CN105544336A - Gap water-permeable brick set and ecological water-permeable pavement formed by brick set in paving manner - Google Patents

Gap water-permeable brick set and ecological water-permeable pavement formed by brick set in paving manner Download PDF

Info

Publication number
CN105544336A
CN105544336A CN201511022522.2A CN201511022522A CN105544336A CN 105544336 A CN105544336 A CN 105544336A CN 201511022522 A CN201511022522 A CN 201511022522A CN 105544336 A CN105544336 A CN 105544336A
Authority
CN
China
Prior art keywords
water
permeable
permeable brick
gap
adjacent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201511022522.2A
Other languages
Chinese (zh)
Other versions
CN105544336B (en
Inventor
姚峰元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KUNSHAN TONGHAI BUILDING MATERIALS TECHNOLOGY Co Ltd
Original Assignee
KUNSHAN TONGHAI BUILDING MATERIALS TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KUNSHAN TONGHAI BUILDING MATERIALS TECHNOLOGY Co Ltd filed Critical KUNSHAN TONGHAI BUILDING MATERIALS TECHNOLOGY Co Ltd
Priority to CN201511022522.2A priority Critical patent/CN105544336B/en
Publication of CN105544336A publication Critical patent/CN105544336A/en
Application granted granted Critical
Publication of CN105544336B publication Critical patent/CN105544336B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/04Pavings made of prefabricated single units made of bricks
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a gap water-permeable brick set and an ecological water-permeable pavement formed by the brick set in a paving manner. The problem that in the prior art, the width of a channel between every two adjacent water-permeable bricks in the same transverse column is large, and accordingly the fastening effect between every two adjacent water-permeable bricks is poor is solved. According to the technical scheme, the gap water-permeable brick set is characterized by comprising a plurality of gap water-permeable bricks; each gap water-permeable brick comprises four side faces; on each gap water-permeable brick, positioning blocks are arranged on two adjacent side faces, and positioning parts are arranged on the other two adjacent side faces; and the positioning blocks on each gap water-permeable brick are matched with the positioning parts on the adjacent gap water-permeable brick, a gap groove is formed between every two adjacent gap water-permeable bricks, and filler is arranged in each gap groove. While good fastening performance and stability are achieved, the ecological pavement has good water permeability, and rainwater which seeps downwards can be collected and is recycled.

Description

Gap water-permeable brick group and the ecological permeable road surface using this brick group to lay
Technical field
The present invention relates to field of road construction, more particularly, the ecological permeable road surface that it relates to a kind of gap water-permeable brick group and uses this brick group to lay.
Background technology
Urban modernization is at development, development is the drainage system in city thereupon, in the last few years, there is larger problem in the drainage system in city, often due to the imperfection of drainage system when running into larger heavy rain season, city is caused to occur the phenomenon of waterlogging, and in order to solve existing waterlogging problem, people stare at more direction and sight in the construction of drainage system, so on the contrary for urban environment brings the problem of more bad lucks, such as, build sewer, be used for building subsoil drain by after the hollow out certain depth of ground, in Japan, build a large amount of sewer as palace, for discharging municipal sewage to solve urban waterlogging problem, but, meanwhile, the construction mode that this tradition is extensive also destroys the ecological environment of urban inner, ecological and urban modernization construction can not get coordinated balance development, since entering 21st century, people are on the basis of urban sewerage and drainage system construction and ecology sustainable development, propose " sponge city " this design, sponge city, it is new generation of city storm water man-agement concept, refer to, in conform change and the natural calamity brought of reply rainwater etc., there is good " elasticity ", water suction when raining, retaining, infiltration, water purification, when needing, the water stored discharged and be used, build sponge city, make city realize nature to accumulate, naturally osmotic, self-purification, simultaneously, also can realize repairing municipal water ecology, protect and improve original urban ecological environment.
In the construction in sponge city, underground can be penetrated into smoothly to allow city rainwater on rainy day, water-permeable brick can be laid on the ground in city, water-permeable brick has good permeable, permeability, rainwater can not amass in road surface but permeate the ground rapidly, improve the life condition of urban ground fabric and edaphon, be in one section of Chinese patent document of " 201420712129.0 " at number of patent application, describe a kind of water-permeable brick modelled after an antique, this water-permeable brick comprises a bottom surface, an end face and four sides, bottom surface, end face and four sides form cuboid, bottom surface, end face and side are wavy setting, side is provided with several fixed blocks, the bakie suitable with fixed block is provided with between two often adjacent fixed blocks, the mounting means of this water-permeable brick continues to install one by one polylith brick, reach the arrangement moulding in documents shown in Fig. 3, leave the raceway groove of a lot of lower than brick end face, in the rainy day, rainwater can drain into raceway groove, and carry out drainage along raceway groove from eminence toward lower, solve rainwater directly in the problem of road surface drainage, equally water-permeable brick is progressively installed, reach the arrangement moulding in documents shown in Fig. 4, every two pieces of adjacent bricks are fastened mutually by fixed block and bakie, after such installation, channel width between every two pieces of bricks reduces, this brick and adjacent brick mutually fastening, make the brick of this brick surrounding simultaneously stressed, brick can turn round and look at and reach better fixed effect.
This water-permeable brick modelled after an antique in use, in order to reach the arrangement moulding in documents shown in Fig. 4, fixed block on adjacent two bricks and bakie can fasten mutually, but, two adjacent water-permeable bricks need to carry out dislocation laminating, fixed block and bakie could fasten mutually, reach fastening effect, when realizing fastening between the water-permeable brick that adjacent two row's lines are placed, fixed block on two water-permeable bricks adjacent in same line is relative, therefore, channel width in same line between adjacent two water-permeable bricks is larger, thus make the fastening effect between adjacent two water-permeable bricks poor, even more serious words, the both sides that two water-permeable bricks are positioned at raceway groove are subject to excessive Action of Gravity Field and sink, two water-permeable bricks are made to tilt to tilt, water-permeable brick easily produces and breaks, road surface is caused to be damaged.
Summary of the invention
For the deficiency that prior art exists, the object of the present invention is to provide cooperation of can aliging between a kind of arbitrary neighborhood two gap water-permeable bricks, there is the gap water-permeable brick group of good tightness and stability and there is water permeability better, can collect down and ooze rear rainwater and the ecological permeable road surface of carrying out recycling.
For achieving the above object, the invention provides following technical scheme: a kind of gap water-permeable brick group, comprise several gap water-permeable bricks, gap water-permeable brick described in each comprises a bottom surface, an end face and four sides, on gap water-permeable brick described in each, wherein have on two adjacent sides and be provided with locating piece, remain on two adjacent sides and be provided with location division, locating piece on gap water-permeable brick described in each coordinates with the location division on adjacent gap water-permeable brick, clearance groove is provided with between adjacent two described gap water-permeable bricks, filler is provided with in described clearance groove.
By adopting technique scheme, on each gap water-permeable brick, two adjacent side are provided with locating piece, two other adjacent side is provided with the location division coordinated with locating piece, arbitrary neighborhood two gap water-permeable bricks can by location division and locating piece alignment, compared with prior art, four sides of gap water-permeable brick can be alignd fastening with four gap water-permeable bricks simultaneously, adjacent gap water-permeable brick can be simultaneously stressed, the gap water-permeable brick group of this gap water-permeable brick arrangement has good stability and fastness, in clearance groove, filler is set, fill out in clearance groove by filler, improve the tightness of adjacent two gap water-permeable bricks in the water-permeable brick group of gap, the situation avoiding adjacent two gap water-permeable bricks to be subject to External Force Acting generation dislocation deformation occurs.
Further, described filler comprises washing meter Shi, and clearance groove fills up by described washing meter Shi.
By adopting technique scheme, clearance groove fills up by sand grains, the compactedness between adjacent two water-permeable bricks can be increased, the road surface that sand grains and water-permeable brick group are laid has good tightness, water-permeable brick can be adjacent with four sides water-permeable brick jointly stressed, this gap water-permeable brick group has stronger fastness, simultaneously, the stacking air space ratio of sand grains is larger, on rainy day, rainwater enters in clearance groove, permeates downwards from stacking space, make clearance groove keep good water permeability, facilitate rainwater to penetrate into underground downwards by clearance groove.
Further, the width of described clearance groove is 5-12mm.
By adopting technique scheme, clearance groove is too little, and rainwater can be discharged timely, and waterlogging problem can not get effective alleviation, and clearance groove is too large, and the tightness between two adjacent slits water-permeable bricks is poor, is subject to external force and easily produces deformation or breakage.
Further, the width of described clearance groove is 6-10mm.
By adopting technique scheme, the width of clearance groove is preferably 6mm to 10mm, this clearance groove is while possessing good drainage performance, and high-heeled shoes also can be avoided to prick and occur into the situation in clearance groove, this gap water-permeable brick group more meets the hommization demand of urban road.
Further, be provided with the expansion stream portion increasing flow in storm-water drainage to clearance groove between adjacent two described gap water-permeable bricks, described expansion stream portion is positioned at directly over clearance groove.
By adopting technique scheme, expand stream portion for increasing storm-water drainage to the flow in clearance groove, expand stream portion and comprise the adjacent side of two gap water-permeable bricks along the chamfer arranged, two chamfers make the space of notch above clearance groove increase, can be increased by the rainwater flow of clearance groove in certain hour, the road surface be paved into by this gap water-permeable brick group, even if when rainfall is larger, also can carry out discharge rainwater in time, efficiently.
Further, the sidewall of adjacent two described gap water-permeable bricks is provided with concave part relative one by one, and described concave part vertically runs through the upper and lower end face of gap water-permeable brick, and concave part fills up by washing meter Shi.
By adopting technique scheme, concave part is provided with between two adjacent water-permeable bricks, by can fill up washing meter Shi at concave part, the dislocation reduced between adjacent two water-permeable bricks is moved, improve water-permeable brick and the firm performance be connected between water-permeable brick, the road surface be paved into by this water-permeable brick group relatively steadily, firmly.
Further, a kind of ecological permeable road surface, comprises permeable brick layer, and described permeable brick layer is laid by above-mentioned gap water-permeable brick group and formed, and described permeable brick layer is arranged with washing rice rock layers, and rainwater is seeped in washing rice rock layers under after clearance groove.
By adopting technique scheme, the road surface that this permeable brick layer is laid has good water permeability, rainwater or municipal sewage can obtain by the clearance groove in permeable brick layer oozing down in time, the hardness of washing meter Shi is higher, the washing rice rock layers of laying plays the effect supporting permeable brick layer, has good support performance and stationarity.
Further, described washing rice rock layers is equipped with pervious layer, graded broken stone layer, impervious layer downwards successively.
By adopting technique scheme, pervious layer is formed by permeable geotextile laying, by permeable geotextile laying under washing rice rock layers, rainwater continues infiltration downwards through permeable geotextiles, some impurity washed in rice stone particles and water can be filtered down by permeable geotextiles, play the effect of filtering rainwater, impervious layer is laid by waterproof geomembrane and is formed, waterproof geomembrane has good barrier performance, can stop that rainwater penetrates in earth's surface under backward by graded broken stone layer, facilitate the recovery of rainwater to recycle.
Further, described graded broken stone layer is provided with drainage pipe.
By adopting technique scheme, drainage pipe comprises several blind pipes, and for discharging rainwater, have high surface infiltration ability and inner water passing capacity, be laid on by blind pipe in graded broken stone layer, the rainwater in graded broken stone layer discharges by blind pipe.
Further, described drainage pipe is communicated with the purifier of purifying rainwater, and described purifier is connected with city domestic water pipeline, and rainwater is discharged in city domestic water pipeline after purifier purification.
By adopting technique scheme, purifier neutralizes the acid element in rainwater, makes the standard that rainwater reaches clean, sanitary, is carried to people by city domestic water pipeline, some areas lack of water, few water problem can be solved, meet the demand of people's living water use.
Accompanying drawing explanation
Fig. 1 is the structural representation one of gap water-permeable brick group;
Fig. 2 is the structural representation two of gap water-permeable brick group;
Fig. 3 is A portion enlarged diagram in Fig. 2;
Fig. 4 is the structural representation three of gap water-permeable brick group;
Fig. 5 is ecological permeable pavement structure schematic diagram.
In figure: 1, gap water-permeable brick; 2, locating piece; 3, concave part; 401, location division; 4, raised line; 5, clearance groove; 6, stream portion is expanded; 7, permeable brick layer; 8, rice rock layers is washed; 9, pervious layer; 10, graded broken stone layer; 11, drainage pipe; 12, impervious layer; 13, purifier; 14, city domestic water pipeline.
Detailed description of the invention
Embodiment referring to figs. 1 through Fig. 5 opposite joint gap water-permeable brick group and the ecological permeable road surface that uses this brick group to lay is described further.
As depicted in figs. 1 and 2, a kind of gap water-permeable brick 1 group and the ecological permeable road surface using this brick group to lay, wherein, a kind of gap water-permeable brick 1 group, comprise several gap water-permeable bricks 1, each gap water-permeable brick 1 includes a bottom surface, an end face and four sides, bottom surface, end face and four sides form a cuboid or square, on each gap water-permeable brick 1, wherein have on two adjacent sides and be provided with locating piece 2, the shape of locating piece 2 is strip, erectting is arranged on the side of water-permeable brick, and remain two sides are provided with the location division 401 coordinated with locating piece 2, in the present embodiment, location division 401 comprises two raised lines 4, two raised line 4 erected parallel are on the side of water-permeable brick, a groove coordinated with locating piece 2 is formed between two raised lines 4, locating piece 2 on each gap water-permeable brick 1 can coordinate with the location division 401 on adjacent gap water-permeable brick 1, as shown in Figures 2 and 3, location division 401 on a gap water-permeable brick 1 on two sides with locating piece 2 and adjacent two gap water-permeable bricks 1 fastens, play the fastening effect between water-permeable brick and water-permeable brick, simultaneously, remaining two sides with location division 401 also can fasten by the gap water-permeable brick 1 adjacent with two other, therefore, compared with prior art, four sides of a gap water-permeable brick 1 can be carried out fastening with other four same slit water-permeable bricks 1 simultaneously, and align one by one in locating piece 2 on gap water-permeable brick 1 and location division 401, avoid like this misplace fasten bring water-permeable brick arrange on problem, in actual production process, a set of tool of production is only needed to produce this kind of gap water-permeable brick 1, and do not need as current most of manufacturer, prepare two cover tool of production production male and female fragments of brick to coordinate, therefore, save some cost of production, several gap water-permeable bricks 1 can be arranged in the gap water-permeable brick 1 group of multiple lines and multiple rows, the fastening effect of water-permeable brick and water-permeable brick can be realized by locating piece 2 and location division 401 between the water-permeable brick group of adjacent a line or row, improve stability and the fastness of gap water-permeable brick 1.
As shown in Figure 1, certain clearance groove 5 is provided with between adjacent two gap water-permeable bricks 1, filler is provided with in clearance groove 5, filler can be washing meter Shi, cement or sand grains, in an embodiment, preferred filler is washing meter Shi, it is large that washing meter Shi has density, hardness is high, the advantage such as wear-resisting, the hardness ratio of washing meter Shi is higher, press down and be not easy generation and break being subject to vehicle on road surface, by washing meter Shi, clearance groove 5 is filled up, increase the compactedness between adjacent two water-permeable bricks, the road surface that water-permeable brick group is laid has good tightness, simultaneously, the diameter of washing meter Shi is 2-5mm, when the diameter of washing meter Shi is less than 2mm, the volume of single washing meter Shi is smaller, be filled in clearance groove 5 internal ratio comparatively dense, the hydrophobic performance of this clearance groove 5 is easily made to reduce, even clearance groove 5 is blocked, rainwater is not easy to permeate below earth's surface from clearance groove 5, when the diameter of washing meter Shi is greater than 5mm, the volume ratio of single washing meter Shi is larger, to put away space excessive for the heap of washing meter Shi, fastening Performance comparision between adjacent water-permeable brick is low, therefore, the diameter of washing meter Shi is preferably 2-5mm, while reaching good hydrophobic effect, make that there is between water-permeable brick good fastening performance, road surface is more stable, the width of clearance groove 5 is 5mm to 12mm, if when the width of clearance groove 5 is less than 5mm, because the width of clearance groove 5 is less, rainwater easily collects at clearance groove 5 place, the rainwater flow of underground is penetrated in unit interval less by clearance groove 5, when rainfall larger season or area, rainwater can not get discharging timely, easily amass on road surface, serious words, the problem effectiveness comparison alleviating waterlogging is poor, if when the width of clearance groove 5 is greater than 12mm, excesssive gap between two adjacent gap water-permeable bricks 1, cause the tightness between two gap water-permeable bricks 1 poor, therefore, the width design of clearance groove 5 is at 5 to 12mm, this clearance groove 5 has good draining, alleviate the effect of waterlogging, but, consider in city, the Ms worn high heels is many, walk on the road surface that this gap water-permeable brick 1 group is laid, the footwear root of high-heeled shoes is easily pricked in clearance groove 5, therefore, further, the width of clearance groove 5 is preferably 6mm to 10mm, this clearance groove 5 is while possessing good drainage performance, also high-heeled shoes can be avoided to prick occur into the situation in clearance groove 5, this gap water-permeable brick 1 group more meets the hommization demand of urban road.
As shown in Figure 4, be provided with between two adjacent gap water-permeable bricks 1 and expand stream portion 6, for increasing storm-water drainage to the flow in clearance groove 5, expanding stream portion 6 is positioned at directly over clearance groove 5, expand stream portion 6 and comprise the adjacent side of two gap water-permeable bricks 1 along the chamfer arranged, two chamfers make the space of notch above clearance groove 5 increase, can be increased by the rainwater flow of clearance groove 5 in certain hour, by this gap water-permeable brick 1 group of road surface be paved into, even if when rainfall is larger, also discharge rainwater can be carried out in time, efficiently.
As shown in Figures 2 and 3, the sidewall of adjacent two gap water-permeable bricks 1 is provided with the concave part 3 be oppositely arranged one by one, concave part 3 runs through the upper and lower end face of gap water-permeable brick 1 straight down, be oppositely arranged two concave parts 3 fill up by washing meter Shi, owing to docking meeting error to some extent between water-permeable brick with water-permeable brick, relativity shift can be produced when being subject to the upper outside power of defeating in road surface between adjacent two water-permeable bricks, cause road surface unstable, therefore, concave part 3 is provided with between two adjacent water-permeable bricks, by can fill up washing meter Shi at concave part 3, the dislocation reduced between adjacent two water-permeable bricks is moved, improve water-permeable brick and the firm performance be connected between water-permeable brick, the road surface be paved into by this water-permeable brick group is more steady, firmly.
As shown in Figure 5, a kind of ecological permeable road surface, comprise permeable brick layer 7, permeable brick layer 7 is laid by above-mentioned gap water-permeable brick 1 group, the road surface laid by this permeable brick layer 7 has good water permeability, rainwater or municipal sewage can obtain by the clearance groove 5 in permeable brick layer 7 oozing down in time, water in permeable brick layer 7 can penetrate into below permeable brick layer 7, permeable brick layer 7 is provided with washing rice rock layers 8 below, rainwater penetrates in washing rice rock layers 8 by clearance groove 5, washing rice rock layers 8 is laid by washing rice stone and is formed, washing rice stone granulate diameter is 2-5mm, the hardness of washing meter Shi is higher, the washing rice rock layers 8 of laying plays the effect supporting permeable brick layer 7, there is good support performance, the particle diameter of washing meter Shi is preferably 3mm, the diameter of washing meter Shi is moderate, washing rice stone is distributed more even, the washing rice rock layers 8 of being laid by this washing rice stone has good stationarity, washing rice rock layers 8 is equipped with pervious layer 9 downwards successively, graded broken stone layer 10, impervious layer 12, in the present embodiment, pervious layer 9 is formed by permeable geotextile laying, permeable geotextiles is by the water permeability geosynthetics of synthetic fibers by acupuncture or braiding, permeable geotextiles has outstanding filtration, isolation, reinforcement protection effect, permeable geotextile laying is being washed rice rock layers 8 times, rainwater continues infiltration downwards through permeable geotextiles, some impurity washed in rice stone particles and water can be filtered down by permeable geotextiles, this pervious layer 9 plays the effect of filtering rainwater, rainwater after filtration enters into graded broken stone layer 10, graded broken stone layer 10 is laid by graded broken stone and is formed, graded broken stone to be gathered materials the compound formed by grade of all sizes, the diameter of graded broken stone is 5-20mm, this graded broken stone is laid on foundation surface, as the subbase of this Ecological Road, because the crushing rate of graded broken stone is less, degree of compaction meets the requirement of road pavement, using graded broken stone layer 10 as subbase, compaction capacity is better, this ecological pavement is made to have good withstand voltage properties, road surface is more steady.
As figure, , shown in, impervious layer 12 is laid on the below of graded broken stone layer 10, impervious layer 12 is laid by waterproof geomembrane and is formed, waterproof geomembrane has good barrier performance, can stop that rainwater penetrates in earth's surface under backward by graded broken stone layer 10, the recovery of rainwater is facilitated to recycle, graded broken stone layer 10 is provided with drainage pipe 11, drainage pipe 11 comprises several blind pipes, for discharging rainwater, blind pipe is by fiber, plastics and synthetic rubber are that raw material is made, its material hydrophobic, there is high surface infiltration ability and inner water passing capacity, blind pipe is laid in graded broken stone layer 10, rainwater in graded broken stone layer 10 discharges by blind pipe, blind pipe is communicated with the purifier 13 of purifying rainwater, rainwater is by being discharged into purifier 13 after blind pipe, be subject to the impact of acid rain, containing more acid element in the rainwater collected, by purifier 13, the acid element in the rainwater of collection is neutralized, purifier 13 is connected with city domestic water pipeline 14, rainwater is discharged in city domestic water pipeline 14 after purifier 13 purifies, by city domestic water pipeline 14 to city conveying living water use, realize the recycling of rainwater, greatly save water resource, can be purified rainwater by purifier 13, ensure that the rainwater after the recovery that people use is clean, health.
The above is only the preferred embodiment of the present invention, protection scope of the present invention be not only confined to above-described embodiment, and all technical schemes belonged under thinking of the present invention all belong to protection scope of the present invention.It should be pointed out that for those skilled in the art, some improvements and modifications without departing from the principles of the present invention, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (10)

1. a gap water-permeable brick group, comprise several gap water-permeable bricks, gap water-permeable brick described in each comprises four sides, it is characterized in that: on gap water-permeable brick described in each, wherein have on two adjacent sides and be provided with locating piece, remain on two adjacent sides and be provided with location division; Locating piece on gap water-permeable brick described in each coordinates with the location division on adjacent gap water-permeable brick, is provided with clearance groove, is provided with filler in described clearance groove between adjacent two described gap water-permeable bricks.
2. gap according to claim 1 water-permeable brick group, is characterized in that: described filler comprises washing meter Shi, and clearance groove fills up by described washing meter Shi.
3. gap according to claim 2 water-permeable brick group, is characterized in that: the width of described clearance groove is 5-12mm.
4. gap according to claim 3 water-permeable brick group, is characterized in that: the width of described clearance groove is 6-10mm.
5. gap according to claim 4 water-permeable brick group, is characterized in that: be provided with the expansion stream portion increasing flow in storm-water drainage to clearance groove between adjacent two described gap water-permeable bricks, described expansion stream portion is positioned at directly over clearance groove.
6. gap according to claim 5 water-permeable brick group, it is characterized in that: the sidewall of adjacent two described gap water-permeable bricks is provided with concave part relative one by one, described concave part vertically runs through the upper and lower end face of gap water-permeable brick, and concave part fills up by washing meter Shi.
7. an ecological permeable road surface, comprise permeable brick layer, it is characterized in that: described permeable brick layer is laid by the gap water-permeable brick group in the claims 1 to 6 described in any and formed, described permeable brick layer is arranged with washing rice rock layers, and rainwater is seeped in washing rice rock layers under after clearance groove.
8. ecological permeable road surface according to claim 7, is characterized in that: described washing rice rock layers is equipped with pervious layer, graded broken stone layer, impervious layer downwards successively.
9. ecological permeable road surface according to claim 8, is characterized in that: described graded broken stone layer is provided with drainage pipe.
10. ecological permeable road surface according to claim 9, it is characterized in that: described drainage pipe is communicated with the purifier of purifying rainwater, described purifier is connected with city domestic water pipeline, and rainwater is discharged in city domestic water pipeline after purifier purification.
CN201511022522.2A 2015-12-30 2015-12-30 Gap water-permeable brick group and the ecological permeable road surface formed using brick group laying Active CN105544336B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511022522.2A CN105544336B (en) 2015-12-30 2015-12-30 Gap water-permeable brick group and the ecological permeable road surface formed using brick group laying

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511022522.2A CN105544336B (en) 2015-12-30 2015-12-30 Gap water-permeable brick group and the ecological permeable road surface formed using brick group laying

Publications (2)

Publication Number Publication Date
CN105544336A true CN105544336A (en) 2016-05-04
CN105544336B CN105544336B (en) 2017-11-24

Family

ID=55823869

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511022522.2A Active CN105544336B (en) 2015-12-30 2015-12-30 Gap water-permeable brick group and the ecological permeable road surface formed using brick group laying

Country Status (1)

Country Link
CN (1) CN105544336B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106049217A (en) * 2016-06-16 2016-10-26 昆山通海建材科技有限公司 Assembly type permeable pavement paving c, block bodies and paving structure
CN107447624A (en) * 2017-09-19 2017-12-08 成都多普力电子科技有限公司 A kind of new-type antiskid water suction floor tile
CN108425298A (en) * 2018-05-12 2018-08-21 昆山通海建材科技有限公司 Assembled interlocks gap porous pavement system and its construction method
CN109137664A (en) * 2018-09-26 2019-01-04 天津市水利科学研究院 A kind of water-permeable brick and preparation method thereof using waste ceramic production
CN109403184A (en) * 2018-12-10 2019-03-01 泰州夏北新型绿色建材科技有限公司 A kind of firm type anti-loose anti-theft brick
CN109403181A (en) * 2017-08-16 2019-03-01 仁创生态环保科技股份有限公司 A kind of porous pavement
CN110965419A (en) * 2019-12-17 2020-04-07 福建海峡环保资源开发有限公司 Interlocking assembly block and using method thereof
CN111424488A (en) * 2020-04-27 2020-07-17 扬州富铭新材料有限公司 Floor tile with water absorption and corrosion prevention effects
CN113026465A (en) * 2021-03-25 2021-06-25 王云芳 Siphon water-permeable brick and paving method thereof
CN113549511A (en) * 2021-08-11 2021-10-26 四川郎酒股份有限公司 White spirit cellar yellow water treatment system and method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04272302A (en) * 1991-01-18 1992-09-29 Masahiro Abe Tile
CN201581323U (en) * 2009-12-07 2010-09-15 济南大学 Sidewalk facing brick made from construction waste
CN102433819A (en) * 2011-10-10 2012-05-02 苏鸣 Semi-flexible structure permeable street and pavement method thereof
KR200461118Y1 (en) * 2009-10-16 2012-06-21 박준희 The make road block of stone brick
CN202809427U (en) * 2012-06-15 2013-03-20 苏州舒布洛克景观建材有限公司 Interlocking grass planting brick
CN204238087U (en) * 2014-11-24 2015-04-01 昆山通海建材科技有限公司 Interlocking-type grass-planting brick
CN205295830U (en) * 2015-12-30 2016-06-08 昆山通海建材科技有限公司 Permeate water brick group and use this brick group to lay ecological permeable pavement who forms of gap

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04272302A (en) * 1991-01-18 1992-09-29 Masahiro Abe Tile
KR200461118Y1 (en) * 2009-10-16 2012-06-21 박준희 The make road block of stone brick
CN201581323U (en) * 2009-12-07 2010-09-15 济南大学 Sidewalk facing brick made from construction waste
CN102433819A (en) * 2011-10-10 2012-05-02 苏鸣 Semi-flexible structure permeable street and pavement method thereof
CN202809427U (en) * 2012-06-15 2013-03-20 苏州舒布洛克景观建材有限公司 Interlocking grass planting brick
CN204238087U (en) * 2014-11-24 2015-04-01 昆山通海建材科技有限公司 Interlocking-type grass-planting brick
CN205295830U (en) * 2015-12-30 2016-06-08 昆山通海建材科技有限公司 Permeate water brick group and use this brick group to lay ecological permeable pavement who forms of gap

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106049217B (en) * 2016-06-16 2019-05-17 昆山通海建材科技有限公司 Fabricated permeable paving method and block and paving structure
CN106049217A (en) * 2016-06-16 2016-10-26 昆山通海建材科技有限公司 Assembly type permeable pavement paving c, block bodies and paving structure
CN109403181A (en) * 2017-08-16 2019-03-01 仁创生态环保科技股份有限公司 A kind of porous pavement
CN107447624A (en) * 2017-09-19 2017-12-08 成都多普力电子科技有限公司 A kind of new-type antiskid water suction floor tile
CN107447624B (en) * 2017-09-19 2023-11-14 成都多普力电子科技有限公司 Novel anti-skid water-absorbing floor tile
CN108425298A (en) * 2018-05-12 2018-08-21 昆山通海建材科技有限公司 Assembled interlocks gap porous pavement system and its construction method
CN109137664A (en) * 2018-09-26 2019-01-04 天津市水利科学研究院 A kind of water-permeable brick and preparation method thereof using waste ceramic production
CN109137664B (en) * 2018-09-26 2023-10-31 天津市水利科学研究院 Water permeable brick produced by utilizing waste ceramic and preparation method thereof
CN109403184A (en) * 2018-12-10 2019-03-01 泰州夏北新型绿色建材科技有限公司 A kind of firm type anti-loose anti-theft brick
CN110965419A (en) * 2019-12-17 2020-04-07 福建海峡环保资源开发有限公司 Interlocking assembly block and using method thereof
CN111424488A (en) * 2020-04-27 2020-07-17 扬州富铭新材料有限公司 Floor tile with water absorption and corrosion prevention effects
CN113026465A (en) * 2021-03-25 2021-06-25 王云芳 Siphon water-permeable brick and paving method thereof
CN113549511A (en) * 2021-08-11 2021-10-26 四川郎酒股份有限公司 White spirit cellar yellow water treatment system and method

Also Published As

Publication number Publication date
CN105544336B (en) 2017-11-24

Similar Documents

Publication Publication Date Title
CN105544336A (en) Gap water-permeable brick set and ecological water-permeable pavement formed by brick set in paving manner
CN204728165U (en) Ecological permeable road surface
CN2883464Y (en) Highway structure of realizing rainwater collection and reuse
CN206289491U (en) A kind of pavement, greenery patches harvest water system
CN108193758B (en) Sponge urban road storing and draining structure
CN106917522A (en) A kind of Outdoor Parking position system based on sponge the idea of the city
CN202913366U (en) Device for repairing waterproof and drainage capacity of original medial strip of road in non-excavation manner
CN211472024U (en) Town road laying structure
CN209958165U (en) Assembled gap permeable pavement
CN207032427U (en) A kind of Rainwater collection system suitable for old cell
CN206052850U (en) A kind of roadside greening rainwater regulating pondage system
CN205295830U (en) Permeate water brick group and use this brick group to lay ecological permeable pavement who forms of gap
CN109403181A (en) A kind of porous pavement
KR101375070B1 (en) under stream block
CN102322094A (en) Road surface combined drainage system
CN113174795A (en) Municipal engineering road laying structure and construction method
CN205223761U (en) A biological depression system that is used for blending purification under rainwater
CN219653844U (en) Airport concealed ecological drainage system
CN108951557B (en) Irrigation and flood control dam for hydraulic engineering
CN202202393U (en) Comprehensive road surface drainage system
CN213358201U (en) Urban road partition belt drainage structure
CN205529776U (en) Infiltration structure of waterproof road in road surface
CN111749073A (en) Water permeable reconstruction technology based on existing road base layer
JP2022011215A (en) Storage system
CN206616426U (en) A kind of drainage system for having a pervious function

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination