CN105580031B - 在多维范围上对包括可分离子系统的系统的评估 - Google Patents
在多维范围上对包括可分离子系统的系统的评估 Download PDFInfo
- Publication number
- CN105580031B CN105580031B CN201480052142.0A CN201480052142A CN105580031B CN 105580031 B CN105580031 B CN 105580031B CN 201480052142 A CN201480052142 A CN 201480052142A CN 105580031 B CN105580031 B CN 105580031B
- Authority
- CN
- China
- Prior art keywords
- group
- interconnected neurons
- neurons
- neural network
- output
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N3/00—Computing arrangements based on biological models
- G06N3/02—Neural networks
- G06N3/04—Architecture, e.g. interconnection topology
- G06N3/049—Temporal neural networks, e.g. delay elements, oscillating neurons or pulsed inputs
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N3/00—Computing arrangements based on biological models
- G06N3/02—Neural networks
- G06N3/04—Architecture, e.g. interconnection topology
- G06N3/0495—Quantised networks; Sparse networks; Compressed networks
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N3/00—Computing arrangements based on biological models
- G06N3/02—Neural networks
- G06N3/04—Architecture, e.g. interconnection topology
- G06N3/0499—Feedforward networks
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N3/00—Computing arrangements based on biological models
- G06N3/02—Neural networks
- G06N3/08—Learning methods
- G06N3/082—Learning methods modifying the architecture, e.g. adding, deleting or silencing nodes or connections
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N3/00—Computing arrangements based on biological models
- G06N3/02—Neural networks
- G06N3/08—Learning methods
- G06N3/0985—Hyperparameter optimisation; Meta-learning; Learning-to-learn
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N3/00—Computing arrangements based on biological models
- G06N3/02—Neural networks
- G06N3/04—Architecture, e.g. interconnection topology
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N3/00—Computing arrangements based on biological models
- G06N3/02—Neural networks
- G06N3/10—Interfaces, programming languages or software development kits, e.g. for simulating neural networks
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N3/00—Computing arrangements based on biological models
- G06N3/02—Neural networks
- G06N3/10—Interfaces, programming languages or software development kits, e.g. for simulating neural networks
- G06N3/105—Shells for specifying net layout
-
- G—PHYSICS
- G08—SIGNALLING
- G08B—SIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
- G08B17/00—Fire alarms; Alarms responsive to explosion
- G08B17/005—Fire alarms; Alarms responsive to explosion for forest fires, e.g. detecting fires spread over a large or outdoors area
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Health & Medical Sciences (AREA)
- Computing Systems (AREA)
- Biomedical Technology (AREA)
- Biophysics (AREA)
- Computational Linguistics (AREA)
- Data Mining & Analysis (AREA)
- Evolutionary Computation (AREA)
- Life Sciences & Earth Sciences (AREA)
- Molecular Biology (AREA)
- Artificial Intelligence (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Mathematical Physics (AREA)
- Software Systems (AREA)
- Health & Medical Sciences (AREA)
- Image Analysis (AREA)
- Testing And Monitoring For Control Systems (AREA)
- Testing Or Calibration Of Command Recording Devices (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Feedback Control In General (AREA)
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US14/065,388 US9721204B2 (en) | 2013-10-28 | 2013-10-28 | Evaluation of a system including separable sub-systems over a multidimensional range |
| US14/065,388 | 2013-10-28 | ||
| PCT/US2014/061220 WO2015065738A2 (en) | 2013-10-28 | 2014-10-17 | Evaluation of a system including separable sub-systems over a multidimensional range |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN105580031A CN105580031A (zh) | 2016-05-11 |
| CN105580031B true CN105580031B (zh) | 2018-01-16 |
Family
ID=51897437
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201480052142.0A Expired - Fee Related CN105580031B (zh) | 2013-10-28 | 2014-10-17 | 在多维范围上对包括可分离子系统的系统的评估 |
Country Status (8)
| Country | Link |
|---|---|
| US (1) | US9721204B2 (enExample) |
| EP (1) | EP3063707A2 (enExample) |
| JP (1) | JP2016538633A (enExample) |
| KR (1) | KR20160076531A (enExample) |
| CN (1) | CN105580031B (enExample) |
| CA (1) | CA2926649A1 (enExample) |
| TW (1) | TW201525883A (enExample) |
| WO (1) | WO2015065738A2 (enExample) |
Families Citing this family (14)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US10417554B2 (en) * | 2014-05-22 | 2019-09-17 | Lee J. Scheffler | Methods and systems for neural and cognitive processing |
| US11423311B2 (en) * | 2015-06-04 | 2022-08-23 | Samsung Electronics Co., Ltd. | Automatic tuning of artificial neural networks |
| US10515312B1 (en) * | 2015-12-30 | 2019-12-24 | Amazon Technologies, Inc. | Neural network model compaction using selective unit removal |
| CN106203621B (zh) * | 2016-07-11 | 2019-04-30 | 北京深鉴智能科技有限公司 | 用于卷积神经网络计算的处理器 |
| US11315018B2 (en) | 2016-10-21 | 2022-04-26 | Nvidia Corporation | Systems and methods for pruning neural networks for resource efficient inference |
| EP3340129B1 (en) * | 2016-12-21 | 2019-01-30 | Axis AB | Artificial neural network class-based pruning |
| US11188820B2 (en) * | 2017-09-08 | 2021-11-30 | International Business Machines Corporation | Deep neural network performance analysis on shared memory accelerator systems |
| CN111587436B (zh) * | 2018-01-17 | 2025-02-28 | 昕诺飞控股有限公司 | 用于使用神经网络进行对象辨识的系统和方法 |
| CN110543933B (zh) * | 2019-08-12 | 2022-10-21 | 北京大学 | 基于flash存算阵列的脉冲型卷积神经网络 |
| CN110570616B (zh) * | 2019-09-10 | 2020-09-25 | 淮阴工学院 | 一种基于物联网的多点火灾预警系统 |
| DE102019214436A1 (de) * | 2019-09-23 | 2021-03-25 | Robert Bosch Gmbh | Verfahren, Vorrichtung und Computerprogramm zum Betreiben eines künstlichen neuronalen Netzes |
| KR20210115863A (ko) | 2020-03-16 | 2021-09-27 | 삼성전자주식회사 | 뉴럴 네트워크 모델을 위한 병렬 처리 방법 및 장치 |
| KR102624947B1 (ko) * | 2023-11-28 | 2024-01-15 | 주식회사 티알씨일렉트릭 | 전동기 역설계 장치 및 방법 |
| CN119227881B (zh) * | 2024-09-12 | 2025-05-06 | 西安电子科技大学 | 引入偏离系数实现耦合模型全域连续相似预测的方法 |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20040193559A1 (en) * | 2003-03-24 | 2004-09-30 | Tetsuya Hoya | Interconnecting neural network system, interconnecting neural network structure construction method, self-organizing neural network structure construction method, and construction programs therefor |
| CN101893541A (zh) * | 2010-06-09 | 2010-11-24 | 哈尔滨工业大学 | 建立纤维增强树脂基复合材料孔隙问题的表征与评价模型的方法 |
Family Cites Families (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP0480654B1 (en) | 1990-10-10 | 1998-03-04 | Honeywell Inc. | Process system identification |
| CA2060554A1 (en) | 1991-04-18 | 1992-10-19 | Shawn Michael Austvold | Apparatus and method for facilitating use of a neural network |
| JP3182112B2 (ja) * | 1997-04-28 | 2001-07-03 | 東京電力株式会社 | 建物外観の色彩決定支援システム |
| JP2004094437A (ja) * | 2002-08-30 | 2004-03-25 | Fuji Electric Holdings Co Ltd | データ予測方法及びデータ予測システム |
| US20060224533A1 (en) | 2005-03-14 | 2006-10-05 | Thaler Stephen L | Neural network development and data analysis tool |
| US7502763B2 (en) | 2005-07-29 | 2009-03-10 | The Florida International University Board Of Trustees | Artificial neural network design and evaluation tool |
| WO2008067676A1 (en) * | 2006-12-08 | 2008-06-12 | Medhat Moussa | Architecture, system and method for artificial neural network implementation |
| GB2462380B (en) | 2007-03-14 | 2012-02-15 | Halliburton Energy Serv Inc | Neural-network based surrogate model construction methods and applications thereof |
-
2013
- 2013-10-28 US US14/065,388 patent/US9721204B2/en active Active
-
2014
- 2014-10-17 WO PCT/US2014/061220 patent/WO2015065738A2/en not_active Ceased
- 2014-10-17 EP EP14796943.0A patent/EP3063707A2/en not_active Withdrawn
- 2014-10-17 CA CA2926649A patent/CA2926649A1/en not_active Abandoned
- 2014-10-17 CN CN201480052142.0A patent/CN105580031B/zh not_active Expired - Fee Related
- 2014-10-17 KR KR1020167013660A patent/KR20160076531A/ko not_active Withdrawn
- 2014-10-17 JP JP2016526188A patent/JP2016538633A/ja active Pending
- 2014-10-23 TW TW103136675A patent/TW201525883A/zh unknown
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20040193559A1 (en) * | 2003-03-24 | 2004-09-30 | Tetsuya Hoya | Interconnecting neural network system, interconnecting neural network structure construction method, self-organizing neural network structure construction method, and construction programs therefor |
| CN101893541A (zh) * | 2010-06-09 | 2010-11-24 | 哈尔滨工业大学 | 建立纤维增强树脂基复合材料孔隙问题的表征与评价模型的方法 |
Non-Patent Citations (2)
| Title |
|---|
| Neural Network Dimension Selection for Dynamical System Identification;Devin Sabo etc;《17th IEEE International Conference on Concrol Applications》;20080905;第972-977页 * |
| Serialization Sets: A Dynamic Dependence-Based Parallel Execution Model;Matthew D.Allen etc;《PPoPP》;20090218;第85-95页 * |
Also Published As
| Publication number | Publication date |
|---|---|
| US9721204B2 (en) | 2017-08-01 |
| TW201525883A (zh) | 2015-07-01 |
| JP2016538633A (ja) | 2016-12-08 |
| CA2926649A1 (en) | 2015-05-07 |
| WO2015065738A2 (en) | 2015-05-07 |
| CN105580031A (zh) | 2016-05-11 |
| WO2015065738A3 (en) | 2015-07-09 |
| US20150120632A1 (en) | 2015-04-30 |
| EP3063707A2 (en) | 2016-09-07 |
| KR20160076531A (ko) | 2016-06-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105580031B (zh) | 在多维范围上对包括可分离子系统的系统的评估 | |
| US9542643B2 (en) | Efficient hardware implementation of spiking networks | |
| US9886663B2 (en) | Compiling network descriptions to multiple platforms | |
| CN105934766B (zh) | 用阴影网络来监视神经网络 | |
| US20150242741A1 (en) | In situ neural network co-processing | |
| US20150269480A1 (en) | Implementing a neural-network processor | |
| CN105874477A (zh) | 配置稀疏神经网络 | |
| CN106663222A (zh) | 神经网络中的分解卷积操作 | |
| US9652711B2 (en) | Analog signal reconstruction and recognition via sub-threshold modulation | |
| CN106030620A (zh) | 用于随机尖峰贝叶斯网络的基于事件的推断和学习 | |
| US9959499B2 (en) | Methods and apparatus for implementation of group tags for neural models | |
| CN106164940A (zh) | 在尖峰神经网络中通过全局标量值来调制可塑性 | |
| CN105659262A (zh) | 在尖峰神经网络中使用重放来实现突触学习 | |
| CN106133755A (zh) | 使用尖峰发放神经网络的图像的不变对象表示 | |
| US20150278685A1 (en) | Probabilistic representation of large sequences using spiking neural network | |
| CN106133763B (zh) | 可塑性突触管理 | |
| CN105659260B (zh) | 动态地指派和检查突触延迟 | |
| CN106104586B (zh) | 神经元形态模型开发的上下文实时反馈 | |
| US20140365413A1 (en) | Efficient implementation of neural population diversity in neural system | |
| US20150242742A1 (en) | Imbalanced cross-inhibitory mechanism for spatial target selection |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180116 Termination date: 20181017 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |