CN105500510B - Building element steam curing system - Google Patents

Building element steam curing system Download PDF

Info

Publication number
CN105500510B
CN105500510B CN201610024057.4A CN201610024057A CN105500510B CN 105500510 B CN105500510 B CN 105500510B CN 201610024057 A CN201610024057 A CN 201610024057A CN 105500510 B CN105500510 B CN 105500510B
Authority
CN
China
Prior art keywords
vaporium
support base
steam curing
hydraulic cylinder
building element
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610024057.4A
Other languages
Chinese (zh)
Other versions
CN105500510A (en
Inventor
田庆喜
苏娟娟
蒋明希
杨广军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou warm tree Industrial Co., Ltd.
Original Assignee
Zhengzhou Warm Tree Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Warm Tree Industrial Co Ltd filed Critical Zhengzhou Warm Tree Industrial Co Ltd
Priority to CN201610024057.4A priority Critical patent/CN105500510B/en
Publication of CN105500510A publication Critical patent/CN105500510A/en
Application granted granted Critical
Publication of CN105500510B publication Critical patent/CN105500510B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B11/00Apparatus or processes for treating or working the shaped or preshaped articles
    • B28B11/24Apparatus or processes for treating or working the shaped or preshaped articles for curing, setting or hardening
    • B28B11/245Curing concrete articles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to building steam curing technical field, it is a kind of building element steam curing system, it includes vaporium, charging aperture and discharging opening are respectively equipped with the left side and right side of vaporium, the door of charging aperture and discharging opening can be opened and closed by being provided with charging aperture and discharging opening, feeding rack is provided with the left side of vaporium, oblique first hydraulic cylinder is installed with the bottom of feeding rack, the piston rod of first hydraulic cylinder can extend out to feeding rack over top, and partition wall is provided with vaporium and vaporium is divided into the first vaporium and the second vaporium.The present invention is rational in infrastructure, it is easy to use, it need not will treat that maintaining device hangs in vaporium with crane, hung out again from vaporium, so as to significantly reduce hoisting difficulty, also significantly reduce the loss of steam, reduce the cost of maintenance, and the quality of maintenance can further be improved by being divided into two vaporiums, by setting pit, the quality and operating efficiency of maintenance can be further improved.

Description

Building element steam curing system
Technical field
It is a kind of building element steam curing system the present invention relates to building steam curing technical field.
Background technology
Steam curing is that concrete component is placed on into steam-curing chamber, and being passed through water vapour makes concrete heat up, and accelerates cement With supplementary cementitious material hydration and hardening process, demoulding strength is rapidly achieved, accelerates template turnover and production efficiency, in building element In the manufacturing process of pipe fitting, pouring the product and mould of shaping needs to carry out steam curing while being put into steam curing cellar for storing things, by In building fitting structure heaviness, it is therefore desirable to will build pipe fitting using crane and hang in maintenance cellar for storing things, maintenance work is gone back after finishing Need to use crane to build pipe fitting and hang out maintenance cellar for storing things, not only operating efficiency is low, and hoisting cost is high;And hanging in and hanging , it is necessary to which the top cover for conserving cellar for storing things is opened during going out maintenance cellar for storing things so that substantial amounts of steam overflows, and causes cost to waste, and Constructed when temperature is relatively low, the temperature of building pipe fitting outside is relatively low, drastically raise, can cause once entering maintenance interior temperature in cellar Maintenance effect is poor, so as to cause product quality to reduce.
The content of the invention
The invention provides a kind of building element steam curing system, the deficiency of above-mentioned prior art is overcome, it can have Effect solve existing steam curing exist lifting waste time and energy, high cost and the problem of waste of steam and poor steam curing effect.
The technical scheme is that be achieved in:A kind of building element steam curing system, including vaporium, The left side and right side of vaporium are respectively equipped with charging aperture and discharging opening, and being provided with charging aperture and discharging opening to open and close The door of charging aperture and discharging opening, is provided with feeding rack in the left side of vaporium, is installed with obliquely in the bottom of feeding rack First hydraulic cylinder, the piston rod of first hydraulic cylinder can extend out to feeding rack over top, provided with partition wall and will in vaporium Vaporium is divided into the first vaporium and the second vaporium, and the first fixation is fixed with along the longitudinal direction on the right side of the first vaporium Axle, second hydraulic cylinder and the 3rd hydraulic cylinder are installed with from A-P in the left side of the first vaporium respectively, are fixed first It is respectively articulated with the top of axle and the first support base and the second support base is installed, the left part difference of the first support base and the second support base It is fixed together with the piston rod of second hydraulic cylinder and the piston rod of the 3rd hydraulic cylinder, on the right side of the second vaporium along front and back To the second fixing axle is fixed with, the 4th hydraulic cylinder and the 5th liquid are installed with respectively from A-P in the left side of the second vaporium Cylinder pressure, is respectively articulated with the top of the second fixing axle and is provided with the 3rd support base and four-supporting, the 3rd support base and the 4th The left part of support base is fixed together with the piston rod of the 4th hydraulic cylinder and the piston rod of the 5th hydraulic cylinder respectively, is fixed second The discharging set corresponding with the right-hand member of the 3rd support base and four-supporting is provided with second vaporium of axle right, discharging set is in Right low left high it is skewed, the outlet of discharging set is corresponding with discharging opening, on partition wall be provided with and the first support base and second Seat right-hand member and the 3rd support base and the corresponding feed inlet and outlet of four-supporting left end are supportted, being provided with feed inlet and outlet to open Open and close the door of feed inlet and outlet.
Preferably, the 3rd support base and the 4th between above-mentioned 4th hydraulic cylinder and the 5th hydraulic cylinder and the second fixing axle Interval is fixed with least three groove from left to right for the bottom of support base, on the top of the 3rd support base and four-supporting Provided with the breach communicated with groove, locating piece is provided with breach, is installed with the second vaporium corresponding with groove Positioning hydraulic cylinders, the piston of positioning hydraulic cylinders is fixed together through groove and with the bottom of locating piece.
Preferably, the top of above-mentioned locating piece is arc.
Preferably, above-mentioned groove is 4 to 20.
Preferably, the door that above-mentioned door, which is hydraulic control, to be moved up and down.
Preferably, the left end of above-mentioned discharging set, which is provided with, can block the electric guard board of building pipe fitting.
The present invention is rational in infrastructure, easy to use, it is not necessary to will to treat that maintaining device hangs in vaporium with crane, then be hung from vaporium Go out, so as to significantly reduce hoisting difficulty, also significantly reduce the loss of steam, reduce the cost of maintenance, and be divided into Two vaporiums can further improve the quality of maintenance, by setting groove, and the quality and work that can further improve maintenance are imitated Rate.
Brief description of the drawings
Main structure diagrams of the Fig. 1 for the present invention when removing the front wallboard of the first vaporium and the second vaporium;
Fig. 2 removes the top view during top plate of the first vaporium and the second vaporium for the present invention;
Fig. 3 is left view of the invention.
Coding in figure is respectively:1 is charging aperture, and 2 be door, and 3 be feeding rack, and 4 be first hydraulic cylinder, and 5 be the first hydraulic pressure The piston rod of cylinder, 6 be partition wall, and 7 be the first vaporium, and 8 be the second vaporium, and 9 be the first fixing axle, and 10 be second hydraulic cylinder, 11 be the first support base, and 12 be the second support base, and 13 be the piston rod of second hydraulic cylinder, and 14 be the second fixing axle, and 15 be the 4th Hydraulic cylinder, 16 be the 3rd support base, and 17 be four-supporting, and 18 be the piston rod of the 4th hydraulic cylinder, and 19 be groove, and 20 be scarce Mouthful, 21 be locating piece, and 22 be positioning hydraulic cylinders, and 23 be the piston of positioning hydraulic cylinders, and 24 be electric guard board.
Embodiment
As shown in Figure 1, Figure 2 and Figure 3, this building element steam curing system, including vaporium, in the left side of vaporium and Right side is respectively equipped with charging aperture 1 and discharging opening, and charging aperture and discharging can be opened and closed by being provided with charging aperture 1 and discharging opening The door 2 of mouth, is provided with feeding rack 3 in the left side of vaporium, the first oblique hydraulic pressure is installed with the bottom of feeding rack 3 Cylinder 4, the piston rod 5 of first hydraulic cylinder can extend out to the over top of feeding rack 3, provided with partition wall 6 and by vaporium in vaporium It is divided into the first vaporium 7 and the second vaporium 8, the first fixing axle 9 is fixed with along the longitudinal direction on the right side of the first vaporium 7, It is installed with the hydraulic cylinder of second hydraulic cylinder 10 and the 3rd respectively from A-P in the left side of the first vaporium 7, is fixed first The top of axle 9, which is respectively articulated with, is provided with the first support base 11 and the second support base 12, the first support base 11 and the second support base 12 Piston rod of the left part respectively with the hydraulic cylinder of piston rod 13 and the 3rd of second hydraulic cylinder be fixed together, in the second vaporium 8 Right side be fixed with the second fixing axle 14 along the longitudinal direction, be installed with respectively from A-P in the left side of the second vaporium 8 4th hydraulic cylinder 15 and the 5th hydraulic cylinder, are respectively articulated with the top of the second fixing axle 14 and are provided with the 3rd support base 16 and the 4th The hydraulic pressure of piston rod 18 and the 5th of the left part of support base 17, the 3rd support base 16 and four-supporting 17 respectively with the 4th hydraulic cylinder The piston rod of cylinder is fixed together, and is provided with the second vaporium 8 of the right of the second fixing axle 14 and the 3rd support base 16 and the The corresponding discharging set of the right-hand member of four-supporting 17, discharging set is in skewed, the outlet of discharging set and the discharging opening of right low left high It is corresponding, it is provided with and the first support base 11 and the right-hand member of the second support base 12 and the 3rd support base 16 and the 4th on partition wall 6 The corresponding feed inlet and outlet of the left end of seat 17 is supportted, the door 2 of feed inlet and outlet can be opened and closed by being provided with feed inlet and outlet.Winter applies In man-hour, tubular type building element and mould are hung on feeding rack 3 with crane, charging aperture 1 is opened, open first hydraulic cylinder 4, the The piston rod 5 of one hydraulic cylinder stretches out and by the first support base 11 in tubular type building element and mould jacking charging aperture 1 obliquely On the second support base 12, many tubular type building elements and mould are sequentially fed through the first support base 11 and the second support base 12 On, while starting steam, keep the temperature in the first vaporium in 15 to 25 degree, after arrival time, open the door 2 of partition wall 6, open The dynamic hydraulic cylinder of second hydraulic cylinder 10 and the 3rd, makes the first support base 11 and the second support base 12 be tilted to the right, many tubular type buildings Component and mould roll into the second vaporium 8, and many tubular type building elements and mould are located at the 3rd support base 16 and the 4th support On seat 17, while starting steam, keep the temperature in the second vaporium 8 in 45 to 60 degree, after arrival time, open discharging opening Door 2, while starting the 4th hydraulic cylinder 15 and the 5th hydraulic cylinder, makes the 3rd support base 16 and four-supporting 17 be tilted to the right, many Root tubular type building element and mould come out along discharging set from discharging opening, so as to complete steam curing operation.By said structure, It need not will treat that maintaining device hangs in vaporium with crane, then be hung out from vaporium, and so as to significantly reduce hoisting difficulty, go back pole The earth reduces the loss of steam, reduces the cost of maintenance, and the quality of maintenance can further be improved by being divided into two vaporiums.
As depicted in figs. 1 and 2, the 3rd support base between the 4th hydraulic cylinder 15 and the 5th hydraulic cylinder and the second fixing axle 14 16 and interval is fixed with least three groove 19 from left to right the bottom of four-supporting 17, in the 3rd support base 16 and the The top of four-supporting 17 is provided with the breach 20 that is communicated with groove 19, and locating piece 21 is provided with breach 20, with 19 pairs of groove Be installed with positioning hydraulic cylinders 22 in the second vaporium 8 answered, the pistons 23 of positioning hydraulic cylinders through groove 19 and with positioning The bottom of block 21 is fixed together.In operating at the scene, because many tubular type building elements and mould easy sticker are combined, so that Steam curing can not be carried out well in joint place, causes product quality to reduce, therefore, in the piston 23 of usually positioning hydraulic cylinders Make the top of locating piece 21 concordant with the top of the 3rd support base 16 and four-supporting 17 with locating piece 21, when first Tubular type building element and mould are entered in the second vaporium 8, and the piston 23 of the positioning hydraulic cylinders of the rightmost side is moved down, and it is fixed to make Spacing is arranged at the top of position block 21 and breach 20, forms a pit, the work of the hydraulic cylinder of piston rod 18 and the 5th of the 4th hydraulic cylinder Upward jack-up is filled in, first tubular type building element and mould turn right and fallen into pit, other tubular type building elements and mould Tool is sequentially entered by this step in corresponding pit, is then turned on steam, the temperature in the second vaporium 8 of holding 45 to 60 degree, steam curing is carried out so as to uniform, after maintenance is finished, the piston 23 of all positioning hydraulic cylinders is risen, start the Four hydraulic cylinders 15 and the 5th hydraulic cylinder, make the 3rd support base 16 and four-supporting 17 be tilted to the right, many tubular type building elements And mould comes out along discharging set from discharging opening, so as to complete steam curing operation.Stability is so not only increased, is also improved Product quality and operating efficiency.
As shown in figure 1, the top of locating piece 21 is arc.Preferably it can so match somebody with somebody with tubular type building element and mold shape Close.
According to actual needs, groove 19 is 4 to 20.
Above-mentioned door 2 is the door that hydraulic control is moved up and down.Operation, hydraulic control door can more be facilitated using hydraulic control Move up and down as existing known technology.
As shown in figure 1, the left end of discharging set, which is provided with, can block the electric guard board 24 of building pipe fitting.Electric guard board 24 is existing There is known technology, can prevent tubular type building element and mould from rolling too fast and falling into discharging set.

Claims (10)

1. a kind of building element steam curing system, including vaporium, charging aperture is respectively equipped with the left side and right side of vaporium And discharging opening, the door of charging aperture and discharging opening can be opened and closed by being provided with charging aperture and discharging opening, it is characterised in that The left side of vaporium is provided with feeding rack, and oblique first hydraulic cylinder, the first hydraulic pressure are installed with the bottom of feeding rack The piston rod of cylinder can extend out to feeding rack over top, in vaporium provided with partition wall and by vaporium be divided into the first vaporium and Second vaporium, the first fixing axle is fixed with the right side of the first vaporium along the longitudinal direction, in the left side of the first vaporium certainly A-P is installed with second hydraulic cylinder and the 3rd hydraulic cylinder respectively, is respectively articulated with the top of the first fixing axle and is provided with The left part of one support base and the second support base, the first support base and the second support base respectively with the piston rod of second hydraulic cylinder and The piston rod of three hydraulic cylinders is fixed together, and the second fixing axle is fixed with along the longitudinal direction on the right side of the second vaporium, The left side of two vaporiums is installed with the 4th hydraulic cylinder and the 5th hydraulic cylinder from A-P respectively, at the top of the second fixing axle Be respectively articulated with and the 3rd support base and four-supporting be installed, the left part of the 3rd support base and four-supporting respectively with the 4th liquid The piston rod of the piston rod of cylinder pressure and the 5th hydraulic cylinder is fixed together, and is provided with the second vaporium of the second fixing axle right The discharging set corresponding with the right-hand member of the 3rd support base and four-supporting, discharging set is in skewed, the discharging set of right low left high Outlet it is corresponding with discharging opening, on partition wall be provided with the first support base and the second support base right-hand member and the 3rd support base and The corresponding feed inlet and outlet of four-supporting left end, the door of feed inlet and outlet can be opened and closed by being provided with feed inlet and outlet.
2. building element steam curing system according to claim 1, it is characterised in that the 4th hydraulic cylinder and the 5th hydraulic pressure Interval is fixed with least three from left to right for the bottom of the 3rd support base and four-supporting between cylinder and the second fixing axle Groove, be provided with the breach that is communicated with groove on the top of the 3rd support base and four-supporting, locating piece be provided with breach, Positioning hydraulic cylinders are installed with the second vaporium corresponding with groove, the piston of positioning hydraulic cylinders is through groove and with determining The bottom of position block is fixed together.
3. building element steam curing system according to claim 2, it is characterised in that the top of locating piece is arc.
4. the building element steam curing system according to Claims 2 or 3, it is characterised in that groove is 4 to 20.
5. the building element steam curing system according to claim 1 or 2 or 3, it is characterised in that door is hydraulic control The door moved up and down.
6. building element steam curing system according to claim 4, it is characterised in that door is to be moved down in hydraulic control Dynamic door.
7. the building element steam curing system according to claim 1 or 2 or 3, it is characterised in that the left end peace of discharging set Equipped with can block building pipe fitting electric guard board.
8. building element steam curing system according to claim 4, it is characterised in that the left end of discharging set is provided with energy Block the electric guard board of building pipe fitting.
9. building element steam curing system according to claim 5, it is characterised in that the left end of discharging set is provided with energy Block the electric guard board of building pipe fitting.
10. building element steam curing system according to claim 6, it is characterised in that the left end of discharging set is provided with The electric guard board of building pipe fitting can be blocked.
CN201610024057.4A 2016-01-08 2016-01-08 Building element steam curing system Active CN105500510B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610024057.4A CN105500510B (en) 2016-01-08 2016-01-08 Building element steam curing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610024057.4A CN105500510B (en) 2016-01-08 2016-01-08 Building element steam curing system

Publications (2)

Publication Number Publication Date
CN105500510A CN105500510A (en) 2016-04-20
CN105500510B true CN105500510B (en) 2017-10-27

Family

ID=55708996

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610024057.4A Active CN105500510B (en) 2016-01-08 2016-01-08 Building element steam curing system

Country Status (1)

Country Link
CN (1) CN105500510B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106042162B (en) * 2016-07-22 2018-03-20 国新德 Prefabricated components curing system provided with movable maintenance type storehouse
CN108748637B (en) * 2018-05-31 2023-06-06 山东大学 Underground steam curing cabin and application method thereof
CN109747026B (en) * 2019-03-14 2021-05-25 杭州渔森农业技术开发有限公司 Pig house floor drain board apparatus for producing
CN111940227A (en) * 2020-08-17 2020-11-17 哈尔滨学院 Assembly type building element curing means based on BIM
CN112659343B (en) * 2020-12-24 2022-04-01 池州华通杆塔有限公司 Steam curing device for concrete pole

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1994007100A1 (en) * 1992-09-11 1994-03-31 Swindell Dressler International Company Low profile kiln apparatus
CN1509861A (en) * 2002-12-24 2004-07-07 Lg化学株式会社 Method and apparatus for continuous producing manu-marble
CN2640717Y (en) * 2003-08-12 2004-09-15 重庆钢铁(集团)有限责任公司 Continuous steam maintenance insulation room for movable concrete prefabricated part
CN201720928U (en) * 2010-08-04 2011-01-26 舟山市宇锦新型墙体材料有限公司 Maintenance device for aerated concrete building block green bodies
CN104032112A (en) * 2014-06-17 2014-09-10 东北大学 Multifunctional heat treatment system for steel pipe
CN204869195U (en) * 2015-08-05 2015-12-16 新疆海福电力器材有限公司 Cement pole, tubular pile, culvert pipe are from formula circulation steam maintenance cellar for storing things that falls

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1994007100A1 (en) * 1992-09-11 1994-03-31 Swindell Dressler International Company Low profile kiln apparatus
CN1509861A (en) * 2002-12-24 2004-07-07 Lg化学株式会社 Method and apparatus for continuous producing manu-marble
CN2640717Y (en) * 2003-08-12 2004-09-15 重庆钢铁(集团)有限责任公司 Continuous steam maintenance insulation room for movable concrete prefabricated part
CN201720928U (en) * 2010-08-04 2011-01-26 舟山市宇锦新型墙体材料有限公司 Maintenance device for aerated concrete building block green bodies
CN104032112A (en) * 2014-06-17 2014-09-10 东北大学 Multifunctional heat treatment system for steel pipe
CN204869195U (en) * 2015-08-05 2015-12-16 新疆海福电力器材有限公司 Cement pole, tubular pile, culvert pipe are from formula circulation steam maintenance cellar for storing things that falls

Also Published As

Publication number Publication date
CN105500510A (en) 2016-04-20

Similar Documents

Publication Publication Date Title
CN105500510B (en) Building element steam curing system
CN111535579A (en) Construction method for support-free mold hanging tool for horizontal post-pouring belt
CN204098486U (en) The concrete of building basement roof ater-casting hangs mould
CN206667680U (en) A kind of residential construction gas flue structure
CN218365535U (en) Building cement pipe pouring device
CN103967273A (en) Concrete formwork supporting device for floor slab concreting
CN201377141Y (en) Reinforcing steel bar positioning clamp of reinforced concrete column
CN106142335B (en) A kind of production method and particular manufacturing craft of rectangular gas flue
CN216760262U (en) Heat preservation wallboard mould
CN109797969B (en) Construction method of post-cast strip tool type advanced formwork lifting system
CN104265055B (en) A kind of construction method of chimney
CN204456428U (en) A kind of entirety being installed on composite wallboard is waftd window
CN205822780U (en) Floor setting-out hole is reserved and blocks mould
CN204850078U (en) Short wall structure of leading of basement outer wall
CN101265704B (en) Underground cast-in-place concrete structure outer wall neck construction method
CN103114718A (en) Collecting and separating machine of sliding form formwork and construction method of variable cross-section cylinder silo sliding form
CN207647169U (en) Climbing type flue formwork system
CN207469596U (en) A kind of beam column outer rim is exempted to tear concrete mold open
CN104746521B (en) The application of oversized cross-section slope cushion layer constructing structure
CN110076879A (en) A kind of concrete casting device for the production of prefabricated superimposed sheet
CN102409842B (en) Fast lifting slip form
CN107386638A (en) The construction method of cast-in-place Decorative hanging board structure under a kind of beam
CN207296398U (en) Cast-in-place Decorative hanging board structure under a kind of beam
CN107780655A (en) Climbing type flue formwork system and construction method thereof
CN107237436A (en) A kind of method of temporarily fixing during cavity floor construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
DD01 Delivery of document by public notice

Addressee: Chen Dongqiang

Document name: Notification of Passing Examination on Formalities

DD01 Delivery of document by public notice
CB03 Change of inventor or designer information

Inventor after: Tian Qingxi

Inventor after: Su Juanjuan

Inventor after: Jiang Mingxi

Inventor after: Yang Guangjun

Inventor before: Chen Dongqiang

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20170921

Address after: 450000 Zhengzhou City, Jinshui District, Henan, No. seven, No. 4 attached to the hospital, unit 5, No. 1, layer 522

Applicant after: Zhengzhou warm tree Industrial Co., Ltd.

Address before: 362121 Xitang, Fujian, Taiwan investment zone, Luoyang Town, Xitang village, No. 73,

Applicant before: Chen Dongqiang

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant