CN107178100A CN201610160135.3A CN201610160135A CN107178100A CN 107178100 A CN107178100 A CN 107178100A CN 201610160135 A CN201610160135 A CN 201610160135A CN 107178100 A CN107178100 A CN 107178100A
Authority
CN
China
Prior art keywords
anchor
steel tube
brace
cylindrical steel
locking bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610160135.3A
Other languages
English (en)
Inventor
蔡烽
张青青
李崇铃
徐斌
李朝晖
金国平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou Design Group Ltd
Original Assignee
Wenzhou Design Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Design Group Ltd filed Critical Wenzhou Design Group Ltd
Priority to CN201610160135.3A priority Critical patent/CN107178100A/zh
Publication of CN107178100A publication Critical patent/CN107178100A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/10Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure
    • E02D31/12Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure against upward hydraulic pressure

Abstract

一种软土地基地下室抗浮装置,其特征在于,装置包括钢套管、外钢圆管、钢绞线、上撑臂、土工布或高强度尼龙布、锚锁杆、锚臂、锚翼、内钢圆管、下撑臂和桩靴。锚臂与上撑臂、锚翼与下撑臂分别进行铰连接,锚锁杆与锚翼、上撑臂铰连接,各锚锁杆之间铺设有土工布或高强度尼龙布;外钢圆管与上撑臂焊接,内钢圆管与下撑臂焊接且置于外钢圆管内部,钢绞线连接内钢圆管,通过外圆管延伸至外部,整个装置表面涂抹防腐蚀涂料,置于钢套管并套入桩靴内。与现有技术相比,具有明显优势:与抗拔桩相比,施工方便,造价低,经济性价比高。与伞状抗拔锚相比,不论在砂性土或软土中都能产生较小初始位移和较高抗拔力,使用范围更广。

Description

一种软土地基地下室抗浮装置及其施工工艺
技术领域
本发明涉及建筑基础领域,尤其是一种软土地基地下室抗浮装置及其施工工艺。
背景技术
随着城市建设的快速发展和地上资源的有限性,充分开发利用地下空间如地下室、地铁、隧道等已成为必然趋势,作为核心问题之一的地下结构抗浮已愈显突出。目前,建筑物的抗浮问题主要采用抗拔桩和抗拔锚来解决。
抗拔桩是由桩侧的摩阻力与桩体自重来提供抗拔力,而向上拉拔力所发挥的桩侧摩阻力,与向下压力相比是有限的,对以受压性能为主的混凝土而言并无优势,若要增加桩体抗拔力,只能以增加桩周面积或桩长来增加侧摩阻力和自重,从经济角度讲性价比不高。
南京工业大学梅国雄等发明的《伞状抗拔锚》(公开号CN201031391Y),在不同地区使用后证明,在南京和北方的砂性土地区使用,该发明具有结构简单、施工方便、单锚抗拨力高,经济性价比高的优点。但在温州、宁波、杭州、上海、天津等软土地区,却出现锚杆在向上的初始拉力下,初始位移较大,而后才发挥一定的抗拔力,且抗拔力较小,但在这之前地下室混凝土却已拉裂破坏。究其原因,是因为南京及北方地下为砂性土,土质密实,伞状抗拔锚实际为六支伞骨架,骨架间的土在砂性土中,因土的剪切角大,在六个伞状翼之间可形成土拱;而在淤泥等软土中,因土的含水量高,土质松软且抗剪强度低,伞骨架在初始拉力下便形成了土体间冲切。
发明内容
本发明在伞状抗拔锚基础上进行创新改进,使其能在软土地基中,既能提供较小初始位移和较高抗拔力,而且,施工方便,经济性价比高。
本发明一种软土地基地下室抗浮装置,其特征在于,装置包括钢套管1、外钢圆管2、钢绞线3、上撑臂4、土工布或高强度尼龙布5、锚锁杆6、锚臂7、锚翼8、内钢圆管9、下撑臂10和桩靴11;锚臂与上撑臂、锚翼与下撑臂分别进行铰连接,锚锁杆与锚翼、上撑臂铰连接,各锚锁杆之间铺设有土工布或高强度尼龙布;外钢圆管与上撑臂焊接,内钢圆管与下撑臂焊接且置于外钢圆管内部,钢绞线连接内钢圆管,通过外圆管延伸至外部,整个装置表面涂抹防腐蚀涂料,置于钢套管并套入桩靴内。
本发明一种软土地基地下室抗浮装置的施工工艺,包括以下步骤:
①制作本发明装置的各个部件,钢套管1、外钢圆管2、钢绞线3、上撑臂4、土工布5、锚锁杆6、锚臂7、锚翼8、内钢圆管9、下撑臂10、桩靴11。
②将锚臂7与锚翼8,下撑臂10与锚翼8,上撑臂4与锚臂7、锚锁杆6铰连接,各锚锁杆6之间铺设有土工布或高强度尼龙布5,外钢圆管2与上撑臂4焊接,内钢圆管9与下撑臂10焊接,且置于外钢圆管2内部,钢绞线3连接内钢圆管9,并通过外圆管2延伸至外部,整个装置表面涂抹防腐蚀涂料,置于钢套管1中,前端套入桩靴11内。
③将装置运至施工现场,精确测量并放样打入点位置,采用锤击或者静压钢套管至规定标高,然后,抽离钢套管1,向上提拉钢绞线3,使锚翼8通过锚臂7依靠上撑臂4、下撑臂10张拉开,内圆钢管9逐渐上升直至锚锁杆6完全张开为止,同时各锚锁杆6之间的土工布5也完全打开,紧接着固定地面的锚索钢绞线3至外圆管2上,在外圆管2内高压注入少量的水泥浆体直至充满整个锚杆装置,回填孔洞夯实,将地面处外圆管2与后期的结构施工时锚固连接。
本发明一种软土地基地下室抗浮装置与现有技术相比,具有明显优势:与抗拔桩相比,施工方便,造价低,经济性价比高。与伞状抗拔锚相比,不论在砂性土或软土中都能产生较小初始位移和较高抗拔力,使用范围更广。
附图说明
图1为本发明实施例入土前立面示意图。
图2为本发明实施例入土后受力打开后的平面示意图。
图中:1.钢套管,2.外钢圆管,3.钢绞线,4.上撑臂,5.土工布或高强度尼龙布,6.锚锁杆,7.锚臂,8.锚翼,9.内钢圆管,10.下撑臂,11.桩靴。
具体实施方式:
根据图1和图2,本发明一个典型实施例制作过程如下:
①制作本发明装置的各个部件,钢套管1、外钢圆管2、钢绞线3、上撑臂4、土工布5、锚锁杆6、锚臂7、锚翼8、内钢圆管9、下撑臂10、桩靴11。
②将锚臂7与锚翼8,下撑臂10与锚翼8,上撑臂4与锚臂7、锚锁杆6铰连接,各锚锁杆6之间铺设有土工布5,外钢圆管2与上撑臂4焊接,内钢圆管9与下撑臂10焊接,且置于外钢圆管2内部,钢绞线3连接内钢圆管9,并通过外圆管2延伸至外部,整个装置表面涂抹防腐蚀涂料,置于钢套管1中,前端套入桩靴11内。
③将装置运至施工现场,精确测量并放样打入点位置,采用锤击或者静压钢套管至规定标高,然后,抽离钢套管1,向上提拉钢绞线3,使锚翼8通过锚臂7依靠上撑臂4、下撑臂10张拉开,内圆钢管9逐渐上升直至锚锁杆6完全张开为止,同时各锚锁杆6之间的土工布5也完全打开,紧接着固定地面的锚索钢绞线3至外圆管2上,在外圆管2内高压注入少量的水泥浆体直至充满整个锚杆装置,回填孔洞夯实,将地面处外圆管2与后期的结构施工时锚固连接。

Claims (2)

1.一种软土地基地下室抗浮装置,其特征在于,装置包括钢套管1、外钢圆管2、钢绞线3、上撑臂4、土工布或高强度尼龙布5、锚锁杆6、锚臂7、锚翼8、内钢圆管9、下撑臂10和桩靴11;锚臂与上撑臂、锚翼与下撑臂分别进行铰连接,锚锁杆与锚翼、上撑臂铰连接,各锚锁杆之间铺设有土工布或高强度尼龙布;外钢圆管与上撑臂焊接,内钢圆管与下撑臂焊接且置于外钢圆管内部,钢绞线连接内钢圆管,通过外圆管延伸至外部,整个装置表面涂抹防腐蚀涂料,置于钢套管并套入桩靴内。
2.一种软土地基地下室抗浮装置的施工工艺,包括以下步骤:
①制作本发明装置的各个部件,钢套管1、外钢圆管2、钢绞线3、上撑臂4、土工布5、锚锁杆6、锚臂7、锚翼8、内钢圆管9、下撑臂10、桩靴11。
②将锚臂7与锚翼8,下撑臂10与锚翼8,上撑臂4与锚臂7、锚锁杆6铰连接,各锚锁杆6之间铺设有土工布或高强度尼龙布5,外钢圆管2与上撑臂4焊接,内钢圆管9与下撑臂10焊接,且置于外钢圆管2内部,钢绞线3连接内钢圆管9,并通过外圆管2延伸至外部,整个装置表面涂抹防腐蚀涂料,置于钢套管1中,前端套入桩靴11内。
③将装置运至施工现场,精确测量并放样打入点位置,采用锤击或者静压钢套管至规定标高,然后,抽离钢套管1,向上提拉钢绞线3,使锚翼8通过锚臂7依靠上撑臂4、下撑臂10张拉开,内圆钢管9逐渐上升直至锚锁杆6完全张开为止,同时各锚锁杆6之间的土工布5也完全打开,紧接着固定地面的锚索钢绞线3至外圆管2上,在外圆管2内高压注入少量的水泥浆体直至充满整个锚杆装置,回填孔洞夯实,将地面处外圆管2与后期的结构施工时锚固连接。
CN201610160135.3A 2016-03-12 2016-03-12 一种软土地基地下室抗浮装置及其施工工艺 Pending CN107178100A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610160135.3A CN107178100A (zh) 2016-03-12 2016-03-12 一种软土地基地下室抗浮装置及其施工工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610160135.3A CN107178100A (zh) 2016-03-12 2016-03-12 一种软土地基地下室抗浮装置及其施工工艺

Publications (1)

Publication Number Publication Date
CN107178100A true CN107178100A (zh) 2017-09-19

Family

ID=59830130

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610160135.3A Pending CN107178100A (zh) 2016-03-12 2016-03-12 一种软土地基地下室抗浮装置及其施工工艺

Country Status (1)

Country Link
CN (1) CN107178100A (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108104134A (zh) * 2017-11-17 2018-06-01 中国建筑第八工程局有限公司 基坑斜撑装置及基坑斜撑施工方法
CN109024627A (zh) * 2018-08-15 2018-12-18 中国人民解放军军事科学院国防工程研究院 一种新型格构-锚杆-锚索复合边坡加固结构及施工方法
CN109257005A (zh) * 2018-09-10 2019-01-22 浙江宏阳新能源科技有限公司 定位装置及包含该定位装置的太阳能电池组件
CN109577325A (zh) * 2018-12-09 2019-04-05 中建五局土木工程有限公司 一种具有囊内树根状连接的承压型扩体抗浮锚杆
CN109898527A (zh) * 2019-02-28 2019-06-18 广西交通设计集团有限公司 一种竹根状互锁锚筋桩及不稳定岩坡加固的施工方法
CN111305200A (zh) * 2020-03-13 2020-06-19 古香义 一种自升式钻井平台的桩靴
CN114197497A (zh) * 2021-12-20 2022-03-18 国能大渡河流域水电开发有限公司 一种加固边坡的伞肋式微型抗滑桩及其施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002121735A (ja) * 2000-10-13 2002-04-26 Yasuhiro Fujita 軟弱地盤用、地下敷設パラシュートアンカー基礎構築工法
CN1415805A (zh) * 2002-12-12 2003-05-07 上海交通大学 船锚式注浆张开型土锚锚头
CN201031391Y (zh) * 2007-05-11 2008-03-05 南京工业大学 伞状抗拔锚
CN103967011A (zh) * 2014-05-07 2014-08-06 孔超 一种软土地层中可回收的伞状承压地锚
CN104179178A (zh) * 2014-08-28 2014-12-03 南昌工程学院 一种柔性伞状支护锚杆及用于支护土层边坡的方法
CN205653821U (zh) * 2016-03-12 2016-10-19 溫州设计集团有限公司 一种软土地基地下室抗浮装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002121735A (ja) * 2000-10-13 2002-04-26 Yasuhiro Fujita 軟弱地盤用、地下敷設パラシュートアンカー基礎構築工法
CN1415805A (zh) * 2002-12-12 2003-05-07 上海交通大学 船锚式注浆张开型土锚锚头
CN201031391Y (zh) * 2007-05-11 2008-03-05 南京工业大学 伞状抗拔锚
CN103967011A (zh) * 2014-05-07 2014-08-06 孔超 一种软土地层中可回收的伞状承压地锚
CN104179178A (zh) * 2014-08-28 2014-12-03 南昌工程学院 一种柔性伞状支护锚杆及用于支护土层边坡的方法
CN205653821U (zh) * 2016-03-12 2016-10-19 溫州设计集团有限公司 一种软土地基地下室抗浮装置

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108104134A (zh) * 2017-11-17 2018-06-01 中国建筑第八工程局有限公司 基坑斜撑装置及基坑斜撑施工方法
CN109024627A (zh) * 2018-08-15 2018-12-18 中国人民解放军军事科学院国防工程研究院 一种新型格构-锚杆-锚索复合边坡加固结构及施工方法
CN109257005A (zh) * 2018-09-10 2019-01-22 浙江宏阳新能源科技有限公司 定位装置及包含该定位装置的太阳能电池组件
CN109577325A (zh) * 2018-12-09 2019-04-05 中建五局土木工程有限公司 一种具有囊内树根状连接的承压型扩体抗浮锚杆
CN109577325B (zh) * 2018-12-09 2020-11-20 中建五局土木工程有限公司 一种具有囊内树根状连接件的承压型扩体抗浮锚杆
CN109898527A (zh) * 2019-02-28 2019-06-18 广西交通设计集团有限公司 一种竹根状互锁锚筋桩及不稳定岩坡加固的施工方法
CN111305200A (zh) * 2020-03-13 2020-06-19 古香义 一种自升式钻井平台的桩靴
CN114197497A (zh) * 2021-12-20 2022-03-18 国能大渡河流域水电开发有限公司 一种加固边坡的伞肋式微型抗滑桩及其施工方法

Similar Documents

Publication Publication Date Title
CN107178100A (zh) 一种软土地基地下室抗浮装置及其施工工艺
CN101761074B (zh) 提高管桩端承力及抗拔力的方法
CN207079577U (zh) 预应力管桩
CN203514303U (zh) 后注浆扩底抗拔微型桩
CN104563147B (zh) 适用于岩溶区的组合结构桩基础及其施工方法
CN109930609A (zh) 一种用于上软下硬地层的排桩复合支护结构及其施工方法
CN103603379A (zh) 抗浮水泥土桩和抗浮锚杆相结合的抗浮体系及其施工工艺
CN209703496U (zh) 一种自张式机械锚杆
CN110185413A (zh) 一种在易塌孔地层形成稳定注浆通道的方法
CN105220714B (zh) 内置锚索灌芯复合式预应力管桩抗浮结构施工方法
CN201835276U (zh) 预制扩孔桩
CN203613568U (zh) 抗浮水泥土桩和抗浮锚杆相结合的抗浮体系
CN103410144B (zh) 预应力钢筋嵌岩灌注桩及施工方法
CN101949151A (zh) 一种可回收的锁定式锚杆及其施工方法
CN205653821U (zh) 一种软土地基地下室抗浮装置
CN102134861B (zh) 土体内预制桩试桩方法
CN102235004A (zh) 一种可回收的端承摩擦型锚杆及其施工方法
CN203583501U (zh) 一种抵抗岩体滑动的深层抗剪装置
CN1051349C (zh) 现场灌注桩的桩端压浆的施工方法及桩端压力注浆压浆管
CN206693220U (zh) 人工挖孔桩抗拔结构
CN201661305U (zh) 一种可回收的摩擦型锚杆
CN210266039U (zh) 主动弹射式桩端后注浆阀
CN204311463U (zh) 一种用于边坡加固的复合锚杆桩
CN204080797U (zh) 一种phc桩与ytsc桩的复合桩
CN208604615U (zh) 一种用于沉井施工的加压下沉装置

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170919

RJ01 Rejection of invention patent application after publication