CN105598984A - 一种冗余度机械臂加速度层运动规划的初始化方法 - Google Patents

一种冗余度机械臂加速度层运动规划的初始化方法 Download PDF

Info

Publication number
CN105598984A
CN105598984A CN201510843147.1A CN201510843147A CN105598984A CN 105598984 A CN105598984 A CN 105598984A CN 201510843147 A CN201510843147 A CN 201510843147A CN 105598984 A CN105598984 A CN 105598984A
Authority
CN
China
Prior art keywords
centerdot
theta
joint
mechanical arm
acceleration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510843147.1A
Other languages
English (en)
Other versions
CN105598984B (zh
Inventor
郭东生
聂卓赟
晏来成
金福江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaqiao University
Original Assignee
Huaqiao University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaqiao University filed Critical Huaqiao University
Priority to CN201510843147.1A priority Critical patent/CN105598984B/zh
Publication of CN105598984A publication Critical patent/CN105598984A/zh
Application granted granted Critical
Publication of CN105598984B publication Critical patent/CN105598984B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Numerical Control (AREA)

Abstract

本发明中的冗余度机械臂加速度层运动规划的初始化方法通过先将冗余度机械臂调节到其极限位置,而后利用该极限位置作为起始值,并设定机械臂任务执行位置作为终止值,建立基于二次型优化描述的加速度层位置调整方案,而后利用数值算法对加速度层位置调整方案求解,最后通过该求解结果驱动机械臂使其由极限位置转动到任务执行位置,该冗余度机械臂加速度层运动规划的初始化方法具有操作方便、工作量小、作业规范的优点。

Description

一种冗余度机械臂加速度层运动规划的初始化方法
技术领域
本发明涉及冗余度机械臂加速度层运动规划领域,具体涉及一种冗余度机械臂加速度层运动规划的初始化方法。
背景技术
冗余度机械臂是一种末端能动的机械装置,其自由度多于执行末端任务所需最少自由度;目前已广泛应用于装备制造、产品加工、机器作业等国民经济生产活动中。冗余度机械臂在工作空间中不同的位置执行任务时,当结束一个任务后,往往需要从当前位置移动到下一个任务的执行位置。一般而言,冗余度机械臂从当前位置移动到下一个任务的执行位置,都是通过慢慢转动机械臂各个关节并不断调整来实现。然而,这种做法是相当繁琐且存在着不足的:每次改变任务操作位置时都有可能需要多次度量各个关节角度以使机械臂准确到达其执行任务的位置;并且任务执行位置测量或调整的不准确也将影响到机械臂正常/成功完成所要求的任务。
发明内容
本发明的目的在于克服一般技术的不足,提供一种操作方便、工作量少、作业规范且是在加速度层上实现的冗余度机械臂运动规划初始化方法。
本发明提供的技术方案如下:一种冗余度机械臂加速度层运动规划的初始化方法,包括以下步骤:
1)启动机械臂控制器,将冗余度机械臂调节到其极限位置,具体操作是依次驱动机械臂各个关节的电机使其最终达到各自的极限位置;
2)将步骤1)的极限位置作为起始值,并设定机械臂任务执行位置作为终止值,建立基于二次型优化描述的加速度层位置调整方案,所述的优化方案受约束于关节角度极限、关节速度极限和关节加速度极限;对于拥有n自由度的机械臂而言,加速度层位置调整方案设计为:
最小化
其中,设计参数γ>0∈R,上标T表示矩阵或向量的转置;θ∈Rn表示关节角度,表示关节速度,表示关节加速度;θd∈Rn为机械臂任务执行初始位置;加速度层位置调整方案受约束于:θ-≤θ≤θ+
其中,θ±∈Rn分别表示关节角度极限、关节速度极限和关节加速度极限;
3)将步骤2)的加速度层位置调整方案利用数值算法进行求解;
4)下位机控制器根据步骤3)的求解结果,驱动机械臂使其由极限位置转动到任务执行位置。
在本发明的较佳实施例中,步骤2)中,将机械臂的关节极限转化为在加速度层上描述的双端约束,具体操作是利用约束转换方法将θ-≤θ≤θ+转化描述为一个基于关节加速度的双端约束,即,其中η-∈Rn和η+∈Rn的第i个元素分别定义为i=1,2,…n,关节极限转换参数k1>0∈R和k2>0∈R,关节极限转换裕量
在本发明的较佳实施例中,步骤3)中,通过数值算法对加速度层位置调整方案进行求解,具体操作是将所述加速度层位置调整方案进一步变换为分段线性投影方程,从而构造相应的数值算法进行求解。
本发明中的冗余度机械臂加速度层运动规划的初始化方法通过先将冗余度机械臂调节到其极限位置,而后利用该极限位置作为起始值,并设定机械臂任务执行位置作为终止值,建立基于二次型优化描述的加速度层位置调整方案,而后利用数值算法对加速度层位置调整方案求解,最后通过该求解结果驱动机械臂使其由极限位置转动到任务执行位置,该冗余度机械臂加速度层运动规划的初始化方法具有操作方便、工作量小、作业规范的优点。
具体实施方式
一种冗余度机械臂加速度层运动规划的初始化方法主要由冗余度机械臂调节到其极限位置、加速度层位置调整方案、数值算法求解器、下位机控制器、冗余度机械臂转动到任务执行位置组成。
首先启动机械臂控制器,将冗余度机械臂调节到其极限位置;再将该极限位置作为起始值,并设定机械臂任务执行位置作为终止值,从而建立基于二次型优化描述的加速度层位置调整方案;然后构造相应的数值算法来求解该加速度层位置调整方案;最后把求解结果用于驱动机械臂使其由极限位置转动到任务执行位置。
基于最小化机械臂各个关节的当前位置与任务执行位置之间偏移量的思想,n自由度冗余度机械臂的加速度层位置调整方案可设计为:
最小化: θ ·· T θ ·· / 2 + ( 2 γ θ · + γ 2 ( θ - θ d ) ) T θ ·· - - - ( 1 )
约束条件:θ-≤θ≤θ+,(2)
θ · - ≤ θ · ≤ θ · + , - - - ( 3 )
θ ·· - ≤ θ ·· ≤ θ ·· + , - - - ( 4 )
其中,设计参数γ>0∈R,上标T表示矩阵或向量的转置;θ∈Rn表示关节角度,表示关节速度,表示关节加速度;θd∈Rn为机械臂任务执行初始位置;θ±∈Rn表示关节角度极限、关节速度极限和关节加速度极限。
利用约束转换方法将(2)-(4)转化描述为一个基于关节加速度的双端约束,即,其中η-∈Rn和η+∈Rn的第i个元素分别定义为i=1,2,…n,关节极限转换参数k1>0∈R和k2>0∈R,关节极限转换裕量用x∈Rn表示机械臂的关节加速度上述的冗余度机械臂加速度层位置调整方案(1)-(4)便可描述为如下的二次型优化问题:
最小化:xTQx/2+pTx(5)
约束条件:η-≤x≤η+,(6)
其中,Q=I∈Rn×nI为单位矩阵。
并且,求解上述的二次型优化问题(5)-(6)等价于求解如下的分段线性投影方程:
PΩ(x-(Qx+p))-x=0∈Rn,(7)
其中,PΩ(·)表示分段线性投影算子。对于分段线性投影方程(7)和二次型优化问题(5)-(6),可采用如下的数值算法来求解:
e(xk)=xk-PΩ(xk-(Qxk+p)),
xk+1=xk-ρ(xk)φ(xk),
φ(xk)=(QT+I)e(xk),
ρ ( x k ) = | | e ( x k ) | | 2 2 / | | φ ( x k ) | | 2 2 ,
其中,迭代次数k=0,1,2,…,||·||2表示向量的二范数。给定初始值x0∈Rn,通过该算法的不断迭代,便可得到分段线性投影方程(7)的解,从而得到二次型优化问题(5)-(6)的最优解,也即加速度层位置调整方案(1)-(4)的最优解。
通过数值算法得到该二次型优化问题的解后,再将求解结果传递给下位机控制器来驱动机械臂使其由极限位置转动到任务执行位置,从而完成冗余度机械臂加速度层运动规划的初始化工作。
综上所述,该冗余度机械臂加速度层运动规划的初始化方法通过先将冗余度机械臂调节到其极限位置1,而后利用该极限位置作为起始值,并设定机械臂任务执行位置作为终止值,建立基于二次型优化描述的加速度层位置调整方案2,而后利用数值算法求解器3对加速度层位置调整方案求解,最后通过该求解结果驱动机械臂使其由极限位置转动到任务执行位置,该冗余度机械臂加速度层运动规划的初始化方法具有操作方便、工作量小、作业规范的优点。
上述仅为本发明的一个具体实施例,但本发明的设计构思并不局限于此,凡利用此构思对本发明进行非实质性的改动,均应属于侵犯本发明保护范围的行为。

Claims (3)

1.一种冗余度机械臂加速度层运动规划的初始化方法,其特征在于:包括以下步骤:
1)启动机械臂控制器,将冗余度机械臂调节到其极限位置,具体操作是依次驱动机械臂各个关节的电机使其最终达到各自的极限位置;
2)将步骤1)的极限位置作为起始值,并设定机械臂任务执行位置作为终止值,建立基于二次型优化描述的加速度层位置调整方案,所述的优化方案受约束于关节角度极限、关节速度极限和关节加速度极限;对于拥有n自由度的机械臂而言,加速度层位置调整方案设计为:
最小化 θ ·· T θ ·· / 2 + ( 2 γ θ · + γ 2 ( θ - θ d ) ) T θ ·· ,
其中,设计参数γ>0∈R,上标T表示矩阵或向量的转置;θ∈Rn表示关节角度,表示关节速度,表示关节加速度;θd∈Rn为机械臂任务执行初始位置;
加速度层位置调整方案受约束于:
θ - ≤ θ ≤ θ + , θ · - ≤ θ · ≤ θ · + , θ ·· - ≤ θ ·· ≤ θ ·· + ;
其中,θ±∈Rn分别表示关节角度极限、关节速度极限和关节加速度极限;
3)将步骤2)的加速度层位置调整方案利用数值算法进行求解;
4)下位机控制器根据步骤3)的求解结果,驱动机械臂使其由极限位置转动到任务执行位置。
2.根据权利要求1所述的冗余度机械臂加速度层运动规划的初始化方法,其特征在于:步骤2)中,将机械臂的关节极限转化为在加速度层上描述的双端约束,具体操作是利用约束转换方法将θ-≤θ≤θ+转化描述为一个基于关节加速度的双端约束,即,其中η-∈Rn和η+∈Rn的第i个元素分别定义为i=1,2,…n,关节极限转换参数k1>0∈R和k2>0∈R,关节极限转换裕量
3.根据权利要求1所述的冗余度机械臂加速度层运动规划的初始化方法,其特征在于:步骤3)中,通过数值算法对加速度层位置调整方案进行求解,具体操作是将所述加速度层位置调整方案进一步变换为分段线性投影方程,从而构造相应的数值算法进行求解。
CN201510843147.1A 2015-11-26 2015-11-26 一种冗余度机械臂加速度层运动规划的初始化方法 Active CN105598984B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510843147.1A CN105598984B (zh) 2015-11-26 2015-11-26 一种冗余度机械臂加速度层运动规划的初始化方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510843147.1A CN105598984B (zh) 2015-11-26 2015-11-26 一种冗余度机械臂加速度层运动规划的初始化方法

Publications (2)

Publication Number Publication Date
CN105598984A true CN105598984A (zh) 2016-05-25
CN105598984B CN105598984B (zh) 2017-10-20

Family

ID=55979587

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510843147.1A Active CN105598984B (zh) 2015-11-26 2015-11-26 一种冗余度机械臂加速度层运动规划的初始化方法

Country Status (1)

Country Link
CN (1) CN105598984B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106625680A (zh) * 2017-02-07 2017-05-10 华侨大学 一种冗余度机械臂加速度层容噪控制方法
CN107127754A (zh) * 2017-05-09 2017-09-05 浙江工业大学 一种基于终态吸引优化指标的冗余机械臂重复运动规划方法
CN107361847A (zh) * 2017-08-17 2017-11-21 成都中科博恩思医学机器人有限公司 一种初始化手术机器人中手术器械的方法及对应装置
CN108098777A (zh) * 2018-01-12 2018-06-01 华侨大学 一种冗余度机械臂力矩层重复运动控制方法
CN109648567A (zh) * 2019-01-25 2019-04-19 华侨大学 一种具有容噪特性的冗余度机械臂高精度规划方法
CN112518749A (zh) * 2020-11-30 2021-03-19 国网浙江省电力有限公司宁波供电公司 一种电力巡检机器人机械臂
CN113771038A (zh) * 2021-09-28 2021-12-10 千翼蓝犀智能制造科技(广州)有限公司 一种冗余度机械臂突加度层运动规划的初始化方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030195643A1 (en) * 2002-04-11 2003-10-16 Knirck Jeffrey G. Method and apparatus for acceleration limiting a position command for motion control
CN101927495A (zh) * 2010-08-25 2010-12-29 中山大学 一种冗余度机械臂重复运动规划方法
CN103144111A (zh) * 2013-02-26 2013-06-12 中山大学 一种qp统一协调的移动机械臂运动描述与规划方法
CN103231381A (zh) * 2013-05-03 2013-08-07 中山大学 一种冗余度机械臂的新型加速度层重复运动规划方法
CN104908040A (zh) * 2015-06-23 2015-09-16 广东顺德中山大学卡内基梅隆大学国际联合研究院 一种冗余度机械臂加速度层的容错规划方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030195643A1 (en) * 2002-04-11 2003-10-16 Knirck Jeffrey G. Method and apparatus for acceleration limiting a position command for motion control
CN101927495A (zh) * 2010-08-25 2010-12-29 中山大学 一种冗余度机械臂重复运动规划方法
CN103144111A (zh) * 2013-02-26 2013-06-12 中山大学 一种qp统一协调的移动机械臂运动描述与规划方法
CN103231381A (zh) * 2013-05-03 2013-08-07 中山大学 一种冗余度机械臂的新型加速度层重复运动规划方法
CN104908040A (zh) * 2015-06-23 2015-09-16 广东顺德中山大学卡内基梅隆大学国际联合研究院 一种冗余度机械臂加速度层的容错规划方法

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106625680A (zh) * 2017-02-07 2017-05-10 华侨大学 一种冗余度机械臂加速度层容噪控制方法
CN106625680B (zh) * 2017-02-07 2019-07-09 华侨大学 一种冗余度机械臂加速度层容噪控制方法
CN107127754A (zh) * 2017-05-09 2017-09-05 浙江工业大学 一种基于终态吸引优化指标的冗余机械臂重复运动规划方法
CN107361847A (zh) * 2017-08-17 2017-11-21 成都中科博恩思医学机器人有限公司 一种初始化手术机器人中手术器械的方法及对应装置
CN107361847B (zh) * 2017-08-17 2019-12-06 成都博恩思医学机器人有限公司 一种初始化手术机器人中手术器械的方法及对应装置
CN108098777A (zh) * 2018-01-12 2018-06-01 华侨大学 一种冗余度机械臂力矩层重复运动控制方法
CN109648567A (zh) * 2019-01-25 2019-04-19 华侨大学 一种具有容噪特性的冗余度机械臂高精度规划方法
CN109648567B (zh) * 2019-01-25 2021-08-03 华侨大学 一种具有容噪特性的冗余度机械臂规划方法
CN112518749A (zh) * 2020-11-30 2021-03-19 国网浙江省电力有限公司宁波供电公司 一种电力巡检机器人机械臂
CN113771038A (zh) * 2021-09-28 2021-12-10 千翼蓝犀智能制造科技(广州)有限公司 一种冗余度机械臂突加度层运动规划的初始化方法

Also Published As

Publication number Publication date
CN105598984B (zh) 2017-10-20

Similar Documents

Publication Publication Date Title
CN105598984A (zh) 一种冗余度机械臂加速度层运动规划的初始化方法
CN101890718B (zh) 一种冗余度机械臂运动规划的初始化方法
CN101927495B (zh) 一种冗余度机械臂重复运动规划方法
CN101804627B (zh) 一种冗余度机械臂运动规划方法
CN103492133B (zh) 具有运动冗余臂的工业机器人和用于控制该机器人的方法
CN105353725B (zh) 用于工业机器人的过辅助点姿态空间圆弧插补方法
CN102514008B (zh) 一种冗余度机械臂的不同层性能指标同时优化方法
JP4137909B2 (ja) ロボットプログラム補正装置
CN108568814A (zh) 机器人以及机器人的控制方法
US20160185574A1 (en) Trajectory calculation system
CN106335064B (zh) 一种柔性关节机器人系统的控制器设计方法
CN105607636A (zh) 一种基于积分滑模算法的轮式移动机器人主从式编队控制方法
CN102785248A (zh) 一种解耦型六自由度工业机器人的运动控制方法
CN105856231A (zh) 一种特定构型六轴工业机器人的运动控制方法
CN107066698A (zh) 基于新型数值求解器的冗余度机械臂重复运动规划方法
CN102033981B (zh) 热轧h型钢飞剪机初始停位角的设计方法
CN103862465A (zh) 多关节机械臂坐标校正方法和系统
CN114611362B (zh) 一种大型器械工作面的安装调试方法、电子装置及介质
CN103459101A (zh) 操纵器关节极限处理算法
CN103279029B (zh) 多机器人手臂系统的自适应协调控制方法
CN102983807A (zh) 异步电机转子时间常数在线识别系统及方法
CN101870104B (zh) 机械手臂反向运动方法
US20210349444A1 (en) Accelerating robotic planning for operating on deformable objects
CN103605290B (zh) 基于向量方法的鲁棒分数阶PDμ控制器的参数整定方法
CN113787502B (zh) 一种基于神经动力学的三轮全向移动机器人状态调整方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant