2016-04-12 2016-04-12 一种宽幅箱梁桥主梁顶板加固结构及该结构的施工方法

Country Status (1)

Country Link
CN (1) CN105714699B (zh)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005090115A (ja) * 2003-09-18 2005-04-07 Fuji Ps Corp 小梁による既設床版の補強工法
CN101091023A (zh) * 2004-11-18 2007-12-19 智能工程(巴哈马)有限公司 加固桥梁的方法
JP2012149400A (ja) * 2011-01-18 2012-08-09 Railway Technical Research Institute 場所打ちコンクリートを用いたスラブの補強工法
CN104328747A (zh) * 2013-07-23 2015-02-04 金辉 一种桥梁单板受力的加固方法及其施工方法
CN105821752A (zh) * 2016-04-05 2016-08-03 沈阳建筑大学 一种宽幅箱梁桥主梁顶板结构及其施工方法
CN205443899U (zh) * 2016-04-05 2016-08-10 沈阳建筑大学 一种宽幅箱梁桥主梁顶板结构
CN205474788U (zh) * 2016-04-12 2016-08-17 沈阳建筑大学 一种宽幅箱梁桥主梁顶板加固结构

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005090115A (ja) * 2003-09-18 2005-04-07 Fuji Ps Corp 小梁による既設床版の補強工法
CN101091023A (zh) * 2004-11-18 2007-12-19 智能工程(巴哈马)有限公司 加固桥梁的方法
JP2012149400A (ja) * 2011-01-18 2012-08-09 Railway Technical Research Institute 場所打ちコンクリートを用いたスラブの補強工法
CN104328747A (zh) * 2013-07-23 2015-02-04 金辉 一种桥梁单板受力的加固方法及其施工方法
CN105821752A (zh) * 2016-04-05 2016-08-03 沈阳建筑大学 一种宽幅箱梁桥主梁顶板结构及其施工方法
CN205443899U (zh) * 2016-04-05 2016-08-10 沈阳建筑大学 一种宽幅箱梁桥主梁顶板结构
CN205474788U (zh) * 2016-04-12 2016-08-17 沈阳建筑大学 一种宽幅箱梁桥主梁顶板加固结构

Also Published As

Publication number Publication date
CN105714699B (zh) 2017-05-03

Similar Documents

Publication Publication Date Title
CN109339828B (zh) 一种隧道预应力仰拱结构及其施工方法
CN104233942B (zh) 一种提高装配式斜交预应力空心板梁桥整体受力的方法
CN105297641B (zh) 公路t梁横隔板预应力加固结构及用其进行加固的工法
CN205443899U (zh) 一种宽幅箱梁桥主梁顶板结构
CN105780994B (zh) 一种震后自复位的偏心支撑钢框架组合楼板及其施工方法
CN208415270U (zh) 一种深基坑装配式可回收钢支撑结构
CN101644032A (zh) 公路桥梁去梁增肋加固施工工艺
CN104674649B (zh) 一种薄壁空心桥墩地震损伤控制体系
CN109057392B (zh) 一种加固用钢结构施工方法
CN105821752B (zh) 一种宽幅箱梁桥主梁顶板结构及其施工方法
CN107217597A (zh) 一种预应力混凝土桥面无缝连接板的施工方法
CN103938871B (zh) 一种采用钢筋混凝土环梁节点的钢管混凝土柱有粘结预应力框架梁结构的施工方法
CN205474788U (zh) 一种宽幅箱梁桥主梁顶板加固结构
CN110485314A (zh) 一种运营状态下高速公路t梁拼宽结构及方法
CN107938884B (zh) 一种加固震损框架的自复位框架-剪力墙结构及施工方法
CN111893878A (zh) 钢箱梁桥面铺装结构及施工方法
CN105631190A (zh) 混凝土深梁的配筋方法
CN106703435B (zh) 预应力钢丝束与碳纤维布组合加固混凝土梁的方法
CN105714699A (zh) 一种宽幅箱梁桥主梁顶板加固结构及该结构的施工方法
KR102299121B1 (ko) 가설교량 및 이의 시공방법
CN105735666A (zh) 一种快速加固混凝土柱的方法
CN105755960B (zh) 一种防止t形梁桥中梁产生侧向弯曲变形的方法
CN114182630A (zh) 一种空心板梁桥面铺装结构及其维修施工方法
CN210507503U (zh) 一种桩筏复合地基结构
CN114370008A (zh) 一种快速提升桥梁承载能力的加固系统及其施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Xue Xingwei

Inventor after: Zhong Xian

Inventor after: Chen Xuan

Inventor after: Sun Juyang

Inventor after: Zhang Hai

Inventor before: Xue Xingwei

Inventor before: Sun Juyang

Inventor before: Zhang Hai

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180213

Address after: 510640 Guangzhou, Guangzhou, Guangdong Province, Tianhe District five mountain road Jinhui Street 88 self-made 12 one or two layers 113, 115

Patentee after: GUANGZHOU ZHANYA CIVIL ENGINEERING TECHNOLOGY CO., LTD.

Address before: 110168 Liaoning province Shenyang Hunnan Hunnan Road No. 9

Patentee before: Shenyang Building Univ.

CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 510000 Room 501, No. 7, Kehui 1st Street, Huangpu District, Guangzhou City, Guangdong Province (office only)

Patentee after: GUANGZHOU ZHANYA CIVIL ENGINEERING TECHNOLOGY Co.,Ltd.

Address before: 510640 113 and 115, floors 1 and 2, building 12, No. 88, Jinhui street, Wushan Road, Tianhe District, Guangzhou, Guangdong

Patentee before: GUANGZHOU ZHANYA CIVIL ENGINEERING TECHNOLOGY Co.,Ltd.