CN105544529B - Self-locking prefabricated pile connecting device and pile connecting method thereof - Google Patents
Self-locking prefabricated pile connecting device and pile connecting method thereof Download PDFInfo
- Publication number
- CN105544529B CN105544529B CN201610070562.2A CN201610070562A CN105544529B CN 105544529 B CN105544529 B CN 105544529B CN 201610070562 A CN201610070562 A CN 201610070562A CN 105544529 B CN105544529 B CN 105544529B
- Authority
- CN
- China
- Prior art keywords
- pile
- prefabricated pile
- connector
- connection deck
- reinforcing bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims description 11
- 230000003014 reinforcing effect Effects 0.000 claims description 29
- 210000003205 muscle Anatomy 0.000 claims description 11
- 238000003780 insertion Methods 0.000 claims description 5
- 230000037431 insertion Effects 0.000 claims description 5
- 238000010276 construction Methods 0.000 abstract description 5
- 238000007789 sealing Methods 0.000 abstract description 3
- 238000003466 welding Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 150000002500 ions Chemical class 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 240000002853 Nelumbo nucifera Species 0.000 description 1
- 235000006508 Nelumbo nucifera Nutrition 0.000 description 1
- 235000006510 Nelumbo pentapetala Nutrition 0.000 description 1
- 238000004873 anchoring Methods 0.000 description 1
- 238000010923 batch production Methods 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000011083 cement mortar Substances 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000009432 framing Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 239000003755 preservative agent Substances 0.000 description 1
- 230000002335 preservative effect Effects 0.000 description 1
- 238000007634 remodeling Methods 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 230000032258 transport Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/52—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
- E02D5/523—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
- E02D5/526—Connection means between pile segments
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/20—Miscellaneous comprising details of connection between elements
Abstract
The invention discloses a self-locking prefabricated pile connecting device which comprises a connecting clamping seat and a connector fit with the connecting clamping seat. The collecting clamping seat is pre-buried in one end of a prefabricated pile, the connector is arranged at the other end of the prefabricated pile, and the connector is of a T-shaped structure. A connecting cavity is formed in the connecting clamping seat, an opening of the connecting cavity extends inwards in the radial direction to form a check block, sealing plates are arranged on the parts, located on the two sides of the connecting cavity, of the connecting clamping seat respectively, and a guide sliding plate is arranged on the sealing plate on at least one side in an inclined mode. The connector is inserted in the connecting cavity of the connecting clamping seat and rotates under the action of the guide sliding plate to form self-locking with the check block. The self-locking prefabricated pile connecting device has the advantages that the structure is simple, connection is convenient, quick pile connection can be achieved on a construction site, and the pile connecting efficiency can be greatly improved.
Description
Technical field
The present invention relates to prefabricated pile interconnection technique field, especially a kind of self-locking prefabricated pile attachment means and its pile extension side
Method.
Background technology
Using the prefabricated concrete-pile of batch production more than present foundation pile, it is possible to achieve mass production, will be prefabricated during construction
Stake transports building-site to, and stake is delivered into designed elevation using modes such as hammering, static pressure, bears the lotus of top buildings or structures transmission
Carry, successively be formed by connecting prefabricated pile one using measures such as welding, mechanical connection, anchor slurries by its foundation pile.
At present, the topmost form of preformed pile connecting is to be welded to connect, by lower section sunk pile to the position of 1m or so from the ground
Put, the stake of upper section is lifted to the stake of lower section, welding is started after adjustment, each weld time is about 40 minutes or so, entirely
The holdup time is long in the earth formation for pile body, easily causes pile sinking difficulty, or even do not reach expected design object;Section stake weldering up and down
After the completion of connecing, connector temperature is higher, and during pile sinking, underground water is met in junction portion suddenly, pile crown is quenched, and weld seam becomes fragile, and directly affects
The stress performance of prefabricated pile;In addition, pile sinking scene is typically open work, in joint welding, influenceed by rain, wind,
Weldquality is difficult guarantee, is hidden some dangers for pile extension, can also directly affect the quality of pile foundation;When wind and rain is larger, it is impossible to construct, shadow
Ring construction speed and efficiency;Additionally, after joint of precast piles welding, it is difficult to carry out preservative treatment, there is corrosive ions geology ring
Under border, joint durability should not ensure.
Existing foundation pile, prefabricated pile is mainly taken welded reinforcement or concrete on end plate to fill out core and is anchored with the connection of cushion cap
The formal layout of reinforcing bar, because by the larger factor of stake inner core cleaning difficulty, concrete is filled out core quality and is difficult to ensure that.Prefabricated
During stake resistance to plucking, wadding weft variation failure is easily caused, prefabricated pile framing connection is unreliable, and on the other hand, concrete fills out core anchoring
There is larger eccentric throw in reinforcing bar, stress is unreasonable with reinforcing bar in prefabricated pile;Welded reinforcement is due to the skill by welder on end plate
The influence of each side such as art level, weather, construction technology, inefficiency, quality is difficult to ensure.
In addition, prefabricated staking has larger eccentric throw after being commonly present the bar connecting of stake and stake, stake and cushion cap, or reinforcing bar is received
, by indirect transfers such as end plates, the stress of prefabricated pile is not reasonable, can cause the waste of material for power.
The content of the invention
The technical problems to be solved by the invention are directed to the present situation of prior art, there is provided simple structure, easy to connect, hold
Loading capability is strong, and can at the construction field (site) realize a kind of self-locking prefabricated pile attachment means of quick pile extension, and its pile extension method is simple,
Pile extension efficiency high.
The present invention solve the technical scheme that is used of above-mentioned technical problem for:
A kind of self-locking prefabricated pile attachment means, including connect deck and the connection being adapted with the connection deck
Head, connection deck is embedded in one end of prefabricated pile in advance, and connector is arranged at the other end of prefabricated pile, the T-shaped structure of connector;Connection
Connecting cavity is formed with deck, is extended radially inwardly at the opening of the connecting cavity and is formed with block, the company is located on connection deck
The both sides for connecing chamber are respectively arranged with closed plate, are at least tiltedly installed with blade fin in the closed plate of side;Connector insertion connects
Connect in the connecting cavity of deck, produced rotation to form self-locking with block by blade fin effect.
It is optimization above-mentioned technical proposal, the concrete measure taken also includes:
Blade fin is tiltedly installed with the closed plate of the both sides of above-mentioned connecting cavity.
The overall structure that above-mentioned closed plate is formed in one with the connection deck.
The connecting portion being adapted with prefabricated pile cage bar extension is provided with the base of above-mentioned connection deck.
Above-mentioned prefabricated pile cage bar extension includes cage bar extension rod and is formed on the heading that cage bar extends boom end, connects
Portion includes connecting hole and the sliding muscle hole through connection deck side wall, and connecting hole is communicated with sliding muscle hole;The width in sliding muscle hole is more than
The diameter of main ribs extension rod, the diameter with diameter greater than main ribs extension rod of connecting hole, and it is straight less than the heading
Footpath.
The lower surface of above-mentioned heading is a conical surface, expands on connecting hole and is formed with bellmouth.
The prefabricated pile reinforcing bar dop that above-mentioned connector passes through to be embedded in advance prefabricated pile end is connected with prefabricated pile, connector
It is threadedly coupled with the prefabricated pile reinforcing bar dop.
Above-mentioned prefabricated pile reinforcing bar dop is made up of reinforcing bar end upset chuck and connecting tube.
Above-mentioned reinforcing bar end upset chuck and connecting tube are threadedly coupled, and internal thread is formed with reinforcing bar end upset chuck, connecting tube
The external screw thread being adapted with the internal thread is formed with outer wall.
A kind of pile extension method of self-locking prefabricated pile attachment means:Comprise the following steps:
Step one, the position that the stake of lower section is sink to 0.8 to 1.2m from the ground, suspend pile sinking, and the stake of lower section is fixed;
Step 2, the stake of upper section is hung to straightening behind lower section stake top, connector is directed at corresponding connection deck, it is slow under
Putting section stake makes connector enter in the connecting cavity of correspondence connection deck, and connector produces rotation after touching blade fin, from
And self-locking is formed with block, complete a pile extension;
Step 3, repeat step one to two, complete the connection of whole pile body.
Compared with prior art, a kind of self-locking prefabricated pile attachment means of the invention, including connection deck and T-shaped knot
The connector of structure, closed plate is provided with connection deck, and blade fin is tiltedly installed with closed plate, connects deck and connector
The two ends of prefabricated pile are respectively arranged at, during pile extension, in the connecting cavity of connector insertion connection deck, connector during underthrust
Rotated by the active force of blade fin, so as to the block being connected at the opening in chamber stops and cannot extract and be formed certainly
Lock;Attachment means simple structure of the invention, pile extension is convenient, can greatly improve pile extension efficiency, and the present invention is using mechanical connection
Mode, it is not necessary to weld at the scene, reduces the body harm of atmosphere pollution and electric welding to operator.
Brief description of the drawings
Fig. 1 is cross section structure diagram of the invention;
Fig. 2 is application structure schematic diagram of the invention;
Fig. 3 is A portions enlarged drawing in Fig. 2;
Fig. 4 is the cross section structure diagram after present invention connection;
Fig. 5 is the three-dimensional structure diagram of connection deck in the embodiment of the present invention one;
Fig. 6 is the top view of connection deck in the embodiment of the present invention one;
Fig. 7 is the perspective cross-sectional structure chart of connection deck in the embodiment of the present invention two.
Specific embodiment
The present invention is described in further detail below in conjunction with accompanying drawing embodiment.
Embodiment as shown in Figures 1 to 7,
Figure grade explanation:Connection deck 1, connecting cavity 1a, block 11, base 12, connector 2, prefabricated pile 3, closed plate 4,
Blade fin 41, prefabricated pile cage bar extension 5, cage bar extension rod 51, heading 52, conical surface 52a, connecting portion 6, connecting hole 61, cone
Shape hole 61a, sliding muscle hole 62, reinforcing bar end upset chuck 71, connecting tube 72.
Embodiment one,
A kind of self-locking prefabricated pile attachment means, including connect deck 1 and the connection being adapted with the connection deck 1
First 2, the pre- one end for being embedded in prefabricated pile 3 of connection deck 1, connector 2 is arranged at the other end of prefabricated pile 3, the T-shaped knot of connector 2
Structure;Connecting cavity 1a is formed with connection deck 1, is extended radially inwardly at the opening of connecting cavity 1a and is formed with block 11, connection card
The both sides that the connecting cavity 1a is located on seat 1 are respectively arranged with closed plate 4, guiding is tiltedly installed with the closed plate 4 of side and is slided
Plate 41;In the connecting cavity 1a of the insertion connection deck 1 of connector 2, acted on by blade fin 41 and produce rotation to be formed certainly with block 11
Lock.
As improvement, blade fin 41 is tiltedly installed with the closed plate 4 of the both sides of connecting cavity 1a;Both sides set and lead
To slide plate 41, in making the down process of connector 2 of T-shaped structure, its head two ends can produce thrust, both sides mean forced,
The stuck phenomenon for avoiding unilateral stress from being likely to result in, it is ensured that the connector 2 of each attachment means can smoothly revolve during pile extension
Turn with block 11 formed self-locking, it is ensured that pile extension it is smooth, quickly complete.
The both sides setting closed plate 4 for connecting deck 1 closes the side of connection deck 1, prevents cement mortar and concrete from entering
Enter to connect and block attachment means in deck 1 and influence connection;In the present embodiment, connection deck 1 and closed plate 4 are using split type
Structure, connection deck 1 and closed plate 4 are processed respectively, process more convenient, and processing cost is low.
In embodiment, the connecting portion 6 being adapted with prefabricated pile cage bar extension 5 is provided with the base 12 for connecting deck 1.
In embodiment, prefabricated pile cage bar extension 5 includes cage bar extension rod 51 and is formed on the end of cage bar extension rod 51
Heading 52, connecting portion 6 includes connecting hole 61 and the sliding muscle hole 62 through the connection side wall of deck 1, connecting hole 61 and sliding muscle hole 62
Communicate;The diameter of the width more than main ribs extension rod 51 in sliding muscle hole 62, connecting hole 61 extends with diameter greater than main ribs
The diameter of bar 51, and less than the diameter of the heading 52.
In embodiment, the lower surface of heading 52 is a conical surface 52a, expands on connecting hole 61 and is formed with bellmouth 61a.
In embodiment, prefabricated pile cage bar extension 5 is formed by the cage bar deep processing of prefabricated pile 3.
During pre-buried connection deck 1, the cage bar extension rod 51 of prefabricated pile cage bar extension 5 is from the sliding muscle hole 62 of connecting portion 6
It is slipped into connecting hole 61, above carrying connection deck 1 makes the connecting hole 61 of connecting portion 6 and the heading 52 of prefabricated pile cage bar extension 5
It is engaged;After the connection adjustment position of deck 1, the bellmouth 61a of system and the conical surface 52a phases of the lower surface of heading 52 are expanded on connecting hole 61
Coordinate.Bellmouth 61a can prevent the slip of prefabricated pile cage bar extension 5 from dislocating, and improve efficiency of assembling, can also increase heading 52
With the contact area of connecting hole 61, bearing capacity is improved.
In embodiment, the prefabricated pile reinforcing bar dop that connector 2 passes through to be embedded in advance the end of prefabricated pile 3 is connected with prefabricated pile 3,
Connector 2 is threadedly coupled with the prefabricated pile reinforcing bar dop.
In embodiment, prefabricated pile reinforcing bar dop is made up of reinforcing bar end upset chuck 71 and connecting tube 72.
In embodiment, reinforcing bar end upset chuck 71 and connecting tube 72 are threadedly coupled, and internal thread is formed with reinforcing bar end upset chuck 71,
The external screw thread being adapted with the internal thread is formed with the outer wall of connecting tube 72.
The reinforcing bar end upset chuck 71 of prefabricated pile reinforcing bar dop is engaged with end reinforced heading, reinforcing bar insertion reinforcing bar end upset
The heading of upsetting end after chuck 71;Connecting tube 72 is engaged by its external screw thread and connected with the internal thread of reinforcing bar end upset chuck 71
It is connected in reinforcing bar end upset chuck 71, connector 2 is threadedly connected in connecting tube 72 by afterbody.
Embodiment two,
Attachment means in the present embodiment are similar to the structure of the attachment means of embodiment one, except that, this implementation
Example in, as shown in fig. 7, closed plate 4 be connected the overall structure that deck 1 is formed in one, using the overall structure more company of can guarantee that
Connect the sealing and stress performance of deck 1.
A kind of pile extension method of self-locking prefabricated pile attachment means:Comprise the following steps:
Step one, the position that the stake of lower section is sink to 0.8 to 1.2m from the ground, suspend pile sinking, and the stake of lower section is fixed;
Step 2, by it is upper section stake be hung to it is lower section stake top after straightening, by connector 2 be aligned it is corresponding connection deck 1, slowly
Under put section stake and connector 2 is entered in the connecting cavity 1a of correspondence connection deck 1, connector 2 touched and produce after blade fin 41
Raw rotation, so as to form self-locking with block 11, completes a pile extension;
Step 3, repeat step one to two, complete the connection of whole pile body.
Operation principle:
During pile extension, the one end for being embedded with connection deck 1 is located at upper end, and the one end for being provided with connector 2 is located at lower end.
The stake of lower section is sink to the position of 1m or so from the ground, suspends pile sinking, if there are corrosive ions in geological environment, can
Filled in connection deck 1 and fill out liquid state anti-corrosion material, if in the absence of corrosive ions in geological environment, can be directly entered is carried out
Pile extension;The stake of upper section is sling, and each connector 2 is directed at corresponding connection deck 1;Adjust each connector 2 " T-shaped " head
Angle, enables connector 2 smoothly to insert in corresponding connection deck 1.
Under put section stake, make each connector 2 insert correspondence connection deck 1 connecting cavity 1a in, in down process, when
Blade fin 41 on the head contact of connector 2 to closed plate 4, connector 2 is rotated by the effect of its horizontal component,
After connector 2 is rotated, its head is located at the lower section of block 11 on connection deck 1, and connector 2 cannot be pulled out by the stop of block 11
Go out so as to form self-locking.
Highly preferred embodiment of the present invention has been elucidated with, and the various change or remodeling made by those of ordinary skill in the art are all
It is without departing from the scope of the invention.
Claims (2)
1. a kind of self-locking prefabricated pile attachment means, including connection deck (1) and the company being adapted with connection deck (1)
Joint (2), described connection deck (1) is embedded in one end of prefabricated pile (3) in advance, and described connector (2) is arranged at prefabricated pile (3)
The other end, it is characterized in that:Described connector (2) T-shaped structure;Connecting cavity (1a) is formed with described connection deck (1),
Extended radially inwardly at the opening of the connecting cavity (1a) and be formed with block (11), the company is located on described connection deck (1)
The both sides for connecing chamber (1a) are respectively arranged with closed plate (4), the entirety that closed plate (4) is formed in one with connection deck (1)
Structure, blade fin (41) is tiltedly installed with the closed plate (4) of the both sides of described connecting cavity (1a);Described connector
(2) in the connecting cavity (1a) of insertion connection deck (1), acted on by blade fin (41) and produce rotation to be formed certainly with block (11)
Lock;
The connecting portion being adapted with prefabricated pile cage bar extension (5) is provided with the base (12) of described connection deck (1)
(6);Described prefabricated pile cage bar extension (5) is including cage bar extension rod (51) and is formed on the upsetting of cage bar extension rod (51) end
Head (52), described connecting portion (6) includes connecting hole (61) and the sliding muscle hole (62) through connection deck (1) side wall, described
Connecting hole (61) communicated with sliding muscle hole (62);The width of described sliding muscle hole (62) is straight more than main ribs extension rod (51)
Footpath, the diameter with diameter greater than main ribs extension rod (51) of described connecting hole (61), and it is straight less than the heading (52)
Footpath;
The lower surface of described heading (52) is a conical surface (52a), expands on described connecting hole (61) and is formed with bellmouth (61a);
Described connector (2) is connected by the pre- prefabricated pile reinforcing bar dop for being embedded in prefabricated pile (3) end with prefabricated pile (3), described
Connector (2) be threadedly coupled with the prefabricated pile reinforcing bar dop;Described prefabricated pile reinforcing bar dop is by reinforcing bar end upset chuck
(71) constituted with connecting tube (72);
Described reinforcing bar end upset chuck (71) and connecting tube (72) are threadedly coupled, and are formed with described reinforcing bar end upset chuck (71) interior
Screw thread, the external screw thread being adapted with the internal thread is formed with the outer wall of described connecting tube (72).
2. the pile extension method of a kind of self-locking prefabricated pile attachment means according to claim 1:It is characterized in that:Including following
Step:
Step one, the position that the stake of lower section is sink to 0.8 to 1.2m from the ground, suspend pile sinking, and the stake of lower section is fixed;
Step 2, by it is upper section stake be hung to it is lower section stake top after straightening, by connector (2) alignment it is corresponding connection deck (1), slowly
Under put section stake make connector (2) enter correspondence connection deck (1) connecting cavity (1a) in, connector (2) touch guiding slide
Plate (41) produces rotation afterwards, so as to form self-locking with block (11), completes a pile extension;
Step 3, repeat step one to two, complete the connection of whole pile body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610070562.2A CN105544529B (en) | 2016-02-02 | 2016-02-02 | Self-locking prefabricated pile connecting device and pile connecting method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610070562.2A CN105544529B (en) | 2016-02-02 | 2016-02-02 | Self-locking prefabricated pile connecting device and pile connecting method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105544529A CN105544529A (en) | 2016-05-04 |
CN105544529B true CN105544529B (en) | 2017-05-24 |
Family
ID=55824051
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610070562.2A Active CN105544529B (en) | 2016-02-02 | 2016-02-02 | Self-locking prefabricated pile connecting device and pile connecting method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105544529B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107605041B (en) * | 2017-09-14 | 2019-11-12 | 袁建华 | Precast concrete connection component and its construction method |
CN113202081A (en) * | 2021-04-02 | 2021-08-03 | 清华大学 | Super absorbent resin water absorption pile for soft soil foundation and construction method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1480593A (en) * | 2002-09-06 | 2004-03-10 | 西胁醇 | Connection structure of pile |
CN2795295Y (en) * | 2005-05-17 | 2006-07-12 | 周兆弟 | Insert type pile extension end plate and prefabricated member |
JP5661165B1 (en) * | 2013-10-29 | 2015-01-28 | シントク工業株式会社 | Pile connection structure |
CN204385723U (en) * | 2015-01-13 | 2015-06-10 | 宿迁力引实业有限公司 | Segment type concrete pile |
CN104988912A (en) * | 2015-06-09 | 2015-10-21 | 周兆弟 | Square pile with connection pieces |
CN205348168U (en) * | 2016-02-02 | 2016-06-29 | 中淳高科桩业股份有限公司 | From locking -type precast pile connecting device |
-
2016
- 2016-02-02 CN CN201610070562.2A patent/CN105544529B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1480593A (en) * | 2002-09-06 | 2004-03-10 | 西胁醇 | Connection structure of pile |
CN2795295Y (en) * | 2005-05-17 | 2006-07-12 | 周兆弟 | Insert type pile extension end plate and prefabricated member |
JP5661165B1 (en) * | 2013-10-29 | 2015-01-28 | シントク工業株式会社 | Pile connection structure |
CN204385723U (en) * | 2015-01-13 | 2015-06-10 | 宿迁力引实业有限公司 | Segment type concrete pile |
CN104988912A (en) * | 2015-06-09 | 2015-10-21 | 周兆弟 | Square pile with connection pieces |
CN205348168U (en) * | 2016-02-02 | 2016-06-29 | 中淳高科桩业股份有限公司 | From locking -type precast pile connecting device |
Also Published As
Publication number | Publication date |
---|---|
CN105544529A (en) | 2016-05-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105840207B (en) | Construction method for comprehensive tunnel entering structure of large-span tunnel penetrating shallow-buried bias-pressure loose accumulation body | |
CN106013151A (en) | Continuous pile wall construction method and construction device used for continuous pile wall construction method | |
US20210040703A1 (en) | Construction method for foundation pit support utilizing prefabricated large-diameter pipe pile | |
CN107975375B (en) | A kind of miniature steel pipe pile reinforced soft foundation construction method of city tunnel | |
CN102605767A (en) | Precast pile reserved with grouting pipe and piling process of precast pile | |
CN102852141A (en) | Rock-socketed pipe pile foundation with pile core by concrete pouring and pile side by static pressure grouting and construction method for rock-socketed pipe pile foundation | |
CN109898521A (en) | A kind of anchored pile supporting and construction method for foundation pit external corner | |
US9279227B2 (en) | Foundation pier system | |
CN109024721B (en) | Reinforced foundation and method for improving bending and shearing resistance of existing building rigid foundation | |
CN105544529B (en) | Self-locking prefabricated pile connecting device and pile connecting method thereof | |
CN104314076B (en) | A kind of soft foundation recoverable prestressed anchor Cable Structure and construction method | |
CN205875193U (en) | Assembled stake integral structure | |
CN110397059A (en) | A kind of compound tree root pile constructing process of preexisting hole stiffness | |
CN109024562A (en) | A kind of long prefabricated tubular pile of major diameter and its construction method of classification propulsion | |
CN109267575A (en) | The construction method of pattern foundation pit supporting structure is cheated in the hole of Soft Soil Area | |
CN203613568U (en) | Anti-floating cement soil pile and anti-floating anchor rod combined anti-floating system | |
CN205348168U (en) | From locking -type precast pile connecting device | |
CN102220764A (en) | Deep foundation pit bracing system and construction method thereof | |
CN203808055U (en) | Screw post-reinforced compacted pile | |
CN105840209A (en) | Construction method for controlling deformation of anchor piles at barrel segment of tunnel | |
CN205742191U (en) | A kind of piling wall constructing device continuously | |
CN205653821U (en) | Anti device that floats of soft soil foundation basement | |
CN212223832U (en) | Deep silt foundation treatment structure | |
CN208039240U (en) | A kind of built pile | |
CN103031840A (en) | Embedded threaded pipe pile stone expansion body manufacturing method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180910 Address after: 315145 No. 166 Linjiang Road, Yinzhou Economic Development Zone, Ningbo, Zhejiang Patentee after: Ningbo Zhong Chun hi tech Limited by Share Ltd Address before: 315145 No. 166 Linjiang Road, Yinzhou Economic Development Zone, Ningbo, Zhejiang Patentee before: Zhongchun Gaoke Pile Industry Co., Ltd. |