CN105625733A CN201511030081.0A CN201511030081A CN105625733A CN 105625733 A CN105625733 A CN 105625733A CN 201511030081 A CN201511030081 A CN 201511030081A CN 105625733 A CN105625733 A CN 105625733A
Authority
CN
China
Prior art keywords
curtain wall
main frame
wall main
installation method
steel framework
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201511030081.0A
Other languages
Chinese (zh)
Inventor
陈晓明
施祺骏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Mechanized Construction Group Co Ltd
Original Assignee
Shanghai Mechanized Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Mechanized Construction Group Co Ltd filed Critical Shanghai Mechanized Construction Group Co Ltd
Priority to CN201511030081.0A priority Critical patent/CN105625733A/en
Publication of CN105625733A publication Critical patent/CN105625733A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls

Abstract

Aiming at the problems of high requirement for installation positioning accuracy, long construction period and easiness in generating a large plane size deviation, which are caused by the case that all sections of curtain wall main frames adopt a spare part installation mode in the prior art, the invention provides an installation method for trusses of the curtain wall main frames. The installation method comprises: arranging embedded parts for installing a first section of curtain wall main frame on a required floor structure, and prefabricating sheet unit structures for composing a second section of curtain wall main frame and above section of curtain wall main frame in a factory; installing the first section of curtain wall main frame in the spare part installation mode; from the second section of curtain wall main frame, assembling the second section of curtain wall main frame and the above section of curtain wall main frame by adopting the sheet unit structures in a sheet installation mode. Measurement on three-dimensional positions of uprights and cross bars, which are required by the spare part installation mode, can be effectively reduced; measurement workload is effectively reduced; moreover, the sheet unit structures prefabricated in the factory are high in accuracy; curtain wall glass is guaranteed to be installed between the adjacent cross bars in a vertical plane where the sheet unit structures are positioned.

Description

A kind of curtain wall main frame becomes Pin installation method
Technical field
The invention belongs to high-rise building building technology field, relate generally to a kind of curtain wall main frame and become Pin installation method.
Background technology
At present, the installation method of high-rise building curtain wall, basic employing loose mail dispersion is installed, existing installation method, speed of application is slow, and the precision controlling difficulty in installation process is big, after installation, the cumulative errors between curtain wall and steel construction are relatively big, and the installation of follow-up glass curtain wall is produced considerable influence.
Existing mounting technique and technique:
Firstly the need of the installation completing relevant position steel structure member, after Steel Structure Installation completes, just can carry out the associated construction of curtain wall steel framework.
Steel construction curtain wall base of frame needs to arrange embedded part on 60 layers of concrete floor, it is necessary to synchronously complete when constructing with floor steel bar template. Loose mail is installed subsequently, first installs its column, after two root post installations, then by middle contact cross bar installation.
Subsequently by same order successively upwards loose mail installation. This installation method is higher for installing positioning accuracy request, and long construction period, and speed of application is slow, is easily generated bigger planar dimension deviation. Owing to this engineering cladding glass is installed on the inclined-plane of steel frame, the rectangle plane dimensional requirement therefore two root posts and cross bar formed is higher, and deviation is slightly larger will result in the result that glass curtain wall cannot be installed. If its rectangle plane angle of inclination deviation is relatively big, also will result in the discount on whole structure.
Therefore, how to provide that a kind of installation accuracy is high, efficiency is high and can ensure that the curtain wall main frame that glass curtain wall is installed smoothly becomes Pin installation method, it has also become construction circle needs the technical problem of further improvement and optimization.
Summary of the invention
It is an object of the invention to provide a kind of curtain wall main frame and become Pin installation method, adopt patch unit structure that second section and curtain wall steel framework above are installed successively from the bottom to top in the way of lamellar installation, may insure that between the adjacent crossbars that glass curtain wall is installed on smoothly described patch unit structure place perpendicular, be effectively increased installation effectiveness and precision.
For solving above-mentioned technical problem, the present invention provides following technical scheme:
A kind of curtain wall main frame becomes Pin installation method, comprises the steps:
1st step, required floor structure is arranged to install the embedded part of first segment curtain wall steel framework, prefabrication is for forming the patch unit structure of second section and curtain wall steel framework above, described patch unit structure includes two root posts and connects a cross bar of described two root posts, described column is hollow pipe, the sleeve that the bottom of every root post internal portion respectively exposes, the inner surface of the outer surface of described sleeve and described column matches, and between the described sleeve in described patch unit structure, by positioning, angle steel is fixing to be connected;
2nd step, installs first segment curtain wall steel framework in the way of loose mail installation, first installs the column of described first segment curtain wall steel framework, then arrange cross bar between the column of adjacent described first segment curtain wall steel framework;
3rd step, installs second section and curtain wall steel framework above from the bottom to top successively, thus completing the installation of whole curtain wall steel framework in the way of lamellar installation.
Optionally, becoming in Pin installation method at above-mentioned curtain wall main frame, the mode that described lamellar is installed comprises the steps:
31st step, saves the patch unit structure hoisting needed for curtain wall steel framework to installation site by installing next, cuts off the location angle steel of patch unit structural base, be sheathed on by sleeve on the corresponding column of bottom installation;
32nd step, proceeds the 31st step, until completing the installation of the patch unit structure of the curtain wall steel framework of all joints;
33rd step, installing the Inter cross bar of second section and adjacent lamellar cellular construction above, completing thus completing the installation of whole curtain wall steel framework.
Optionally, becoming in Pin installation method at above-mentioned curtain wall main frame, described 32nd step follows Construction of Steel Structure progress, the curtain wall steel framework that successively upwards construction saves accordingly.
Optionally, become in Pin installation method at above-mentioned curtain wall main frame, by welding manner, sleeve is sheathed on the corresponding column of bottom installation.
Optionally, becoming in Pin installation method at above-mentioned curtain wall main frame, the cross bar in described patch unit structure is connected to the top of described two root posts.
Optionally, becoming in Pin installation method at above-mentioned curtain wall main frame, between the described sleeve in described patch unit structure, by positioning, angle steel is fixing to be connected.
Optionally, becoming in Pin installation method at above-mentioned curtain wall main frame, described column is pipe, and described sleeve is circular sleeve.
Optionally, becoming in Pin installation method at above-mentioned curtain wall main frame, in described 2nd step, described column divides two rows to be staggered.
Optionally, become in Pin installation method at above-mentioned curtain wall main frame, after the 3rd step, also include being installed on cladding glass between the adjacent crossbars of described patch unit structure place perpendicular.
From techniques disclosed above scheme, in compared to existing technology, the mode that all joint curtain wall main frames all adopt loose mail to install, cause the positioning accuracy request installed is high and long construction period, speed of application is slow, it is easy to the problem producing bigger planar dimension deviation; The present invention is from second section curtain wall main frame, patch unit structure is adopted to assemble second section and curtain wall main frame above in the way of lamellar installation, can effectively reduce the three-dimensional position measuring of the column required for loose mail mounting means and cross bar, effectively reduce measurement workload, and the patch unit structure of prefabrication, precision is high, such that it is able to improve installation accuracy, it is ensured that cladding glass is installed between the adjacent crossbars of described patch unit structure place perpendicular.
Accompanying drawing explanation
The curtain wall main frame that Fig. 1 is one embodiment of the invention becomes embedded part in Pin installation method to arrange schematic diagram;
The curtain wall main frame that Fig. 2 is one embodiment of the invention becomes the structural representation of patch unit structure in Pin installation method.
The curtain wall main frame that Fig. 3 is one embodiment of the invention becomes Pin installation method central post to be installed on embedded parts structure schematic diagram;
The curtain wall main frame that Fig. 4 is one embodiment of the invention becomes cross bar and column connection diagram in Pin installation method;
The curtain wall main frame that Fig. 5 is one embodiment of the invention becomes the floor map of first segment curtain wall steel framework in Pin installation method; .
The curtain wall main frame that Fig. 6 is one embodiment of the invention becomes the facade partial schematic diagram of second section and curtain wall steel framework above in Pin installation method; .
The curtain wall main frame that Fig. 7 is one embodiment of the invention becomes the floor map of second section and curtain wall steel framework above in Pin installation method; .
The curtain wall main frame that Fig. 8 is one embodiment of the invention becomes the floor map of cladding glass installation site in Pin installation method; .
In figure: 1-embedded part, 2-column, 3-cross bar, 4-sleeve, 5-position angle steel, 6-cladding glass, 7-floor structure, 10-patch unit structure.
Detailed description of the invention
The curtain wall main frame present invention proposed below in conjunction with the drawings and specific embodiments becomes Pin installation method to be described in further detail. According to the following describes and claims, advantages and features of the invention will be apparent from. It should be noted that, accompanying drawing all adopts the form simplified very much and all uses non-ratio accurately, only in order to convenience, the purpose aiding in illustrating the embodiment of the present invention lucidly.
Refer to Fig. 1 to Fig. 8, present embodiment discloses a kind of curtain wall main frame and become Pin installation method, comprise the steps:
1st step, as shown in Figure 1, required floor structure 7 is arranged to install the embedded part 1 of first segment curtain wall steel framework, prefabrication is for forming the patch unit structure 10 of second section and curtain wall steel framework above, as shown in Figure 2, described patch unit structure 10 includes two root posts 2 and connects a cross bar 3 of described two root posts 2, described column 2 is hollow pipe, the sleeve 4 that the bottom internal portion respectively of every root post 2 exposes, the inner surface of the outer surface of described sleeve 4 and described column 2 matches, between two described sleeves 4 in described patch unit structure 10, by positioning, angle steel 5 is fixing to be connected. prefabricated patch unit structure 10 has the higher accuracy of manufacture, the problem that the rectangular surfaces being made up of column 2 and cross bar 3 when loose mail can be avoided to install produces large-size deviation, it is ensured that follow-up cladding glass 6 can be installed in the rectangular surfaces that column 2 and cross bar 3 form. prefabricated patch unit structure 10 can also save substantial amounts of loose mail installation procedure, is effectively increased installation effectiveness, improves installation accuracy. additionally, by positioning, angle steel 5 is fixing to be connected between described sleeve 4 in described patch unit structure 10, it is possible to preventing in transportation, two root posts 2 in patch unit structure 10 occur loosening deformation, further ensure that follow-up installment work.
2nd step, in the way of loose mail installation, first segment curtain wall steel framework is installed, as shown in Figure 3, the column 2 of described first segment curtain wall steel framework is first installed, by the lower end full weld of the column 2 of first segment curtain wall steel framework on described embedded part 1, then, as shown in Figure 4, cross bar 3 is set between the column 2 of adjacent described first segment curtain wall steel framework, it is possible to the mode being threaded connection or welding, cross bar 3 is connected between adjacent column 2. In the present embodiment, cross bar 3 is polyline shaped after arranging, as it is shown in figure 5, the floor map that Fig. 5 is first segment curtain wall steel framework. .
3rd step, installs second section and curtain wall steel framework above from the bottom to top successively, thus completing the installation of whole curtain wall steel framework in the way of lamellar installation. The mode that second section and curtain wall steel framework above are installed by lamellar is installed, the mode not only comparing loose mail installation improves the efficiency of installation, and guarantee follow-up cladding glass 6 can being installed in the rectangular surfaces that column 2 and cross bar 3 form, improve installation accuracy.
Optionally, becoming in Pin installation method at above-mentioned curtain wall main frame, the mode that described lamellar is installed comprises the steps:
31st step, lifts the patch unit structure 10 needed for installing next joint curtain wall steel framework to installation site, cuts off the location angle steel 5 bottom patch unit structure 10, overlapped by sleeve 4 on the 4 corresponding columns 2 being located at bottom installation;
32nd step, proceeds the 31st step, until completing the installation of the patch unit structure 10 of the curtain wall steel framework of all joints;
33rd step, installing the Inter cross bar 3 of second section and adjacent lamellar cellular construction 10 above, as shown in Figures 6 and 7, completing thus completing the installation of whole curtain wall steel framework.
Optionally, becoming in Pin installation method at above-mentioned curtain wall main frame, described 32nd step follows Construction of Steel Structure progress, the curtain wall steel framework that successively upwards construction saves accordingly.
In order to improve the bonding strength between sleeve 4 and the corresponding column 2 of bottom installation, optionally, become in Pin installation method at above-mentioned curtain wall main frame, by welding manner, sleeve 4 is sheathed on the corresponding column 2 of bottom installation.
Optionally, becoming in Pin installation method at above-mentioned curtain wall main frame, the cross bar 3 in described patch unit structure 10 is connected to the top of described two root posts 2.
Optionally, becoming in Pin installation method at above-mentioned curtain wall main frame, between the described sleeve 4 in described patch unit structure 10, by positioning, angle steel 5 is fixing to be connected. By arranging location angle steel 5, it is possible to prevent in transportation, two root posts 2 in patch unit structure 10 occur loosening deformation, further ensure that follow-up installment work.
Socket for the ease of column 2 with sleeve pipe, it is preferred that described column 2 is pipe, and described sleeve 4 is circular sleeve 4.
Optionally, becoming in Pin installation method at above-mentioned curtain wall main frame, in described 2nd step, 2 point two of described column row be staggered. Thus, described cross bar 3 forms broken line type lines in horizontal plane, has preferably aesthetic.
Optionally, become in Pin installation method at above-mentioned curtain wall main frame, after the 3rd step, also include being installed on cladding glass 6 between the adjacent crossbars 3 of described patch unit structure 10 place perpendicular, as shown in Figure 8. Owing to described patch unit structure 10 is to get on the form superposition of lamellar, it is prevented that produce the rectangular surfaces for arranging cladding glass 6 and bigger planar dimension deviation occurs, it is ensured that reliably installing smoothly of cladding glass 6.
Foregoing description is only the description to present pre-ferred embodiments, not any restriction to the scope of the invention, any change that the those of ordinary skill in field of the present invention does according to the disclosure above content, modification, belongs to the protection domain of claims.

Claims (8)

1. a curtain wall main frame becomes Pin installation method, it is characterised in that comprise the steps:
1st step, required floor structure is arranged to install the embedded part of first segment curtain wall steel framework, prefabrication is for forming the patch unit structure of second section and curtain wall steel framework above, described patch unit structure includes two root posts and connects a cross bar of described two root posts, described column is hollow pipe, the sleeve that the bottom of every root post internal portion respectively exposes, the inner surface of the outer surface of described sleeve and described column matches, and between the described sleeve in described patch unit structure, by positioning, angle steel is fixing to be connected;
2nd step, installs first segment curtain wall steel framework in the way of loose mail installation, first installs the column of described first segment curtain wall steel framework, then arrange cross bar between the column of adjacent described first segment curtain wall steel framework;
3rd step, installs second section and curtain wall steel framework above from the bottom to top successively, thus completing the installation of whole curtain wall steel framework in the way of lamellar installation.
2. curtain wall main frame as claimed in claim 1 becomes Pin installation method, it is characterised in that the mode that described lamellar is installed comprises the steps:
31st step, saves the patch unit structure hoisting needed for curtain wall steel framework to installation site by installing next, cuts off the location angle steel of patch unit structural base, be sheathed on by sleeve on the corresponding column of bottom installation;
32nd step, proceeds the 31st step, until completing the installation of the patch unit structure of the curtain wall steel framework of all joints;
33rd step, installing the Inter cross bar of second section and adjacent lamellar cellular construction above, completing thus completing the installation of whole curtain wall steel framework.
3. curtain wall main frame as claimed in claim 2 becomes Pin installation method, it is characterised in that described 32nd step follows Construction of Steel Structure progress, the curtain wall steel framework that successively upwards construction saves accordingly.
4. curtain wall main frame as claimed in claim 2 becomes Pin installation method, it is characterised in that be sheathed on the corresponding column of bottom installation by sleeve by welding manner.
5. curtain wall main frame as claimed in claim 1 becomes Pin installation method, it is characterised in that the cross bar in described patch unit structure is connected to the top of described two root posts.
6. curtain wall main frame as claimed in claim 1 becomes Pin installation method, it is characterised in that described column is pipe, and described sleeve is circular sleeve.
7. curtain wall main frame as claimed in claim 1 becomes Pin installation method, it is characterised in that in described 2nd step, described column divides two rows to be staggered.
8. in claim 1-7, curtain wall main frame as described in any one becomes Pin installation method, it is characterised in that after the 3rd step, also includes being installed on cladding glass between the adjacent crossbars of described patch unit structure place perpendicular.
CN201511030081.0A 2015-12-31 2015-12-31 Installation method for trusses of curtain wall main frames Pending CN105625733A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511030081.0A CN105625733A (en) 2015-12-31 2015-12-31 Installation method for trusses of curtain wall main frames

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511030081.0A CN105625733A (en) 2015-12-31 2015-12-31 Installation method for trusses of curtain wall main frames

Publications (1)

Publication Number Publication Date
CN105625733A true CN105625733A (en) 2016-06-01

Family

ID=56041039

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511030081.0A Pending CN105625733A (en) 2015-12-31 2015-12-31 Installation method for trusses of curtain wall main frames

Country Status (1)

Country Link
CN (1) CN105625733A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112814383A (en) * 2021-01-06 2021-05-18 上海建工一建集团有限公司 Construction method of double-layer roof curtain wall structure

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1124809A (en) * 1994-02-04 1996-06-19 丁明朗 Curtain wall composed of frame panel
CN1525020A (en) * 2003-09-17 2004-09-01 安建丞 Erection and construction method for glass curtain wall of building
US20080216444A1 (en) * 2004-04-26 2008-09-11 Stephen N. Loyd Irrevocable Family Trust Curtain wall system and method
JP2008266891A (en) * 2007-04-16 2008-11-06 Shimizu Corp Curtain wall mounting method and device
CN201560512U (en) * 2009-12-02 2010-08-25 中山盛兴股份有限公司 Pre-fabricated small unit curtain wall
CN102425255A (en) * 2011-10-10 2012-04-25 苏州柯利达装饰股份有限公司 Assembled unit frame glass curtain wall system
CN202370134U (en) * 2011-12-20 2012-08-08 苏州柯利达装饰股份有限公司 Unit type curtain wall system with vertical sunshade strip
CN203531198U (en) * 2013-10-22 2014-04-09 深圳金粤幕墙装饰工程有限公司 Large cantilever unit type stone combined device
CN103806577A (en) * 2012-11-06 2014-05-21 南通四建装饰工程有限公司 Installation method for super-large-area unit type slabstone curtain wall

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1124809A (en) * 1994-02-04 1996-06-19 丁明朗 Curtain wall composed of frame panel
CN1525020A (en) * 2003-09-17 2004-09-01 安建丞 Erection and construction method for glass curtain wall of building
US20080216444A1 (en) * 2004-04-26 2008-09-11 Stephen N. Loyd Irrevocable Family Trust Curtain wall system and method
JP2008266891A (en) * 2007-04-16 2008-11-06 Shimizu Corp Curtain wall mounting method and device
CN201560512U (en) * 2009-12-02 2010-08-25 中山盛兴股份有限公司 Pre-fabricated small unit curtain wall
CN102425255A (en) * 2011-10-10 2012-04-25 苏州柯利达装饰股份有限公司 Assembled unit frame glass curtain wall system
CN202370134U (en) * 2011-12-20 2012-08-08 苏州柯利达装饰股份有限公司 Unit type curtain wall system with vertical sunshade strip
CN103806577A (en) * 2012-11-06 2014-05-21 南通四建装饰工程有限公司 Installation method for super-large-area unit type slabstone curtain wall
CN203531198U (en) * 2013-10-22 2014-04-09 深圳金粤幕墙装饰工程有限公司 Large cantilever unit type stone combined device

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
冯燕妮: "斜面框架式铝合金玻璃幕墙施工技术", 《装备制造》 *
刘益状: "论框架玻璃幕墙安装工程施工方法", 《现代商贸工业》 *
姚道苗等: "浅谈框架式幕墙的安装过程", 《门窗》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112814383A (en) * 2021-01-06 2021-05-18 上海建工一建集团有限公司 Construction method of double-layer roof curtain wall structure

Similar Documents

Publication Publication Date Title
CN105484388A (en) Prefabricated assembly type shear wall vertical slit connecting structure and construction method thereof
CN109208486B (en) Embedding and repairing segmented manufacturing process between steel bridge roof plates
CN105350639B (en) A kind of facade intersects grid structure peripheral frame and its installation method
CN104631684A (en) Single-layer latticed shell steel structure roof system based on concrete building and assembling method of single-layer latticed shell steel structure roof system based on concrete building
CN104963408A (en) Building structure and construction method thereof
CN203613651U (en) Connection structure for steel pipe columns and beam
CN102864934A (en) Construction method of back-bolt type dry hanging stone curtain wall
KR101751776B1 (en) the hybrid self-positioning connecting structure of column and beam
KR20160001216A (en) Rahmen using hinge type pc wall and method for constructing the same
CN111636303A (en) Cross baseline control method for block assembly manufacturing of curved steel box structure
CN103883128A (en) Multi-tier large-span steel structure mounting method
CN104878695A (en) Viaduct cover beam shaping bottom die support and application method thereof
CN110847599A (en) Special-shaped column formwork filling reinforcement device and construction method thereof
CN114482349A (en) Construction method of straight-through double-pull-rod steel frame supported long-span glass curtain wall system
CN104179362A (en) Building site guardrail fast to mount and demount
CN105625733A (en) Installation method for trusses of curtain wall main frames
JP6667940B2 (en) Exterior wall panel and column layout structure of exterior wall and layout construction method
CN102852329B (en) Construction method of concrete arched door and window lintel
CN104947804A (en) Steel bracket and construction method for constructing beam column joint structure through steel bracket
CN104196153A (en) Thick L-shaped steel plate shear wall column and manufacturing method thereof
CN104018682A (en) Method based on implementation of splicing of steel reinforced column on construction site
CN103711132A (en) Cylindrical reinforcing steel bar connecting method and connecting structure in reverse building method
CN106760486A (en) Exterior wall mould and its erection method in foundation ditch
CN204040471U (en) A kind of Novel direct piece cap template
CN204475514U (en) A kind of building structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160601