CN105507650A - 一种用于输电线路杆塔耐腐蚀接地装置 - Google Patents

一种用于输电线路杆塔耐腐蚀接地装置 Download PDF

Info

Publication number
CN105507650A
CN105507650A CN201510516287.8A CN201510516287A CN105507650A CN 105507650 A CN105507650 A CN 105507650A CN 201510516287 A CN201510516287 A CN 201510516287A CN 105507650 A CN105507650 A CN 105507650A
Authority
CN
China
Prior art keywords
concrete
prepared
prepare
corrosion
demoulding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510516287.8A
Other languages
English (en)
Other versions
CN105507650B (zh
Inventor
杜明
苏永义
刘斐
隋树法
王海
薛伦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Changyou Electric Power Engineering Co ltd
Original Assignee
STATE GRID SHANDONG FEIXIAN POWER SUPPLY Co
State Grid Corp of China SGCC
Linyi Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by STATE GRID SHANDONG FEIXIAN POWER SUPPLY Co, State Grid Corp of China SGCC, Linyi Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical STATE GRID SHANDONG FEIXIAN POWER SUPPLY Co
Priority to CN201510516287.8A priority Critical patent/CN105507650B/zh
Publication of CN105507650A publication Critical patent/CN105507650A/zh
Application granted granted Critical
Publication of CN105507650B publication Critical patent/CN105507650B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/91Use of waste materials as fillers for mortars or concrete

Landscapes

  • Artificial Fish Reefs (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

本发明属于电力材料技术领域,公开了一种用于输电线杆塔耐腐蚀接地装置,其按照如下方法制备而得:1)制备物料A,2)制备物料B,3)制备物料C,4)制备混凝土,5)成型脱模。本发明电线杆具备较好的抗冻融性、抗压强度以及抗裂强度。

Description

一种用于输电线路杆塔耐腐蚀接地装置
技术领域
本发明属于电力材料技术领域,具体涉及一种用于输电线路杆塔耐腐蚀接地装置。
背景技术
传统的架空输电线路中使用的电线杆普遍存在着质量重、易腐烂、耐久性差等缺陷,寿命较短,在运行过程中需要经常维护,容易出现各种安全隐患。比如钢杆和铁塔也存在易腐蚀、生锈,施工、运输和维护困难等问题,对于特高压、超高压输电,因为钢杆和铁塔的自重超过强度极限,塔高上不去。在每年的输电线路跳闸事故中,雷击事故和污闪事故几乎各占一半。大量使用复合绝缘子仍不能彻底解决雷电和污闪事故,因此所造成的国民经济的损失无法评估。因此,采用新材料制造电线杆,解决雷击事故和污闪事故已迫在眉睫。
普通混凝土制备的电线杆具有重量轻、维护要求小、绝缘性好等性能,但其成型工艺不仅成本高,并且在生产过程中会出现缺料、不规则气孔、翘曲变形和起泡等不良缺陷。成型后的电线杆的抗张强度和抗压强度较低,在恶劣天气时易产生断裂现象。
发明内容
本发明的目的是解决现有技术中电线杆的诸多缺陷,经过大量试验和探索,改变现有的原料组成及制备方法,提供一种用于输电线路杆塔耐腐蚀接地装置,该接地装置具备较好的抗冻融性、抗压强度以及抗裂强度。
为了实现上述目的,本发明的技术方案通过如下方式来实现的:
一种用于输电线路杆塔耐腐蚀接地装置,其按照如下方法制备而得:1)制备物料A,2)制备物料B,3)制备物料C,4)制备混凝土,5)成型脱模。
具体地,所述装置按照如下工艺制备而得:
1)制备物料A:将玉米秸秆和花生壳按照2:1的重量比投入到粉碎机中进行粉碎,过50目筛,得到物料A;
2)制备物料B:将聚氨酯泡沫和鸡蛋壳按照2:1的重量比混合,粉碎成50目的粉末,然后添加同等重量的水浸泡30min,即得物料B;
3)制备物料C:将废弃鱼骨研磨粉碎,然后添加占废弃鱼骨两倍重量的浓度为20g/L的氢氧化钠水溶液浸泡120小时,随后加热至60℃,提取6小时,最后添加十二烷基苯磺酸钠,搅拌均匀,即得物料C;废弃鱼骨和十二烷基苯磺酸钠的重量比为3:1;
4)制备混凝土:按照重量份往搅拌机中依次添加42.5普通硅酸盐水泥100-120份、碎石60-80份、高炉矿渣35-45份、粉煤灰20-30份、磷石膏20-30份、物料A12-16份、物料B10-15份、物料C6-8份以及水30-50份,搅拌至均匀,静置20分钟,然后排出至容器中,即得混凝土;
5)成型脱模:通过布料机将混凝土均匀分布在装有钢筋网的电杆模具内,经过张拉工艺后,采用离心工艺成型,静置3-5小时后,脱模即得电线杆。
优选地,碎石粒径为5-10mm;高炉矿渣和电石渣的粒径均为1-5mm;粉煤灰的粒径为0.2-1mm;磷石膏的粒径为10-50um。
优选地,钢筋网由直径为5-10mm的8根预应力钢丝做主筋,直径为3-5mm的冷拔高强丝做环向构造筋编制而成,相邻环向构造筋的距离为10-50mm。所述电杆的壁厚为40-80毫米,长度为5-20米。
本发明取得的有益效果主要包括以下几点:
本发明采用农业废弃物作为减水剂,产品造价低,满足防冻、抗冻、抗渗等要求,达到了国内普通型和高效型减水剂的各项技术指标;聚氨酯泡沫和鸡蛋壳按照一定比例混合,具备较好的防冻防膨胀和机械性能,实现了变废为宝;采用废弃鱼骨来提取蛋白作为发泡剂,成本低廉,发泡尺寸孔径均匀性优良,稳定性和相容性好;本发明电线杆,材料来源广泛,大掺量矿物废料,大大降低了成本;本发明电线杆抗碳化性好,抗冻融性好、抗压强度高,抗裂强度好以及重量轻,可用作普通电杆、部分预应力电杆、预应力电杆,适用于低压农村电网、铁路电网等建设。
具体实施方式
为了使本技术领域的人员更好地理解本申请中的技术方案,下面将结合本申请具体实施例,对本发明进行更加清楚、完整地描述,显然,所描述的实施例仅仅是本申请一部分实施例,而不是全部的实施例。基于本申请中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都应当属于本发明保护的范围。
实施例1
一种用于输电线路杆塔耐腐蚀接地装置,其按照如下方法制备而得:
1)将玉米秸秆和花生壳按照2:1的重量比投入到粉碎机中进行粉碎,过50目筛,得到物料A;
2)将聚氨酯泡沫和鸡蛋壳按照2:1的重量比混合,粉碎成50目的粉末,然后添加同等重量的水浸泡30min,即得物料B;
3)将废弃鱼骨研磨粉碎,然后添加占废弃鱼骨两倍重量的浓度为20g/L的氢氧化钠水溶液浸泡120小时,随后加热至60℃,提取6小时,最后添加十二烷基苯磺酸钠,搅拌均匀,即得物料C;废弃鱼骨和十二烷基苯磺酸钠的重量比为3:1;
4)按照重量份往搅拌机中依次添加42.5普通硅酸盐水泥100份、碎石60份、高炉矿渣35份、粉煤灰20份、磷石膏20份、物料A12份、物料B10份、物料C6份以及水30份,搅拌至均匀,静置20分钟,然后排出至容器中,即得混凝土;其中,碎石粒径为5mm;高炉矿渣和电石渣的粒径均为1mm;粉煤灰的粒径为0.2mm;磷石膏的粒径为10um;
5)通过布料机将混凝土均匀分布在装有钢筋网的电杆模具内,经过张拉工艺后,采用离心工艺密实成型,静置3小时后,脱模即得电线杆;
所述钢筋网由直径为5mm的8根预应力钢丝做主筋,直径为3mm的冷拔高强丝做环向构造筋编制而成,相邻环向构造筋的距离为30mm;所述电杆的壁厚为40毫米,长度为10米。
实施例2
以实施例1为例,本发明制备的产品性能如下:
混凝土层厚度为50cm;
混凝土抗压强度:155MPa;
混凝土抗折强度:18.2MPa;
混凝土抗渗性能:P12等级无渗水高度;
混凝土抗碳化性:28天碳化检测深度为0.3mm;
混凝土抗冻融性:400次冻融循环无质量损失;
电杆抗裂检验:r0 cr≥1.3,普通部分预应力电杆设计r0 cr≥0.8;
尧度变形:
加荷至100%时,杆顶挠度a0 s=36mm,标准允许a0 s<116mm;
重量变化:
重量为比普通混凝土电杆减少18%。
上面结合具体实施例对本发明进行了示例性的描述,显然本发明的实现并不受上述方式的限制,只要采用了本发明的方法构思和技术方案进行的各种改进,或未经改进将本发明的构思和技术方案直接应用于其它场合的,均在本发明的保护范围内。

Claims (3)

1.一种用于输电线杆塔塔耐腐蚀接地装置,其按照如下方法制备而得:1)制备物料A,2)制备物料B,3)制备物料C,4)制备混凝土,5)成型脱模。
2.根据权利要求1所述的装置,其特征在于,所述装置按照如下工艺制备而得:
1)制备物料A:将玉米秸秆和花生壳按照2:1的重量比投入到粉碎机中进行粉碎,过50目筛,得到物料A;
2)制备物料B:将聚氨酯泡沫和鸡蛋壳按照2:1的重量比混合,粉碎成50目的粉末,然后添加同等重量的水浸泡30min,即得物料B;
3)制备物料C:将废弃鱼骨研磨粉碎,然后添加占废弃鱼骨两倍重量的浓度为20g/L的氢氧化钠水溶液浸泡120小时,随后加热至60℃,提取6小时,最后添加十二烷基苯磺酸钠,搅拌均匀,即得物料C;废弃鱼骨和十二烷基苯磺酸钠的重量比为3:1;
4)制备混凝土:按照重量份往搅拌机中依次添加42.5普通硅酸盐水泥100-120份、碎石60-80份、高炉矿渣35-45份、粉煤灰20-30份、磷石膏20-30份、物料A12-16份、物料B10-15份、物料C6-8份以及水30-50份,搅拌至均匀,静置20分钟,然后排出至容器中,即得混凝土;
5)成型脱模:通过布料机将混凝土均匀分布在装有钢筋网的电杆模具内,经过张拉工艺后,采用离心工艺成型,静置3-5小时后,脱模即得电线杆。
3.根据权利要求2所述的装置,其特征在于,
所述碎石粒径为5-10mm;所述高炉矿渣和电石渣的粒径均为1-5mm;所述粉煤灰的粒径为0.2-1mm;所述磷石膏的粒径为10-50um。
CN201510516287.8A 2015-08-21 2015-08-21 一种用于输电线路杆塔耐腐蚀接地装置 Active CN105507650B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510516287.8A CN105507650B (zh) 2015-08-21 2015-08-21 一种用于输电线路杆塔耐腐蚀接地装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510516287.8A CN105507650B (zh) 2015-08-21 2015-08-21 一种用于输电线路杆塔耐腐蚀接地装置

Publications (2)

Publication Number Publication Date
CN105507650A true CN105507650A (zh) 2016-04-20
CN105507650B CN105507650B (zh) 2018-03-02

Family

ID=55715922

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510516287.8A Active CN105507650B (zh) 2015-08-21 2015-08-21 一种用于输电线路杆塔耐腐蚀接地装置

Country Status (1)

Country Link
CN (1) CN105507650B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107216097A (zh) * 2017-07-31 2017-09-29 靳占新 一种绝缘电线杆

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080313972A1 (en) * 2005-08-30 2008-12-25 Grob Gustav R Method for Vertically Extruding a Concrete Element, Device for Producing a Concrete Element, and Wind Turbine Generator Tower Produced by This Method
CN102650175A (zh) * 2012-04-16 2012-08-29 浙江省电力设计院 一种输电线路的中空夹层钢管混凝土杆
CN104120909A (zh) * 2014-07-18 2014-10-29 国家电网公司 一种高强度高压线电杆及其制备方法
CN104150835A (zh) * 2014-07-18 2014-11-19 国家电网公司 一种混凝土电杆
CN104500866A (zh) * 2014-12-15 2015-04-08 祁锦明 内置螺旋弹簧的混凝土空心细长构件
CN105330228A (zh) * 2015-08-18 2016-02-17 国网山东省电力公司临沂供电公司 一种绝缘电线杆

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080313972A1 (en) * 2005-08-30 2008-12-25 Grob Gustav R Method for Vertically Extruding a Concrete Element, Device for Producing a Concrete Element, and Wind Turbine Generator Tower Produced by This Method
CN102650175A (zh) * 2012-04-16 2012-08-29 浙江省电力设计院 一种输电线路的中空夹层钢管混凝土杆
CN104120909A (zh) * 2014-07-18 2014-10-29 国家电网公司 一种高强度高压线电杆及其制备方法
CN104150835A (zh) * 2014-07-18 2014-11-19 国家电网公司 一种混凝土电杆
CN104500866A (zh) * 2014-12-15 2015-04-08 祁锦明 内置螺旋弹簧的混凝土空心细长构件
CN105330228A (zh) * 2015-08-18 2016-02-17 国网山东省电力公司临沂供电公司 一种绝缘电线杆

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107216097A (zh) * 2017-07-31 2017-09-29 靳占新 一种绝缘电线杆

Also Published As

Publication number Publication date
CN105507650B (zh) 2018-03-02

Similar Documents

Publication Publication Date Title
CN105503065B (zh) 一种复合式电线杆
CN105330228B (zh) 一种绝缘电线杆
CN103225439B (zh) 一种混凝土电杆
CN105418015B (zh) 一种用于输电线路的混凝土电线杆
CN104120909B (zh) 一种高强度高压线电杆
CN104649641A (zh) 一种粉碎秸秆纤维增韧无机保温砂浆及使用方法
CN103524086A (zh) 一种抗裂水泥混凝土
CN110922118A (zh) 一种装配式构件用全轻高强混凝土及其制备方法
CN104150835A (zh) 一种混凝土电杆
CN105330227B (zh) 一种环保输电架
CN103242012A (zh) 一种基于页岩陶砂的发泡混凝土
CN103515036A (zh) 一种高强度陶瓷绝缘子的制作方法
CN105367017B (zh) 一种用于输电线路的杆塔
CN110863691A (zh) 一种特种高强预应力混凝土电杆
CN103510738A (zh) 高耐久性大弯矩混凝土电杆
CN105507650A (zh) 一种用于输电线路杆塔耐腐蚀接地装置
CN107237538B (zh) 一种高强度安全混凝土电杆
CN107216097A (zh) 一种绝缘电线杆
CN111231098A (zh) 薄壁离心gfrp管超高性能混凝土复合电杆及其成型工艺
CN111268970A (zh) 一种接地导电混凝土及其制备方法
CN108044766B (zh) 一种防护掩体及其制备方法
CN107313646B (zh) 一种抗渗抗冻混凝土电杆
CN105819790A (zh) 一种混凝土电线杆的制备工艺
CN201635471U (zh) 一种环形部分预应力混凝土电杆
CN115403295A (zh) 一种绿色减碳混凝土外加剂、绿色减碳混凝土及制备方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Zhang Jifei

Inventor after: Wang Kuixin

Inventor after: Yang Xiaokun

Inventor after: Zhang Jincun

Inventor after: Han Shushan

Inventor after: Li Minghui

Inventor before: Du Ming

Inventor before: Su Yongyi

Inventor before: Liu Fei

Inventor before: Sui Shufa

Inventor before: Wang Hai

Inventor before: Xue Lun

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191108

Address after: Li Lu Suzhou city in Jiangsu province 215000 Wuzhong District No. 99

Patentee after: SUZHOU CITY WUZHONG TECHNOLOGY INNOVATION PARK MANAGEMENT CO.,LTD.

Address before: 276001 No. 130, Lu Shan Road, Lanshan District, Shandong, Linyi

Co-patentee before: State Grid Corporation of China

Patentee before: LINYI POWER SUPPLY COMPANY OF STATE GRID SHANDONG ELECTRIC POWER COMPANY

Co-patentee before: STATE GRID SHANDONG FEIXIAN POWER SUPPLY Co.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221215

Address after: Room 3557, Building 9, Taishan Science and Technology Industrial Park, Yitianmen Street, Tai'an High tech Zone, Tai'an City, Shandong Province, 271000

Patentee after: Shandong Changyou Electric Power Engineering Co.,Ltd.

Address before: 215000 99 Changli Road, Wuzhong District, Suzhou City, Jiangsu Province

Patentee before: SUZHOU CITY WUZHONG TECHNOLOGY INNOVATION PARK MANAGEMENT CO.,LTD.

TR01 Transfer of patent right