CN105569073B - Suspension type change wall thickness ellipse is inverse to be made vertical shaft and its becomes wall thickness setting method - Google Patents

Suspension type change wall thickness ellipse is inverse to be made vertical shaft and its becomes wall thickness setting method Download PDF

Info

Publication number
CN105569073B
CN105569073B CN201510987993.0A CN201510987993A CN105569073B CN 105569073 B CN105569073 B CN 105569073B CN 201510987993 A CN201510987993 A CN 201510987993A CN 105569073 B CN105569073 B CN 105569073B
Authority
CN
China
Prior art keywords
wall
wall thickness
vertical shaft
borehole wall
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510987993.0A
Other languages
Chinese (zh)
Other versions
CN105569073A (en
Inventor
陈孝湘
张培勇
赵金飞
李广福
吴征
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Fujian Electric Power Engineering Co Ltd
Original Assignee
Fujian Electric Power Survey and Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Electric Power Survey and Design Institute filed Critical Fujian Electric Power Survey and Design Institute
Priority to CN201510987993.0A priority Critical patent/CN105569073B/en
Publication of CN105569073A publication Critical patent/CN105569073A/en
Application granted granted Critical
Publication of CN105569073B publication Critical patent/CN105569073B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads

Abstract

Make vertical shaft with inverse the present invention relates to civil engineering, particularly a kind of suspension type change wall thickness ellipse is inverse to be made vertical shaft and its becomes wall thickness setting method, the inverse structural feature for making vertical shaft is, include plural number and save the oval borehole wall, constructed for assembling reinforcement casting concrete, often the major axis radius of the section borehole wall is identical with minor axis radius, and the borehole wall in the top is that inverted L shape constructs, each section borehole wall is saved by the distributing bar side of being connected thereto one in the assembling reinforcement of the borehole wall afterwards, until inverse make vertical shaft connection subterranean tunnel.Become the setting method of wall thickness based on the earth lateral pressure of reality, choose and adjust the wall thickness value of the borehole wall, obtain the ratio of reinforcement of zone of reasonableness, finally adjust and determine borehole wall wall thickness value.So, the weight of each section borehole wall is carry downwards in a manner of transmitting the preliminary shaft of inverted L shape, overall Path of Force Transfer is clear, effectively increase the borehole wall by power load, shaft structure can be simplified by becoming the construction of wall thickness, rationally reduce and take up an area width, while simplify operational procedure, reduce construction work amount.

Description

Suspension type change wall thickness ellipse is inverse to be made vertical shaft and its becomes wall thickness setting method
Technical field
Make vertical shaft with inverse the present invention relates to a kind of civil engineering, particularly a kind of suspension type change wall thickness ellipse is inverse to make vertical shaft And its become wall thickness setting method.
Background technology
In the prior art, the contrary sequence method vertical shaft of domestic underground engineering uses rectangle and circular cross sections structure, vertical shaft Side wall is waits wall thickness framework, but the vertical shaft of circular configuration, based on being pressurized, arrangement of reinforcement is small, but its low space utilization, occupation of land face Area is big;Headroom utilization rate is high in the vertical shaft well of rectangular configuration, it is small to take up an area, but its structure is so that by based on curved, arrangement of reinforcement is big, construction Difficulty is big.And existing technology, either rectangle or circular well, it is deep larger digging all using wall thickness arrangements of reinforcement such as upper and lower, surroundings Work shaft in, it is less economical.In addition, during using reverse construction, due to after soil excavation, shaft wall pour preceding presence One soil body faces the time of sky, then can not form native arch excavating side wall using rectangular well, then side wall soil can be caused to cave in, and then Cause construction accident.
Chinese patent ZL 201520024209.1, which is provided, a kind of is hampered that the ellipse removed obstacles is inverse to be erected for push pipe jacking Well, using oval contrary sequence method vertical shaft, circular configuration and rectangular configuration stress are good, arrangement of reinforcement is small, floor space is small etc. can be had concurrently Advantage, but the structure of vertical shaft described in the art solutions constructs for vertical reducing, is divided into the part of upper, middle and lower three, top Use and dehisce construction outside to stablize shaft collar, middle part sets circular table as workbench, while reinforces the part borehole wall;Under Portion's vertical shaft internal diameter is more than middle part, and using multiple supporting frameworks, main purpose is to serve jacking construction troubleshooting, is provisional knot Structure.
Although above-mentioned patented technology make use of the vertical shaft of ellipse, but be also only that circle is entered according to the scope of barrier The appropriate adjustment of row, the inverse construction advantage for making vertical shaft of ellipse is not given full play to;Other above-mentioned patented technology and prior art It is inverse make vertical shaft using etc. wall thickness framework, this thickness for being primarily due to side wall soil excavation is difficult to accurately control, usually Cause to backbreak, using etc. wall thickness structure be easy to Construction control;And the concrete square amount caused by wall thickness structure such as use will not increase Add excessive.But in practice of construction, because the earth lateral pressure of vertical shaft either short transverse or lateral part all respectively has not Together, so, otherwise vertical shaft entirety discontinuity, or change shaft wall structure above and below vertical shaft or borehole wall ID is fitted Different earth lateral pressures is answered, causes shaft structure complicated, Path of Force Transfer is crisscross between the different segment borehole wall, construction work amount Increase, construction investment are higher.
The content of the invention
It is an object of the invention to clear, the raising borehole wall according to a kind of Path of Force Transfer is provided in place of the deficiencies in the prior art By power load, the suspension type change wall thickness ellipse of simplified shaft structure is inverse to be made vertical shaft and its becomes wall thickness setting method.
Suspension type of the present invention becomes the inverse purpose for making vertical shaft of wall thickness ellipse and realized by following approach:
Suspension type becomes wall thickness ellipse against vertical shaft is made, and its structural feature is, includes plural number and saves the oval borehole wall, to tie up Casting concrete of wire-tiing constructs, and often the major axis inside radius a of the elliptic cross-section of the section borehole wall is identical, short axle inside radius b is identical, The borehole wall of the top is the preliminary shaft of inverted L shape construction, and standing portion is located at the inverse the top borehole wall for making vertical shaft, and lateral part is then parallel In ground, and it is fixedly installed on foundation soil, each section borehole wall saves well by the distributing bar side of being connected thereto one afterwards In the assembling reinforcement of wall, until inverse make vertical shaft connection subterranean tunnel;The elliptic cross-section of borehole wall wall thickness t at major axisbWith short axle Locate wall thickness taRatio be 0.5≤(tb/ta)≤1.0, while inverse often section borehole wall wall thickness of the vertical shaft along short transverse of making is according to soil Lateral pressure adjusts the wall thickness of acquisition.
The inverted L shape construction borehole wall is the whole inverse preliminary shaft for making vertical shaft, and foundation soil, inverted L are passed to by the structure of ground segment Type structure presses flexural member arrangement of reinforcement.Against vertical shaft is made, for merogenesis against pouring, each section borehole wall below preliminary shaft uses structure from top to bottom Reinforcing bar is made to be attached, so, by distributing bar by all side wall weight transmittings below a certain section borehole wall to this section side wall, The preliminary shaft of inverted L shape is finally transmitted to, now inverted L shape preliminary shaft is a kind of suspended structure, is suspended on ground foundation soil, to transmit Mode carry the weight of each section borehole wall downwards, overall Path of Force Transfer is clear, inverse to make under such actuating system construction The inside cross-sectional of vertical shaft can be made unanimously, effectively increase being constructed by power load, the simplified borehole wall for the borehole wall.
Because the elliptic cross-section of the borehole wall is variant in major axis and short-axis direction stress size, on Impact direction and not With, wall thickness t at short axleaStress moment of flexure to be bent into well, and wall thickness t at major axisbStress moment of flexure be to well outside sweep, Therefore, in order to further improve the stress utilization rate of side wall construction, the present invention is provided with the borehole wall of elliptic cross-section in major axis side To with the different construction of wall thickness on short-axis direction, via it is multiple calculate, test and experiment obtain long axis direction and short axle Wall-thickness ratio on direction, i.e., obtain the stress utilization rate of more preferable side wall construction by using the structure for becoming wall thickness.In addition, In the short transverse of vertical shaft, due to the borehole wall using unified internal diameter, therefore the stress for often saving the borehole wall in the height direction is also not With, it is necessary to according to reality earth lateral pressure adaptive setting obtain.Since then, the same of underslung borehole wall force transfer structure is being set When, using laterally, longitudinal direction become the vertical shaft of wall thickness and construct, to be overall against providing structural mechanics as vertical shaft for elliptic cylindrical structure The basis of aspect so that inverse vertical shaft of making of the present invention can realize simple for structure, rationally reduction occupation of land width, simplified construction journey Sequence, reduce the technique effect of construction work amount.
Suspension type of the present invention becomes wall thickness ellipse, and against making, vertical shaft change wall thickness setting method is specially inverse to make vertical shaft in height The wall thickness in degree direction determines method, and it is characterized by, and comprises the following steps:
1st, the earth lateral pressure of shaft structure side wall is that uniform line load is acted in structure, and earth lateral pressure is according to heterogeneity The soil body be specially:Sandy soil:Cohesive soil:WhereinFor effective interior friction of the soil body Angle;
2nd, according to wall thickness t at major axisbWith wall thickness t at short axleaRatio be 0.5≤(tb/taChoose t in)≤1.0bAnd taJust Initial value, radius is then calculated according to the long and short axle of the borehole wall of each section vertical shaft and establishes plane framework, wherein the calculating of long and short axle Radius a0、b0Respectively:a0=a+ (ta/2)、b0=b+ (tb/2);
3rd, the internal force of borehole wall framework is calculated:
Wherein:ka、kbFor bending moment coefficients, it calculates radius a with major axis0, short axle calculate radius b0Ratio relation see below Table:
a0/b0 1 0.9 0.8 0.7 0.6 0.5
ka 0 0.0571 0.1329 0.2375 0.3902 0.6299
kb 0 -0.0602 -0.1484 -0.2829 -0.4987 -0.8701
In form, for moment of flexure just to represent to bend into well, moment of flexure is negative indication to well outside sweep.
4th, the ratio of reinforcement ρ of tension reinforcement is calculated:A in formulasFor by GB 50010《The Concrete Structure Design is advised Model》The area of the pulled steel sum being calculated:Wherein:α1Cut for concrete Face compression chord coefficient, fcFor concrete axial compression strength design load;H be single-unit shaft wall height, h0For concrete section Effective depth, M by calculating section moment-curvature relationship, i.e. M in step 3aOr Mb, substitute into calculate respectively;fyTension reinforcement Strength failure criterion;T is to calculate the thickness where section, the t as chosen in advanceaOr tbValue.
5th, judge ρ whether in the range of setting:0.2%≤ρ≤2.0%, if it is, the t currently chosenaOr tbValue For the wall thickness value of determination, if it is not, then choosing t againbAnd ta, repeat step 3-4, until the ratio of reinforcement ρ of tension reinforcement is being set In fixed scope, now selected tbAnd taFor when the wall thickness of the prosthomere borehole wall.
Thus, considering inverse to make on the basis of vertical shaft often saves the suspension type force structure of the borehole wall, to carry out the wall thickness of vertical shaft More careful force analysis, accomplished with becoming the construction of wall thickness above and below vertical shaft, left and right change wall thickness arrangement of reinforcement, inside cross-sectional can be obtained Inverse for ellipse makees vertical shaft, simple for structure, so, can using vertical shaft that is oval, becoming wall thickness, suspension type reverse construction Rationally reduce vertical shaft side and take up an area width, simplify operational procedure, reduce construction work amount, at the same can also by curved wall, Become the method for wall thickness arrangement of reinforcement, cost saving.
The present invention can be specially further:
The ratio for often saving the short axle inside radius a and major axis inside radius b in oval borehole wall section is 0.3≤(a/b)≤1.0.
It is variant in major axis and short-axis direction stress size in view of the elliptic cross-section of the borehole wall, in order to ensure side wall The stress utilization rate of structure, the major axis radius and minor axis radius of elliptic cross-section are obtained via multiple calculating, test and experiment Ratio data, under this proportion structure, preferable side wall construction stress utilization rate can be obtained.
The height for often saving the oval borehole wall is 1.0-1.5m.
It is inverse to make vertical shaft from top to bottom, the plural number section borehole wall is provided with a section wall seat, it is located at hoistway wall base soil side tool There is a projection, it is embedded in vertical shaft base soil.
The inverse height for making vertical shaft is depending on Specific construction situation, if the height of vertical shaft is higher, in order to ensure passing The stability and reliability of power path by a section borehole wall every certain height, it is necessary to set wall-forming seat, wall seat and other wells Wall compared to difference raised in being provided with the side that can consolidate in embedded vertical shaft base soil, by the active force of vertical shaft base soil, Continue to provide the suspension force for carrying load downwards on original actuating system.
The a diameter of 8-12mm of distributing bar of the connection two adjacent sections borehole wall.
Merogenesis work done in the manner of a certain author pours vertical shaft from top to bottom, is connected between each section vertical shaft using 8~Φ of Φ 12 construction muscle, passes through structure Reinforcing bar is made by all side wall weight transmittings below a certain section borehole wall to this section side wall, is finally transmitted to below the preliminary shaft of inverted L shape Foundation soil.
In summary, it is by the perpendicular of up to inferior inner section the invention provides a kind of suspension type ellipse against vertical shaft is made Well is constructed, the borehole wall constructed using the preliminary shaft of the top as inverted L shape, and it is adopted as being suspended on foundation soil between each section vertical shaft Connected with distributing bar, by distributing bar by all side wall weight transmittings below a certain section borehole wall to this section side wall, finally The foundation soil being transferred to below the preliminary shaft of inverted L shape;Using distributing bar transmission between the load-bearing of suspension type preliminary shaft, the different segment borehole wall The way of load, Path of Force Transfer is clear, simple structure;Rationally reduce and take up an area width, while simplify operational procedure, reduce and apply Work quantities.
Brief description of the drawings
Fig. 1, which is that suspension type of the present invention ellipse is inverse, makees the cross section structure schematic diagram of vertical shaft in the height direction.
Fig. 2 is the inverse lateral cross section structural representation for making vertical shaft of suspension type of the present invention ellipse.
The present invention is described further with reference to embodiment.
Embodiment
Most preferred embodiment:
Referring to the drawings 1, suspension type becomes wall thickness ellipse against vertical shaft is made, and merogenesis work done in the manner of a certain author pours vertical shaft from top to bottom, includes Plural number saves the oval borehole wall, and it is 1.0-1.5m often to save, and is constructed for assembling reinforcement casting concrete, often saves the major axis internal diameter of the borehole wall It is identical with short axle internal diameter.The borehole wall in the top constructs for inverted L shape, and the inverted L shape is configured to the inverse preliminary shaft 1 for making vertical shaft, preliminary shaft 1 Standing portion is fixedly installed on foundation soil as the inverse the top borehole wall for making vertical shaft, lateral part then parallel to ground, L-type structure presses flexural member arrangement of reinforcement;Excavate downwards, constructed section by section section by section afterwards, each section borehole wall 2 passes through a diameter of 8-12mm The distributing bar side of being connected thereto one save the borehole wall assembling reinforcement on, until it is inverse make vertical shaft connection subterranean tunnel, final section The borehole wall is ingate.So, from preliminary shaft down, by distributing bar by it is a certain section the borehole wall below all side wall weight transmittings extremely This section side wall, the foundation soil being finally transmitted to below the preliminary shaft of inverted L shape, therefore, and from this delivery type structure, inverted L shape well Neck is a kind of suspended structure, carries the weight of each section borehole wall downwards in a manner of transmission.
The inverse lateral cross section that vertical shaft is considered as vertical shaft of ellipse of the present invention constructs for elliptic cross-section, sees accompanying drawing 2, wherein the ratio for often saving the minor axis radius a and major axis radius b in oval borehole wall section is 0.3≤(a/b)≤1.0;And major axis Locate wall thickness tbWith wall thickness t at short axleaRatio be 0.5≤(tb/ta)≤1.0.Above-mentioned cross-sectional configuration considers the ellipse of the borehole wall Tee section is variant in major axis and short-axis direction stress size, on Impact direction and different, departing from only from section The improvement of shape, the stress utilization rate of borehole wall side wall construction is further considered, improved isometrical steady against the structure for making vertical shaft It is qualitative.
Because the inverse height for making vertical shaft is depending on Specific construction situation, if the height of vertical shaft is higher, in order to true Protect Path of Force Transfer stability and reliability, it is necessary to the one section borehole wall set into wall-forming seat 3 every certain height, wall seat 3 with Other boreholes wall compared to difference raised in being provided with the side that can consolidate in embedded vertical shaft base soil, by the work of hoistway wall base soil Firmly, continue to provide the suspension force for carrying load downwards on original actuating system.Borehole wall cat ladder 4 is installed in vertical shaft.
The elliptic cross-section of borehole wall wall thickness t at major axisbWith wall thickness t at short axleaRatio be 0.5≤(tb/ta)≤1.0, Simultaneously inverse vertical shaft of making often saves borehole wall wall thickness to adjust the wall thickness of acquisition according to earth lateral pressure along short transverse, and it becomes the whole of wall thickness It is specific as follows to determine method:
1) soil pressure of shaft structure side wall is calculated using earth pressure at rest, considers earth's surface mobile load, and itemize using load Coefficient participates in calculating, and calculation formula is with reference to national standard GB 50007《Code for design of building》Perform, earth lateral pressure is equal Load action is connected up in structure:
To sandy soil:
To cohesive soil:
In formula:For the effective angle of inner friction of the soil body, tested and obtained using triaxial consolidation undrained shear;Consolidated according to staight scissors Knot quick shear test peak strength c,Index is estimatedEmpirical equation be:
2) the major and minor axis calculating radius for calculating the borehole wall of each section vertical shaft establishes plane framework, the calculating radius of long and short axle a0、b0Formula is seen below respectively:
Typically by the ratio t of short axle wall thickness and major axis wall thickness during initial calculationa/tb=0.75~0.80 round after tried Calculate, major axis wall thickness generally takes tb>=330mm, now corresponding short axle wall thickness is ta≥250mm;
3) internal force of borehole wall framework is calculated, calculating can use finite element method or structural mechanics method, using structural mechanics The reduced mechanical model of method is as follows, ka、kbIt is relevant with the calculating radii ratio of long and short axle for bending moment coefficients, for modal value Bending moment coefficients be shown in Table 1,
The oval shaft wall bending moment coefficients of table 1
a0/b0 1 0.9 0.8 0.7 0.6 0.5
ka 0 0.0571 0.1329 0.2375 0.3902 0.6299
kb 0 -0.0602 -0.1484 -0.2829 -0.4987 -0.8701
Note:For moment of flexure just to represent to bend into well, moment of flexure is negative indication to well outside sweep.
4) sectional reinforcement is carried out by simple bending primary structure member respectively to controlling sections respectively, the interior outside muscle of the borehole wall is using a circle Elongated arrangement, it is horizontal to be placed in principal rod on the outside of the borehole wall;For the vertical shaft with waterproof requirement, thickness of protection tier meets water side Not less than 50mm, while the fracture width of section is checked, general control is not more than 0.2mm.
5) (0.2%≤ρ≤2.0%) in the reasonable scope whether according to the ratio of reinforcement ρ of tension reinforcement, suitably adjustment wall is grown Wall thickness at short axle, untill the ratio of reinforcement is in the reasonable scope, i.e., 0.2%≤ρ≤2.0%, the ratio of reinforcement press national standard GB 50010《Code for design of concrete structures》Component flexure bearing capacity formula determine:
In formula:
α1(dimensionless) concrete section compression chord coefficient, 1.0 are taken when strength grade of concrete is no more than C50, when Concrete strength takes 0.94 when being C80, therebetween by linear interpolation;
fc(N/mm2) concrete axial compression strength design load;
H (mm) is single-unit shaft wall height, if taking linear meter(lin.m.) highly to calculate, its value is 1000mm;
h0(mm) it is concrete section effective depth, generally taOr tbSubtract thickness of protection tier;
M (Nmm) by calculating section moment-curvature relationship, i.e. M1Or M2
fy(N/mm2) tension reinforcement strength failure criterion;
As(mm2) it is by GB 50010《Code for design of concrete structures》The area of the pulled steel sum being calculated;
T (mm) is to calculate the thickness where section, i.e. taOr tb
Suspension type of the present invention become the inverse construction method for making vertical shaft of wall thickness ellipse into:(1) according to drawing requirement, processing Oval steel form, between the high 1.0~1.5m of template → (2) field lofting, the major axis and short axle of oval vertical shaft are made, simultaneously The top layer loosened soil of preliminary shaft scope is removed comprising preliminary shaft bottom plate scope → (3), the excavation soil body → (4) pour preliminary shaft → (5) preliminary shaft and mixed After solidifying native intensity reaches the 70% of design strength, the first segment well side wall scope soil body → (6) clay model processing, colligation side wall are excavated Reinforcing bar, connecting structure reinforcing bar → (7) building mould, pour side wall concrete (being poured using water-proof concrete) → (8) side wall coagulation After soil reaches the 70% of design strength, tear open in the soil body → (10) repetition that steel form → (9) are excavated in the range of next section borehole wall Abovementioned steps, until well reaches design altitude → (11) according to actual conditions, after well completes construction, pour vertical shaft and permanently push up Plate, carry out walkway.
The not described part of the present invention is same as the prior art.

Claims (6)

1. suspension type becomes, wall thickness ellipse is inverse to make vertical shaft, it is characterised in that includes plural number and saves the oval borehole wall, is assembling reinforcement Casting concrete constructs, and often the major axis inside radius a of the elliptic cross-section of the section borehole wall is identical, short axle inside radius b is identical, in the top The borehole wall be inverted L shape construction preliminary shaft, standing portion is located at the inverse the top borehole wall for making vertical shaft, and lateral part is then parallel to ground Face, and be fixedly installed on foundation soil, each section borehole wall saves the borehole wall by the distributing bar side of being connected thereto one afterwards In assembling reinforcement, until inverse make vertical shaft connection subterranean tunnel;The elliptic cross-section of borehole wall wall thickness t at major axisbWith wall at short axle Thick taRatio be 0.5≤(tb/ta)<1.0, while inverse often section borehole wall wall thickness of the vertical shaft along short transverse of making is according to native side pressure Power adjusts the wall thickness of acquisition.
2. suspension type becomes the inverse vertical shaft of making of wall thickness ellipse and becomes wall thickness setting method, it is characterised in that comprises the following steps:
(1) earth lateral pressure of shaft structure side wall is uniform line load and acted on shaft structure that earth lateral pressure is according to difference The soil body of property is specially:Sandy soil:Cohesive soil:WhereinFor the effective interior of the soil body Angle of friction;
(2) the major axis inside radius for often saving the elliptic cross-section of the borehole wall is a, and short axle inside radius is b, and the elliptic cross-section of the borehole wall is in length Wall thickness is t at axlebIt is t with wall thickness at short axlea, choose tbAnd taInitial value, selection range is according to wall thickness t at major axisbWith short axle Locate wall thickness taRatio:0.5≤(tb/ta)<1.0, radius is then calculated according to the long and short axle of the borehole wall of each section vertical shaft and established Plane framework, wherein the calculating radius a of long and short axle0、b0Respectively:a0=a+ (ta/2)、b0=b+ (tb/2);
(3) internal force of borehole wall framework is calculated:
Wherein:ka、kbFor bending moment coefficients, it calculates radius a with major axis0, short axle calculate radius b0Ratio relation see the table below:
a0/b0 1 0.9 0.8 0.7 0.6 0.5 ka 0 0.0571 0.1329 0.2375 0.3902 0.6299 kb 0 -0.0602 -0.1484 -0.2829 -0.4987 -0.8701
In form, for moment of flexure just to represent to bend into well, moment of flexure is negative indication to well outside sweep;
(4) ratio of reinforcement ρ of tension reinforcement is calculated:A in formulasFor by GB 50010《Code for design of concrete structures》Meter Obtained area of the pulled steel sum:Wherein:α1It is pressurized for concrete section Stress coefficient, fcFor concrete axial compression strength design load;H be single-unit shaft wall height, h0It is effectively high for concrete section Degree, M by calculating section moment-curvature relationship, i.e. M in step 3aOr Mb, substitute into calculate respectively;fyThe intensity of tension reinforcement is set Evaluation;T is to calculate the thickness where section, the t as chosen in advanceaOr tbValue,
(5) judge ρ whether in the range of setting:0.2%≤ρ≤2.0%, if it is, the t currently chosenaOr tbIt is worth to be true Fixed wall thickness value, if it is not, then choosing t againbAnd ta, repeat step (3)-(4), until the ratio of reinforcement ρ of tension reinforcement is being set In fixed scope, now selected tbAnd taFor when the wall thickness of the prosthomere borehole wall.
3. suspension type according to claim 1 becomes, wall thickness ellipse is inverse to make vertical shaft, it is characterised in that often saves the oval borehole wall The minor axis radius a and major axis radius b in section ratio are 0.3≤(a/b)≤1.0.
4. suspension type according to claim 1 becomes, wall thickness ellipse is inverse to make vertical shaft, it is characterised in that it is inverse make vertical shaft by upper and Under, the plural number section borehole wall is provided with a section wall seat, it is located at, and hoistway wall base soil side is raised with one, and it is embedded in vertical shaft base soil In.
5. suspension type according to claim 1 becomes, wall thickness ellipse is inverse to make vertical shaft, it is characterised in that often saves the oval borehole wall Height be 1.0-1.5m.
6. suspension type according to claim 1 becomes, wall thickness ellipse is inverse to make vertical shaft, it is characterised in that the connection adjacent two Save a diameter of 8-12mm of distributing bar of the borehole wall.
CN201510987993.0A 2015-12-24 2015-12-24 Suspension type change wall thickness ellipse is inverse to be made vertical shaft and its becomes wall thickness setting method Active CN105569073B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510987993.0A CN105569073B (en) 2015-12-24 2015-12-24 Suspension type change wall thickness ellipse is inverse to be made vertical shaft and its becomes wall thickness setting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510987993.0A CN105569073B (en) 2015-12-24 2015-12-24 Suspension type change wall thickness ellipse is inverse to be made vertical shaft and its becomes wall thickness setting method

Publications (2)

Publication Number Publication Date
CN105569073A CN105569073A (en) 2016-05-11
CN105569073B true CN105569073B (en) 2018-03-27

Family

ID=55879660

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510987993.0A Active CN105569073B (en) 2015-12-24 2015-12-24 Suspension type change wall thickness ellipse is inverse to be made vertical shaft and its becomes wall thickness setting method

Country Status (1)

Country Link
CN (1) CN105569073B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112431225A (en) * 2020-10-16 2021-03-02 中国化学工程第十四建设有限公司 Top-down construction method for pipe-jacking brick-built working well
CN117150817B (en) * 2023-10-26 2024-02-02 湖南大学 Combined door type anti-floating frame design method based on soil arch effect

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030012185A (en) * 2001-07-30 2003-02-12 나이가이데구니가 가부시끼가이샤 A method of constructing an underground parking lot by sinking wall-like piles by their weights
CN2561930Y (en) * 2001-12-04 2003-07-23 北京中煤矿山工程有限公司 Steel plate concrete composite well wall with multi-layer steel plate laminated structure
CN104499560A (en) * 2014-12-22 2015-04-08 洛阳城市建设勘察设计院有限公司 Combined rainwater seepage well and construction method
CN204457778U (en) * 2015-01-14 2015-07-08 国家电网公司 Being hampered for push pipe jacking, the ellipse of removing obstacles is inverse makes vertical shaft

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030012185A (en) * 2001-07-30 2003-02-12 나이가이데구니가 가부시끼가이샤 A method of constructing an underground parking lot by sinking wall-like piles by their weights
CN2561930Y (en) * 2001-12-04 2003-07-23 北京中煤矿山工程有限公司 Steel plate concrete composite well wall with multi-layer steel plate laminated structure
CN104499560A (en) * 2014-12-22 2015-04-08 洛阳城市建设勘察设计院有限公司 Combined rainwater seepage well and construction method
CN204457778U (en) * 2015-01-14 2015-07-08 国家电网公司 Being hampered for push pipe jacking, the ellipse of removing obstacles is inverse makes vertical shaft

Also Published As

Publication number Publication date
CN105569073A (en) 2016-05-11

Similar Documents

Publication Publication Date Title
CN108385673B (en) Miniature upper filling ball sleeve pile and construction method thereof
CN106958208A (en) A kind of novel reinforced method of double curvature arched bridge
CN102996133A (en) Construction method applicable to intersection between inclined shaft and slant hole of weak surrounding rock tunnel
CN105544575B (en) A kind of bottom concrete construction method under water of use steel truss reinforcement
CN104294753A (en) Bridge prefabricated hollow pier stud connecting structure and construction method thereof
CN209924998U (en) Shallow earthing shield tunnel is worn road reinforcement protection architecture down
CN103726586A (en) H-shaped steel and steel plate framework assembly shear wall with interfaces with grooves and manufacturing method
CN104314006B (en) Towards the high-performance slide device of large-tonnage pushing tow engineering
CN104563147B (en) Composite structure pile foundation applied to karst area and construction method of composite structure pile foundation
CN109208825A (en) A kind of assembled arthitecutral structure convenient for docking and being in the milk
CN105569073B (en) Suspension type change wall thickness ellipse is inverse to be made vertical shaft and its becomes wall thickness setting method
CN202730749U (en) Prefabricated reinforced concrete H-shaped support pile
CN204151798U (en) A kind of steel reinforced concrete anti-slide pile structure
CN104895122B (en) A kind of construction method of shield tunnel
CN106245667A (en) A small-sized clump of piles and the attachment structure of cushion cap
CN204139191U (en) A kind of pile-raft foundation structure
CN205242441U (en) Oval contrary shaft of doing of suspension type
CN109056790A (en) Stake three layers of retaining wall structure of support and construction method
CN206070724U (en) The structure at design large span deep buried metro station is combined using Y shape pillar with uplift pile
CN104612142A (en) Integral abutment bridge structure based on composite flexible piles and construction method thereof
CN204677212U (en) A kind of structure reducing tunnel lining structure internal force
CN104234063A (en) Structure of steel-reinforced concrete slide-resistant pile
CN204174527U (en) The hollow pier stud syndeton of a kind of bridge prefabrication
CN106759264A (en) One kind grouting pipe network and its construction method
CN208251156U (en) It is a kind of to reduce the grand heavy device of underground structure using building enclosure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 350003 Gulou District, Fujian, Fuzhou No. 54 Road, No. 268

Patentee after: China Electric Power Construction Group Fujian electric survey and Design Institute Co., Ltd.

Address before: 350003 Gulou District, Fujian, Fuzhou No. 54 Road, No. 268

Patentee before: Fujian Electric Power Survey and Design Institute