CN105569333A - Construction formwork of cantilever layer outer wall preformed hole, and construction method - Google Patents

Construction formwork of cantilever layer outer wall preformed hole, and construction method Download PDF

Info

Publication number
CN105569333A
CN105569333A CN201510199143.4A CN201510199143A CN105569333A CN 105569333 A CN105569333 A CN 105569333A CN 201510199143 A CN201510199143 A CN 201510199143A CN 105569333 A CN105569333 A CN 105569333A
Authority
CN
China
Prior art keywords
preformed hole
construction
exterior wall
formwork
tub
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510199143.4A
Other languages
Chinese (zh)
Other versions
CN105569333B (en
Inventor
林华湘
周志辉
洪建伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau First Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau First Construction Engineering Co Ltd filed Critical China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority to CN201510199143.4A priority Critical patent/CN105569333B/en
Publication of CN105569333A publication Critical patent/CN105569333A/en
Application granted granted Critical
Publication of CN105569333B publication Critical patent/CN105569333B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a construction formwork of a cantilever layer outer wall preformed hole, and a construction method. The construction formwork comprises upper plates arranged side by side. The lower ends of the upper plates are detachably connected with small jointed boards 2. The junction ends of the upper plates and the small jointed boards are provided with butt joint platforms. After taper pins pass through holes on the butt joint platform, taper pin sheets are inserted into conical grooves on the lower ends of the taper pins, so that the upper plate and the small jointed board are detachably connected. The position of the lower end of the upper plate, where a preformed hole is needed, is provided with a wooden box. The formwork can be used as a standard formwork, and provides convenience for preformed hole construction, and has a dual-purpose function. The formwork uses the wooden box to fill the preformed hole, foam pre-embedding in a conventional method is replaced, so that problems in the conventional construction method of offset and deformation of the preformed hole, and floor foam pollution are solved. The construction formwork ensures the size of the preformed hole can satisfy requirements of construction.

Description

A kind of construction formwork of overhang layer exterior wall preformed hole and construction method
Technical field
The present invention relates to a kind of construction formwork and construction method of overhang layer exterior wall preformed hole, belong to construction formwork technical field of construction.
Background technology
In the promoting the use of of aluminum alloy mould plate, the collocation monolithic outrigger that climbs often can coordinate external wall to intert construction preferably, but due to the climb lease expenses of outrigger of monolithic high, job site adopts steel pipe outrigger to coordinate aluminum alloy mould plate construction usually.When adopting the construction of steel pipe outrigger to outrigger overhang layer, the hole that channel-section steel is placed must be reserved bottom exterior wall shear wall.In traditional construction method, employing be carry out pre-buried with foam bottom exterior wall shear wall, after exterior wall form removal, empty hole again.On the one hand, light and the strength deficiency of quality due to foam, often wall column concrete vibrate construction process in produce the phenomenon such as skew, distortion, reserved opening size and positioning requirements can not be met, and the later stage needs the hole less than normal to size to carry out cutter to beat, and pre-buried foam needs to empty, foam bits scrappy in a large number can be produced at floor and be difficult to cleaning; On the other hand, because of the requirement of working procedure, running into rack-layer construction of encorbelmenting then needs to stop to return outrigger to take, and this not only adds outrigger construction and returns the workload of taking, and create impact to the progress of construction.Thus, the improvement of conventional construction method is extremely urgent.
Summary of the invention
The object of the invention is to, there is provided that a kind of structure is simple, easy construction, environmental protection, saving construction cost, and can ensure that preformed hole size meets construction formwork and the construction method of the overhang layer exterior wall preformed hole of construction requirement, to overcome prior art deficiency.
Technical scheme of the present invention: a kind of construction formwork of overhang layer exterior wall preformed hole, comprises the cope match-plate pattern be arranged side by side, be removably connected with little jigsaw or/and be provided with tub in the lower end of cope match-plate pattern.
Further, be provided with dock at the link of cope match-plate pattern and little jigsaw, cone pin is through after the through hole on dock, and cone pin sheet inserts in the cone tank of cone pin lower end, and cope match-plate pattern and little jigsaw are removably connected.
Aforesaid cope match-plate pattern and little jigsaw are aluminium alloy structure.
The size of aforesaid little jigsaw is consistent with the cross section of tub.
A kind of construction method adopting the construction formwork of above-mentioned overhang layer exterior wall preformed hole to make overhang layer exterior wall preformed hole, comprise existing aluminum alloy mould plate construction method, first cope match-plate pattern and little jigsaw are assembled into detachable aluminum alloy mould plate, then detachable aluminum alloy mould plate is propped up side by side and be located at overhang layer exterior wall both sides, then the little jigsaw being arranged on overhang layer exterior wall preformed hole place is removed, tub is packed in the space stayed after little jigsaw is removed simultaneously, now just can vibrate to concreting in the template installed, reach after design strength until concrete, template and tub are removed, the position can removed at tub like this obtains preformed hole.
In said method, the cross section of described tub and the in the same size of preformed hole.
Owing to adopting technique scheme, the invention has the advantages that: aluminum alloy mould plate is divided into cope match-plate pattern and little jigsaw according to the size of preformed hole by the present invention, when typical floor is constructed, cope match-plate pattern and little jigsaw are assembled into detachable aluminum alloy mould plate and normal construction; When running into the overhang layer exterior wall needing pre-buried channel-section steel, remove needing the little jigsaw offering preformed hole place, tub is packed in the space stayed after little jigsaw is removed simultaneously, removed by tub after exterior wall concrete reaches design strength like this, the position can removed at tub obtains preformed hole again.Therefore, namely template of the present invention can be used as standard form and uses, be convenient to preformed hole construction again, there is the function of dual-use material, and the present invention adopts tub to clog preformed hole, thus the foam that instead of in conventional method is pre-buried, thus solves in conventional construction method preformed hole and produce the problems such as skew, distortion and floor foam pollution, ensure that preformed hole size can meet construction requirement.In addition, when adopting method of the present invention to construct, return take without the need to carrying out outrigger, not only reduce the labour intensity of workman, accelerate construction speed, and save construction cost, improve efficiency of construction.
Accompanying drawing explanation
Structural representation when Fig. 1 is the invention process;
Fig. 2 is the B-B sectional view of Fig. 1;
Fig. 3 is the A-A sectional view of Fig. 1.
Description of reference numerals: 1-cope match-plate pattern, the little jigsaw of 2-, 3-dock, 4-cone pin, 5-cone pin sheet, 6-tub, 7-overhang layer exterior wall.
Detailed description of the invention
In order to make the object of the invention, technical scheme and advantage clearly, below in conjunction with accompanying drawing, the present invention is described in further detail.
The structural representation of the construction formwork of a kind of overhang layer exterior wall preformed hole of the present invention as shown in Figure 1, comprise the cope match-plate pattern 1 be arranged side by side, removably connect in the lower end of cope match-plate pattern 1 and little jigsaw 2, namely dock 3 is provided with at the link of cope match-plate pattern 1 and little jigsaw 2, cone pin 4 is through after the through hole on dock 3, cone pin sheet 5 inserts in the cone tank of cone pin 4 lower end, and cope match-plate pattern 1 and little jigsaw 2 are removably connected.Meanwhile, the position offering preformed hole is needed to be provided with tub 6 in the lower end of cope match-plate pattern 1.Described cope match-plate pattern 1 and little jigsaw 2 are aluminium alloy structure, and the size of little jigsaw 2 is consistent with the cross section of tub 6.
When adopting construction formwork of the present invention to make overhang layer exterior wall preformed hole, first cope match-plate pattern 1 and little jigsaw 2 are assembled into detachable aluminum alloy mould plate, then detachable aluminum alloy mould plate is propped up side by side and be located at overhang layer exterior wall 7 both sides, also detachable aluminum alloy mould plate matching standard aluminum alloy mould plate can be constructed, but detachable aluminum alloy mould plate need be arranged on preformed hole offers place.The little jigsaw 2 being arranged on overhang layer exterior wall 7 preformed hole place is removed, tub 6 is packed in the space stayed after little jigsaw 2 is removed, the described cross section of tub 6 and the in the same size of preformed hole simultaneously.Now just can vibrate to concreting in the template installed, reach after design strength, template and tub 6 are removed until concrete, the position can removed at tub 6 like this obtain preformed hole.

Claims (6)

1. a construction formwork for overhang layer exterior wall preformed hole, comprises the cope match-plate pattern (1) be arranged side by side, it is characterized in that: be removably connected with little jigsaw (2) or/and be provided with tub (6) in the lower end of cope match-plate pattern (1).
2. the construction formwork of overhang layer exterior wall preformed hole according to claim 1, it is characterized in that: be provided with dock (3) at the link of cope match-plate pattern (1) and little jigsaw (2), cone pin (4) is through after the through hole on dock (3), cone pin sheet (5) inserts in the cone tank of cone pin (4) lower end, and cope match-plate pattern (1) and little jigsaw (2) are removably connected.
3. the construction formwork of overhang layer exterior wall preformed hole according to claim 1 and 2, is characterized in that: described cope match-plate pattern (1) and little jigsaw (2) are aluminium alloy structure.
4. the construction formwork of overhang layer exterior wall preformed hole according to claim 1 and 2, is characterized in that: the size of described little jigsaw (2) is consistent with the cross section of tub (6).
5. the construction method adopting the construction formwork of the overhang layer exterior wall preformed hole described in Claims 1 to 4 any one to make overhang layer exterior wall preformed hole, comprise existing aluminum alloy mould plate construction method, it is characterized in that: first cope match-plate pattern (1) and little jigsaw (2) are assembled into detachable aluminum alloy mould plate, then detachable aluminum alloy mould plate is propped up side by side and be located at overhang layer exterior wall (7) both sides, the little jigsaw (2) that then will be arranged on overhang layer exterior wall (7) preformed hole place is removed, tub (6) is packed in the space stayed after little jigsaw (2) is removed simultaneously, now just can vibrate to concreting in the template installed, reach after design strength until concrete, template and tub (6) are removed, the position can removed in tub (6) like this obtains preformed hole.
6. the construction method of overhang layer exterior wall preformed hole according to claim 5, is characterized in that: the cross section of described tub (6) and the in the same size of preformed hole.
CN201510199143.4A 2015-04-24 2015-04-24 A kind of construction formwork and construction method of overhang layer exterior wall preformed hole Active CN105569333B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510199143.4A CN105569333B (en) 2015-04-24 2015-04-24 A kind of construction formwork and construction method of overhang layer exterior wall preformed hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510199143.4A CN105569333B (en) 2015-04-24 2015-04-24 A kind of construction formwork and construction method of overhang layer exterior wall preformed hole

Publications (2)

Publication Number Publication Date
CN105569333A true CN105569333A (en) 2016-05-11
CN105569333B CN105569333B (en) 2018-02-09

Family

ID=55879904

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510199143.4A Active CN105569333B (en) 2015-04-24 2015-04-24 A kind of construction formwork and construction method of overhang layer exterior wall preformed hole

Country Status (1)

Country Link
CN (1) CN105569333B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105888237A (en) * 2016-06-13 2016-08-24 福建省南铝铝材工程有限公司 Construction method applied to channel steel of aluminum alloy template system
CN106567543A (en) * 2016-10-26 2017-04-19 上海中锦建设集团股份有限公司 Slab-bottom structural concrete column reserved hole construction method
CN108331343A (en) * 2018-02-07 2018-07-27 中国二十冶集团有限公司 The construction method of Cantilever Beams and aluminum alloy mould plate lap-joint
CN109779237A (en) * 2019-03-08 2019-05-21 中国十七冶集团有限公司 A kind of scaffold overhanging I-steel is in shear wall position construction auxiliary device and construction method
CN110241845A (en) * 2019-07-12 2019-09-17 中国化学工程第十一建设有限公司 A kind of Equipment Foundations preformed hole fuse and its construction method easy to dismantle
CN114673266A (en) * 2022-03-22 2022-06-28 广东腾越建筑工程有限公司 Plugging process for reserved hole of concrete outer wall of building

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1421456A (en) * 1972-02-21 1976-01-21 Doris Dev Richesse Sous Marine Construction of perforated walls
CN103806650A (en) * 2014-02-25 2014-05-21 绍兴县明煌建材科技有限公司 Steel column mould and construction method thereof
CN204059938U (en) * 2014-07-18 2014-12-31 福建海源新材料科技有限公司 A kind of interior angle aluminum alloy pattern plate
CN204571289U (en) * 2015-04-24 2015-08-19 中建四局第一建筑工程有限公司 A kind of construction formwork of overhang layer exterior wall preformed hole

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1421456A (en) * 1972-02-21 1976-01-21 Doris Dev Richesse Sous Marine Construction of perforated walls
CN103806650A (en) * 2014-02-25 2014-05-21 绍兴县明煌建材科技有限公司 Steel column mould and construction method thereof
CN204059938U (en) * 2014-07-18 2014-12-31 福建海源新材料科技有限公司 A kind of interior angle aluminum alloy pattern plate
CN204571289U (en) * 2015-04-24 2015-08-19 中建四局第一建筑工程有限公司 A kind of construction formwork of overhang layer exterior wall preformed hole

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105888237A (en) * 2016-06-13 2016-08-24 福建省南铝铝材工程有限公司 Construction method applied to channel steel of aluminum alloy template system
CN105888237B (en) * 2016-06-13 2017-11-17 福建省南铝铝模科技有限公司 A kind of construction method being used at aluminum alloy formwork system channel-section steel
CN106567543A (en) * 2016-10-26 2017-04-19 上海中锦建设集团股份有限公司 Slab-bottom structural concrete column reserved hole construction method
CN108331343A (en) * 2018-02-07 2018-07-27 中国二十冶集团有限公司 The construction method of Cantilever Beams and aluminum alloy mould plate lap-joint
CN109779237A (en) * 2019-03-08 2019-05-21 中国十七冶集团有限公司 A kind of scaffold overhanging I-steel is in shear wall position construction auxiliary device and construction method
CN110241845A (en) * 2019-07-12 2019-09-17 中国化学工程第十一建设有限公司 A kind of Equipment Foundations preformed hole fuse and its construction method easy to dismantle
CN114673266A (en) * 2022-03-22 2022-06-28 广东腾越建筑工程有限公司 Plugging process for reserved hole of concrete outer wall of building

Also Published As

Publication number Publication date
CN105569333B (en) 2018-02-09

Similar Documents

Publication Publication Date Title
CN105569333A (en) Construction formwork of cantilever layer outer wall preformed hole, and construction method
CN105696789A (en) Vertical aluminum mould building system and construction method thereof
CN205400043U (en) Constructional column is funnel combination tool for concreting
CN206495501U (en) A kind of cast-in-place concrete floor reserving hole template
CN204040458U (en) A kind of aluminum template system aluminium extruded sections
CN102720356A (en) Steel beam grid floor formwork system
CN204571289U (en) A kind of construction formwork of overhang layer exterior wall preformed hole
CN206110650U (en) Assembled aluminum alloy compound template
CN204059940U (en) A kind of concrete floor aluminum alloy mould plate
CN104453235B (en) Current conversion station fire wall construction technology
CN209737901U (en) Wood formwork for laboratory based on mortise and tenon technology
CN105155838B (en) A kind of quick detachable high-strength building formwork
CN102650158A (en) Connecting device used in casting of shear walls in upper and lower layers
CN109372003A (en) Cushion cap foundation depth rim of a cup template and the construction method for removing rim of a cup template
CN206220519U (en) Aluminum alloy pattern plate ruggedized construction
CN205976486U (en) Aluminum alloy stair template
CN203755682U (en) Secondary pouring form board constructing structure for small opening of concrete structure floor slab
CN210850729U (en) One-way superimposed sheet bending resistance mould and side forms thereof
CN104727553B (en) Aluminum alloy shear wall and floor template adopted construction method and device
CN209723008U (en) Cushion cap foundation depth rim of a cup template
CN207813012U (en) A kind of small space floor template structure
CN207727982U (en) A kind of building wall corner Constructional Col-umn Construction template
CN206468004U (en) A kind of quick template of stair
CN217501033U (en) Can dismantle design steel form and fall board mould
CN204590625U (en) A kind of releasing box for aluminum alloy mould plate system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant