CN102425255A - Assembled unit frame glass curtain wall system - Google Patents
Assembled unit frame glass curtain wall system Download PDFInfo
- Publication number
- CN102425255A CN102425255A CN2011103031703A CN201110303170A CN102425255A CN 102425255 A CN102425255 A CN 102425255A CN 2011103031703 A CN2011103031703 A CN 2011103031703A CN 201110303170 A CN201110303170 A CN 201110303170A CN 102425255 A CN102425255 A CN 102425255A
- Authority
- CN
- China
- Prior art keywords
- curtain wall
- frame
- unit
- pressing plate
- hollow glass
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000011521 glass Substances 0.000 title claims abstract description 37
- 238000003825 pressing Methods 0.000 claims abstract description 21
- 238000007789 sealing Methods 0.000 claims abstract description 10
- 239000000565 sealant Substances 0.000 claims abstract description 7
- 229910000838 Al alloy Inorganic materials 0.000 claims description 8
- 238000010276 construction Methods 0.000 claims description 7
- 229920002943 EPDM rubber Polymers 0.000 claims description 4
- 239000002390 adhesive tape Substances 0.000 claims description 4
- 229920001296 polysiloxane Polymers 0.000 claims description 4
- 238000004519 manufacturing process Methods 0.000 abstract description 10
- 238000009434 installation Methods 0.000 abstract description 8
- 238000000034 method Methods 0.000 abstract description 5
- 230000007547 defect Effects 0.000 abstract 1
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000012530 fluid Substances 0.000 description 2
- 239000003292 glue Substances 0.000 description 2
- 239000010935 stainless steel Substances 0.000 description 2
- 229910001220 stainless steel Inorganic materials 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000009432 framing Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000010079 rubber tapping Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Images
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
The invention discloses an assembled unit frame glass curtain wall system which comprises a frame unit and a panel unit, wherein the frame unit comprises a male upright post, a female upright post and a transverse beam, and the male upright post, the female upright post and the transverse beam form a frame structure; and the panel unit comprises hollow glass and a pressing plate, the hollow glass is positioned on the frame unit, a sealing rubber strip is installed in the contact position of the male upright post, the female upright post and the transverse beam with the hollow glass, the hollow glass is pressed by the pressing plate, and the pressing plate is fixedly connected with the frame unit through screws. All processes for assembling the curtain wall system frame unit are completed in a plant, and the panel unit is installed on the site. Compared with the traditional curtain wall system, the curtain wall system disclosed by the invention has the advantages that the manufacturing process is simpler, more sealing rubber strips and sealants are not needed, the production efficiency is high, the processing flatness is good, the precision is high, the field installation is convenient, and the defect of large deviation in the traditional field installation is overcome.
Description
Technical field
The present invention relates to a kind of curtain wall system, particularly a kind of assembled unit frame glass curtain wall system.
Background technology
Along with the high speed development of Chinese national economy and improving constantly of living standards of the people; And the lifting of architect's design concept " human nature in building "; Building is more and more to high-rise, high-grade, multifunctional direction development; For the outward appearance that makes building seems more attractive in appearance, the external surface of building generally all is provided with curtain wall.Curtain wall is the exterior wall pad of building, and not load-bearing hangs up as curtain, so be called the suspension wall again, is the modern large-scale lightweight body of wall of using always with highrise building that has decorative effect.By structural framing with inlay sheet material and form, do not bear the architectural exterior-protecting construction of agent structure load and effect.
Conventional components formula curtain wall system is the connection assembly unit of carrying out stand column and beam of curtain wall at building-site, the glass plate is installed is again formed complete curtain wall.The conventional elements curtain wall system, construction process is complicated, and production and processing efficient is low, and cost is higher.Cost of transportation is high, and the site operation difficulty is big.
Summary of the invention
To the deficiency of above-mentioned prior art, the purpose of this invention is to provide a kind of shortcoming that both can overcome element type curtain wall site operation low precision, can solve the production complicacy of unit type curtain wall and the assembled unit frame glass curtain wall system of the big problem of installation difficulty again.
For solving the problems of the technologies described above, the present invention adopts following technical scheme:
A kind of assembled unit frame glass curtain wall system, it comprises: frame unit, said frame unit comprises public post, female column and crossbeam, said public post, female column and crossbeam form a frame construction; Panel unit; Said panel unit comprises hollow glass and pressing plate; Said hollow glass is positioned on the said frame unit; Said public post, female column, crossbeam are equipped with sealing joint strip with the position that said hollow glass contacts, and said pressing plate is pushed down said hollow glass, and said pressing plate is connected through screw with said frame unit.
Preferably, be provided with the EPDM adhesive tape between said pressing plate and the said hollow glass.
Preferably, be pasted with the aluminium alloys clasp on said female column.
Preferably, be provided with the silicone building sealant in the slit between said public post and the said female column.
Preferably, said pressing plate is provided with the outer buckle closure of aluminium alloys.
Technique scheme has following beneficial effect: all process steps of this curtain wall system frame unit assembling can be accomplished in factory, and panel unit is installed at the scene, compares traditional curtain wall system; Its manufacturing process is simpler, need not too much sealing joint strip and fluid sealant, and production efficiency is high;, the processing good planeness, precision is high; On-the-spot easy for installation, overcome the big problem of on-the-spot in the past installation deviation.And this curtain wall system constructs brief practicality, and cost is low, the telescopic construction distance rationally, resistance to deformation, anti-seismic performance is good, cell cube is in light weight, more is prone to transportation.Frame unit is to separate transportation with glass, and it is more convenient to transport, and can shorten the production cycle.
Description of drawings
Fig. 1 is the cross-sectional structural representation of the embodiment of the invention.
Fig. 2 is an embodiment of the invention vertical profile structural representation.
The specific embodiment
Below in conjunction with accompanying drawing the preferred embodiments of the present invention are described in detail.
Like Fig. 1, shown in 2, this assembled unit frame glass curtain wall system comprises frame unit and panel unit two parts, and frame unit can be assembled in factory, and panel unit can be assembled at the scene.
Frame unit comprises public post 01, female column 02 and crossbeam 03, and public post 01, female column 02 and crossbeam 03 are through the screw 08 fixing frame construction that forms.Female column 02 is pasted with aluminium alloys clasp 06 through structure glue 14, is provided with silicone building sealant 10 in the slit between public post 01 and the female column 01.The assembling of said frame unit all can be accomplished in factory.
Panel unit comprises hollow glass 07 and pressing plate 04; Hollow glass 07 is positioned on the frame unit; The position that public post 01, female column 02, crossbeam 03 contact with hollow glass 07 is equipped with sealing joint strip 11,12; Pressing plate 04 is pushed down hollow glass 07, and pressing plate 04 is fixedly connected through screw 09 with public post 01, female column 02 or crossbeam 03 on the frame unit.Be provided with EPDM adhesive tape 13 between pressing plate 04 and the hollow glass 07, pressing plate 04 is provided with the outer buckle closure 05 of aluminium alloys.
This curtain wall system is when assembling; At first sealing joint strip 11,12 is penetrated in the notch of public post 01; Sealing joint strip 12 is penetrated in the notch of female column 02 and crossbeam 03, through stainless steel screw 08 crossbeam 03 and public post 01, female column 02 are coupled together completion group frame then.Then aluminium alloys clasp 06 is cemented and detain the jail in female column 02, accomplish the assembling of frame system through structure glue 14.The assembling of frame unit is all accomplished in processing factory.
The frame unit scene of being transported to is lifted, installs in order during lifting, treat the frame unit installation after, in the slit of public post 01 and female column 02, beat silicone building sealant 10, sealing joint strip 12 is penetrated in the notch of pressing plate 04.Hollow glass 07 usefulness glass holder is put to assigned address, then pressing plate 04 pad is gone up EPDM adhesive tape 13 and couple together completion group frame through stainless steel self tapping screw 09 and crossbeam 03, female column 02.Then the outer buckle closure 05 of aluminium alloys is contained on the pressing plate 04, accomplishes panel unit and install, the assembling of panel unit is all accomplished at the scene.
The all process steps of this curtain wall system frame unit assembling can be accomplished in factory, and panel unit is installed at the scene, compares traditional curtain wall system; Its manufacturing process is simpler, need not too much sealing joint strip and fluid sealant, and production efficiency is high;, the processing good planeness, precision is high; On-the-spot easy for installation, overcome the big problem of on-the-spot in the past installation deviation.And this curtain wall system constructs brief practicality, and cost is low, the telescopic construction distance rationally, resistance to deformation, anti-seismic performance is good, cell cube is in light weight, more is prone to transportation.Frame unit is to separate transportation with glass, and it is more convenient to transport, and can shorten the production cycle.
More than a kind of assembled unit frame glass curtain wall system had carried out detailed introduction to the embodiment of the invention provides; For one of ordinary skill in the art; According to the thought of the embodiment of the invention, the part that on the specific embodiment and range of application, all can change, in sum; This description should not be construed as limitation of the present invention, and all any changes of making according to design philosophy of the present invention are all within protection scope of the present invention.
Claims (5)
1. assembled unit frame glass curtain wall system is characterized in that it comprises:
Frame unit, said frame unit comprises public post, female column and crossbeam, said public post, female column and crossbeam form a frame construction;
Panel unit; Said panel unit comprises hollow glass and pressing plate; Said hollow glass is positioned on the said frame unit; Said public post, female column, crossbeam are equipped with sealing joint strip with the position that said hollow glass contacts, and said pressing plate is pushed down said hollow glass, and said pressing plate is connected through screw with said frame unit.
2. assembled unit frame glass curtain wall according to claim 1 system is characterized in that: be provided with the EPDM adhesive tape between said pressing plate and the said hollow glass.
3. assembled unit frame glass curtain wall according to claim 1 system is characterized in that: be pasted with the aluminium alloys clasp on said female column.
4. assembled unit frame glass curtain wall according to claim 1 system is characterized in that: be provided with the silicone building sealant in the slit between said public post and the said female column.
5. assembled unit frame glass curtain wall according to claim 1 system is characterized in that: said pressing plate is provided with the outer buckle closure of aluminium alloys.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2011103031703A CN102425255A (en) | 2011-10-10 | 2011-10-10 | Assembled unit frame glass curtain wall system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2011103031703A CN102425255A (en) | 2011-10-10 | 2011-10-10 | Assembled unit frame glass curtain wall system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN102425255A true CN102425255A (en) | 2012-04-25 |
Family
ID=45959281
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2011103031703A Pending CN102425255A (en) | 2011-10-10 | 2011-10-10 | Assembled unit frame glass curtain wall system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102425255A (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102943540A (en) * | 2012-12-05 | 2013-02-27 | 深圳市三鑫幕墙工程有限公司 | Connecting device and curtain wall structure using same |
| CN103469943A (en) * | 2013-09-18 | 2013-12-25 | 江苏龙升幕墙工程有限公司 | Multi-angle glass curtain wall unit plate and glass curtain wall system formed by same |
| CN104695599A (en) * | 2015-03-18 | 2015-06-10 | 苏州苏明装饰股份有限公司 | Beam and column connection structure in glass curtain wall and construction method thereof |
| CN105625733A (en) * | 2015-12-31 | 2016-06-01 | 上海市机械施工集团有限公司 | Installation method for trusses of curtain wall main frames |
| CN112112329A (en) * | 2020-08-03 | 2020-12-22 | 五冶集团上海有限公司 | Aluminum alloy groove buckle cover for outdoor brightening wiring of glass curtain wall and mounting method |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2677471Y (en) * | 2003-12-30 | 2005-02-09 | 深圳金粤幕墙装饰工程有限公司 | Unit, curtain wall assembling device |
| CN101100880A (en) * | 2007-07-25 | 2008-01-09 | 李毅 | Breathing type solar energy photovoltaic glass curtain wall and use thereof |
| CN101205741A (en) * | 2006-12-18 | 2008-06-25 | 王广武 | Warm-edge vacuum glass insulation curtain wall |
| CN201148680Y (en) * | 2007-12-30 | 2008-11-12 | 浙江中南建设集团有限公司 | Hollow glass curtain wall |
-
2011
- 2011-10-10 CN CN2011103031703A patent/CN102425255A/en active Pending
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2677471Y (en) * | 2003-12-30 | 2005-02-09 | 深圳金粤幕墙装饰工程有限公司 | Unit, curtain wall assembling device |
| CN101205741A (en) * | 2006-12-18 | 2008-06-25 | 王广武 | Warm-edge vacuum glass insulation curtain wall |
| CN101100880A (en) * | 2007-07-25 | 2008-01-09 | 李毅 | Breathing type solar energy photovoltaic glass curtain wall and use thereof |
| CN201148680Y (en) * | 2007-12-30 | 2008-11-12 | 浙江中南建设集团有限公司 | Hollow glass curtain wall |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102943540A (en) * | 2012-12-05 | 2013-02-27 | 深圳市三鑫幕墙工程有限公司 | Connecting device and curtain wall structure using same |
| CN103469943A (en) * | 2013-09-18 | 2013-12-25 | 江苏龙升幕墙工程有限公司 | Multi-angle glass curtain wall unit plate and glass curtain wall system formed by same |
| CN103469943B (en) * | 2013-09-18 | 2016-05-04 | 江苏龙升节能科技股份有限公司 | Multi-angle glass curtain wall unit plate and consisting of glass curtain wall system |
| CN104695599A (en) * | 2015-03-18 | 2015-06-10 | 苏州苏明装饰股份有限公司 | Beam and column connection structure in glass curtain wall and construction method thereof |
| CN105625733A (en) * | 2015-12-31 | 2016-06-01 | 上海市机械施工集团有限公司 | Installation method for trusses of curtain wall main frames |
| CN112112329A (en) * | 2020-08-03 | 2020-12-22 | 五冶集团上海有限公司 | Aluminum alloy groove buckle cover for outdoor brightening wiring of glass curtain wall and mounting method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102425255A (en) | Assembled unit frame glass curtain wall system | |
| CN103015594B (en) | Fit formation and installation method of panel of arc-shaped glass curtain wall | |
| CN104314206A (en) | Novel aluminum-coated steel decorative curtain wall with hidden frame | |
| CN103469943B (en) | Multi-angle glass curtain wall unit plate and consisting of glass curtain wall system | |
| CN202227545U (en) | Steel-aluminum combined curtain wall system | |
| CN205259415U (en) | Glass rib connection structure among full glass curtain wall of large -span | |
| CN102888916B (en) | Inversion-type energy saving curtain wall | |
| CN202248430U (en) | Aluminum-clad steel unit curtain wall system | |
| CN209975818U (en) | Glass curtain wall node structure of diamond body daylighting top | |
| CN102392505A (en) | Concave-convex type unit curtain wall system | |
| CN205617563U (en) | Bridge cut -off aluminium sunshine room | |
| CN205530864U (en) | Metal clad sheet curtain mounting structure | |
| CN108193767B (en) | Organ plate type annular air corridor daylighting roof system | |
| CN205276620U (en) | Can realize curtain that integrates of quick construction | |
| CN102146707A (en) | Building curtain wall structure | |
| CN205296504U (en) | Refute glass curtain wall who connects claw stealthy | |
| CN202809939U (en) | Frame-hidden corner upright column capable of opening window | |
| CN202672421U (en) | Main structure and glass curtain wall plate integrated device | |
| CN103993663B (en) | A kind of active sun energy room | |
| CN210713433U (en) | Hidden frame glass curtain wall system | |
| CN203499067U (en) | Non-uniplanar quadrilateral unit curtain wall | |
| CN202248429U (en) | Open type aluminum plate small unit curtain wall system | |
| CN202483037U (en) | Connection structure of large decorative buckling cover for exposed frame glass curtain wall | |
| CN202454578U (en) | Improved type double-glass solar cell module | |
| CN203961070U (en) | A kind of aluminium sheet integrated modular curtain wall panel |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120425 |