CN105544336B - Gap water-permeable brick group and the ecological permeable road surface formed using brick group laying - Google Patents
Gap water-permeable brick group and the ecological permeable road surface formed using brick group laying Download PDFInfo
- Publication number
- CN105544336B CN105544336B CN201511022522.2A CN201511022522A CN105544336B CN 105544336 B CN105544336 B CN 105544336B CN 201511022522 A CN201511022522 A CN 201511022522A CN 105544336 B CN105544336 B CN 105544336B
- Authority
- CN
- China
- Prior art keywords
- permeable brick
- water
- permeable
- gap water
- brick
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C5/00—Pavings made of prefabricated single units
- E01C5/04—Pavings made of prefabricated single units made of bricks
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/224—Surface drainage of streets
- E01C11/225—Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
Abstract
The ecological permeable road surface formed the invention discloses a kind of gap water-permeable brick group and using brick group laying, the channel width solved in same row in the prior art between two neighboring water-permeable brick is larger, so that the problem of fastening effect between two neighboring water-permeable brick is poor, its drip irrigation device is a kind of gap water-permeable brick group, including several gap water-permeable bricks, each gap water-permeable brick includes four sides, on each gap water-permeable brick, wherein have and locating piece is provided with two adjacent sides, location division is provided with remaining two adjacent sides;Locating piece on each gap water-permeable brick coordinates with the location division on adjacent gap water-permeable brick, clearance groove is provided between two neighboring gap water-permeable brick, filler is provided with clearance groove, with preferable tightness and stability simultaneously, the ecological permeable road surface has preferable water permeability, and the rainwater after being oozed under collecting simultaneously carries out recycling.
Description
Technical field
The present invention relates to field of road construction, more specifically, it relates to a kind of gap water-permeable brick group and use the brick group
Lay the ecological permeable road surface formed.
Background technology
Urban modernization is evolving, and what is continued to develop therewith is the drainage system in city, in the last few years, the row in city
There is the problem of larger in water system, often due to the imperfection of drainage system, causes city when running into larger heavy rain season
There is the phenomenon of waterlogging, and in order to solve the problems, such as existing waterlogging, people stare at more directions and sight in drainage system
In construction, the problem of more bad so is brought for urban environment on the contrary, such as, sewer is built, ground hollow out is certain
It is used to build subsoil drain after depth, in Japan, a large amount of sewers such as palace has been built, for discharging municipal sewage
To solve the problems, such as urban waterlogging, but at the same time the extensive construction mode of this tradition also destroys the ecology of urban inner
Environment, ecology cannot get coordinated balance development with urban modernization construction, and since 21st century, people are in municipal drainage
On the basis of the sustainable developments of both system Construction and ecology, it is proposed that " sponge city " this design, sponge city, is new one
For Urban Storm Flood management concept, the natural calamity for referring to bring in adaptation environmental change and reply rainwater etc. has good
" elasticity ", water suction when raining, water storage, infiltration, water purification, it is necessary to when the water stored is discharged and is used, construction sponge city,
City is realized nature accumulation, naturally osmotic, self-purification, city Ecology, protection and improvement are repaired it is also possible to realize
Original urban ecological environment.
, can be on the ground in city in order to allow city rainy day rainwater smoothly to penetrate into underground in the construction in sponge city
Water-permeable brick is laid on face, water-permeable brick has good permeable, permeability, and rainwater will not be accumulated in road surface but rapidly permeated into
Underground, improve urban ground fabric and the life condition of edaphon, be " 201420712129.0 " in number of patent application
In one Chinese patent document, a kind of water-permeable brick modelled after an antique is described, the water-permeable brick includes a bottom surface, a top surface and four
Side, bottom surface, top surface and four sides form cuboid, and bottom surface, top surface and side are wavy setting, are provided with side
Several fixed blocks, often it is provided with the bakie being adapted with fixed block, the installation of the water-permeable brick between two adjacent fixed blocks
Mode continues to install polylith brick one by one, reaches the arrangement moulding shown in Fig. 3 in documents, leaves a lot of and is less than brick
The raceway groove of top surface, in the rainy day, rainwater can drain into raceway groove, and carry out drainage from eminence toward lower along raceway groove, and it is straight to solve rainwater
The problem of being connected on road surface drainage, equally water-permeable brick is progressively installed, reaches the arrangement moulding shown in Fig. 4 in documents,
So that every two pieces of adjacent bricks are mutually fastened by fixed block with bakie, and after such installation, the raceway groove between every two pieces of bricks
Width reduces, and the brick mutually fastens with adjacent brick so that for the brick of the brick surrounding simultaneously in stress, brick, which can care for, reaches more preferable
Fixed effect.
This water-permeable brick modelled after an antique when in use, in order to reach the arrangement moulding in documents shown in Fig. 4, two neighboring brick
On fixed block can mutually be fastened with bakie, still, adjacent two water-permeable bricks need to be bonded into line misregistration, fixed block and bakie
It could mutually fasten, reach the effect of fastening, when realizing fastening between the water-permeable brick that adjacent two rows row is placed, same row
In fixed block on adjacent two water-permeable bricks be it is relative, therefore, the raceway groove in same row between two neighboring water-permeable brick
Width is larger, so that the fastening effect between two neighboring water-permeable brick is poor, even more seriously, two water-permeable bricks are located at
The both sides of raceway groove are sunk by excessive Action of Gravity Field, tilt two water-permeable bricks and tilt, water-permeable brick easily produces rupture, caused
Road surface is damaged.
The content of the invention
In view of the deficienciess of the prior art, it is an object of the invention to provide a kind of two gap water-permeable bricks of arbitrary neighborhood
Between can align cooperation, gap water-permeable brick group with preferable tightness and stability and preferable with water permeability,
Rear rainwater is oozed under collecting and carries out the ecological permeable road surface of recycling.
To achieve the above object, the invention provides following technical scheme:A kind of gap water-permeable brick group, including several seams
Gap water-permeable brick, each gap water-permeable brick includes a bottom surface, a top surface and four sides, saturating in each described gap
On water brick, locating piece is provided with two adjacent sides wherein having, is provided with location division on remaining two adjacent sides, often
Locating piece on the one gap water-permeable brick coordinates with the location division on adjacent gap water-permeable brick, and the two neighboring gap is saturating
Clearance groove is provided between water brick, filler is provided with the clearance groove.
By using above-mentioned technical proposal, two adjacent sides are provided with locating piece on each gap water-permeable brick, in addition
Two adjacent sides are provided with the location division coordinated with locating piece, and two gap water-permeable bricks of arbitrary neighborhood can be by fixed
Position portion and locating piece alignment, compared with prior art, four sides of gap water-permeable brick can be simultaneously permeable with four gaps
Brick alignment fastening, adjacent gap water-permeable brick stress, the gap water-permeable brick group that the gap water-permeable brick arrangement forms can have simultaneously
There are preferable stability and fastness, filler is set in clearance groove, filled out by filler in clearance groove, it is saturating to improve gap
The tightness of two neighboring gap water-permeable brick in water brick group, avoid two neighboring gap water-permeable brick from being acted on by external force and produce dislocation
The situation of deformation occurs.
Further, the filler includes washing meter Shi, and the washing meter Shi fills up clearance groove.
By using above-mentioned technical proposal, sand grains fills up clearance groove, can increase tight between two neighboring water-permeable brick
The road surface of gathering property, sand grains and the laying of water-permeable brick group has preferable tightness, the water-permeable brick that water-permeable brick can be adjacent with four sides
Common stress, the gap water-permeable brick group have stronger fastness, meanwhile, the stacking space of sand grains is bigger, rainy day, rainwater
Enter in clearance groove, permeated downwards from stacking in space, clearance groove is kept preferable water permeability, facilitate rainwater by
Slot is penetrated down into underground.
Further, the width of the clearance groove is 5-12mm.
By using above-mentioned technical proposal, clearance groove is too small, and rainwater can be discharged timely, and waterlogging problem cannot have
The alleviation of effect, clearance groove is too big, and the tightness between two adjacent slits water-permeable bricks is poor, easily produced by external force deformation or
Person is damaged.
Further, the width of the clearance groove is 6-10mm.
By using above-mentioned technical proposal, the width of clearance groove is preferably 6mm to 10mm, and the clearance groove is possessing preferably
While drainage performance, high-heeled shoes can also be avoided to prick and occurred into the situation in clearance groove, the gap water-permeable brick group more meets city
The hommization demand of city's road.
Further, increase rainwater is provided between the two neighboring gap water-permeable brick and is discharged into flow in clearance groove
Expand stream portion, the surface expanded stream portion and be located at clearance groove.
By using above-mentioned technical proposal, expand stream portion and be used to increase the flow that rainwater is discharged into clearance groove, expand stream portion bag
The adjacent side of two gap water-permeable bricks is included along the chamfer set, two chamfers increase the space of notch above clearance groove
Greatly, can be increased in certain time by the rainwater flow of clearance groove, the road surface being paved into by this gap water-permeable brick group, even in
In the case that rainfall is larger, also can in time, efficiently carry out discharge rainwater.
Further, concave part relative one by one is provided with the side wall of the two neighboring gap water-permeable brick, it is described recessed
Groove portion runs through the upper and lower end face of gap water-permeable brick vertically, and washing meter Shi fills up concave part.
By using above-mentioned technical proposal, concave part is provided between two adjacent water-permeable bricks, by concave part
Washing meter Shi can be filled up, the dislocation movement between two neighboring water-permeable brick is reduced, improves what is connected between water-permeable brick and water-permeable brick
Firm performance, the road surface being paved into by the water-permeable brick group are relatively more steady, firm.
Further, a kind of ecological permeable road surface, including permeable brick layer, the permeable brick layer is by above-mentioned gap water-permeable brick group
Laying forms, and the permeable brick layer is arranged with washing rice rock layers, and rainwater is by being seeped under after clearance groove in washing rice rock layers.
By using above-mentioned technical proposal, the road surface of the permeable brick layer laying has preferable water permeability, rainwater
Or municipal sewage can obtain oozing down in time by the clearance groove in permeable brick layer, it is higher to wash meter Shi hardness, laying
The washing rice rock layers formed play a part of the permeable brick layer of support, have preferable support performance and stationarity.
Further, the washing rice rock layers are equipped with downwards pervious bed, graded broken stone layer, impermeable stratum successively.
By using above-mentioned technical proposal, pervious bed is formed by permeable geotextile laying, by permeable geotextile laying in water
Wash under meter rock layers, rainwater continues infiltration downwards through permeable geotextiles, and the impurity in some washing rice stone particles and water can lead to
Cross permeable geotextiles to filter down, play the effect of filtering rainwater, impermeable stratum is formed by the laying of waterproof geomembrane, waterproof
Geomembrane has preferable barrier performance, can stop rainwater by graded broken stone layer it is backward under penetrate into earth's surface, facilitate rain
The recovery of water is recycled.
Further, it is provided with drainage pipeline on the graded broken stone layer.
By using above-mentioned technical proposal, drainage pipeline includes several blind pipes, for discharging rainwater, has high table
Sweat ability and internal water passing capacity, blind pipe is laid in graded broken stone layer, and blind pipe enters the rainwater in graded broken stone layer
Row discharge.
Further, the drainage pipeline is communicated with the purifier of purifying rainwater, and the purifier is connected with city
Domestic water line, rainwater are discharged into after purifier purifies in city domestic water pipeline.
By using above-mentioned technical proposal, purifier neutralizes to the acid element in rainwater, rainwater is reached dry
Only, hygienic standard, conveyed by city domestic water pipeline to people, can solve the problems, such as some areas water shortage, few water,
Meets the needs of people's domestic water.
Brief description of the drawings
Fig. 1 is the structural representation one of gap water-permeable brick group;
Fig. 2 is the structural representation two of gap water-permeable brick group;
Fig. 3 is A portions enlarged diagram in Fig. 2;
Fig. 4 is the structural representation three of gap water-permeable brick group;
Fig. 5 is ecological permeable pavement structure schematic diagram.
In figure:1st, gap water-permeable brick;2nd, locating piece;3rd, concave part;401st, location division;4th, raised line;5th, clearance groove;6th, expand
Stream portion;7th, permeable brick layer;8th, rice rock layers are washed;9th, pervious bed;10th, graded broken stone layer;11st, drainage pipeline;12nd, impermeable stratum;
13rd, purifier;14th, city domestic water pipeline.
Embodiment
The embodiment on the ecological permeable road surface formed referring to figs. 1 to Fig. 5 opposite joints gap water-permeable brick group and using brick group laying
It is described further.
As depicted in figs. 1 and 2, a kind of 1 group of gap water-permeable brick and the ecological permeable road surface formed using brick group laying, its
In, a kind of 1 group of gap water-permeable brick, including several gap water-permeable bricks 1, each gap water-permeable brick 1 include a bottom surface,
One top surface and four sides, bottom surface, top surface and four sides form a cuboid or square, saturating in each gap
On water brick 1, locating piece 2 is provided with two adjacent sides wherein having, locating piece 2 is shaped as strip, and setting is arranged on
On the side of water-permeable brick, and the location division 401 coordinated with locating piece 2 is provided with remaining two sides got off, in this implementation
In example, location division 401 includes two raised lines 4, and two erected parallels of raised line 4 are on the side of water-permeable brick, between two raised lines 4
A groove with the cooperation of locating piece 2 is formed, the locating piece 2 on each gap water-permeable brick 1 can be permeable with adjacent gap
Location division 401 on brick 1 coordinates, as shown in Figures 2 and 3, on a gap water-permeable brick 1 two sides with locating piece 2 with
Location division 401 on two neighboring gap water-permeable brick 1 is fastened, and plays the fastening effect between water-permeable brick and water-permeable brick, together
When, the gap water-permeable brick 1 that remaining two sides with location division 401 can also be adjacent with two other is fastened, because
This, compared with prior art, four sides of a gap water-permeable brick 1 can be entered with other four same slit water-permeable bricks 1 simultaneously
Row fastening, and locating piece 2 on gap water-permeable brick 1 and location division 401 are alignd one by one, thus are avoided that dislocation snap fastener strap is permeable
The problem of in brick arrangement, in actual production process, it is only necessary to a set of tool of production produces a kind of this gap water-permeable brick 1, without
Need as current most of manufacturers, prepare two sets of tool of production production male and female fragments of brick and coordinated, therefore, save one
A little production costs, several gap water-permeable bricks 1 can be arranged in 1 group of the gap water-permeable brick of multiple lines and multiple rows, adjacent a line or one
The fastening effect of water-permeable brick and water-permeable brick can be realized between the water-permeable brick group of row by locating piece 2 and location division 401, is carried
The stability and fastness of high gap water-permeable brick 1.
As shown in figure 1, being provided with certain clearance groove 5 between two neighboring gap water-permeable brick 1, it is provided with clearance groove 5
Filler, filler can be washing meter Shi, cement or sand grains, in embodiment, be preferably filled with thing as washing meter Shi, washing
Meter Shi has the advantages that density is big, hardness is high, wear-resisting, washes that meter Shi hardness is higher, and vehicle pushes not on by road surface
Rupture is easily produced, clearance groove 5 is filled up by washing meter Shi, increases the compactedness between two neighboring water-permeable brick, makes
The road surface of water-permeable brick group laying has preferable tightness, meanwhile, meter Shi a diameter of 2-5mm is washed, washes meter Shi diameter
During less than 2mm, single washing meter Shi volume is smaller, is filled in the internal ratio comparatively dense of clearance groove 5, easily makes the clearance groove 5
Hydrophobic performance is reduced, or even clearance groove 5 is blocked, and rainwater is not easy the lower section from clearance groove 5 to earth's surface and permeated, and washes the straight of meter Shi
When footpath is more than 5mm, single washing meter Shi volume is bigger, and washing meter Shi heap, to put away space excessive, adjacent water-permeable brick it
Between fastening performance than relatively low, therefore, the diameter for washing meter Shi is preferably 2-5mm, while good hydrophobic effect is reached,
Make that there is preferable fastening performance between water-permeable brick, road surface is more stable, and the width of clearance groove 5 is 5mm to 12mm, if clearance groove
When 5 width is less than 5mm, because the width of clearance groove 5 is smaller, rainwater easily collects at clearance groove 5, passes through in the unit interval
The rainwater flow that clearance groove 5 penetrates into underground is less, rainfall larger season or it is regional when, rainwater cannot be arranged timely
Put, easily product is on road surface, if serious, the problem of alleviating waterlogging effect it is poor, if the width of clearance groove 5 is more than
During 12mm, the gap between two adjacent gap water-permeable bricks 1 is excessive, cause tightness between two gap water-permeable bricks 1 compared with
Difference, therefore, 5 to 12mm, the clearance groove 5 has preferable draining, alleviates the effect of waterlogging, so for the width design of clearance groove 5
And, it is contemplated that in city, the Ms to wear high heels is relatively more, walks on the road surface that 1 group of laying of the gap water-permeable brick forms,
The footwear root of high-heeled shoes is easily pricked into clearance groove 5, and therefore, further, the width of clearance groove 5 is preferably 6mm to 10mm, between being somebody's turn to do
Slot 5 can also avoid high-heeled shoes from pricking and occur into the situation in clearance groove 5 while possessing preferable drainage performance, the seam
The hommization demand that 1 group of gap water-permeable brick more meets urban road.
Expand stream portion 6 as shown in figure 4, being provided between two adjacent gap water-permeable bricks 1, for increasing between rainwater is discharged into
Flow in slot 5, expand the surface that stream portion 6 is located at clearance groove 5, expanding stream portion 6 includes the adjacent side of two gap water-permeable bricks 1
Along the chamfer set, two chamfers increase the space of the top notch of clearance groove 5, can pass through clearance groove in certain time
5 rainwater flow increase, by this 1 group of road surface being paved into of gap water-permeable brick, in the case that rainfall is larger, also can and
When, efficiently carry out discharge rainwater.
As shown in Figures 2 and 3, it is provided with the concave part being oppositely arranged one by one in the side wall of two neighboring gap water-permeable brick 1
3, concave part 3 runs through the upper and lower end face of gap water-permeable brick 1 straight down, and washing meter Shi enters be oppositely arranged two concave parts 3
Go and fill up, error is understood due to being docked between water-permeable brick and water-permeable brick, by outer on road surface between two neighboring water-permeable brick
Relative skew can be produced when forcing power, causes road surface unstable, therefore, concave part is provided between two adjacent water-permeable bricks
3, by concave part 3 can fill up washing meter Shi, reduce between two neighboring water-permeable brick dislocation movement, improve water-permeable brick with thoroughly
The firm performance connected between water brick, the road surface being paved into by the water-permeable brick group are relatively more steady, firm.
As shown in figure 5, a kind of ecological permeable road surface, including permeable brick layer 7, permeable brick layer 7 is by above-mentioned 1 group of gap water-permeable brick
What laying formed, the road surface laid by the permeable brick layer 7 has preferable water permeability, and rainwater or municipal sewage can
To obtain oozing down in time by the clearance groove 5 in permeable brick layer 7, the water in permeable brick layer 7 can be penetrated under permeable brick layer 7
Washing rice rock layers 8 are provided below in face, permeable brick layer 7, and rainwater is penetrated into washing rice rock layers 8 by clearance groove 5, washes meter Shi
Layer 8 is formed by the laying of washing rice stone, and washing rice stone particle diameter is 2-5mm, washes the water that meter Shi hardness is higher, lays
Wash meter rock layers 8 and play a part of the permeable brick layer 7 of support, there is preferable support performance, the particle diameter for washing meter Shi is preferably
3mm, it is moderate to wash meter Shi diameter, makes the distribution of washing rice stone than more uniform, the washing meter Shi formed by washing rice stone laying
Layer 8 has preferable stationarity, and washing rice rock layers 8 are equipped with pervious bed 9, graded broken stone layer 10, impermeable stratum 12 successively downwards,
In the present embodiment, pervious bed 9 is formed by permeable geotextile laying, and permeable geotextiles are to pass through acupuncture or braiding by synthetic fibers
The water penetration geosynthetics formed, permeable geotextiles have outstanding filtering, isolation, reinforcement protection effect, by permeable soil
Work cloth is laid under washing rice rock layers 8, and rainwater continues infiltration downwards through permeable geotextiles, in some washing rice stone particles and water
Impurity can be filtered down by permeable geotextiles, the pervious bed 9 plays the effect of filtering rainwater, and rainwater after filtering enters
To graded broken stone layer 10, graded broken stone layer 10 is formed by graded broken stone laying, and graded broken stone is by grade collection of all sizes
Expect the compound of composition, a diameter of 5-20mm of graded broken stone, this graded broken stone is laid on foundation surface, as the life
The underlayment of state road, because the crushing rate of graded broken stone is smaller, compactness meets the requirement of road pavement, by graded broken stone layer
10 are used as underlayment, and compaction capacity is preferable, make the ecological pavement have preferably pressure-resistant performance, road surface more steady.
As figure, it is shown, impermeable stratum 12 is laid on the lower section of graded broken stone layer 10, and impermeable stratum 12 is by waterproof geotechnique
Film laying forms, and waterproof geomembrane has preferable barrier performance, can stop rainwater by graded broken stone layer 10 it is backward under
Penetrate into earth's surface, facilitate the recovery of rainwater to be recycled, drainage pipeline 11, drainage pipeline are provided with graded broken stone layer 10
11 include several blind pipes, and for discharging rainwater, blind pipe is made up of fiber, plastics and synthetic rubber of raw material, and its material is hated
Water, there is high surface infiltration ability and internal water passing capacity, blind pipe is laid in graded broken stone layer 10, blind pipe is by grading
Rainwater in metalling 10 is discharged, and blind pipe is communicated with the purifier 13 of purifying rainwater, and rainwater after blind pipe by being discharged into
Purifier 13, is influenceed by acid rain, and more acid element is contained in the rainwater being collected into, and will be received by purifier 13
Acid element in the rainwater of collection is neutralized, and purifier 13 is connected with city domestic water pipeline 14, and rainwater is by purification
Device 13 is discharged into city domestic water pipeline 14 after purifying, and conveying life to city by city domestic water pipeline 14 uses
Water, the recycling of rainwater is realized, greatlys save water resource, rainwater can purified by purifier 13, ensured
Rainwater after the recovery that people use is clean, sanitary.
Described above is only the preferred embodiment of the present invention, and protection scope of the present invention is not limited merely to above-mentioned implementation
Example, all technical schemes belonged under thinking of the present invention belong to protection scope of the present invention.It should be pointed out that for the art
Those of ordinary skill for, some improvements and modifications without departing from the principles of the present invention, these improvements and modifications
It should be regarded as protection scope of the present invention.
Claims (5)
1. a kind of gap water-permeable brick group, including several gap water-permeable bricks, each gap water-permeable brick includes four sides, its
It is characterised by:On each described gap water-permeable brick, locating piece is provided with two adjacent sides wherein having, it is remaining two
Location division is provided with adjacent side;Locating piece on each gap water-permeable brick on adjacent gap water-permeable brick with determining
Position portion coordinates, and washing rice rock layers are equipped with the gap water-permeable brick group, are provided between the two neighboring gap water-permeable brick
Clearance groove, is provided with filler in the clearance groove, and the filler includes washing meter Shi, and the washing meter Shi fills out clearance groove
Full, the width of the clearance groove be 6-10mm, is provided with and increases between rainwater is discharged between the two neighboring gap water-permeable brick
The expansion stream portion of flow in slot, the surface expanded stream portion and be located at clearance groove, the side wall of the two neighboring gap water-permeable brick
On be provided with concave part relative one by one, the concave part runs through the upper and lower end face of gap water-permeable brick vertically, and washing meter Shi will be recessed
Groove portion is filled up.
2. a kind of ecological permeable road surface, including permeable brick layer, it is characterised in that:The permeable brick layer is by the institute of the claims 1
The gap water-permeable brick group laying stated forms, and the permeable brick layer is arranged with washing rice rock layers, and rainwater is by oozing under after clearance groove
Into washing rice rock layers.
3. ecological permeable road surface according to claim 2, it is characterised in that:The washing rice rock layers are equipped with downwards successively
Pervious bed, graded broken stone layer, impermeable stratum.
4. ecological permeable road surface according to claim 3, it is characterised in that:Drainpipe is provided with the graded broken stone layer
Road.
5. ecological permeable road surface according to claim 4, it is characterised in that:The drainage pipeline is communicated with purifying rainwater
Purifier, the purifier are connected with city domestic water pipeline, and rainwater is discharged into city after purifier purifies
In domestic water line.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511022522.2A CN105544336B (en) | 2015-12-30 | 2015-12-30 | Gap water-permeable brick group and the ecological permeable road surface formed using brick group laying |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511022522.2A CN105544336B (en) | 2015-12-30 | 2015-12-30 | Gap water-permeable brick group and the ecological permeable road surface formed using brick group laying |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105544336A CN105544336A (en) | 2016-05-04 |
CN105544336B true CN105544336B (en) | 2017-11-24 |
Family
ID=55823869
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201511022522.2A Active CN105544336B (en) | 2015-12-30 | 2015-12-30 | Gap water-permeable brick group and the ecological permeable road surface formed using brick group laying |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105544336B (en) |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106049217B (en) * | 2016-06-16 | 2019-05-17 | 昆山通海建材科技有限公司 | Fabricated permeable paving method and block and paving structure |
CN109403181A (en) * | 2017-08-16 | 2019-03-01 | 仁创生态环保科技股份有限公司 | A kind of porous pavement |
CN107447624B (en) * | 2017-09-19 | 2023-11-14 | 成都多普力电子科技有限公司 | Novel anti-skid water-absorbing floor tile |
CN108425298A (en) * | 2018-05-12 | 2018-08-21 | 昆山通海建材科技有限公司 | Assembled interlocks gap porous pavement system and its construction method |
CN109137664B (en) * | 2018-09-26 | 2023-10-31 | 天津市水利科学研究院 | Water permeable brick produced by utilizing waste ceramic and preparation method thereof |
CN109403184A (en) * | 2018-12-10 | 2019-03-01 | 泰州夏北新型绿色建材科技有限公司 | A kind of firm type anti-loose anti-theft brick |
CN110965419A (en) * | 2019-12-17 | 2020-04-07 | 福建海峡环保资源开发有限公司 | Interlocking assembly block and using method thereof |
CN111424488A (en) * | 2020-04-27 | 2020-07-17 | 扬州富铭新材料有限公司 | Floor tile with water absorption and corrosion prevention effects |
CN113026465A (en) * | 2021-03-25 | 2021-06-25 | 王云芳 | Siphon water-permeable brick and paving method thereof |
CN113549511A (en) * | 2021-08-11 | 2021-10-26 | 四川郎酒股份有限公司 | White spirit cellar yellow water treatment system and method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04272302A (en) * | 1991-01-18 | 1992-09-29 | Masahiro Abe | Tile |
CN201581323U (en) * | 2009-12-07 | 2010-09-15 | 济南大学 | Sidewalk facing brick made from construction waste |
CN102433819A (en) * | 2011-10-10 | 2012-05-02 | 苏鸣 | Semi-flexible structure permeable street and pavement method thereof |
KR200461118Y1 (en) * | 2009-10-16 | 2012-06-21 | 박준희 | The make road block of stone brick |
CN202809427U (en) * | 2012-06-15 | 2013-03-20 | 苏州舒布洛克景观建材有限公司 | Interlocking grass planting brick |
CN204238087U (en) * | 2014-11-24 | 2015-04-01 | 昆山通海建材科技有限公司 | Interlocking-type grass-planting brick |
CN205295830U (en) * | 2015-12-30 | 2016-06-08 | 昆山通海建材科技有限公司 | Permeate water brick group and use this brick group to lay ecological permeable pavement who forms of gap |
-
2015
- 2015-12-30 CN CN201511022522.2A patent/CN105544336B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04272302A (en) * | 1991-01-18 | 1992-09-29 | Masahiro Abe | Tile |
KR200461118Y1 (en) * | 2009-10-16 | 2012-06-21 | 박준희 | The make road block of stone brick |
CN201581323U (en) * | 2009-12-07 | 2010-09-15 | 济南大学 | Sidewalk facing brick made from construction waste |
CN102433819A (en) * | 2011-10-10 | 2012-05-02 | 苏鸣 | Semi-flexible structure permeable street and pavement method thereof |
CN202809427U (en) * | 2012-06-15 | 2013-03-20 | 苏州舒布洛克景观建材有限公司 | Interlocking grass planting brick |
CN204238087U (en) * | 2014-11-24 | 2015-04-01 | 昆山通海建材科技有限公司 | Interlocking-type grass-planting brick |
CN205295830U (en) * | 2015-12-30 | 2016-06-08 | 昆山通海建材科技有限公司 | Permeate water brick group and use this brick group to lay ecological permeable pavement who forms of gap |
Also Published As
Publication number | Publication date |
---|---|
CN105544336A (en) | 2016-05-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105544336B (en) | Gap water-permeable brick group and the ecological permeable road surface formed using brick group laying | |
CN206752614U (en) | A kind of sponge-type road sinks formula afforests dividing strip Rainwater collection system | |
CN105714911A (en) | Low-influence region rainwater treatment and utilization system and region rainwater treatment method | |
CN2883464Y (en) | Highway structure of realizing rainwater collection and reuse | |
CN203049610U (en) | Road cutting pile-plank trough type retaining wall structure for railway rich water area | |
CN203080678U (en) | Environment-friendly community shock-resistant rainwater ecological utilizing system | |
CN205348354U (en) | System that utilizes is handled to regional low rainwater that influences | |
CN208023593U (en) | A kind of foundation pit fertilizer slot backfill structure in sponge city | |
CN109024458A (en) | A kind of coal mine subsidence land landscape revetment and the construction method of water-bed antiseepage | |
CN211472024U (en) | Town road laying structure | |
CN109457566A (en) | A kind of assembled gap porous pavement | |
CN209958165U (en) | Assembled gap permeable pavement | |
CN103266633A (en) | Seepage-proof sewage discharging and floodwater draining method for tailing reservoir in wet metallurgy | |
CN207376761U (en) | concrete prefabricated rainwater seepage well | |
CN110226379A (en) | The saline and alkaline region water resource of the automatic dripping irrigation of the structure containing terraced fields, which is regulated and stored, utilizes system | |
CN205295830U (en) | Permeate water brick group and use this brick group to lay ecological permeable pavement who forms of gap | |
CN1252361C (en) | Water resource recovering systems | |
CN205223761U (en) | A biological depression system that is used for blending purification under rainwater | |
CN110230345A (en) | Saline and alkaline regional architecture and greenery patches water resource, which are regulated and stored, utilizes system | |
CN214800636U (en) | Concealed pipe salt discharge, separation and control foundation structure for saline-alkali soil improvement | |
CN110226380A (en) | The saline and alkaline regional water resources of automatic irrigation, which are regulated and stored, utilizes system | |
CN205529776U (en) | Infiltration structure of waterproof road in road surface | |
CN107354989A (en) | A kind of Rainwater collection system suitable for old cell | |
CN210288156U (en) | Rainwater and sewage diversion tunnel | |
CN106436820A (en) | Rainwater seepage and drainage equipment for municipal administration and installing method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |