CN105544360B - A kind of kerbstone construction whipline and its application method - Google Patents
A kind of kerbstone construction whipline and its application method Download PDFInfo
- Publication number
- CN105544360B CN105544360B CN201610038068.8A CN201610038068A CN105544360B CN 105544360 B CN105544360 B CN 105544360B CN 201610038068 A CN201610038068 A CN 201610038068A CN 105544360 B CN105544360 B CN 105544360B
- Authority
- CN
- China
- Prior art keywords
- kerbstone
- driving wheel
- traversing
- fixture
- rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C19/00—Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
- E01C19/52—Apparatus for laying individual preformed surfacing elements, e.g. kerbstones
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Jib Cranes (AREA)
- Vehicle Cleaning, Maintenance, Repair, Refitting, And Outriggers (AREA)
Abstract
The invention discloses a kind of kerbstone construction whipline and its application method, including:Vehicle frame;Track is installed on the vehicle frame;Movable pulley is installed on the track;One end of the track is provided with fixed pulley;The fixed pulley is connected by rope with movable pulley;One end jockey of the rope, the other end are connected by pulley blocks with lifting driving wheel;The lifting driving wheel is installed on vehicle frame;The track end is also equipped with sprocket wheel;The sprocket wheel is connected by chain with traversing drive sprocket;The traversing drive sprocket is installed on vehicle frame;The chain is fixedly connected with movable pulley.By designed path, lifting driving wheel, fixed pulley, movable pulley and fixture, the rotating of control lifting driving wheel, realizes the lifting of fixture;By designing sprocket wheel, traversing drive sprocket and chain, the rotating of traversing drive sprocket is controlled, realizes the transverse shifting of fixture;By design specialized kerbstone fixture, clamp kerbstone more convenient firm.
Description
Technical field
The present invention relates to municipal construction auxiliary Tools Technology, more particularly to a kind of kerbstone construction whipline and its
Application method.
Background technology
Kerbstone is the boundary line that car lane, pavement, greenery patches, isolation strip and road other parts are distinguished on road surface,
Play the role of ensureing pedestrian, vehicular traffic safety and pavement edge neat appearance.Kerbstone has become modern municipal construction
In essential construction material.
At present, kerbstone is in the construction process mainly using artificial carrying and installation or using machineries such as large-scale crane, fork trucks
Carry out short-haul operation;Manually carrying kerbstone is not only time-consuming and laborious, work efficiency is relatively low, but also easily injures trick by a crashing object
Thing;Big machinery carries out short-haul operation kerbstone and there is the problems such as carrying is dumb, efficiency is low and cost is excessive, particularly
Some road narrows local big machinery at all can not normal operation, can not play the advantage of big machinery;Therefore having must
Design a kind of time saving and energy saving and easy to operate small-sized machine ancillary equipment, help construction personnel complete kerbstone carrying and
Installation.
The content of the invention
The purpose of the present invention is exactly to solve the above-mentioned problems, it is proposed that a kind of kerbstone construction whipline and its use
Method, for existing kerbstone existing deficiency in the construction process, with Modern mechanical design is theoretical and theory, redesigns
A kind of kerbstone construction whipline, to solve the problems, such as that kerbstone exists in the construction process.
To achieve these goals, the present invention adopts the following technical scheme that:
A kind of kerbstone construction whipline, including:Vehicle frame;Track is installed on the vehicle frame;Installed on the track
There is movable pulley;One end of the track is provided with fixed pulley;The fixed pulley is connected by rope with movable pulley;The rope
One end jockey, the other end are connected by pulley blocks with lifting driving wheel;The lifting driving wheel is installed on vehicle frame;
The track end is also equipped with traversing reverse wheel;The traversing reverse wheel is connected by driving member and traversing driving wheel
Connect;The traversing driving wheel is installed on vehicle frame;The driving member is also connected with movable pulley;Driven by rotating traversing driving wheel
Driving member works, and then driving member drives movable pulley transverse shifting again, so as to fulfill the transverse shifting of fixture.
