CN106869137A - 一种混合钢筋笼及基坑支护桩 - Google Patents
一种混合钢筋笼及基坑支护桩 Download PDFInfo
- Publication number
- CN106869137A CN106869137A CN201710107570.4A CN201710107570A CN106869137A CN 106869137 A CN106869137 A CN 106869137A CN 201710107570 A CN201710107570 A CN 201710107570A CN 106869137 A CN106869137 A CN 106869137A
- Authority
- CN
- China
- Prior art keywords
- steel reinforcement
- reinforcement cage
- foundation pit
- gfrp muscle
- pit supporting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Piles And Underground Anchors (AREA)
Abstract
本发明提供一种混合钢筋笼及基坑支护桩,所述钢筋笼至少在其主要受力侧沿其轴线固定有GFRP筋。与现有技术相比,通过在钢筋笼受力面固定GFRP筋,利用GFRP筋材作为基坑支护桩抵抗弯矩所需配筋,以达到充分利用GFRP筋材较高的抗拉强度、较低的重量和造价的目的。
Description
技术领域
本发明涉及基坑支护技术领域,具体来说是一种混合钢筋笼及基坑支护桩。
背景技术
对于地下工程,尤其是市政建设的地下工程,由于干扰因素多,施工难度大。
地下工程往往涉及基坑开挖,而城市环境很难满足放坡开挖的条件,所以,一般采用有支护的开挖。基坑支护的形式有多种,根据地质、水文情况不同,可以选择地连墙或排桩支护或其他支护,也可以所多种支护的组合形式。由于地连墙造价高,所以,应用比较普遍的为钻孔灌注桩。
钻孔灌注桩,即先钻孔、清孔、下钢筋笼、浇筑混凝土。待支护桩养护合格后,即可开挖。在开挖过程中,由于基坑内的土被挖走后,支护桩受到基坑外的主动土压力,致使支护桩受力,其中的抵抗弯矩性能是其重点。所以,对于支护桩的钢筋笼,要求其具有一定的抗弯能力。而现有技术中,钢筋笼均采用钢筋通过加工、焊接制成。但护桩中采用传统制作的钢筋笼,配筋量大、造价高、需要破除时破除难度大。
发明内容
本发明的目的是为了充分利用普通钢筋和GFRP筋材的各自特点,将GFRP筋材的抗拉强度高、重量轻、造价相对较低等诸多优点利用起来,解决上述问题。
为了实现上述目的,本发明的技术方案如下:
一种混合钢筋笼,应用于基坑中;所述钢筋笼至少在其朝向基坑外的一侧沿其轴线固定有GFRP筋。
优选的,所述钢筋笼包括由箍筋和架立筋形成的架立钢筋笼;在所述架立钢筋笼朝向基坑外和基坑内的两侧均沿其轴向固定有GFRP筋。
优选的,所述箍筋为螺旋箍筋,架立筋沿螺旋箍筋轴向固定在沿基坑壁方向的两侧。
优选的,所述架立钢筋笼朝向基坑外和朝向基坑内的GFRP筋对称设置,GFRP筋材的布置方式根据计算要求而定。
优选的,所述架立筋与螺旋箍筋采用焊接固定,所述GFRP筋与螺旋箍筋采用绑扎固定。
本发明还提供一种基坑支护桩,包括上述的混合钢筋笼。
优选的,支护桩桩头破除点向下一段距离的螺旋箍筋段为加密箍筋段。
优选的,在所述加密段的箍筋上还固定入冠梁的连接钢筋笼。
优选的,所述GFRP筋上端伸至桩头破除点处。
优选的,所述连接钢筋笼的纵向筋与GFRP筋具有一定搭接长度。
本发明与现有技术相比,具有以下有益效果:
通过在钢筋笼受力面固定GFRP筋,利用GFRP筋材作为基坑支护桩抵抗弯矩所需配筋,以达到充分利用GFRP筋材较高的抗拉强度、较低的重量和造价。尤其是在钢筋笼朝向坑内和坑外的两侧均固定有GFRP筋,使得支护桩抗弯强度更高,重量更轻,辅以支撑或锚拉结构,支护效果更好。
应用上述钢筋笼的支护桩,为了保护GFRP筋不被破坏,GFRP筋仅伸至桩头破除点,并通过“笼中笼”的结构,实现支护桩与冠梁的连接。
通过箍筋的加密段,解决GFRP筋材与内部钢筋笼传力问题。
附图说明
图1为本发明实施例1的断面结构示意图;
图2为实施例2的立面结构示意图。
具体实施方式
为使对本发明的结构特征及所达成的功效有更进一步的了解与认识,用以较佳的实施例及附图配合详细的说明,说明如下:
实施例1
一种混合钢筋笼,包括由箍筋2和架立筋3形成的架立钢筋笼,至少在架立钢筋笼主要受力侧沿其轴线固定有多根GFRP筋1。本实施例提供的钢筋笼在架立钢筋笼朝向基坑外和基坑内的两侧均沿其轴向固定有多根GFRP筋1。
箍筋2为螺旋箍筋,本实施例将螺旋箍筋的圆周面沿其轴线分为多个部分,具体可根据计算结果来划分。本实施例将螺旋箍筋的圆周面分为4等分,朝向基坑内和基坑外的两等分圆周面用以固定GFRP筋1,沿基坑壁方向的两等分用以固定架立筋3。每等分内的架立筋3或GFRP筋1数量相等。每等分内的架立筋3或GFRP筋1的根数根据钢筋笼的直径以及地质情况计算而定。
其中,架立筋3即为普通的钢筋。与螺旋箍筋采用焊接固定,GFRP筋1与螺旋箍筋采用绑扎固定。
本实施例中使用的GFRP筋1为通长的GFRP筋,必要时可以搭接,搭接长度应满足相关规定。
实施例2
一种基坑支护桩,包括如实施例1所述的混合钢筋笼。由于在破除桩头时,会对桩身造成一定影响,所以,本实施例在对护桩桩头破除点向下一段距离的螺旋箍筋段进行加密,形成箍筋加密段21。为了避免破除桩头时对GFRP筋1造成影响,本实施例中的GFRP筋1上端仅伸至桩头破除点处。为了与冠梁4连接,本实施例还在加密段的箍筋2上还固定入冠梁4的连接钢筋笼5,形成“笼中笼”结构。其中,连接钢筋笼5的纵向筋与GFRP筋1具有一定搭接长度。
以上显示和描述了本发明的基本原理、主要特征和本发明的优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是本发明的原理,在不脱离本发明精神和范围的前提下本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明的范围内。本发明要求的保护范围由所附的权利要求书及其等同物界定。
Claims (10)
1.一种混合钢筋笼,应用于基坑支护;其特征在于:所述钢筋笼至少在其朝向基坑外的一侧沿其轴线固定有GFRP筋。
2.根据权利要求书1所述的一种混合钢筋笼,其特征在于:所述钢筋笼包括由箍筋和架立筋形成的架立钢筋笼;在所述架立钢筋笼朝向基坑外和基坑内的两侧均沿其轴向固定有GFRP筋。
3.根据权利要求2所述的一种混合钢筋笼,其特征在于:所述箍筋为螺旋箍筋,架立筋沿螺旋箍筋轴向固定在沿基坑壁方向。
4.根据权利要求2所述的一种混合钢筋笼,其特征在于:所述架立钢筋笼朝向基坑外和朝向基坑内的GFRP筋对称设置。
5.根据权利要求3或4所述的一种混合钢筋笼,其特征在于:所述架立筋与螺旋箍筋采用焊接固定,所述GFRP筋与螺旋箍筋采用绑扎固定。
6.一种基坑支护桩,其特征在于,包括混合钢筋笼;所述混合钢筋笼为权利要求1至5任一所述的混合钢筋笼。
7.根据权利要求6所述的一种基坑支护桩,其特征在于:支护桩桩头破除点向下一段距离的螺旋箍筋段为加密箍筋段。
8.根据权利要求7所述的一种基坑支护桩,其特征在于:在所述加密段的箍筋上还固定入冠梁的连接钢筋笼。
9.根据权利要求8所述的一种基坑支护桩,其特征在于:所述GFRP筋上端伸至桩头破除点处。
10.根据权利要求9所述的一种基坑支护桩,其特征在于:所述连接钢筋笼的纵向筋与GFRP筋具有一定搭接长度。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710107570.4A CN106869137A (zh) | 2017-02-27 | 2017-02-27 | 一种混合钢筋笼及基坑支护桩 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710107570.4A CN106869137A (zh) | 2017-02-27 | 2017-02-27 | 一种混合钢筋笼及基坑支护桩 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106869137A true CN106869137A (zh) | 2017-06-20 |
Family
ID=59167712
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710107570.4A Pending CN106869137A (zh) | 2017-02-27 | 2017-02-27 | 一种混合钢筋笼及基坑支护桩 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106869137A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110130359A (zh) * | 2019-05-10 | 2019-08-16 | 中国建筑西南勘察设计研究院有限公司 | 一种bfrp筋材混合配筋支护桩及其施工方法 |
CN110835916A (zh) * | 2019-10-23 | 2020-02-25 | 江苏兴厦建设工程集团有限公司 | 一种排桩gfrp筋组合支护结构及支护方法 |
CN114875895A (zh) * | 2022-05-19 | 2022-08-09 | 中国五冶集团有限公司 | 一种地下支护桩玻璃纤维筋-钢筋笼及其连接方法 |
CN115126159A (zh) * | 2022-06-24 | 2022-09-30 | 保利长大工程有限公司 | 一种玻璃纤维桩基筋笼及其施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040237435A1 (en) * | 2003-06-02 | 2004-12-02 | Yurkevich Engineering Bureau Ltd. | Reinforced-concrete column in the soil pit and method of its construction |
CN203498827U (zh) * | 2013-10-22 | 2014-03-26 | 中铁十三局集团第五工程有限公司 | 一种用于地下工程施工的抗浮玻璃纤维筋钢筋笼 |
CN104612133A (zh) * | 2015-01-15 | 2015-05-13 | 安徽省建筑科学研究设计院 | 一种玻璃纤维筋与钢筋混合配筋的混凝土预制桩 |
CN105625298A (zh) * | 2016-03-16 | 2016-06-01 | 中冶集团武汉勘察研究院有限公司 | 采用玻璃纤维筋搭接套铣的地下连续墙结构及其施工方法 |
CN106087979A (zh) * | 2016-07-28 | 2016-11-09 | 安徽省建筑科学研究设计院 | 一种用于混凝土预制桩中的钢筋骨架笼 |
-
2017
- 2017-02-27 CN CN201710107570.4A patent/CN106869137A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040237435A1 (en) * | 2003-06-02 | 2004-12-02 | Yurkevich Engineering Bureau Ltd. | Reinforced-concrete column in the soil pit and method of its construction |
CN203498827U (zh) * | 2013-10-22 | 2014-03-26 | 中铁十三局集团第五工程有限公司 | 一种用于地下工程施工的抗浮玻璃纤维筋钢筋笼 |
CN104612133A (zh) * | 2015-01-15 | 2015-05-13 | 安徽省建筑科学研究设计院 | 一种玻璃纤维筋与钢筋混合配筋的混凝土预制桩 |
CN105625298A (zh) * | 2016-03-16 | 2016-06-01 | 中冶集团武汉勘察研究院有限公司 | 采用玻璃纤维筋搭接套铣的地下连续墙结构及其施工方法 |
CN106087979A (zh) * | 2016-07-28 | 2016-11-09 | 安徽省建筑科学研究设计院 | 一种用于混凝土预制桩中的钢筋骨架笼 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110130359A (zh) * | 2019-05-10 | 2019-08-16 | 中国建筑西南勘察设计研究院有限公司 | 一种bfrp筋材混合配筋支护桩及其施工方法 |
CN110835916A (zh) * | 2019-10-23 | 2020-02-25 | 江苏兴厦建设工程集团有限公司 | 一种排桩gfrp筋组合支护结构及支护方法 |
CN114875895A (zh) * | 2022-05-19 | 2022-08-09 | 中国五冶集团有限公司 | 一种地下支护桩玻璃纤维筋-钢筋笼及其连接方法 |
CN115126159A (zh) * | 2022-06-24 | 2022-09-30 | 保利长大工程有限公司 | 一种玻璃纤维桩基筋笼及其施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106869137A (zh) | 一种混合钢筋笼及基坑支护桩 | |
CN103510540B (zh) | 浆砌片石挡土墙加固施工方法及其结构 | |
CN104452784B (zh) | 一种用于边坡加固的复合锚杆桩及其施工工艺 | |
JP6279945B2 (ja) | 土構造物ののり面表層すべり対策工法 | |
CN104314585A (zh) | 隧道全断面预加固方法及结构 | |
CN106498950A (zh) | 锚头置于桩身的深基坑桩锚支护体系及其实施方法 | |
CN106759376A (zh) | 用于临近既有地下结构的基坑桩锚支护体系及其施工方法 | |
CN206599785U (zh) | 一种排桩锚拉水泥土桩连续墙支护结构 | |
JP5136270B2 (ja) | 合成摩擦杭の造成方法 | |
CN109113749A (zh) | 软弱围岩四线超大断面铁路隧道施工方法 | |
CN104563147B (zh) | 适用于岩溶区的组合结构桩基础及其施工方法 | |
CN108316290A (zh) | 无承台的一柱一桩结构及其施工方法 | |
CN102002942A (zh) | 空芯钻桩及钢管水泥土复合桩成桩施工工艺 | |
KR101144312B1 (ko) | 강관말뚝 선단확대장치 및 그를 이용한 강관말뚝 시공방법 | |
CN205822200U (zh) | 一种复合钢管斜桩基坑围护结构 | |
CN207297028U (zh) | 用于近距离下穿桩基础的钢纤维混凝土管片结构 | |
CN106223332A (zh) | 复合式混凝土桩 | |
CN110067245A (zh) | 一种可扩径加固的螺旋自钻式钢桩及其建造方法 | |
CN108277798A (zh) | 预应力型钢支护桩及其施工方法 | |
CN204311463U (zh) | 一种用于边坡加固的复合锚杆桩 | |
CN204608771U (zh) | 混凝土桩及复合式混凝土桩 | |
CN106988327A (zh) | 一种竖向控制注浆钢花管桩基托梁挡墙结构及其施工方法 | |
CN103266608B (zh) | 桁架组合式抗滑锚杆 | |
CN208039240U (zh) | 一种组合桩 | |
JP6198474B2 (ja) | アンカーの補強構造 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170620 |
|
RJ01 | Rejection of invention patent application after publication |