CN105626076A - High-efficiency mining method of dragline saw-tooth type working bench - Google Patents

High-efficiency mining method of dragline saw-tooth type working bench Download PDF

Info

Publication number
CN105626076A
CN105626076A CN201610220607.XA CN201610220607A CN105626076A CN 105626076 A CN105626076 A CN 105626076A CN 201610220607 A CN201610220607 A CN 201610220607A CN 105626076 A CN105626076 A CN 105626076A
Authority
CN
China
Prior art keywords
zag
zig
bucket shovel
shovel
harbour
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610220607.XA
Other languages
Chinese (zh)
Other versions
CN105626076B (en
Inventor
张瑞新
赵红泽
马新根
孙健东
刘煜
武海龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology Beijing CUMTB
Original Assignee
China University of Mining and Technology Beijing CUMTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology Beijing CUMTB filed Critical China University of Mining and Technology Beijing CUMTB
Priority to CN201610220607.XA priority Critical patent/CN105626076B/en
Publication of CN105626076A publication Critical patent/CN105626076A/en
Application granted granted Critical
Publication of CN105626076B publication Critical patent/CN105626076B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/26Methods of surface mining; Layouts therefor
    • E21C41/28Methods of surface mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C47/00Machines for obtaining or the removal of materials in open-pit mines
    • E21C47/02Machines for obtaining or the removal of materials in open-pit mines for coal, brown coal, or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Shovels (AREA)
  • Component Parts Of Construction Machinery (AREA)

Abstract

The embodiment of the invention discloses a high-efficiency mining method of a dragline saw-tooth type working bench, which relates to the technical field of open coal mining and can improve the operating efficiency of draglines. The high-efficiency mining method of a dragline saw-tooth type working bench comprises the steps of: carrying out pin-point blasting on solid rock steps above a coal seam to form a blasting muck pile; leveling and stripping the blasting muck pile by joint operation of push dozers, single-bucket excavators and trucks to form a dragline working bench of a predetermined height, forming a saw-tooth type wharf by extension on the edge of one side of the dragline working bench near the dumping site; when not less than one saw-tooth type wharf is formed by extension on the edge of one side of the dragline working bench near the dumping site, driving the dragline into the ditch to the working area; and driving the dragline in a predetermined traveling line sequentially through the saw-tooth wharf inside bench and the saw-tooth wharf to carry out casting operation. The high-efficiency mining method of a dragline saw-tooth type working bench is suitable for open coal mining by a dragline casting process without transportation.

Description

One draws bucket shovel zig-zag working berm high-efficiency mining method
Technical field
The present invention relates to Opencut coal mine mining technical field, particularly relate to one and draw bucket shovel zig-zag working berm high-efficiency mining method.
Background technology
The key operation flow process of domestic open coal mine application overcast stripping is as follows:
(1) pin-point blasting in advance of entity height step forms quick-fried heap;
(2) dozer, Dan Dou, the auxiliary quick-fried heap of released part of truck, and square position expanded, flatten;
(3) draw bucket shovel to stand on and on square position, carry out casting operation.
At home in the application of overcast stripping, draw bucket shovel usually to stand on and the rectangle square position of dozer, single bucket excavator, truck joint mapping carries out casting operation. This kind of overcast stripping decoration form and operation square position design, field practice mainly exists following problem: (1). draw the rectangular design of bucket shovel operation square position, too much material is concentrated on coal ditch place, not only increase the square position expansion workload of single bucket excavator, truck, too increase Pull shovel handling and peel off two casting amounts in link, indirectly reduce the effective casting efficiency drawing bucket shovel; (2). for effectively playing the unit operational capability drawing bucket shovel, the requirement for height that operation square position is certain need to be ensured, rectangular design will certainly limit the width of operation square position, make to draw the bucket shovel working rig distance of positions away from refuse dump, abandon restriction in space, casting haul distance row and draw the operation efficiency of bucket shovel.
Summary of the invention
In view of this, the embodiment of the present invention provides one to draw bucket shovel zig-zag working berm high-efficiency mining method, it is possible to improves and draws bucket shovel operation efficiency, reduces and peel off cost.
For achieving the above object, embodiments of the invention adopt following technical scheme:
One draws bucket shovel zig-zag working berm high-efficiency mining method, comprising:
Step 1, entity rock step to top, coal seam carry out pin-point blasting and form quick-fried heap;
Step 2, the employing smooth quick-fried heap of dozer, the operation square position of formation single bucket excavator, truck and transport passage;
Step 3, adopt dozer, single bucket excavator, truck integration of operation is smooth and peels off quick-fried heap, formed predetermined height draw bucket shovel operation square position, wherein, draw bucket shovel operation square position near side, refuse dump edge expand be formed with zig-zag harbour;
Step 4, draw bucket shovel operation square position near side, refuse dump edge expand formation be no less than a zig-zag harbour time, draw bucket shovel walk row enter ditch to work area;
Step 5, draw bucket shovel according to predetermined track route, walk in successively and inside zig-zag harbour, between square position and zig-zag harbour, carry out casting operation;
Step 6, dozer, single bucket excavator, truck advance with the circulation drawing bucket shovel to repeat above-mentioned steps 3 to step 5, until completing the quick-fried heap casting operation in whole unit bar district.
Can selection of land, the described entity rock step to top, coal seam carries out pin-point blasting and forms quick-fried heap, comprising:
The entity rock step on top, coal seam is carried out pin-point blasting 1/3 material amount is directly thrown into refuse dump.
Can selection of land, described in draw bucket shovel operation square position height be 13-14m.
Can selection of land, the spacing T of adjacent saw-tooth shape harbour, determine according to following calculation formula:
T=[33.3-0.56H] L-D;
In formula:
H is for drawing bucket shovel Working bench height;
L establishes step-length for drawing bucket shovel shifting;
D establishes surplus for oppositely moving.
Can selection of land, the edge of described zig-zag harbour is circular arc, and arc diameter is 36.2m.
Can selection of land, described in draw bucket shovel according to predetermined track route, walk in successively and inside zig-zag harbour, between square position and zig-zag harbour, carry out casting operation, comprising:
Bucket shovel is drawn to carry out circulation casting operation between Article 1 activity center line and Article 2 activity center line; Wherein,
Three casting operation seats in the plane are comprised in each work cycle, bucket shovel is drawn first to carry out casting operation in a seat in the plane, then oppositely move along Article 1 activity center line and it is located at No. two seats in the plane and carries out casting operation, vertically move No. three seats in the plane being set on Article 2 activity center line afterwards, after completing the casting operation of a circulation, return along former road by No. three seats in the plane, move the seat in the plane established to next one circulation and proceed casting operation.
Can selection of land, a described seat in the plane is apart from next step 90m to be blasted.
The one that the embodiment of the present invention provides draws bucket shovel zig-zag working berm high-efficiency mining method, it is formed with zig-zag harbour in the edge expansion drawing bucket shovel operation square position near side, refuse dump, draw bucket shovel according to predetermined track route, walk in successively and inside zig-zag harbour, between square position and zig-zag harbour, carry out casting operation; Draw the bucket shovel space geometry form of operation square position and layout by optimization design like this and draw bucket shovel walk to shovel route, effectively reduce without dozer, single bucket excavator, the stripping amount of truck and the repetition workload of Pull shovel handling in transport casting composite technology system, i.e. two casting amounts, simplify drawing bucket shovel walk shovel program, be conducive to balanced operation face production stripping ratio and performance performance efficiency, improve and drawing bucket shovel operation efficiency, reduce stripping cost.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, it is briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is a wing high step schematic cross-section to be blasted;
Fig. 2 is a wing high step sling blasting schematic cross-section;
Fig. 3 is the preliminary leveling operation schematic diagram of dozer;
Fig. 4 is that schematic diagram is arranged in sawtooth terminal operation square position;
Fig. 5 is the contrast schematic diagram of rectangle square position and sawtooth square position;
Fig. 6 draws walking to shovel route and making industry seat in the plane schematic diagram of adjacent two circulations of bucket shovel.
In figure: 1, high step to be blasted, 2, coal seam, 3, mound, 4, the quick-fried heap of throwing, 5, single bucket excavator, the transport passage of truck, 6, single bucket excavator, truck is smooth and peels off the quick-fried operation square position piling formation, 7, single bucket excavator, the smooth direction of propulsion with peeling off quick-fried heap of truck, 8, Pull shovel handling direction of propulsion, 9, draw bucket shovel circulation casting operation first seat in the plane, 10, draw bucket shovel circulation casting operation the 2nd seat in the plane, 11, draw bucket shovel circulation casting operation the 3rd seat in the plane, 12, draw bucket shovel operation sawtooth harbour, 13, Pull shovel handling Article 1 activity center line, 14, rectangle square position Pull shovel handling Article 2 activity center line, 15, sawtooth square position Pull shovel handling Article 2 activity center line, 16 Article 2 activity center line departure distance (4m), 17, drawing bucket shovel adjacent two circulation walk to produce route, 18, draw the chassis signal of bucket shovel, 19, draw square position inside bucket shovel operation harbour.
Embodiment
Bucket shovel zig-zag working berm high-efficiency mining method is drawn to be described in detail embodiment of the present invention one below in conjunction with accompanying drawing.
Should be clear and definite, described embodiment is only the present invention's part embodiment, instead of whole embodiments. Based on the embodiment in the present invention, those of ordinary skill in the art, not making other embodiments all obtained under creative work prerequisite, belong to the scope of protection of the invention.
Referring to Fig. 1 to Fig. 6, one of the present invention draws bucket shovel zig-zag working berm high-efficiency mining embodiment of the method, comprising:
Step 1, entity rock step to top, coal seam carry out pin-point blasting and form quick-fried heap.
In this step, adopt perforation rig to be drilled with big gun hole on the entity height step on top, coal seam in advance, then install explosive and carry out pin-point blasting. The throwing rate of pin-point blasting can reach 33%, and the direct throwing of stripping amount by about 1/3 is in worked-out section.
Step 2, the employing smooth quick-fried heap of dozer, the operation square position of formation single bucket excavator, truck and transport passage.
Step 3, adopt dozer, single bucket excavator, truck integration of operation is smooth and peels off quick-fried heap, formed predetermined height draw bucket shovel operation square position, wherein, draw bucket shovel operation square position near side, refuse dump edge expand be formed with zig-zag harbour.
In the present embodiment, after pin-point blasting is implemented, dozer carries out the section of falling operation on quick-fried heap, this work mainly contains two effects, one is the height reducing the quick-fried heap of pin-point blasting step, for brushing power shovel preparation work place, part stripping amount directly being pushed away and abandon to worked-out section, two is for drawing bucket shovel preparation work square position the section of falling while.
Quick-fried heap top is carried out smooth by dozer, after preparing the working berm of dredger dredge, adjust single bucket excavator (being commonly called as power shovel) carry out brushing operation, by formed after presplitting blasting domatic on the quick-fried amount casting of residue to outside, high bench slope is brushed out pre-ceasma. Dozer carries out at power shovel rear following the trail of operation, and the quick-fried amount poured out by power shovel is abandoned to refuse dump one thruster, and quick-fried heap carries out the part section of falling, and for drawing bucket shovel to do expansion platform.
After presplitting face upper brushes helper is completed by power shovel, through dozer, work place is carried out smooth, when meeting truck transport condition, power shovel is adjusted to and drawing the bucket shovel will one end of operation, the mode of end working face is adopted to carry out the section of falling operation, its stripping amount is abandoned to drawing bucket to shovel standing place near the side of refuse dump by truck row, for drawing bucket shovel to do expansion platform, expands formation zig-zag harbour drawing bucket shovel operation square position near the edge of side, refuse dump.
When drawing bucket shovel expansion platform width to meet its operating condition, truck coordinates the power shovel quick-fried amount of residue to be contact road or the end side contact road of drawing bucket shovel to enter working face, quick-fried for the residue of power shovel operation amount is directly arranged by truck and is abandoned to internal dumping after possessing the current condition of truck by route. Like this, both reduced the workload drawing bucket shovel, and again saved and draw the row of bucket shovel to abandon space.
In the present embodiment, described in draw bucket shovel operation square position height be preferably 13-14m. Operation square position height draws bucket shovel unit casting operation most effective when being 13-14m.
Step 4, draw bucket shovel operation square position near side, refuse dump edge expand formation be no less than a zig-zag harbour time, draw bucket shovel walk row enter ditch to work area.
Drawing bucket shovel, be a kind of large-scale walking excavator, strip mining transformation and extensive hydro project for coal, shale, ferrous metal and nonferrous metallic ores etc. are cut the earth. Main purposes rock is carried to worked-out section, open-pit, hydro project edge when peeling off. The rock of big block can be transported to larger distance by it.
Step 5, draw bucket shovel according to predetermined track route, walk in successively and inside zig-zag harbour, between square position and zig-zag harbour, carry out casting operation.
Step 6, dozer, single bucket excavator, truck advance with the circulation drawing bucket shovel to repeat above-mentioned steps 3 to step 5, until completing the quick-fried heap casting operation in whole unit bar district.
The one that the embodiment of the present invention provides draws bucket shovel zig-zag working berm high-efficiency mining method, it is formed with zig-zag harbour in the edge expansion drawing bucket shovel operation square position near side, refuse dump, draw bucket shovel according to predetermined track route, walk in successively and inside zig-zag harbour, between square position and zig-zag harbour, carry out casting operation; Draw the bucket shovel space geometry form of operation square position and layout by optimization design like this and draw bucket shovel walk to shovel route, effectively reduce without dozer, single bucket excavator, the stripping amount of truck and the repetition workload of Pull shovel handling in transport casting composite technology system, i.e. two casting amounts, simplify drawing bucket shovel walk shovel program, be conducive to balanced operation face production stripping ratio and performance performance efficiency, improve and drawing bucket shovel operation efficiency, reduce stripping cost.
Draw in bucket shovel zig-zag working berm high-efficiency mining embodiment of the method aforementioned, can selection of land, the described entity rock step to top, coal seam carries out pin-point blasting and forms quick-fried heap, comprising: the entity rock step on top, coal seam is carried out pin-point blasting 1/3 material amount is directly thrown into refuse dump.
Aforementioned draw bucket shovel zig-zag working berm high-efficiency mining embodiment of the method in, can selection of land, the spacing T of adjacent saw-tooth shape harbour, determine according to following calculation formula:
T=[33.3-0.56H] L-D;
In formula:
H is for drawing bucket shovel Working bench height;
L establishes step-length for drawing bucket shovel shifting;
D establishes surplus for oppositely moving.
In the present embodiment, adjacent saw-tooth shape harbour spacing is draw the circulation of bucket shovel to advance step pitch.
In the present embodiment, described in draw bucket shovel that the 8750-65 type of Bucyrus company of the U.S. can be adopted to draw bucket shovel, its shiftings sets step-length as 2.3m, oppositely moves and sets surplus as 12.8m, drawing bucket to shovel Working bench height when getting 13m, and calculating circulation advance distance is 47.0m.
Drawing in bucket shovel zig-zag working berm high-efficiency mining embodiment of the method aforementioned, zig-zag harbour size can be determined by material amount, and described zig-zag harbour width can be determined by the demand of the requirement and casting service range of drawing bucket shovel safe casting square position key element.
Referring to Fig. 4 and Fig. 5, as an optional enforcement mode, the edge of described zig-zag harbour is circular arc, and arc diameter is 36.2m, wherein, drawing bucket shovel job safety distance to be 5m, drawing bucket shovel chassis 18 radius to be 10.6m, the current width of dozer be 5m. In the present embodiment, zig-zag code, 12 total lengths are 21m.
Referring to Fig. 4 to Fig. 6, draw in bucket shovel zig-zag working berm high-efficiency mining embodiment of the method aforementioned, can selection of land, described draw bucket shovel according to predetermined track route, walk in successively and inside zig-zag harbour, between square position and zig-zag harbour, carry out casting operation, comprising: draw bucket shovel to carry out circulation casting operation between Article 1 activity center line 13 and Article 2 activity center line 15; Wherein,
Three casting operation seats in the plane are comprised in each work cycle, bucket shovel is drawn first to carry out casting operation in a seat in the plane 9, then oppositely move along Article 1 activity center line 13 and it is located at No. two seats in the plane 10 and carries out casting operation, vertically move No. three seats in the plane 11 being set on Article 2 activity center line 15 afterwards, after completing the casting operation of a circulation, return along former road by No. three seats in the plane 11, move the seat in the plane 9 established to next one circulation and proceed casting operation.
In the present embodiment, the straight line that No. one 9, No. two seats in the plane 10 of wherein every time circulating are connected is called that drawing struggles against and shovels Article 1 activity center 13, and the straight line that circulation No. three seats in the plane 11 are connected every time is called that drawing struggles against and shovels Article 2 activity center line 15.
Aforementioned draw bucket shovel zig-zag working berm high-efficiency mining embodiment of the method in, can selection of land, a described seat in the plane is apart from next step 90m to be blasted.
The embodiment of the present invention is to draw the operating feature of bucket shovel and walks to shovel rule as foundation, by to the optimization drawing bucket shovel Working bench to arrange shape, propose one and draw the bucket shovel novel reoovery method of zig-zag working berm, this reoovery method has following useful effect in concrete enforcement: 1. the design of zig-zag working berm can effectively avoid casting material in the accumulation at coal ditch place, make more material amount by dozer, single bucket excavator, the direct casting of truck enters internal dumping, thus reduce two casting amounts in whole casting process, improve the overall charge stripping efficiency of overcast stripping, 2. at zig-zag working berm and draw bucket shovel to walk to shovel in the design of route, operation seat in the plane, each sawtooth harbour is the casting operation seat in the plane drawing bucket shovel, sawtooth harbour makes to draw operation seat in the plane that bucket shovels on zig-zag harbour more near internal dumping to the outstanding structure in internal dumping direction, and therefore, it is possible to provide bigger interior emptying, less row abandon angle of rotation, 3. between zig-zag working berm adjacent saw-tooth shape harbour longitudinal direction, material is interrupted with natural repose angle to be piled up, therefore draw bucket to shovel front when the operation of harbour position to advance in circulation longitudinal extent without casting material amount, therefore without the need to considering drawing the minimum operating radius restriction of bucket shovel during this seat in the plane operation, can reduce and drawing bucket to shovel the reverse shifting of operation on harbour and establish seat in the plane and paths arrangement, 4. during existing overcast stripping is applied at home, the adjustment of working surface production stripping ratio cannot ensure to draw bucket shovel operation square position to be maintained at optimum height 13-14m usually, and the design of zig-zag working berm can by regulating the geometrical shape (length, width) of zig-zag harbour, not affecting the adjustment realizing production stripping ratio under the prerequisite drawing bucket shovel operation square position height, make the practical application of overcast stripping more flexible.
The above; it is only the specific embodiment of the present invention, but protection scope of the present invention is not limited thereto, any it is familiar with those skilled in the art in the technical scope that the present invention discloses; the change that can expect easily or replacement, all should be encompassed within protection scope of the present invention. Therefore, protection scope of the present invention should be as the criterion with the protection domain of claim.

Claims (7)

1. one kind is drawn bucket shovel zig-zag working berm reoovery method, it is characterised in that, comprising:
Step 1, entity rock step to top, coal seam carry out pin-point blasting and form quick-fried heap;
Step 2, the employing smooth quick-fried heap of dozer, the operation square position of formation single bucket excavator, truck and transport passage;
Step 3, adopt dozer, single bucket excavator, truck integration of operation is smooth and peels off quick-fried heap, formed predetermined height draw bucket shovel operation square position, wherein, draw bucket shovel operation square position near side, refuse dump edge expand be formed with zig-zag harbour;
Step 4, draw bucket shovel operation square position near side, refuse dump edge expand formation be no less than a zig-zag harbour time, draw bucket shovel walk row enter ditch to work area;
Step 5, draw bucket shovel according to predetermined track route, walk in successively and inside zig-zag harbour, between square position and zig-zag harbour, carry out casting operation;
Step 6, dozer, single bucket excavator, truck advance with the circulation drawing bucket shovel to repeat above-mentioned steps 3 to step 5, until completing the quick-fried heap casting operation in whole unit bar district.
2. according to claim 1 draw bucket shovel zig-zag working berm high-efficiency mining method, it is characterized in that, the described entity rock step to top, coal seam carries out pin-point blasting and forms quick-fried heap, comprising: the entity rock step on top, coal seam is carried out pin-point blasting 1/3 material amount is directly thrown into refuse dump.
3. according to claim 1 draw bucket shovel zig-zag working berm high-efficiency mining method, it is characterised in that, described in draw bucket shovel operation square position height be 13-14m.
4. drawing according to claim 1,2 or 3 is struggled against and is shoveled zig-zag working berm high-efficiency mining method, it is characterised in that,
The spacing T of adjacent saw-tooth shape harbour, determines according to following calculation formula:
T=[33.3-0.56H] L-D;
In formula:
H is for drawing bucket shovel Working bench height;
L establishes step-length for drawing bucket shovel shifting;
D establishes surplus for oppositely moving.
5. drawing according to the arbitrary item of Claims 1-4 is struggled against and is shoveled zig-zag working berm high-efficiency mining method, it is characterised in that,
The edge of described zig-zag harbour is circular arc, and arc diameter is 36.2m.
6. drawing according to the arbitrary item of claim 1 to 5 is struggled against and is shoveled zig-zag working berm high-efficiency mining method, it is characterized in that, described draw bucket shovel according to predetermined track route, walk in successively and inside zig-zag harbour, between square position and zig-zag harbour, carry out casting operation, comprising:
Bucket shovel is drawn to carry out circulation casting operation between Article 1 activity center line and Article 2 activity center line; Wherein,
Three casting operation seats in the plane are comprised in each work cycle, bucket shovel is drawn first to carry out casting operation in a seat in the plane, then oppositely move along Article 1 activity center line and it is located at No. two seats in the plane and carries out casting operation, vertically move No. three seats in the plane being set on Article 2 activity center line afterwards, after completing the casting operation of a circulation, return along former road by No. three seats in the plane, move the seat in the plane established to next one circulation and proceed casting operation.
7. according to claim 6 draw bucket shovel zig-zag working berm high-efficiency mining method, it is characterised in that, a described seat in the plane is apart from next step 90m to be blasted.
CN201610220607.XA 2016-04-11 2016-04-11 It is a kind of to draw bucket shovel zigzag working berm high-efficiency mining method Expired - Fee Related CN105626076B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610220607.XA CN105626076B (en) 2016-04-11 2016-04-11 It is a kind of to draw bucket shovel zigzag working berm high-efficiency mining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610220607.XA CN105626076B (en) 2016-04-11 2016-04-11 It is a kind of to draw bucket shovel zigzag working berm high-efficiency mining method

Publications (2)

Publication Number Publication Date
CN105626076A true CN105626076A (en) 2016-06-01
CN105626076B CN105626076B (en) 2018-06-19

Family

ID=56041367

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610220607.XA Expired - Fee Related CN105626076B (en) 2016-04-11 2016-04-11 It is a kind of to draw bucket shovel zigzag working berm high-efficiency mining method

Country Status (1)

Country Link
CN (1) CN105626076B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106121651A (en) * 2016-06-21 2016-11-16 中国矿业大学(北京) Draw the intelligent less important work method and device of bucket shovel
CN106930765A (en) * 2017-03-16 2017-07-07 福建省新华都工程有限责任公司 A kind of change inherently adopts the Ratio in Open-pit Mine dress method that dress operation realizes cost efficiency
CN109944592A (en) * 2019-03-28 2019-06-28 辽宁工程技术大学 Pull shovel handling technique pinpoint blasting step height design method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103216237A (en) * 2012-12-28 2013-07-24 中国神华能源股份有限公司 Open pit coal mine mining process
CN103256051A (en) * 2013-05-14 2013-08-21 中国煤炭科工集团太原研究院 Double-wing continuous coal mining technique for open-pit coal mine
CN103388478A (en) * 2013-07-30 2013-11-13 中国神华能源股份有限公司 Forming method for transportation road of bucket shovel applied to open pit coal mine
CN103470262A (en) * 2013-09-12 2013-12-25 中国矿业大学 Mining method of nearly horizontal mineral deposit of opencast coal field by casting and internally dumping

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103216237A (en) * 2012-12-28 2013-07-24 中国神华能源股份有限公司 Open pit coal mine mining process
CN103256051A (en) * 2013-05-14 2013-08-21 中国煤炭科工集团太原研究院 Double-wing continuous coal mining technique for open-pit coal mine
CN103388478A (en) * 2013-07-30 2013-11-13 中国神华能源股份有限公司 Forming method for transportation road of bucket shovel applied to open pit coal mine
CN103470262A (en) * 2013-09-12 2013-12-25 中国矿业大学 Mining method of nearly horizontal mineral deposit of opencast coal field by casting and internally dumping

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
尚涛等: "白音华二号露天煤矿拉斗铲倒堆工艺应用研究", 《煤炭工程》 *
张平宽等: "拉斗铲倒堆剥离工艺在黑岱沟露天煤矿的应用", 《露天采矿技术》 *
张平宽等: "拉斗铲倒堆工艺在黑岱沟露天煤矿的应用", 《露天采矿技术》 *
张洪等: "拉斗铲无运输倒堆工艺系统作业方式研究", 《露天采矿技术》 *
张瑞新等: "黑岱沟露天矿拉斗铲挖掘作业方式研究", 《煤炭工程》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106121651A (en) * 2016-06-21 2016-11-16 中国矿业大学(北京) Draw the intelligent less important work method and device of bucket shovel
CN106121651B (en) * 2016-06-21 2018-08-14 中国矿业大学(北京) Draw the intelligent less important work method and device of bucket shovel
CN106930765A (en) * 2017-03-16 2017-07-07 福建省新华都工程有限责任公司 A kind of change inherently adopts the Ratio in Open-pit Mine dress method that dress operation realizes cost efficiency
CN106930765B (en) * 2017-03-16 2019-01-11 福建省新华都工程有限责任公司 The Ratio in Open-pit Mine dress method of dress process realization cost efficiency is inherently adopted in a kind of change
CN109944592A (en) * 2019-03-28 2019-06-28 辽宁工程技术大学 Pull shovel handling technique pinpoint blasting step height design method

Also Published As

Publication number Publication date
CN105626076B (en) 2018-06-19

Similar Documents

Publication Publication Date Title
CN105781554A (en) Mining method for open coal mine through dragline non-transportation casting technology
CN107013217B (en) A kind of open coal mine casting bridge-type Pull shovel handling operational method
CN103216238B (en) A kind of Opencut coal mine mining technique
CN109931064B (en) Independent reverse stacking operation method for dragline of opencast coal mine
CN107687342B (en) A kind of open coal mine drawing bucket shovel active line segmentation alternative expression exploiting field forward method
CN101775821B (en) Device and method for vertically transporting earthwork by reverse construction method
CN106869936A (en) It is a kind of to be suitable to the surface mining new method of steep slope topography
CN103388478B (en) Forming method for transportation road of bucket shovel applied to open pit coal mine
CN110486021B (en) Construction method for converting large-section tunnel into two small-section tunnels
WO2019109602A1 (en) Short-face coal-pillar-free mining method having zero gangue discharge
CN109931065B (en) Open pit coal mine throwing blasting-loosening blasting partition mining method
CN105626076A (en) High-efficiency mining method of dragline saw-tooth type working bench
CN108708284A (en) A kind of steel trestle construction method for resisting flood discharge bed scour
CN105626068A (en) Dismantling method of open-pit coal mine end slope bridge
CN108756886B (en) Internal drainage process design method for metal strip mine slope turning into deep concave stage
CN114508353B (en) Initial rapid construction method for strip mine with inclined coal seam
CN106014409A (en) Novel method suitable for flat ground type tailings pond tailings dry type recovery
CN105926631A (en) Construction method for excavating bridge foundation pit in steep rock surface
CN111852554B (en) Rapid trenching method for large water inrush quantity pit open-pit mine small-block full-section deep one-time blasting
CN110984993B (en) Mining process for realizing non-transportation dumping of strip mine and scraper type dumping machine
CN112253121A (en) Strip mine transportation method
CN207229112U (en) A kind of submerged tunnel push pipe mole
CN213775379U (en) Construction system for small-section ultra-long water delivery tunnel in hard rock stratum
JP7319346B2 (en) Open shield machine and open shield construction method
CN215632971U (en) Digging and building construction structure of large underground mine chamber

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180619