The movable pulley is provided with connecting shaft;Sliding block is fixedly connected with the connecting shaft;The sliding block installation is in orbit;
The sliding block both sides are provided with the connection ring of connection driving member.
The traversing reverse wheel is sprocket wheel;The driving member is chain;The traversing driving wheel is traversing drive sprocket;Institute
Sprocket wheel is stated to be connected with traversing drive sprocket by chain;The traversing drive sprocket is installed on vehicle frame;The chain is slided with dynamic
The connection ring of wheel is fixedly connected;By the rotation of traversing drive sprocket, the rotation of chain is driven, chain is driving movable pulley shifting
It is dynamic, so as to fulfill the transverse shifting of movable pulley.
Preferably, the traversing reverse wheel is commutation fixed pulley;The traversing driving wheel is traversing driving fixed pulley;It is described
Traversing driving fixed pulley is designed with groove I and groove II;The driving member includes rope I and rope II;Described I one end of rope with
The connection ring connection of movable pulley, the groove I of the other end and traversing driving fixed pulley;Described II one end of rope and movable pulley it is another
Connection ring connects, and the other end is connected with the groove II of traversing driving fixed pulley;The rope I and rope II are respectively wound around groove
I and groove II on;For the canoe of the rope I and rope II on the contrary, i.e. one is clockwise, another is then counterclockwise.
The bottom of frame is provided with universal wheel;Support board is designed with the vehicle frame;For carrying kerbstone;The car
Frame side is provided with supporting rack;Lifting driving wheel and traversing drive sprocket or lifting driving wheel and horizontal stroke are installed on support frame as described above
Move driving wheel.
The pulley blocks include top sheave group and lower sheave group;The lower sheave group is fixed on vehicle frame;The top sheave
Group is connected by rope fixed pulley;The lower sheave group is connected by another rope prior to top sheave group, is finally driven with lifting
Driving wheel connects.
Driving handle is designed with the lifting driving wheel, traversing drive sprocket and traversing driving wheel.
The fixture includes clamping bar and two groups of clamp hands;Two groups of clamp hands are separately mounted to the both ends of clamping bar;The clamping bar
It is connected with rope.
The each group of clamp hand includes clamp hand I and clamp hand II;The clamp hand I is rotatablely connected with clamp hand II.
The clamp hand I includes clamping bar I and lifting rod I;Described I one end of clamping bar is rotatablely connected with lifting rod I, the other end
It is connected with grip block.
The clamp hand II includes clamping bar II and lifting rod II;Described II one end of clamping bar is rotatablely connected with lifting rod II,
The other end is connected with grip block.
The lifting rod I and lifting rod II are rotatablely connected with clamping bar.
The middle part of the clamping bar I and clamping bar II is intersected by an articulation piece is hinged to the structure of shear arm
Shape.
A kind of application method of kerbstone construction whipline, comprises the following steps that:
(1) kerbstone is loaded
Crane is run to the transverse shifting for controlling fixture by rotating traversing driving wheel to the position of storage kerbstone, is led to
The lifting for rotating lifting driving wheel control fixture is crossed, most fixture is run to kerbstone position at last;
Fixture is opened, fixture is installed on kerbstone, keeps traversing driving wheel motionless, rotates clockwise lifting driving
Wheel, lifting driving wheel are final to drive fixture work, folder by work of the rope successively with running block, fixed pulley and movable pulley
Tool first clamps kerbstone, then fixture rises together with kerbstone under the pulling force effect of rope;Rotate counterclockwise liter
When dropping driving wheel, then fixture declines together with kerbstone;By controlling the rotating of lifting driving wheel, the liter of fixture is realized
Drop;
Keep lifting driving wheel motionless, rotate clockwise traversing driving wheel, traversing driving wheel drives dynamic slide by driving member
Wheel moves right;Movable pulley drives fixture and kerbstone to move right together;When rotating counterclockwise traversing driving wheel, then clamp strap
Kerbstone to be moved to the left;By controlling the rotating of traversing driving wheel, the transverse shifting of fixture is realized;
By controlling the rotating of lifting driving wheel and the rotating of traversing driving wheel, kerbstone is loaded into vehicle frame
On support board;
(2) kerbstone is unloaded
The crane for being loaded with kerbstone is run to the position of installation kerbstone;Fixture is installed on kerbstone;Pass through control
The rotating of system lifting driving wheel and the rotating of traversing driving wheel, it is sequentially placed by the kerbstone on vehicle frame support board
Installation site.
The beneficial effects of the invention are as follows:
The present invention is a kind of kerbstone construction whipline and its application method, by designed path, lifting driving wheel, is determined
Pulley, movable pulley and fixture, need to only control the rotating of lifting driving wheel, so that it may realize the elevating movement of fixture;Pass through design
Sprocket wheel, traversing drive sprocket and chain, need to only control the rotating of traversing drive sprocket, so that it may realize the transverse shifting of fixture;
By designing running block, labour-saving purpose is played;By the kerbstone fixture of design specialized, clamp kerbstone more convenient
Firmly.
Brief description of the drawings
Fig. 1 is the structure diagram of crane of the present invention;
Fig. 2 is the front view of crane of the present invention;
Fig. 3 is the structure diagram of chain gear transmission of the present invention;
Fig. 4 is the structure diagram of present clip;
Fig. 5 is the structure diagram of the embodiment of the present invention 2;
Fig. 6 is the structure diagram of the traversing driving fixed pulley of the present invention
Wherein, 1. vehicle frame, 11. wheels, 12. support boards, 13. tracks, 14. fixed pulleys, 15. movable pulleys, 16. reversing gear brackets,
17 connecting shafts, 18. connection rings, 19. supporting racks, 2. fixtures, 21. clamping bars, 22. clamp hands, 23. clamp hands I, 231. lifting rods I, 232.
Clamping bar I, 24. clamp hands II, 241. lifting rods II, 242. clamping bars II, 3. lifting driving wheels, 31. lifting ropes, 32. pulleys
Group, 321. top sheave groups, 322. lower sheave groups, 33. driving handles, 4. traversing drive sprockets, 41. chains, 42. sprocket wheels, 5. is horizontal
Driving fixed pulley is moved, 51. ropes I, 52. ropes II, 53. commutation fixed pulleys, 54 groove Is, 55. groove IIs, 56. handles, 6. slide
Block, 7. traversing driving wheels, 8. driving members, 9. traversing reverse wheels.
Embodiment
The present invention will be further described with embodiment below in conjunction with the accompanying drawings:
Embodiment 1
As shown in Figure 1, a kind of kerbstone construction whipline, including:Vehicle frame 1;Track 13 is installed on vehicle frame 1;Track
Movable pulley 15 is installed on 13;One end of track 13 is provided with fixed pulley 14;Fixed pulley 14 passes through liter valency rope 31 and a movable pulley
14 connections;One end jockey 2 of rope 31 is lifted, the other end is connected by pulley blocks 32 with lifting driving wheel 3;Lifting driving
Wheel 3 is installed on vehicle frame 1;
As shown in Fig. 2, 13 end of track is provided with reversing gear bracket 16;Traversing reverse wheel 9 is installed on the reversing gear bracket 16;It is horizontal
Reverse wheel 9 is moved to be connected with traversing driving wheel 7 by driving member 8;Traversing driving wheel 7 is installed on vehicle frame 1;Driving member 8 is also with moving
Pulley 15 connects;Driving member 8 is driven to work by rotating traversing driving wheel 7, then driving member 8 drives movable pulley 15 laterally to move again
It is dynamic, so as to fulfill the transverse shifting of fixture 2.
Movable pulley 15 is provided with connecting shaft 17;Sliding block 6 is fixedly connected with connecting shaft 17;Sliding block installation is in orbit;Sliding block
Both sides are provided with the connection ring 18 of connection driving member.
As shown in figure 3, the traversing reverse wheel 9 is sprocket wheel 42;The driving member 8 is chain 41;The traversing driving wheel 7
For traversing drive sprocket 4;The sprocket wheel 42 is connected by chain 41 with traversing drive sprocket 4;The traversing drive sprocket 4 is installed
On vehicle frame 1;The chain 41 is fixedly connected with the connection ring 18 of movable pulley 15;By the rotation of traversing drive sprocket 4, drive
The rotation of chain 41, chain 41 is driving movable pulley 15 to move, so as to fulfill the transverse shifting of movable pulley 15.
1 bottom of vehicle frame is provided with universal wheel 11;Support board 12 is designed with vehicle frame 1;For carrying kerbstone;1 side of vehicle frame
Face is provided with supporting rack 19;Lifting driving wheel 3 and traversing drive sprocket 4 are installed on supporting rack 19.
Pulley blocks 32 include top sheave group 321 and lower sheave group 322;The lower sheave group 322 is fixed on vehicle frame 1;On
Pulley blocks 321 are connected by lifting rope 31 with fixed pulley 14;Lower sheave group 322 is by another rope prior to top sheave group
321 connections, are finally connected with lifting driving wheel 3.
Driving handle 33 is designed with lifting driving wheel 3 and traversing drive sprocket 4.
As shown in figure 4, fixture 2 includes clamping bar 21 and two groups of clamp hands 22;Two groups of clamp hands 22 are separately mounted to the two of clamping bar 21
End;Clamping bar 21 is connected with rope 5.
Each group of clamp hand 22 includes clamp hand I 23 and clamp hand II 24;Clamp hand I 23 is rotatablely connected with clamp hand II 24.
Clamp hand I 23 includes clamping bar I 232 and lifting rod I 231;I 232 one end of clamping bar is rotatablely connected with lifting rod I 231,
The other end is connected with grip block 25.
Clamp hand II 24 includes clamping bar II 242 and lifting rod II 241;II 242 one end of clamping bar is rotated with lifting rod II 241
Connection, the other end are connected with grip block 25.
Lifting rod I 231 and lifting rod II 241 are rotatablely connected with clamping bar 21.
The middle part of clamping bar I 232 and clamping bar II 242 is intersected by an articulation piece and is hinged to the structure of shear arm
Shape.
A kind of application method of kerbstone construction whipline, comprises the following steps that:
(1) kerbstone is loaded
Crane is run to the position of storage kerbstone, controls the horizontal of fixture 2 to move by rotating traversing drive sprocket 4
It is dynamic, the lifting of fixture 2 is controlled by rotating lifting driving wheel 3, most fixture 2 is run to kerbstone position at last;
Fixture 2 is opened, fixture 2 is installed on kerbstone, keeps traversing drive sprocket 4 motionless, rotates clockwise lifting
Driving wheel 3, by lifting rope 31, band running block 32, fixed pulley 14 and movable pulley 15 work lifting driving wheel 3 successively, finally
Fixture 2 is driven to move, fixture 2 first clamps kerbstone, then fixture 2 is with road under the pulling force effect of lifting rope 31
Kerb rises together;When rotating counterclockwise lifting driving wheel 3, then fixture 2 declines together with kerbstone;By controlling lifting to drive
The rotating of driving wheel 3, realizes the lifting of fixture 2;
Keep lifting driving wheel 3 motionless, rotate clockwise traversing drive sprocket 4, traversing drive sprocket 4 passes through 41 band of chain
Dynamic movable pulley 15 moves right;Movable pulley 15 drives fixture 2 and kerbstone to move right together;Rotate counterclockwise traversing drive chain
When taking turns 4, then fixture 2 is moved to the left with kerbstone;By controlling the rotating of traversing drive sprocket 4, the transverse direction of fixture 2 is realized
It is mobile;
By controlling the rotating of lifting driving wheel 3 and the rotating of traversing drive sprocket 4, kerbstone is loaded into car
On the support board 12 of frame 1;
(2) kerbstone is unloaded
The crane for being loaded with kerbstone is run to the position of installation kerbstone;Fixture 2 is installed on kerbstone;Pass through control
The rotating of system lifting driving wheel 3 and the rotating of traversing drive sprocket 4, by the kerbstone on 1 support board 12 of vehicle frame successively
It is placed into its installation site.
Embodiment 2
As shown in Figure 1, a kind of kerbstone construction whipline, including:Vehicle frame 1;Track 13 is installed on vehicle frame 1;Track
Movable pulley 15 is installed on 13;One end of track 13 is provided with fixed pulley 14;Fixed pulley 14 passes through liter valency rope 31 and a movable pulley
14 connections;One end jockey 2 of rope 31 is lifted, the other end is connected by pulley blocks 32 with lifting driving wheel 3;Lifting driving
Wheel 3 is installed on vehicle frame 1;
As shown in Fig. 2, 13 end of track is also equipped with traversing reverse wheel 9;Traversing reverse wheel 9 by driving member 8 with it is traversing
Driving wheel 7 connects;Traversing driving wheel 7 is installed on vehicle frame 1;Driving member 8 is also connected with movable pulley 15;By rotating traversing driving
The drive driving member 8 of wheel 7 works, and then driving member 8 drives 15 transverse shifting of movable pulley again, so as to fulfill the transverse shifting of fixture 2.
Movable pulley 15 is provided with connecting shaft 17;Sliding block 6 is fixedly connected with connecting shaft 17;Sliding block installation is in orbit;Sliding block
Both sides are provided with the connection ring 18 of connection driving member.
As shown in Figure 5 and Figure 6, it is preferred that the traversing reverse wheel 9 is commutation fixed pulley 53;The traversing driving wheel 7 is
Traversing driving fixed pulley 5;The traversing driving fixed pulley 5 is designed with groove I 54 and groove II 55;The driving member 8 includes rope
Rope I 51 and rope II 52;Described I 51 one end of rope is connected with the connection ring 18 of movable pulley 15, and the other end is fixed sliding with traversing driving
The groove I 54 of wheel 5;Described II 52 one end of rope is connected with another connection ring 18 of movable pulley 15, and the other end and traversing driving are fixed
The groove II 55 of pulley 5 connects;The rope I 51 and rope II 52 are respectively wound around in groove I 54 and groove II 55;The rope
For the canoe of rope I 51 and rope II 52 on the contrary, i.e. one is clockwise, another is then counterclockwise.
1 bottom of vehicle frame is provided with universal wheel 11;Support board 12 is designed with vehicle frame 1;For carrying kerbstone;1 side of vehicle frame
Face is provided with supporting rack 19;Lifting driving wheel 3 and traversing drive sprocket 4 are installed on supporting rack 19.
Pulley blocks 32 include top sheave group 321 and lower sheave group 322;The lower sheave group 322 is fixed on vehicle frame 1;On
Pulley blocks 321 are connected by lifting rope 31 with fixed pulley 14;Lower sheave group 322 is by another rope prior to top sheave group
321 connections, are finally connected with lifting driving wheel 3.
Driving handle 33 is designed with lifting driving wheel 3 and traversing drive sprocket 4.
As shown in figure 4, fixture 2 includes clamping bar 21 and two groups of clamp hands 22;Two groups of clamp hands 22 are separately mounted to the two of clamping bar 21
End;Clamping bar 21 is connected with rope 5.
Each group of clamp hand 22 includes clamp hand I 23 and clamp hand II 24;Clamp hand I 23 is rotatablely connected with clamp hand II 24.
Clamp hand I 23 includes clamping bar I 232 and lifting rod I 231;I 232 one end of clamping bar is rotatablely connected with lifting rod I 231,
The other end is connected with grip block 25.
Clamp hand II 24 includes clamping bar II 242 and lifting rod II 241;II 242 one end of clamping bar is rotated with lifting rod II 241
Connection, the other end are connected with grip block 25.
