CN105543554A - Comprehensive dust fall control box for roadway - Google Patents

Comprehensive dust fall control box for roadway Download PDF

Info

Publication number
CN105543554A
CN105543554A CN201510982384.6A CN201510982384A CN105543554A CN 105543554 A CN105543554 A CN 105543554A CN 201510982384 A CN201510982384 A CN 201510982384A CN 105543554 A CN105543554 A CN 105543554A
Authority
CN
China
Prior art keywords
speed
alloy material
room temperature
min again
warming
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510982384.6A
Other languages
Chinese (zh)
Inventor
顾俊元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGSHU YIANDA ELECTRIC APPLIANCE Co Ltd
Original Assignee
CHANGSHU YIANDA ELECTRIC APPLIANCE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGSHU YIANDA ELECTRIC APPLIANCE Co Ltd filed Critical CHANGSHU YIANDA ELECTRIC APPLIANCE Co Ltd
Priority to CN201510982384.6A priority Critical patent/CN105543554A/en
Publication of CN105543554A publication Critical patent/CN105543554A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C9/00Alloys based on copper
    • C22C9/10Alloys based on copper with silicon as the next major constituent
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22FCHANGING THE PHYSICAL STRUCTURE OF NON-FERROUS METALS AND NON-FERROUS ALLOYS
    • C22F1/00Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working
    • C22F1/08Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working of copper or alloys based thereon
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F5/00Means or methods for preventing, binding, depositing, or removing dust; Preventing explosions or fires

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Organic Chemistry (AREA)
  • Metallurgy (AREA)
  • Mechanical Engineering (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Heat Treatment Of Sheet Steel (AREA)
  • Processing Of Solid Wastes (AREA)
  • Heat Treatment Of Steel (AREA)

Abstract

The invention discloses a comprehensive dust fall control box for a roadway. The comprehensive dust fall control box for the roadway comprises a metal body made of alloy materials subjected to heat treatment. The components of the alloy materials include 1-2% of Si, 0.5% of N, 0.3% of B, 0.7% of Be, 0.2% of Co, 0.4% of Sb and the balance Cu and unavoidable impurities. The alloy materials are subjected to heat treatment through the following steps that (1) the temperature is raised to 655 DEG C at the speed of 25 DEG C/min and kept for 3.5 h; (2) the temperature is reduced to the room temperature at the speed of 35 DEG C/min; (3) the temperature is raised to 755 DEG C at the speed of 20 DEG C/min and kept for 2.5 h; and (4) the temperature is reduced to the room temperature at the speed of 15 DEG C/min. The metal body of the comprehensive dust fall control box for the roadway is good in performance, and the service life is long.

Description

Tunnel integrated dust-removing controlling box
Technical field
The present invention relates to tunnel integrated dust-removing controlling box.
Background technology
The tunnel work under bad environment of integrated dust-removing controlling box, to its metal master performance requriements higher.
Summary of the invention
The object of the present invention is to provide a kind of tunnel integrated dust-removing controlling box, its metal master is made by through heat treated alloy material, and metal master is lightweight, intensity is high, abrasion-resistant, corrosion-resistant, heat-resisting, cold-resistant, antioxidant property is good, and duration of service is long.
For achieving the above object, technical scheme of the present invention is a kind of tunnel of design integrated dust-removing controlling box, and comprise metal master, described metal master is made by through heat treated alloy material, and by weight percentage, the composition of this alloy material is:
Si:1~2%,
N:0.5%,
B:0.3%,
Be:0.7%,
Co:0.2%,
Sb:0.4%,
Surplus is Cu and inevitable impurity;
Described alloy material is heat-treated as follows:
1) be warming up to 655 DEG C with the speed of 25 DEG C/min, be incubated 3.5 hours;
2) room temperature is cooled to the speed of 35 DEG C/min again;
3) be warming up to 755 DEG C with the speed of 20 DEG C/min again, be incubated 2.5 hours;
4) room temperature is cooled to the speed of 15 DEG C/min again.
Preferably, tunnel integrated dust-removing controlling box, comprises metal master, and described metal master is made by through heat treated alloy material, and by weight percentage, the composition of this alloy material is:
Si:1%,
N:0.5%,
B:0.3%,
Be:0.7%,
Co:0.2%,
Sb:0.4%,
Surplus is Cu and inevitable impurity;
Described alloy material is heat-treated as follows:
1) be warming up to 655 DEG C with the speed of 25 DEG C/min, be incubated 3.5 hours;
2) room temperature is cooled to the speed of 35 DEG C/min again;
3) be warming up to 755 DEG C with the speed of 20 DEG C/min again, be incubated 2.5 hours;
4) room temperature is cooled to the speed of 15 DEG C/min again.
Preferably, tunnel integrated dust-removing controlling box, comprises metal master, and described metal master is made by through heat treated alloy material, and by weight percentage, the composition of this alloy material is:
Si:2%,
N:0.5%,
B:0.3%,
Be:0.7%,
Co:0.2%,
Sb:0.4%,
Surplus is Cu and inevitable impurity;
Described alloy material is heat-treated as follows:
1) be warming up to 655 DEG C with the speed of 25 DEG C/min, be incubated 3.5 hours;
2) room temperature is cooled to the speed of 35 DEG C/min again;
3) be warming up to 755 DEG C with the speed of 20 DEG C/min again, be incubated 2.5 hours;
4) room temperature is cooled to the speed of 15 DEG C/min again.
Advantage of the present invention and beneficial effect are: provide a kind of tunnel integrated dust-removing controlling box, its metal master is made by through heat treated alloy material, metal master is lightweight, intensity is high, abrasion-resistant, corrosion-resistant, heat-resisting, cold-resistant, antioxidant property is good, and duration of service is long.
Embodiment
Below in conjunction with embodiment, the specific embodiment of the present invention is further described.Following examples only for technical scheme of the present invention is clearly described, and can not limit the scope of the invention with this.
The technical scheme that the present invention specifically implements is:
Embodiment 1
A kind of tunnel integrated dust-removing controlling box, comprise metal master, described metal master is made by through heat treated alloy material, and by weight percentage, the composition of this alloy material is:
Si:1~2%,
N:0.5%,
B:0.3%,
Be:0.7%,
Co:0.2%,
Sb:0.4%,
Surplus is Cu and inevitable impurity;
Described alloy material is heat-treated as follows:
1) be warming up to 655 DEG C with the speed of 25 DEG C/min, be incubated 3.5 hours;
2) room temperature is cooled to the speed of 35 DEG C/min again;
3) be warming up to 755 DEG C with the speed of 20 DEG C/min again, be incubated 2.5 hours;
4) room temperature is cooled to the speed of 15 DEG C/min again.
Embodiment 2
Tunnel integrated dust-removing controlling box, comprises metal master, and described metal master is made by through heat treated alloy material, and by weight percentage, the composition of this alloy material is:
Si:1%,
N:0.5%,
B:0.3%,
Be:0.7%,
Co:0.2%,
Sb:0.4%,
Surplus is Cu and inevitable impurity;
Described alloy material is heat-treated as follows:
1) be warming up to 655 DEG C with the speed of 25 DEG C/min, be incubated 3.5 hours;
2) room temperature is cooled to the speed of 35 DEG C/min again;
3) be warming up to 755 DEG C with the speed of 20 DEG C/min again, be incubated 2.5 hours;
4) room temperature is cooled to the speed of 15 DEG C/min again.
Embodiment 3
Tunnel integrated dust-removing controlling box, comprises metal master, and described metal master is made by through heat treated alloy material, and by weight percentage, the composition of this alloy material is:
Si:2%,
N:0.5%,
B:0.3%,
Be:0.7%,
Co:0.2%,
Sb:0.4%,
Surplus is Cu and inevitable impurity;
Described alloy material is heat-treated as follows:
1) be warming up to 655 DEG C with the speed of 25 DEG C/min, be incubated 3.5 hours;
2) room temperature is cooled to the speed of 35 DEG C/min again;
3) be warming up to 755 DEG C with the speed of 20 DEG C/min again, be incubated 2.5 hours;
4) room temperature is cooled to the speed of 15 DEG C/min again.
The above is only the preferred embodiment of the present invention; it should be pointed out that for those skilled in the art, under the prerequisite not departing from the technology of the present invention principle; can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (3)

1. tunnel integrated dust-removing controlling box, is characterized in that, comprise metal master, and described metal master is made by through heat treated alloy material, and by weight percentage, the composition of this alloy material is:
Si:1~2%,
N:0.5%,
B:0.3%,
Be:0.7%,
Co:0.2%,
Sb:0.4%,
Surplus is Cu and inevitable impurity;
Described alloy material is heat-treated as follows:
1) be warming up to 655 DEG C with the speed of 25 DEG C/min, be incubated 3.5 hours;
2) room temperature is cooled to the speed of 35 DEG C/min again;
3) be warming up to 755 DEG C with the speed of 20 DEG C/min again, be incubated 2.5 hours;
4) room temperature is cooled to the speed of 15 DEG C/min again.
2. tunnel according to claim 1 integrated dust-removing controlling box, it is characterized in that, comprise metal master, described metal master is made by through heat treated alloy material, and by weight percentage, the composition of this alloy material is:
Si:1%,
N:0.5%,
B:0.3%,
Be:0.7%,
Co:0.2%,
Sb:0.4%,
Surplus is Cu and inevitable impurity;
Described alloy material is heat-treated as follows:
1) be warming up to 655 DEG C with the speed of 25 DEG C/min, be incubated 3.5 hours;
2) room temperature is cooled to the speed of 35 DEG C/min again;
3) be warming up to 755 DEG C with the speed of 20 DEG C/min again, be incubated 2.5 hours;
4) room temperature is cooled to the speed of 15 DEG C/min again.
3. tunnel according to claim 1 integrated dust-removing controlling box, it is characterized in that, comprise metal master, described metal master is made by through heat treated alloy material, and by weight percentage, the composition of this alloy material is:
Si:2%,
N:0.5%,
B:0.3%,
Be:0.7%,
Co:0.2%,
Sb:0.4%,
Surplus is Cu and inevitable impurity;
Described alloy material is heat-treated as follows:
1) be warming up to 655 DEG C with the speed of 25 DEG C/min, be incubated 3.5 hours;
2) room temperature is cooled to the speed of 35 DEG C/min again;
3) be warming up to 755 DEG C with the speed of 20 DEG C/min again, be incubated 2.5 hours;
4) room temperature is cooled to the speed of 15 DEG C/min again.
CN201510982384.6A 2015-12-24 2015-12-24 Comprehensive dust fall control box for roadway Pending CN105543554A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510982384.6A CN105543554A (en) 2015-12-24 2015-12-24 Comprehensive dust fall control box for roadway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510982384.6A CN105543554A (en) 2015-12-24 2015-12-24 Comprehensive dust fall control box for roadway

Publications (1)

Publication Number Publication Date
CN105543554A true CN105543554A (en) 2016-05-04

Family

ID=55823109

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510982384.6A Pending CN105543554A (en) 2015-12-24 2015-12-24 Comprehensive dust fall control box for roadway

Country Status (1)

Country Link
CN (1) CN105543554A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107278072A (en) * 2017-06-21 2017-10-20 滁州市朝友精密制造有限公司 A kind of ME vertical control boxes

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1930314A (en) * 2004-03-12 2007-03-14 住友金属工业株式会社 Copper alloy and process for producing the same

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1930314A (en) * 2004-03-12 2007-03-14 住友金属工业株式会社 Copper alloy and process for producing the same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107278072A (en) * 2017-06-21 2017-10-20 滁州市朝友精密制造有限公司 A kind of ME vertical control boxes

Similar Documents

Publication Publication Date Title
CN105543554A (en) Comprehensive dust fall control box for roadway
CN105349917A (en) Oil slinger for wire rod mill
CN105397303A (en) Industrial laser marking machine
CN105543657A (en) Cage for wire rolling mill
CN105543553A (en) Mining comprehensive dust fall control box
CN105483540A (en) Spinning pipe
CN105369163A (en) Fixed shear blade for wire mill
CN105420640A (en) Movable shearing edge for wire rolling mill
CN105369148A (en) Retainer
CN105385964A (en) Movable shear blade
CN105483569A (en) Fixed shear blade
CN105506367A (en) Voice-activated dust removing device applied to laneway
CN105543723A (en) Wire way device
CN105525137A (en) Spraying rod for roadways
CN105506362A (en) Mining voice control dust reducing device
CN105506363A (en) Mining porous nozzle
CN105349887A (en) Oil slinger
CN105370954A (en) Electric ball valve for roadway
CN105525138A (en) Ultrasonic atomization nozzle for roadways
CN105369060A (en) Flameproof power box for mine
CN105543656A (en) Sendesi wire bundling machine
CN105506361A (en) Roadway porous nozzle
CN105543724A (en) Hydraulic element
CN105568048A (en) Mining pressure sensor
CN105420537A (en) Mine spray lance

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160504