CN105568964A - 一种管桩扩大头施工用伞状辅助装置 - Google Patents
一种管桩扩大头施工用伞状辅助装置 Download PDFInfo
- Publication number
- CN105568964A CN105568964A CN201610094483.5A CN201610094483A CN105568964A CN 105568964 A CN105568964 A CN 105568964A CN 201610094483 A CN201610094483 A CN 201610094483A CN 105568964 A CN105568964 A CN 105568964A
- Authority
- CN
- China
- Prior art keywords
- pile
- rod
- connecting rod
- pull bar
- expanded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
- E02D5/44—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with enlarged footing or enlargements at the bottom of the pile
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/72—Pile shoes
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
一种管桩扩大头施工用伞状辅助装置,本申请旋转杆下端有桩尖,所述桩尖外侧有3个折叠刚支撑,折叠刚支撑等角度绕桩尖中心线一周,外推拉杆下端与对应折叠刚支撑上端相连,钢支撑推杆下端与对应折叠刚支撑中端相连,钢支撑推杆上端与对应内推拉杆下端相连,外推拉杆上部和内推拉杆中部之间通过内外杆连接管相连,内推拉杆上端与上连接杆和下连接杆一端相连,上连接杆的另一端和下连接杆的另一端与旋转杆上部相连。本发明辅助装置能使桩端扩大,其是使用机械旋转扩大的桩尖,形成的扩大头,能够扩大管桩桩端面积,形成的扩大头承载力提高。使用后大大缩短工期。与普通预制管桩相比,由于减小桩长,从而大大缩短了工期。
Description
技术领域
本发明涉及施工辅助设备领域,特别是涉及一种管桩扩大头施工用伞状辅助装置。
背景技术
通常,预制管桩只作为摩擦型桩基础。不少已有的施工方法,虽然提出了预制管桩高压注浆、高压旋喷等扩大头技术,但效果确不太明显。伞形结构与传统的相比具有较好的扩展性,将其与管桩扩大头结构相结合,可以大幅扩大桩端面积,并且在普通高压旋喷注浆技术中,形成一次扩大头的桩尖,较大幅度提高预制管桩单桩承载力。
发明内容
针对以上问题,本发明提供一种管桩扩大头施工用伞状辅助装置,该辅助装置能使桩端扩大,其是使用机械旋转扩大的桩尖,形成的扩大头,该扩大头由钢板钢杆包围混凝土所构成的钢板-混凝土组合结构,能够扩大管桩桩端面积,通常扩大达280%。形成的扩大头承载力提高。使用本发明利用两次扩大头管桩的施工方法,进行预制管桩基础施工,两次扩大头管桩与普通高压旋喷管桩相比:单位长度承载力提高128%,单位承载力费用降低35%,使用后大大缩短工期。与普通预制管桩相比,由于减小桩长,从而大大缩短了工期,为达此目的,本发明提供一种管桩扩大头施工用伞状辅助装置,包括旋转杆、桩尖、折叠刚支撑、外推拉杆、内外杆连接管、钢支撑推杆、内推拉杆、上连接杆和下连接杆,所述旋转杆下端有桩尖,所述桩尖外侧有3个折叠刚支撑,所述折叠刚支撑等角度绕桩尖中心线一周,所述外推拉杆下端与对应折叠刚支撑上端相连,所述钢支撑推杆下端与对应折叠刚支撑中端相连,所述钢支撑推杆上端与对应内推拉杆下端相连,所述外推拉杆上部和内推拉杆中部之间通过内外杆连接管相连,所述内推拉杆上端与上连接杆和下连接杆一端相连,所述上连接杆的另一端和下连接杆的另一端与旋转杆上部相连。
本发明的进一步改进,所述桩尖上有桩尖保护套,为了防止桩尖磨损可设置桩尖保护套。
本发明的进一步改进,所述上连接杆和下连接杆之间通过加强连接杆相连,为了提高支撑强度可设置加强连接杆。
本发明涉及一种管桩扩大头施工用伞状辅助装置,使用过程先对桩尖进行机械旋转扩大,提高桩端面积;再在扩大了的桩端下部使用高压旋喷注浆技术,形成具有固定形状的固结体。如此形成预制管桩底端两次扩大头,从而较大幅度地提高预制管桩单桩承载力。
本发明创新点如下:
1、机械旋转扩大的桩尖,采用撑伞原理,具有特别功能的卡子、一个多用推张钢管;
2、在普通高压旋喷注浆技术中,增加能形成一次扩大头的桩尖,较大幅度提高预制管桩单桩承载力。
3、采用本发明后桩尖能够张开,施工成本会尽可能低;并且简化了施工流程。
附图说明
图1为本发明一种结构示意图;
图2为本发明另一种结构示意图;
标记说明:
1、旋转杆;2、桩尖;3、折叠刚支撑;
4、外推拉杆;5、内外杆连接管;6、钢支撑推杆;
7、内推拉杆;8、上连接杆;9、加强连接杆;
10、下连接杆。
具体实施方式
以下结合附图和实施例对发明做详细的说明:
本发明提供一种管桩扩大头施工用伞状辅助装置,该辅助装置能使桩端扩大,其是使用机械旋转扩大的桩尖,形成的扩大头,该扩大头由钢板钢杆包围混凝土所构成的钢板-混凝土组合结构,能够扩大管桩桩端面积,通常扩大达280%。形成的扩大头承载力提高。使用本发明利用两次扩大头管桩的施工方法,进行预制管桩基础施工,两次扩大头管桩与普通高压旋喷管桩相比:单位长度承载力提高128%,单位承载力费用降低35%,使用后大大缩短工期。与普通预制管桩相比,由于减小桩长,从而大大缩短了工期。
作为本发明一种实施例,本发明提供一种管桩扩大头施工用伞状辅助装置,包括旋转杆1、桩尖2、折叠刚支撑3、外推拉杆4、内外杆连接管5、钢支撑推杆6、内推拉杆7、上连接杆8和下连接杆10,所述旋转杆1下端有桩尖2,所述桩尖2外侧有3个折叠刚支撑3,所述折叠刚支撑3等角度绕桩尖2中心线一周,所述外推拉杆4下端与对应折叠刚支撑3上端相连,所述钢支撑推杆6下端与对应折叠刚支撑3中端相连,所述钢支撑推杆6上端与对应内推拉杆7下端相连,所述外推拉杆4上部和内推拉杆7中部之间通过内外杆连接管5相连,所述内推拉杆7上端与上连接杆8和下连接杆10一端相连,所述上连接杆8的另一端和下连接杆10的另一端与旋转杆1上部相连。
作为本发明一种最佳具体实施例,本发明提供如图1图2所示的一种管桩扩大头施工用伞状辅助装置,包括旋转杆1、桩尖2、折叠刚支撑3、外推拉杆4、内外杆连接管5、钢支撑推杆6、内推拉杆7、上连接杆8和下连接杆10,所述旋转杆1下端有桩尖2,所述桩尖2上有桩尖保护套,为了防止桩尖磨损可设置桩尖保护套,所述桩尖2外侧有3个折叠刚支撑3,所述折叠刚支撑3等角度绕桩尖2中心线一周,所述外推拉杆4下端与对应折叠刚支撑3上端相连,所述钢支撑推杆6下端与对应折叠刚支撑3中端相连,所述钢支撑推杆6上端与对应内推拉杆7下端相连,所述外推拉杆4上部和内推拉杆7中部之间通过内外杆连接管5相连,所述内推拉杆7上端与上连接杆8和下连接杆10一端相连,所述上连接杆8的另一端和下连接杆10的另一端与旋转杆1上部相连,所述上连接杆8和下连接杆10之间通过加强连接杆9相连,为了提高支撑强度可设置加强连接杆。
以上所述,仅是本发明的较佳实施例而已,并非是对本发明作任何其他形式的限制,而依据本发明的技术实质所作的任何修改或等同变化,仍属于本发明所要求保护的范围。
Claims (3)
1.一种管桩扩大头施工用伞状辅助装置,包括旋转杆(1)、桩尖(2)、折叠刚支撑(3)、外推拉杆(4)、内外杆连接管(5)、钢支撑推杆(6)、内推拉杆(7)、上连接杆(8)和下连接杆(10),其特征在于:所述旋转杆(1)下端有桩尖(2),所述桩尖(2)外侧有3个折叠刚支撑(3),所述折叠刚支撑(3)等角度绕桩尖(2)中心线一周,所述外推拉杆(4)下端与对应折叠刚支撑(3)上端相连,所述钢支撑推杆(6)下端与对应折叠刚支撑(3)中端相连,所述钢支撑推杆(6)上端与对应内推拉杆(7)下端相连,所述外推拉杆(4)上部和内推拉杆(7)中部之间通过内外杆连接管(5)相连,所述内推拉杆(7)上端与上连接杆(8)和下连接杆(10)一端相连,所述上连接杆(8)的另一端和下连接杆(10)的另一端与旋转杆(1)上部相连。
2.根据权利要求1所述的一种管桩扩大头施工用伞状辅助装置,其特征在于:所述桩尖(2)上有桩尖保护套。
3.根据权利要求1所述的一种管桩扩大头施工用伞状辅助装置,其特征在于:所述上连接杆(8)和下连接杆(10)之间通过加强连接杆(9)相连。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610094483.5A CN105568964A (zh) | 2016-02-22 | 2016-02-22 | 一种管桩扩大头施工用伞状辅助装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610094483.5A CN105568964A (zh) | 2016-02-22 | 2016-02-22 | 一种管桩扩大头施工用伞状辅助装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105568964A true CN105568964A (zh) | 2016-05-11 |
Family
ID=55879551
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610094483.5A Pending CN105568964A (zh) | 2016-02-22 | 2016-02-22 | 一种管桩扩大头施工用伞状辅助装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105568964A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113309074A (zh) * | 2021-05-12 | 2021-08-27 | 海南省农垦设计院有限公司 | 一种用于建筑节能工程的基坑支护桩 |
CN114839205A (zh) * | 2022-05-11 | 2022-08-02 | 中国矿业大学 | 一种伞状张合型分段式低应变完整性测试装置及方法 |
CN115125942A (zh) * | 2022-07-22 | 2022-09-30 | 广东省源天工程有限公司 | 一种钢管桩地基基础加固机构 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6047505A (en) * | 1997-12-01 | 2000-04-11 | Willow; Robert E. | Expandable base bearing pile and method of bearing pile installation |
CN1342812A (zh) * | 2001-10-11 | 2002-04-03 | 浙江大学 | 伞形桩端、桩身扩大器 |
CN1488818A (zh) * | 2003-08-04 | 2004-04-14 | 吕怀民 | 一种套盘桩和成桩方法和挤扩装置、沉桩机和用途 |
CN103938623A (zh) * | 2013-01-17 | 2014-07-23 | 上海市浦东新区知识产权保护协会 | 一种管桩的施工方法 |
CN205369233U (zh) * | 2016-02-22 | 2016-07-06 | 上海宝冶集团有限公司 | 一种管桩扩大头施工用伞状辅助装置 |
-
2016
- 2016-02-22 CN CN201610094483.5A patent/CN105568964A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6047505A (en) * | 1997-12-01 | 2000-04-11 | Willow; Robert E. | Expandable base bearing pile and method of bearing pile installation |
CN1342812A (zh) * | 2001-10-11 | 2002-04-03 | 浙江大学 | 伞形桩端、桩身扩大器 |
CN1488818A (zh) * | 2003-08-04 | 2004-04-14 | 吕怀民 | 一种套盘桩和成桩方法和挤扩装置、沉桩机和用途 |
CN103938623A (zh) * | 2013-01-17 | 2014-07-23 | 上海市浦东新区知识产权保护协会 | 一种管桩的施工方法 |
CN205369233U (zh) * | 2016-02-22 | 2016-07-06 | 上海宝冶集团有限公司 | 一种管桩扩大头施工用伞状辅助装置 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113309074A (zh) * | 2021-05-12 | 2021-08-27 | 海南省农垦设计院有限公司 | 一种用于建筑节能工程的基坑支护桩 |
CN114839205A (zh) * | 2022-05-11 | 2022-08-02 | 中国矿业大学 | 一种伞状张合型分段式低应变完整性测试装置及方法 |
CN114839205B (zh) * | 2022-05-11 | 2024-01-23 | 中国矿业大学 | 一种伞状张合型分段式低应变完整性测试装置及方法 |
CN115125942A (zh) * | 2022-07-22 | 2022-09-30 | 广东省源天工程有限公司 | 一种钢管桩地基基础加固机构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101761074B (zh) | 提高管桩端承力及抗拔力的方法 | |
CN201794079U (zh) | 一种基坑支撑系统 | |
CN105568964A (zh) | 一种管桩扩大头施工用伞状辅助装置 | |
CN102605773B (zh) | 注浆成型扩底钻孔灌注桩的施工方法及其挤扩装置 | |
CN203684211U (zh) | 一种钻孔灌注桩的桩头处理装置 | |
CN107178100A (zh) | 一种软土地基地下室抗浮装置及其施工工艺 | |
CN104563147B (zh) | 适用于岩溶区的组合结构桩基础及其施工方法 | |
CN102080377B (zh) | 复合锚杆及其导向施工方法 | |
CN107227795A (zh) | 型钢混凝土梁与钢管混凝土柱刚接节点 | |
CN105332376A (zh) | 液压式机械手拔桩夹紧装置及拔桩机 | |
CN205369233U (zh) | 一种管桩扩大头施工用伞状辅助装置 | |
CN106869137A (zh) | 一种混合钢筋笼及基坑支护桩 | |
CN105040693A (zh) | 端部扩大型抗浮锚杆 | |
CN106638569B (zh) | 一种提高桩承载力及稳定性的装置及方法 | |
CN205399419U (zh) | 一种灌注桩扩大头夯扩装置 | |
CN204898666U (zh) | 一种压入式后注浆中空扩孔锚杆 | |
CN203034460U (zh) | 沉管灌注桩施工用反插振动导向装置 | |
CN206941577U (zh) | 一种钢管桩连接结构 | |
CN205116154U (zh) | 一种边坡支护钢管混凝土桩 | |
CN202543908U (zh) | 注浆成型扩底钻孔灌注桩的挤扩装置 | |
CN205653821U (zh) | 一种软土地基地下室抗浮装置 | |
CN204703158U (zh) | 端部扩大型抗浮锚杆 | |
CN204163073U (zh) | 桩基钢筋笼套筒钢筋接头结构 | |
CN208039240U (zh) | 一种组合桩 | |
CN206035494U (zh) | 一种管棚施工推进器 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160511 |
|
RJ01 | Rejection of invention patent application after publication |