Lifting rod I 231 and lifting rod II 241 are rotatablely connected with clamping bar 21.
The middle part of clamping bar I 232 and clamping bar II 242 is intersected by an articulation piece and is hinged to the structure of shear arm
Shape.
A kind of application method of kerbstone construction whipline, comprises the following steps that:
(1) kerbstone is loaded
Crane is run to the position of storage kerbstone, controls the horizontal of fixture 2 to move by rotating traversing driving fixed pulley 5
It is dynamic, the lifting of fixture 2 is controlled by rotating lifting driving wheel 3, most fixture 2 is run to kerbstone position at last;
Fixture 2 is opened, fixture 2 is installed on kerbstone, keeps traversing driving fixed pulley 5 motionless, rotates clockwise liter
Driving wheel 3 drops, and by lifting rope 31, band running block 32, fixed pulley 14 and movable pulley 15 work lifting driving wheel 3 successively, most
Eventually drive fixture 2 move, fixture 2 lifting rope 31 pulling force effect under, kerbstone is clamped first, then fixture 2 with
Kerbstone rises together;When rotating counterclockwise lifting driving wheel 3, then fixture 2 declines together with kerbstone;Lifted by controlling
The rotating of driving wheel 3, realizes the lifting of fixture 2;
Keep lifting driving wheel 3 motionless, rotate clockwise traversing driving fixed pulley 5, traversing driving fixed pulley 5 passes through rope
I 41 drive movable pulleys 15 move right;Movable pulley 15 drives fixture 2 and kerbstone to move right together;Rotate counterclockwise traversing
When driving fixed pulley 5, traversing driving fixed pulley 5 drives movable pulley 15 to be moved to the left by rope II 52, so that fixture 2 is with road
Kerb is moved to the left;By controlling the rotating of traversing driving fixed pulley 5, the transverse shifting of fixture 2 is realized;
By controlling the rotating of lifting driving wheel 3 and the rotating of traversing driving wheel 5, kerbstone is loaded into vehicle frame
On 1 support board 12;
(2) kerbstone is unloaded
The crane for being loaded with kerbstone is run to the position of installation kerbstone;Fixture 2 is installed on kerbstone;Pass through control
System lifting driving wheel 3 rotating and it is traversing driving fixed pulley 5 rotating, by the kerbstone on 1 support board 12 of vehicle frame according to
It is secondary to be placed into its installation site.
Although above-mentioned be described the embodiment of the present invention with reference to attached drawing, model not is protected to the present invention
The limitation enclosed, those skilled in the art should understand that, on the basis of technical scheme, those skilled in the art are not
Need to make the creative labor the various modifications that can be made or deformation still within protection scope of the present invention.
Claims (9)
- The whipline 1. a kind of kerbstone is constructed, it is characterized in that, including:Vehicle frame;Track is installed on the vehicle frame;The track On movable pulley is installed;One end of the track is provided with fixed pulley;The fixed pulley is connected by rope with movable pulley;It is described One end of rope is connected with the fixture for clamping kerbstone, and the other end is connected by pulley blocks with lifting driving wheel;The liter Driving wheel is dropped to be installed on vehicle frame;The track end is also equipped with traversing reverse wheel;The traversing reverse wheel is connected by driving member with traversing driving wheel; The traversing driving wheel is installed on vehicle frame;The driving member is also connected with movable pulley;The movable pulley is provided with connecting shaft;Sliding block is fixedly connected with the connecting shaft;The sliding block installation is in orbit;It is described Sliding block both sides are provided with the connection ring of connection driving member.
- 2. a kind of kerbstone construction whipline as claimed in claim 1, it is characterized in that, the traversing reverse wheel is sprocket wheel; The driving member is chain;The traversing driving wheel is traversing drive sprocket;The traversing reverse wheel passes through chain and traversing drive Movable sprocket connects;The chain is fixedly connected with the connection ring of movable pulley.
- 3. a kind of kerbstone construction whipline as claimed in claim 1, it is characterized in that, the traversing reverse wheel is fixed for commutation Pulley;The traversing driving wheel is traversing driving fixed pulley;The traversing driving fixed pulley is designed with groove I and groove II;Institute Stating driving member includes rope I and rope II;The connection ring of described I one end of rope and movable pulley connects, the other end and traversing driving The groove I connection of fixed pulley;Another connection ring of described II one end of rope and movable pulley connects, and the other end is fixed sliding with traversing driving The groove II connection of wheel;The rope I and rope II are respectively wound around in groove I and groove II;The rope I and rope II Canoe is opposite.
- 4. a kind of kerbstone construction whipline as claimed in claim 1, it is characterized in that, the bottom of frame is provided with universal Wheel;Support board is designed with the vehicle frame;The vehicle frame side is provided with supporting rack;Lifting driving is installed on support frame as described above Wheel and traversing driving wheel.
- 5. a kind of kerbstone construction whipline as claimed in claim 1, it is characterized in that, the pulley blocks include top sheave group With lower sheave group;The lower sheave group is fixed on vehicle frame;The top sheave group is connected by rope fixed pulley;The lower sheave Group is connected by another rope prior to top sheave group, is finally connected with lifting driving wheel.
- 6. a kind of kerbstone construction whipline as claimed in claim 1, it is characterized in that, the fixture includes clamping bar and two groups Clamp hand;Two groups of clamp hands are separately mounted to the both ends of clamping bar;The clamping bar is connected with rope;The each group of clamp hand includes folder Hand I and clamp hand II;The clamp hand I is rotatablely connected with clamp hand II.
- 7. a kind of kerbstone construction whipline as claimed in claim 6, it is characterized in that, the clamp hand I includes I He of clamping bar Lifting rod I;Described I one end of clamping bar is rotatablely connected with lifting rod I, and the other end is connected with grip block;The clamp hand II includes folder Tight bar II and lifting rod II;Described II one end of clamping bar is rotatablely connected with lifting rod II, and the other end is connected with grip block.
- 8. a kind of kerbstone construction whipline as claimed in claim 7, it is characterized in that, the lifting rod I and lifting rod II It is rotatablely connected with clamping bar;The middle part of the clamping bar I and clamping bar II is intersected by an articulation piece is hinged to shear arm Structure shape.
- 9. a kind of application method of kerbstone construction whipline as described in claim 1-8 is any, it is characterized in that, specifically make It is as follows with step:(1) kerbstone is loadedCrane is run to the transverse shifting for controlling fixture by rotating traversing driving wheel to the position of storage kerbstone, by turning The lifting of dynamic lifting driving wheel control fixture, most fixture is run to kerbstone position at last;Fixture is opened, fixture is installed on kerbstone, keeps traversing driving wheel motionless, rotates clockwise lifting driving wheel, is risen Driving wheel is dropped by work of the rope successively with running block, fixed pulley and movable pulley, final fixture with kerbstone together on Rise;When rotating counterclockwise lifting driving wheel, then fixture declines together with kerbstone;By controlling the positive and negative of lifting driving wheel Turn, realize the lifting of fixture;Keep lifting driving wheel motionless, rotate clockwise traversing driving wheel, traversing driving wheel by driving member drive movable pulley to Move right;Movable pulley drives fixture and kerbstone to move right together;When rotating counterclockwise traversing driving wheel, then fixture is with road Kerb is moved to the left;By controlling the rotating of traversing driving wheel, the transverse shifting of fixture is realized;By controlling the rotating of lifting driving wheel and the rotating of traversing driving wheel, kerbstone is loaded into the loading of vehicle frame On plate;(2) kerbstone is unloadedThe crane for being loaded with kerbstone is run to the position of installation kerbstone;Fixture is installed on kerbstone;Risen by controlling The rotating of driving wheel and the rotating of traversing driving wheel are dropped, the kerbstone on vehicle frame support board is sequentially placed its installation Position.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610038068.8A CN105544360B (en) | 2016-01-20 | 2016-01-20 | A kind of kerbstone construction whipline and its application method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610038068.8A CN105544360B (en) | 2016-01-20 | 2016-01-20 | A kind of kerbstone construction whipline and its application method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105544360A CN105544360A (en) | 2016-05-04 |
CN105544360B true CN105544360B (en) | 2018-04-17 |
Family
ID=55823893
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610038068.8A Active CN105544360B (en) | 2016-01-20 | 2016-01-20 | A kind of kerbstone construction whipline and its application method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105544360B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106149533B (en) * | 2016-08-26 | 2018-04-13 | 南通威而多专用汽车制造有限公司 | Hand-held kerbstone paver |
CN110642173A (en) * | 2019-08-27 | 2020-01-03 | 中国二十冶集团有限公司 | Curb mounting trolley and construction method |
CN110747719B (en) * | 2019-09-28 | 2023-10-03 | 郑州市市政工程管理处 | Road curb repairing and installing machine |
CN110714396B (en) * | 2019-10-08 | 2022-01-04 | 王保松 | Automatic equipment that falls of curb of cooperation municipal works car |
CN111153207A (en) * | 2020-04-08 | 2020-05-15 | 南京泰普森自动化设备有限公司 | Detection system and shifting device thereof |
CN112281603A (en) * | 2020-11-09 | 2021-01-29 | 来飞 | Curb laying device for highway construction |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1132174A (en) * | 1967-02-10 | 1968-10-30 | Tyler Brothers Concrete Produc | Lifting apparatus |
DE2654828A1 (en) * | 1976-12-03 | 1978-06-08 | Barth Kg Dr | Machine for placing paving slabs - has overhanging arm with trolley with lifting chain for slabs |
CN203284096U (en) * | 2013-04-27 | 2013-11-13 | 嘉兴职业技术学院 | Crane used for construction site |
CN205347939U (en) * | 2016-01-20 | 2016-06-29 | 山东大学 | Supplementary crane of curb construction |
-
2016
- 2016-01-20 CN CN201610038068.8A patent/CN105544360B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN105544360A (en) | 2016-05-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105544360B (en) | A kind of kerbstone construction whipline and its application method | |
CN203475853U (en) | Light wall board construction work vehicle | |
CN110409844A (en) | Cement partition wall panel mounting | |
CN210828374U (en) | Cement partition plate mounting machine | |
CN103042430A (en) | Rotary shifting carrying gripper | |
CN206357221U (en) | A kind of workshop transfer robot | |
CN210176029U (en) | Hand grasping mechanism of intelligent manipulator stacker crane | |
CN109250516A (en) | A kind of cantilever palletizing machine | |
CN209396575U (en) | Hollow brick automatically unloads base machine | |
CN106144409B (en) | Barrel lifts switching mechanism | |
CN205311740U (en) | Scraped car disassembles conveying system | |
CN205347939U (en) | Supplementary crane of curb construction | |
CN202346605U (en) | Trolley for slag conveying crane and slag conveying crane employing trolley | |
CN101633479A (en) | Transportation manipulators of railway truck body | |
CN220282843U (en) | Flexible walking type stacking and boxing equipment | |
CN108544441A (en) | A kind of handware processing fixed station | |
CN211639646U (en) | Maintenance auxiliary device for petroleum drilling diesel engine | |
CN108862114A (en) | A kind of logistics goods handling system | |
CN204525879U (en) | A kind of hydralic hose vulcanization conveying device | |
CN211393786U (en) | Snatch jacking equipment | |
CN202897366U (en) | Oil drill joint production line electric induction furnace material lifting mechanism | |
CN205662081U (en) | Concrete block hacking machine | |
CN210910005U (en) | Manipulator electrical control device | |
CN208843323U (en) | A kind of cantilever palletizing machine | |
CN201816566U (en) | Electric automobile cell box replacing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |