CN105648923A - 一种斜拉索鞍座的定位装置及其定位方法 - Google Patents

一种斜拉索鞍座的定位装置及其定位方法 Download PDF

Info

Publication number
CN105648923A
CN105648923A CN201610198064.6A CN201610198064A CN105648923A CN 105648923 A CN105648923 A CN 105648923A CN 201610198064 A CN201610198064 A CN 201610198064A CN 105648923 A CN105648923 A CN 105648923A
Authority
CN
China
Prior art keywords
cable saddle
positioner
positioning
saddle
king
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610198064.6A
Other languages
English (en)
Other versions
CN105648923B (zh
Inventor
阳雪
范伟
伍德华
汪正科
刘磊
龚灼
李勇
黄赛赛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of CTCE Group
Original Assignee
First Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of CTCE Group filed Critical First Engineering Co Ltd of CTCE Group
Priority to CN201610198064.6A priority Critical patent/CN105648923B/zh
Publication of CN105648923A publication Critical patent/CN105648923A/zh
Application granted granted Critical
Publication of CN105648923B publication Critical patent/CN105648923B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/14Towers; Anchors ; Connection of cables to bridge parts; Saddle supports

Abstract

本发明提供一种斜拉索鞍座的定位装置,包括底座以及一端分别与该底座铰接的支撑杆和伸缩支撑,该支撑杆与伸缩支撑的另一端铰接,所述支撑杆的上端连接有用于放置索鞍的承重板。采用该定位装置的斜拉索鞍座定位方法,包括如下步骤:1)在已浇筑完成的塔柱顶端劲性骨架外侧设置标高点,根据该标高点确定索鞍的定位高程;2)调节伸缩支撑的长度使支撑杆的角度与分丝管角度一致;3)在塔柱施工完成之后采用全站仪放出主塔中心十字线,利用铅垂确定索鞍的方位,安装索鞍;4)通过全站仪对索鞍的定位关键点坐标进行复核,调整索鞍位置并固定,拆除定位装置。本发明确保索鞍定位精度,保证工程质量,提高工作效率。

Description

一种斜拉索鞍座的定位装置及其定位方法
技术领域
本发明涉及斜拉桥施工技术领域,具体涉及一种用于斜拉索鞍座的定位装置及其定位方法。
背景技术
索鞍安装精度及其几何线型将是保证塔柱砼与索鞍共同受力,防止混凝土出现裂缝的重要条件。在采用扇形布置的斜拉索中,主塔的索导管均布置在主塔的上塔柱段,他们的分布比较密集,倾角变化大,索鞍安装施工空间小,干扰大。
发明内容
为解决现有技术施工难度大、效率低下的不足之处,本发明提供一种斜拉索鞍座的定位装置,以确保索鞍定位精度,保证工程质量,提高工作效率。
为解决上述技术问题,本发明采用如下技术方案:
一种斜拉索鞍座的定位装置,包括底座以及一端分别与该底座铰接的支撑杆和伸缩支撑,该支撑杆与伸缩支撑的另一端铰接,所述支撑杆的上端连接有用于放置索鞍的承重板。
进一步地,所述承重板上设置有一对限位板。
本发明还提供一种采用上述定位装置的斜拉索鞍座定位方法,包括如下步骤:
1)高程定位:根据塔柱施工测量数据,在已浇筑完成的塔柱顶端劲性骨架外侧设置标高点,根据该标高点确定索鞍的定位高程;
2)安装定位装置:在索鞍定位高程位置将定位装置与劲性骨架固定连接,调节伸缩支撑的长度使支撑杆的角度与分丝管角度一致;
3)方位定位:在塔柱施工完成之后采用全站仪放出主塔中心十字线,利用铅垂确定索鞍的方位,并将索鞍放入定位装置的限位板之间;
4)坐标复核:通过全站仪对索鞍的定位关键点坐标进行复核,调整索鞍位置并固定,拆除定位装置,所述定位关键点坐标分别位于索鞍的两端部和中点。
由以上技术方案可知,本发明具有如下有益效果:
1、可通过调节定位装置角度与索鞍角度达成一致,克服倾角变化的问题,并达到重复使用的效果;
2、通过定位装置的限位可有效控制索鞍定位区间,克服施工空间小,干扰大,从而造成的定位难度大的问题,大大提高索鞍定位效率;
3、设备安装拆除快捷方便,不易变形,容易控制,减少人员配备,有效缩短施工时间,提高施工效率;
4、通过不同测量方法对索鞍定位进行复核,可保证索鞍定位的精度,确保施工质量。
附图说明
图1为本发明中定位装置的主视图;
图2为本发明中定位装置的侧视图;
图3为本发明定位方法中标高点的安装位置;
图4为本发明定位方法中主塔中心十字线的示意图。
图中:1、底座,2、支撑杆,3、伸缩支撑,4、承重板,5、限位板,6、索鞍,7、主塔,8、劲性骨架,9、标高点。
具体实施方式
下面结合附图对本发明的一种优选实施方式作详细的说明。
如图1和2所示,斜拉索鞍座的定位装置包括一个由角钢构成的底座1,该底座的两端分别铰接有支撑杆2和伸缩支撑3,该支撑杆和伸缩支撑的另一端铰接,可通过调节伸缩支撑的长度从而调节支撑杆的倾斜度,进而调节索鞍的安装角度。
所述支撑杆2的上端连接有用于放置索鞍6的承重板4,该承重板上设置有一对限位板5。
本发明采用定位装置对索鞍进行定位施工的具体实施过程如下:
1、高程定位:根据塔柱施工测量数据,在已浇筑完成的塔柱顶端劲性骨架8外侧焊接20cm槽钢引入标高点9,参照图3,采用水准仪确定索鞍的定位高程。
2、安装定位装置:在索鞍定位高程位置将定位装置与劲性骨架8固定连接,调节伸缩支撑3的长度使支撑杆2的角度与分丝管角度一致。
3、方位定位:在塔柱施工完成之后采用全站仪放出主塔7的中心十字线,利用铅垂确定索鞍方位,通过塔吊将索鞍放入定位装置的限位板5之间。
4、坐标复核:通过全站仪对索鞍6的定位关键点坐标进行复核,调整索鞍位置,利用φ20钢筋网片将索鞍固定,然后拆除定位装置,所述定位关键点坐标分别位于索鞍的两端部和中点。
以上所述实施方式仅仅是对本发明的优选实施方式进行描述,并非对本发明的范围进行限定,在不脱离本发明设计精神的前提下,本领域普通技术人员对本发明的技术方案作出的各种变形和改进,均应落入本发明的权利要求书确定的保护范围内。

Claims (4)

1.一种斜拉索鞍座的定位装置,其特征在于,包括底座(1)以及一端分别与该底座铰接的支撑杆(2)和伸缩支撑(3),该支撑杆与伸缩支撑的另一端铰接,所述支撑杆(2)的上端连接有用于放置索鞍的承重板(4)。
2.根据权利要求1所述的定位装置,其特征在于,所述承重板(4)上设置有一对限位板(5)。
3.一种采用权利要求1所述定位装置的斜拉索鞍座定位方法,其特征在于,包括如下步骤:
1)高程定位:根据塔柱施工测量数据,在已浇筑完成的塔柱顶端劲性骨架外侧设置标高点,根据该标高点确定索鞍的定位高程;
2)安装定位装置:在索鞍定位高程位置将定位装置与劲性骨架固定连接,调节伸缩支撑的长度使支撑杆的角度与分丝管角度一致;
3)方位定位:在塔柱施工完成之后采用全站仪放出主塔中心十字线,利用铅垂确定索鞍的方位,并将索鞍放入定位装置的限位板之间;
4)坐标复核:通过全站仪对索鞍的定位关键点坐标进行复核,调整索鞍位置并固定,拆除定位装置。
4.根据权利要求3所述的斜拉索鞍座定位方法,其特征在于,步骤4)中,所述定位关键点坐标分别位于索鞍的两端部和中点。
CN201610198064.6A 2016-03-31 2016-03-31 一种斜拉索鞍座的定位方法 Active CN105648923B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610198064.6A CN105648923B (zh) 2016-03-31 2016-03-31 一种斜拉索鞍座的定位方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610198064.6A CN105648923B (zh) 2016-03-31 2016-03-31 一种斜拉索鞍座的定位方法

Publications (2)

Publication Number Publication Date
CN105648923A true CN105648923A (zh) 2016-06-08
CN105648923B CN105648923B (zh) 2017-05-10

Family

ID=56496596

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610198064.6A Active CN105648923B (zh) 2016-03-31 2016-03-31 一种斜拉索鞍座的定位方法

Country Status (1)

Country Link
CN (1) CN105648923B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106544959A (zh) * 2016-12-12 2017-03-29 中铁大桥局集团有限公司 含有鞍座的主塔吊装节段及桥梁主塔鞍座的施工方法
CN107881914A (zh) * 2017-12-15 2018-04-06 中交第二航务工程局有限公司 一种分丝管式索鞍后场装配式定位装置及装配方法
CN108487064A (zh) * 2018-03-09 2018-09-04 济南城建集团有限公司 分离式安装悬索桥主索鞍座施工方法
CN106638318B (zh) * 2016-11-25 2019-03-15 中铁大桥局集团第五工程有限公司 斜拉桥梁端锚固点的定位方法及索导管安装方法
CN114319123A (zh) * 2021-12-31 2022-04-12 中交二公局第一工程有限公司 一种预制装配式分丝管定位装置及分丝管定位方法

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000064225A (ja) * 1998-08-25 2000-02-29 Shinko Kosen Kogyo Kk 吊構造物のケーブル取り付け方法
CN201272942Y (zh) * 2008-12-22 2009-07-15 湖南路桥建设集团公司 一种斜拉桥斜拉索塔端安装角度调整装置
KR20100043165A (ko) * 2010-02-04 2010-04-28 스미토모 덴코 스틸 와이어 가부시키가이샤 새들 구조체와 긴장용 케이블
CN102373669A (zh) * 2011-10-14 2012-03-14 中铁三局集团有限公司 自动平衡吊喂缆索装置
CN203429556U (zh) * 2013-05-21 2014-02-12 中交四航局第一工程有限公司 一种索鞍快速安装、定位系统
CN204112227U (zh) * 2014-08-28 2015-01-21 中交第二航务工程局有限公司 可调式索股托架
CN204418027U (zh) * 2014-12-18 2015-06-24 中铁建设集团有限公司 一种用于自锚式悬索桥散索鞍底座安装的托架
CN204688938U (zh) * 2015-04-30 2015-10-07 和县浙徽新型材料有限公司 皮带输送机的输送带张口角度自动调节机构
CN205474865U (zh) * 2016-03-31 2016-08-17 中铁四局集团第一工程有限公司 一种斜拉索鞍座的定位装置

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000064225A (ja) * 1998-08-25 2000-02-29 Shinko Kosen Kogyo Kk 吊構造物のケーブル取り付け方法
CN201272942Y (zh) * 2008-12-22 2009-07-15 湖南路桥建设集团公司 一种斜拉桥斜拉索塔端安装角度调整装置
KR20100043165A (ko) * 2010-02-04 2010-04-28 스미토모 덴코 스틸 와이어 가부시키가이샤 새들 구조체와 긴장용 케이블
CN102373669A (zh) * 2011-10-14 2012-03-14 中铁三局集团有限公司 自动平衡吊喂缆索装置
CN203429556U (zh) * 2013-05-21 2014-02-12 中交四航局第一工程有限公司 一种索鞍快速安装、定位系统
CN204112227U (zh) * 2014-08-28 2015-01-21 中交第二航务工程局有限公司 可调式索股托架
CN204418027U (zh) * 2014-12-18 2015-06-24 中铁建设集团有限公司 一种用于自锚式悬索桥散索鞍底座安装的托架
CN204688938U (zh) * 2015-04-30 2015-10-07 和县浙徽新型材料有限公司 皮带输送机的输送带张口角度自动调节机构
CN205474865U (zh) * 2016-03-31 2016-08-17 中铁四局集团第一工程有限公司 一种斜拉索鞍座的定位装置

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638318B (zh) * 2016-11-25 2019-03-15 中铁大桥局集团第五工程有限公司 斜拉桥梁端锚固点的定位方法及索导管安装方法
CN106544959A (zh) * 2016-12-12 2017-03-29 中铁大桥局集团有限公司 含有鞍座的主塔吊装节段及桥梁主塔鞍座的施工方法
CN106544959B (zh) * 2016-12-12 2018-05-29 中铁大桥局集团有限公司 含有鞍座的主塔吊装节段及桥梁主塔鞍座的施工方法
CN107881914A (zh) * 2017-12-15 2018-04-06 中交第二航务工程局有限公司 一种分丝管式索鞍后场装配式定位装置及装配方法
CN107881914B (zh) * 2017-12-15 2023-09-12 中交第二航务工程局有限公司 一种分丝管式索鞍后场装配式定位装置及装配方法
CN108487064A (zh) * 2018-03-09 2018-09-04 济南城建集团有限公司 分离式安装悬索桥主索鞍座施工方法
CN108487064B (zh) * 2018-03-09 2019-06-25 济南城建集团有限公司 分离式安装悬索桥主索鞍座施工方法
CN114319123A (zh) * 2021-12-31 2022-04-12 中交二公局第一工程有限公司 一种预制装配式分丝管定位装置及分丝管定位方法
CN114319123B (zh) * 2021-12-31 2024-04-09 中交二公局第一工程有限公司 一种预制装配式分丝管定位装置及分丝管定位方法

Also Published As

Publication number Publication date
CN105648923B (zh) 2017-05-10

Similar Documents

Publication Publication Date Title
CN105648923B (zh) 一种斜拉索鞍座的定位方法
CN202031179U (zh) 基础预埋螺栓的中心线找正和标高调整装置
CN103437279B (zh) 高空现浇箱梁承压支柱及其施工工艺
CN109138446A (zh) 一种大跨度管桁架吊装方法
CN103114732B (zh) 铸钢相贯管节点空间定位方法
CN103087731B (zh) 一种干熄焦炉炉壳的激光测量安装方法
CN101736698B (zh) 斜拉桥塔柱索导管精确定位方法
CN103243649B (zh) 一种索鞍快速安装、定位的系统及方法
CN106087744B (zh) 斜拉桥混凝土梁索导管支撑定位装置及方法
CN102926538A (zh) 反力箱和反力墙的施工方法
CN107336346A (zh) 一种制梁台座
CN107633121B (zh) 基于bim的铁塔加固支架施工方法
CN115387221A (zh) 高海拔地区高墩线型控制方法
CN103243928B (zh) 双向倾斜v型柱施工方法
CN205474865U (zh) 一种斜拉索鞍座的定位装置
CN205156894U (zh) 箱梁现场荷载试验用位移传感器固定支架
CN109629449A (zh) 一种钢箱拱桥拱脚钢混结合段安装定位支架及对位方法
CN107881914B (zh) 一种分丝管式索鞍后场装配式定位装置及装配方法
CN202994159U (zh) 一种钢管拱变形观测标的定位装置
CN104264781A (zh) 网格状柱面钢结构网壳及其施工方法
CN204187217U (zh) 一种环形螺栓套筒组整体预埋及定位工装
CN103981893B (zh) 燃汽机基础预埋螺栓悬挂加固装置及方法
CN209585630U (zh) 建筑施工模板可调节支撑架
CN206982971U (zh) 一种制梁台座
CN103572870B (zh) 一种超长高倾斜度幕墙斜柱及其安装方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant