- CN105565201A CN105565201A CN201610086933.6A CN201610086933A CN105565201A CN 105565201 A CN105565201 A CN 105565201A CN 201610086933 A CN201610086933 A CN 201610086933A CN 105565201 A CN105565201 A CN 105565201A
- Authority
- CN
- China
- Prior art keywords
- jack
- vertical
- baseplate
- ball valve
- pushing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66F—HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
- B66F3/00—Devices, e.g. jacks, adapted for uninterrupted lifting of loads
- B66F3/24—Devices, e.g. jacks, adapted for uninterrupted lifting of loads fluid-pressure operated
- B66F3/25—Constructional features
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mechanical Engineering (AREA)
- Structural Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
具备三向同步顶推功能的千斤顶,包括垂直千斤顶底板、垂直千斤顶、垂直千斤顶上的油嘴,其特征在于:在千斤顶基座板的三分之二位置处设置有滑槽,另外三分之一的位置处设置有纵向水平千斤顶顶推座,在所述滑槽上设置垂直千斤顶底板,在所述垂直千斤顶底板纵向一侧设置受力支座,另一侧设置垂直千斤顶,所述顶推座与所述受力支座之间设置有纵向水平千斤顶;在垂直千斤顶底板横向两侧的千斤顶基座板上设置有两个横向纠偏反力架,在两者之间安装横向纠偏千斤顶。本发明集顶推设备自成一体,为大型建筑物整体移动提供一种同时具备纵、横、竖三向顶推功能的专用顶推工具,实现大型建筑物体在平面、坡度和曲线路径条件下整体精准移动施工的优点。
Description
技术领域
本发明涉及对不能拆卸的大型建筑物体整体移动工具,确切地说是一种具备三向同步顶推功能的千斤顶。
背景技术
目前,在各种大型工程建设中,涉及到规划红线内的古老建筑物,如珍贵文物、历史文化建筑物。为实现对文物保护的目的,需采取整体移动到规划红线外的办法对文物进行保护。在整体移动过程中,传统的移动方法通常采取纵、横向拖拉法,需要将大型建筑物体整体顶升后,在其下方设置轨道,在轨道上铺设滚洞,用卷扬机将移动的物体纵向拖拉到位。随着千斤顶技术的应用,千斤顶代替拖拉中的卷扬机,从而减小了起动时的冲击作用。然而,普通的千斤顶只具备单向顶推的功能,对顶升、纵移、横移物体需进一步设置轨道、铺设滚洞、设置顶推点,工序繁多、推进速度慢,要将一座大型建筑物体,整体精准移动一段距离,是一件非常艰巨的工程,如果移动路径有一定坡度,那施工过程就更加艰难。
特别是当前我国的高铁、高速公路建设中,反复跨越铁路、公路、河流的跨线桥梁不断出现,在不便采用支架现浇、不利于架桥机作业、不具备吊装条件的地方进行异形跨线桥梁施工时,需要在岸边先完成梁板的整体预制,再采用顶推的技术将整个梁板精准顶推到位的时候,单向千斤顶已经无法满足施工的要求,需要具备多向顶推功能的千斤顶才能满足工程施工的需求。
发明内容
本发明的目的在于:提供一种具备三向同步顶推功能的千斤顶,顶推设备自成一体,为大型建筑物整体移动提供一种同时具备纵、横、竖三向顶推功能的专用顶推工具,满足大型建筑物体在平面、坡度和曲线路径条件下整体精准移动施工需要。
本发明的目的是通过实施下述技术方案来实现的:
具备三向同步顶推功能的千斤顶,包括垂直千斤顶底板、垂直千斤顶、垂直千斤顶上的油嘴,其特征在于:在千斤顶基座板的三分之二位置处设置有滑槽,另外三分之一的位置处设置有纵向水平千斤顶顶推座,在所述滑槽上设置垂直千斤顶底板,在所述垂直千斤顶底板纵向一侧设置受力支座,另一侧设置垂直千斤顶,在垂直千斤顶上设置有水平油嘴;
所述顶推座与所述受力支座之间设置纵向水平千斤顶,在所述水平千斤顶上设置有垂直油嘴;
在垂直千斤顶底板横向两侧的千斤顶基座板上设置有两个横向纠偏反力架,在所述横向纠偏反力架与所述垂直千斤顶横向两侧分别安装两个横向纠偏千斤顶。
附加技术特征:
1)在垂直千斤顶上端设置有凹形球阀槽,在所属凹形球阀槽上端的设置有凸形球阀,在所述凸形球阀顶端设置有顶盘。
本发明的优点是:提供一种具备三向同步顶推功能的千斤顶,顶推设备自成一体,为大型建筑物整体移动提供一种同时具备纵、横、竖三向顶推功能的专用顶推工具,实现大型建筑物体在平面、坡度和曲线路径条件下整体精准移动施工的优点。
附图说明
图1、本发明主视图;
图2、本发明俯视图。
图中标记:1、为千斤顶基座板,2、为千斤顶基座板上的滑槽,3、为垂直千斤顶底端的底板,4、垂直千斤顶底板上的受力支座,5、为纵向水平千斤顶顶推座,6、为纵向水平千斤顶,7、为垂直千斤顶,8、为垂直千斤顶上端的凹形球阀槽,9、为凹形球阀槽上端的凸形球阀,10、为凸形球阀顶端设置的顶盘,11、为纵向水平千斤顶上的垂直油嘴,12、为垂直千斤顶上的水平油嘴,13、为千斤顶基座板上的横向纠偏反力架,14、为横向纠偏千斤顶。
具体实施方式
实施例1:A型具备三向同步顶推功能的千斤顶
包括垂直千斤顶底板、垂直千斤顶、垂直千斤顶上的油嘴,其特征在于:在千斤顶基座板1的三分之二位置处设置有滑槽2,另外三分之一的位置处设置有纵向水平千斤顶顶推座5,在所述滑槽上设置垂直千斤顶底板3,在所述垂直千斤顶底板纵向一侧设置受力支座4,另一侧设置垂直千斤顶7,在垂直千斤顶上设置有水平油嘴12;
所述顶推座5与所述受力支座4之间设置纵向水平千斤顶6,在所述水平千斤顶上设置有垂直油嘴11。
在垂直千斤顶7底板横向两侧的千斤顶基座板1上设置有两个横向纠偏反力架13,在所述横向纠偏反力架13与所述垂直千斤顶7横向两侧分别安装两个横向纠偏千斤顶14。
实施例2:B型具备三向同步顶推功能的千斤顶
本型千斤顶与A型千斤顶基本相同,区别仅在于:在垂直千斤顶7上端设置有凹形球阀槽8,在所属凹形球阀槽上端的设置有凸形球阀9,在所述凸形球阀9顶端设置有顶盘10。
Claims (2)
1.具备三向同步顶推功能的千斤顶,包括垂直千斤顶底板、垂直千斤顶、垂直千斤顶上的油嘴,其特征在于:在千斤顶基座板(1)的三分之二位置处设置有滑槽(2),另外三分之一的位置处设置有纵向水平千斤顶顶推座(5),在所述滑槽上设置垂直千斤顶底板(3),在所述垂直千斤顶底板纵向一侧设置受力支座(4),另一侧设置垂直千斤顶(7),在垂直千斤顶上设置有水平油嘴(12);
所述顶推座(5)与所述受力支座(4)之间设置纵向水平千斤顶(6),在所述水平千斤顶上设置有垂直油嘴(11);
在垂直千斤顶(7)底板横向两侧的千斤顶基座板(1)上设置有两个横向纠偏反力架(13),在所述横向纠偏反力架(13)与所述垂直千斤顶(7)横向两侧分别安装两个横向纠偏千斤顶(14)。
2.按照权利要求1所述的具备三向同步顶推功能的千斤顶,其特征在于:在垂直千斤顶(7)上端设置有凹形球阀槽(8),在所属凹形球阀槽上端的设置有凸形球阀(9),在所述凸形球阀(9)顶端设置有顶盘(10)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610086933.6A CN105565201A (zh) | 2016-02-16 | 2016-02-16 | 具备三向同步顶推功能的千斤顶 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610086933.6A CN105565201A (zh) | 2016-02-16 | 2016-02-16 | 具备三向同步顶推功能的千斤顶 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105565201A true CN105565201A (zh) | 2016-05-11 |
Family
ID=55875929
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610086933.6A Pending CN105565201A (zh) | 2016-02-16 | 2016-02-16 | 具备三向同步顶推功能的千斤顶 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105565201A (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108004934A (zh) * | 2017-12-25 | 2018-05-08 | 宋振辉 | 安全落梁自锁式多向纠偏液压装置及其使用方法 |
CN108408634A (zh) * | 2018-04-16 | 2018-08-17 | 山东国舜建设集团有限公司 | 一种锥段液压千斤顶 |
CN108560429A (zh) * | 2017-09-18 | 2018-09-21 | 贵州路桥集团有限公司 | 步履顶推装置及顶推方法 |
CN110104598A (zh) * | 2019-05-17 | 2019-08-09 | 江苏东尚住宅工业有限公司 | 一种超大吨位重物水平移动装置及方法 |
CN112227203A (zh) * | 2019-07-15 | 2021-01-15 | 泰州市荣美液压机械制造有限公司 | 一种多向调位液压装置及其控制方法 |
CN114775451A (zh) * | 2022-04-25 | 2022-07-22 | 中铁十局集团青岛工程有限公司 | 一种用于小型钢箱梁施工的顶推装置 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2228073Y (zh) * | 1995-05-12 | 1996-05-29 | 洪茂雄 | 可组立千斤顶的支撑架结构 |
FR2783514A3 (fr) * | 1998-09-23 | 2000-03-24 | Michael Hung | Unite hydraulique de levage rapide utilisee dans un verin |
CN204000614U (zh) * | 2014-04-10 | 2014-12-10 | 宏润建设集团股份有限公司 | 架设桥梁的三向移位器 |
CN204981011U (zh) * | 2015-07-29 | 2016-01-20 | 厦门理工学院 | 一种三维千斤顶 |
CN205328513U (zh) * | 2016-02-16 | 2016-06-22 | 四川川交路桥有限责任公司 | 具备三向同步顶推功能的千斤顶 |
-
2016
- 2016-02-16 CN CN201610086933.6A patent/CN105565201A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2228073Y (zh) * | 1995-05-12 | 1996-05-29 | 洪茂雄 | 可组立千斤顶的支撑架结构 |
FR2783514A3 (fr) * | 1998-09-23 | 2000-03-24 | Michael Hung | Unite hydraulique de levage rapide utilisee dans un verin |
CN204000614U (zh) * | 2014-04-10 | 2014-12-10 | 宏润建设集团股份有限公司 | 架设桥梁的三向移位器 |
CN204981011U (zh) * | 2015-07-29 | 2016-01-20 | 厦门理工学院 | 一种三维千斤顶 |
CN205328513U (zh) * | 2016-02-16 | 2016-06-22 | 四川川交路桥有限责任公司 | 具备三向同步顶推功能的千斤顶 |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108560429A (zh) * | 2017-09-18 | 2018-09-21 | 贵州路桥集团有限公司 | 步履顶推装置及顶推方法 |
CN108004934A (zh) * | 2017-12-25 | 2018-05-08 | 宋振辉 | 安全落梁自锁式多向纠偏液压装置及其使用方法 |
CN108408634A (zh) * | 2018-04-16 | 2018-08-17 | 山东国舜建设集团有限公司 | 一种锥段液压千斤顶 |
CN108408634B (zh) * | 2018-04-16 | 2023-09-12 | 山东国舜建设集团有限公司 | 一种锥段液压千斤顶 |
CN110104598A (zh) * | 2019-05-17 | 2019-08-09 | 江苏东尚住宅工业有限公司 | 一种超大吨位重物水平移动装置及方法 |
CN112227203A (zh) * | 2019-07-15 | 2021-01-15 | 泰州市荣美液压机械制造有限公司 | 一种多向调位液压装置及其控制方法 |
CN114775451A (zh) * | 2022-04-25 | 2022-07-22 | 中铁十局集团青岛工程有限公司 | 一种用于小型钢箱梁施工的顶推装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105565201A (zh) | 具备三向同步顶推功能的千斤顶 | |
CN103669227B (zh) | 一种桥梁钢-混结合段钢箱梁滑移定位方法 | |
CN107151980A (zh) | 大跨度钢箱梁可升降自行式连续顶推系统及其施工方法 | |
CN205328513U (zh) | 具备三向同步顶推功能的千斤顶 | |
CN103696374B (zh) | 平曲线段大跨简支钢桁梁悬臂架设方法 | |
CN102587229B (zh) | 一种轨排接头及制造安装方法 | |
CN106202766A (zh) | 地面出入式盾构法隧道施工引起的土体垂直变形计算方法 | |
CN102155230B (zh) | 基于圆坐标的隧道曲线段放样方法 | |
CN102433827A (zh) | 一种试车场高速环道路面施工放样方法 | |
CN104895035A (zh) | 垂直升船机大型承船厢高效安装方法及安装定位辅助工装装置 | |
CN106246186A (zh) | 一种竖井掘进机导向控制及调整方法 | |
CN105220718A (zh) | 一种建筑施工对邻近既有隧道的影响预测定方法 | |
CN103344214B (zh) | 一种1.6次抛物线型特大桥墩测量及墩身线形控制方法 | |
CN209178837U (zh) | 大跨度斜交异形钢箱梁顶推动结构 | |
CN103090107A (zh) | 矩形大断面钢结构拼装临时支撑管节顶进机构 | |
CN203259122U (zh) | 一种有关地铁隧道内的疏散平台的测量装置 | |
CN205276273U (zh) | 一种土木工程施工用空心桩体 | |
CN204662408U (zh) | 垂直升船机大型承船厢高效安装定位辅助工装装置 | |
CN104006798A (zh) | 墩柱垂直度测量仪 | |
CN204298736U (zh) | 一种带有定位结构的钢塔柱 | |
CN202830950U (zh) | 铁路门式框架桥顶进限位滑道 | |
CN203893846U (zh) | 墩柱垂直度测量仪 | |
CN203034378U (zh) | 横向调节限位装置 | |
CN209620044U (zh) | 一种移动式自适应钢支撑 | |
CN209603113U (zh) | 一种下穿铁路框架桥地基加固装置及施工装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |