CN105500510A - Steam curing system for building elements - Google Patents

Steam curing system for building elements Download PDF

Info

Publication number
CN105500510A
CN105500510A CN201610024057.4A CN201610024057A CN105500510A CN 105500510 A CN105500510 A CN 105500510A CN 201610024057 A CN201610024057 A CN 201610024057A CN 105500510 A CN105500510 A CN 105500510A
Authority
CN
China
Prior art keywords
vaporium
hydraulic cylinder
supporting seat
supporting
curing system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610024057.4A
Other languages
Chinese (zh)
Other versions
CN105500510B (en
Inventor
陈东强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou warm tree Industrial Co., Ltd.
Original Assignee
陈东强
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 陈东强 filed Critical 陈东强
Priority to CN201610024057.4A priority Critical patent/CN105500510B/en
Publication of CN105500510A publication Critical patent/CN105500510A/en
Application granted granted Critical
Publication of CN105500510B publication Critical patent/CN105500510B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B11/00Apparatus or processes for treating or working the shaped or preshaped articles
    • B28B11/24Apparatus or processes for treating or working the shaped or preshaped articles for curing, setting or hardening
    • B28B11/245Curing concrete articles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to the technical field of building steam curing, and discloses a steam curing system for building elements. The steam curing system comprises a steam chamber, the left side and the right side of the steam chamber are provided with a feeding port and a discharging port respectively, and the feeding port and the discharging port are provided with doors which can open and close the feeding port and the discharging port; the left side of the steam chamber is provided with a feeding frame, the bottom of the fixing frame is fixedly provided with a first hydraulic cylinder which is inclined, a piston rod of the first hydraulic cylinder can stretch to the position over the top of the feeding frame, and a partition wall is arranged in the steam chamber and divides the steam chamber into a first steam chamber body and a second steam chamber body. According to the steam curing system for the building elements, the structure is reasonable, use is convenient, a crane is not needed to hoist the elements to be cured into the steam chamber and then hoist the cured elements out of the steam chamber, therefore, the hoisting difficulty is greatly lowered, the steam loss is greatly reduced, and the curing cost is lowered; the curing quality can be further improved by dividing the steam chamber into the two steam chamber bodies; the curing quality and working efficiency can be further improved by arranging pit grooves.

Description

Building element steam curing system
Technical field
The present invention relates to building steam curing technical field, is a kind of building element steam curing system.
Background technology
Steam curing is that concrete component is placed on steam-curing chamber, passing into water vapour makes concrete heat up, accelerate cement and supplementary cementitious material hydration and hardening process, reach demoulding strength fast, accelerate template turnover and production efficiency, in the manufacturing process of building element pipe fitting, build shaping product and mould to need to put into steam curing cellar for storing things simultaneously and carry out steam curing, because building fitting structure is heavy, therefore need to use crane to be hung in by building pipe fitting in maintenance cellar for storing things, also need after maintenance work to use crane building pipe fitting to be hung out maintenance cellar for storing things, not only operating efficiency is low, and hoisting cost is high, and in the process hanging in and hang out maintenance cellar for storing things, the top cover by maintenance is stored is needed to open, a large amount of steam is overflowed, cost is caused to waste, and construct when temperature is lower, building pipe fitting temperature is outside lower, sharply raises once entering into temperature in maintenance cellar for storing things, maintenance effect can be caused poor, thus cause product quality to reduce.
Summary of the invention
The invention provides a kind of building element steam curing system, overcome the deficiency of above-mentioned prior art, it can effectively solve, and existing steam curing existence lifting is wasted time and energy, cost is high and the problem of waste of steam and steam curing weak effect.
Technical scheme of the present invention is achieved like this: a kind of building element steam curing system, comprise vaporium, charging aperture and discharging opening is respectively equipped with in the left side of vaporium and right side, charging aperture and discharging opening are provided with the door that can open and close charging aperture and discharging opening, feeding rack is provided with in the left side of vaporium, be installed with in the bottom of feeding rack in the first skewed hydraulic cylinder, the piston rod of the first hydraulic cylinder can extend out to feeding rack over top, in vaporium, be provided with partition wall and vaporium be divided into the first vaporium and the second vaporium, the first fixed axis is fixed with along the longitudinal direction on the right side of the first vaporium, the second hydraulic cylinder and the 3rd hydraulic cylinder is installed with respectively from A-P in the left side of the first vaporium, hinged respectively at the top of the first fixed axis the first supporting seat and the second supporting seat are installed, the left part of the first supporting seat and the second supporting seat is fixed together with the piston rod of the second hydraulic cylinder and the piston rod of the 3rd hydraulic cylinder respectively, the second fixed axis is fixed with along the longitudinal direction on the right side of the second vaporium, the 4th hydraulic cylinder and the 5th hydraulic cylinder is installed with respectively from A-P in the left side of the second vaporium, hinged respectively at the top of the second fixed axis the 3rd supporting seat and four-supporting is installed, the left part of the 3rd supporting seat and four-supporting is fixed together with the piston rod of the 4th hydraulic cylinder and the piston rod of the 5th hydraulic cylinder respectively, the discharging seat corresponding with the right-hand member of the 3rd supporting seat and four-supporting is provided with in the second vaporium of the second fixed axis right, discharging seat is the skewed of right low left high, the outlet of discharging seat is corresponding with discharging opening, partition wall is provided with the feed inlet and outlet corresponding with the first supporting seat and the second supporting seat right-hand member and the 3rd supporting seat and four-supporting left end, feed inlet and outlet is provided with the door that can open and close feed inlet and outlet.
As preferably, the bottom of above-mentioned 4th hydraulic cylinder and the 3rd supporting seat between the 5th hydraulic cylinder and the second fixed axis and four-supporting is fixed with the groove of at least three in interval all from left to right, the breach communicated with groove is provided with on the top of the 3rd supporting seat and four-supporting, locating piece is provided with in breach, be provided with positioning hydraulic cylinders at the second vaporium internal fixtion corresponding with groove, the piston of positioning hydraulic cylinders passes groove and is fixed together with the bottom of locating piece.
As preferably, the top of above-mentioned locating piece is arc.
As preferably, above-mentioned groove is 4 to 20.
As preferably, above-mentioned door is the door that hydraulic control moves up and down.
As preferably, the left end of above-mentioned discharging seat is provided with the electric guard board that can block building pipe fitting.
The present invention is rational in infrastructure, easy to use, do not need will treat that maintaining device hangs in vaporium with crane, hang out from vaporium again, thus significantly reduce hoisting difficulty, also significantly reduce the loss of steam, reduce the cost of maintenance, and be divided into the quality that two vaporiums can improve maintenance further, by arranging groove, quality and the operating efficiency of maintenance can be improved further.
Accompanying drawing explanation
Fig. 1 is the main TV structure schematic diagram of the present invention when removing the front wallboard of the first vaporium and the second vaporium;
Fig. 2 is the top view of the present invention when removing the top board of the first vaporium and the second vaporium;
Fig. 3 is left view of the present invention.
Coding in figure is respectively: 1 is charging aperture, 2 is door, 3 is feeding rack, 4 is the first hydraulic cylinder, 5 is the piston rod of the first hydraulic cylinder, 6 is partition wall, 7 is the first vaporium, 8 is the second vaporium, 9 is the first fixed axis, 10 is the second hydraulic cylinder, 11 is the first supporting seat, 12 is the second supporting seat, 13 is the piston rod of the second hydraulic cylinder, 14 is the second fixed axis, 15 is the 4th hydraulic cylinder, 16 is the 3rd supporting seat, 17 is four-supporting, 18 is the piston rod of the 4th hydraulic cylinder, 19 is groove, 20 is breach, 21 is locating piece, 22 is positioning hydraulic cylinders, 23 is the piston of positioning hydraulic cylinders, 24 is electric guard board.
Detailed description of the invention
As Fig. 1, shown in Fig. 2 and Fig. 3, this building element steam curing system, comprise vaporium, charging aperture 1 and discharging opening is respectively equipped with in the left side of vaporium and right side, charging aperture 1 and discharging opening are provided with the door 2 that can open and close charging aperture and discharging opening, feeding rack 3 is provided with in the left side of vaporium, be installed with in the first skewed hydraulic cylinder 4 in the bottom of feeding rack 3, the piston rod 5 of the first hydraulic cylinder can extend out to feeding rack 3 over top, in vaporium, be provided with partition wall 6 and vaporium be divided into the first vaporium 7 and the second vaporium 8, the first fixed axis 9 is fixed with along the longitudinal direction on the right side of the first vaporium 7, the second hydraulic cylinder 10 and the 3rd hydraulic cylinder is installed with respectively from A-P in the left side of the first vaporium 7, hinged respectively at the top of the first fixed axis 9 first supporting seat 11 and the second supporting seat 12 is installed, the left part of the first supporting seat 11 and the second supporting seat 12 is fixed together with the piston rod 13 of the second hydraulic cylinder and the piston rod of the 3rd hydraulic cylinder respectively, the second fixed axis 14 is fixed with along the longitudinal direction on the right side of the second vaporium 8, the 4th hydraulic cylinder 15 and the 5th hydraulic cylinder is installed with respectively from A-P in the left side of the second vaporium 8, hinged respectively at the top of the second fixed axis 14 the 3rd supporting seat 16 and four-supporting 17 is installed, the left part of the 3rd supporting seat 16 and four-supporting 17 is fixed together with the piston rod 18 of the 4th hydraulic cylinder and the piston rod of the 5th hydraulic cylinder respectively, the discharging seat corresponding with the right-hand member of the 3rd supporting seat 16 and four-supporting 17 is provided with in the second vaporium 8 of the second fixed axis 14 right, discharging seat is the skewed of right low left high, the outlet of discharging seat is corresponding with discharging opening, partition wall 6 is provided with the feed inlet and outlet corresponding with the first supporting seat 11 and the second supporting seat 12 right-hand member and the 3rd supporting seat 16 and four-supporting 17 left end, feed inlet and outlet is provided with the door 2 that can open and close feed inlet and outlet.During winter construction, tubular type building element and mould crane are winched on feeding rack 3, charging aperture 1 is opened, open the first hydraulic cylinder 4, the piston rod 5 of the first hydraulic cylinder stretches out and obliquely by the first supporting seat 11 in tubular type building element and mould jacking charging aperture 1 and the second supporting seat 12, sequentially many tubular type building elements and mould are fed through on the first supporting seat 11 and the second supporting seat 12, start steam simultaneously, the temperature in the first vaporium is kept to spend 15 to 25, after the time of advent, open the door 2 of partition wall 6, start the second hydraulic cylinder 10 and the 3rd hydraulic cylinder, first supporting seat 11 and the second supporting seat 12 are tilted to the right, many tubular type building elements and mould roll into the second vaporium 8, many tubular type building elements and mould are positioned on the 3rd supporting seat 16 and four-supporting 17, start steam simultaneously, the temperature in the second vaporium 8 is kept to spend 45 to 60, after the time of advent, open the door 2 of discharging opening, start the 4th hydraulic cylinder 15 and the 5th hydraulic cylinder simultaneously, 3rd supporting seat 16 and four-supporting 17 are tilted to the right, many tubular type building elements and mould are along discharging seat from discharging opening out, thus complete steam curing operation.By said structure, do not need will treat that maintaining device hangs in vaporium with crane, then hang out from vaporium, thus significantly reduce hoisting difficulty, also significantly reduce the loss of steam, reduce the cost of maintenance, and be divided into the quality that two vaporiums can improve maintenance further.
As depicted in figs. 1 and 2, the bottom of the 4th hydraulic cylinder 15 and the 3rd supporting seat 16 between the 5th hydraulic cylinder and the second fixed axis 14 and four-supporting 17 is fixed with the groove 19 of at least three in interval all from left to right, the breach 20 communicated with groove 19 is provided with on the top of the 3rd supporting seat 16 and four-supporting 17, locating piece 21 is provided with in breach 20, be provided with positioning hydraulic cylinders 22 at the second vaporium 8 internal fixtion corresponding with groove 19, the piston 23 of positioning hydraulic cylinders passes groove 19 and is fixed together with the bottom of locating piece 21.At the scene in operation, because many tubular type building elements and mould easily fit together, thus steam curing can not be carried out well in joint place, product quality is caused to reduce, therefore, all make the top of locating piece 21 concordant with the top of four-supporting 17 with the 3rd supporting seat 16 with locating piece 21 at the piston 23 of positioning hydraulic cylinders at ordinary times, when first tubular type building element and mould enter in the second vaporium 8, the piston 23 of the positioning hydraulic cylinders of the rightmost side moves down, locating piece 21 is made to have spacing with the top of breach 20, form a hole groove, the piston rod 18 of the 4th hydraulic cylinder and the piston upwards jack-up of the 5th hydraulic cylinder, first tubular type building element and mould turn right and fall in the groove of hole, other tubular type building element and mould enter in corresponding hole groove by this step successively, then steam is opened, the temperature in the second vaporium 8 is kept to spend 45 to 60, thus evenly can carry out steam curing, after maintenance, the piston 23 of all positioning hydraulic cylinders is risen, start the 4th hydraulic cylinder 15 and the 5th hydraulic cylinder, 3rd supporting seat 16 and four-supporting 17 are tilted to the right, many tubular type building elements and mould are along discharging seat from discharging opening out, thus complete steam curing operation.Not only increase stability like this, also improve product quality and operating efficiency.
As shown in Figure 1, the top of locating piece 21 is arc.To coordinate with tubular type building element and mold shape better like this.
According to actual needs, groove 19 is 4 to 20.
Above-mentioned door 2 is the door that hydraulic control moves up and down.Adopt the convenient operation of hydraulic control energy, hydraulic control door moves up and down as existing known technology.
As shown in Figure 1, the left end of discharging seat is provided with the electric guard board 24 that can block building pipe fitting.Electric guard board 24 is existing known technology, can prevent tubular type building element and mould from rolling too fast and falling on discharging seat.

Claims (10)

1. a building element steam curing system, it is characterized in that, comprise vaporium, charging aperture and discharging opening is respectively equipped with in the left side of vaporium and right side, charging aperture and discharging opening are provided with the door that can open and close charging aperture and discharging opening, feeding rack is provided with in the left side of vaporium, be installed with in the bottom of feeding rack in the first skewed hydraulic cylinder, the piston rod of the first hydraulic cylinder can extend out to feeding rack over top, in vaporium, be provided with partition wall and vaporium be divided into the first vaporium and the second vaporium, the first fixed axis is fixed with along the longitudinal direction on the right side of the first vaporium, the second hydraulic cylinder and the 3rd hydraulic cylinder is installed with respectively from A-P in the left side of the first vaporium, hinged respectively at the top of the first fixed axis the first supporting seat and the second supporting seat are installed, the left part of the first supporting seat and the second supporting seat is fixed together with the piston rod of the second hydraulic cylinder and the piston rod of the 3rd hydraulic cylinder respectively, the second fixed axis is fixed with along the longitudinal direction on the right side of the second vaporium, the 4th hydraulic cylinder and the 5th hydraulic cylinder is installed with respectively from A-P in the left side of the second vaporium, hinged respectively at the top of the second fixed axis the 3rd supporting seat and four-supporting is installed, the left part of the 3rd supporting seat and four-supporting is fixed together with the piston rod of the 4th hydraulic cylinder and the piston rod of the 5th hydraulic cylinder respectively, the discharging seat corresponding with the right-hand member of the 3rd supporting seat and four-supporting is provided with in the second vaporium of the second fixed axis right, discharging seat is the skewed of right low left high, the outlet of discharging seat is corresponding with discharging opening, partition wall is provided with the feed inlet and outlet corresponding with the first supporting seat and the second supporting seat right-hand member and the 3rd supporting seat and four-supporting left end, feed inlet and outlet is provided with the door that can open and close feed inlet and outlet.
2. building element steam curing system according to claim 1, it is characterized in that, the bottom of the 4th hydraulic cylinder and the 3rd supporting seat between the 5th hydraulic cylinder and the second fixed axis and four-supporting is fixed with the groove of at least three in interval all from left to right, the breach communicated with groove is provided with on the top of the 3rd supporting seat and four-supporting, locating piece is provided with in breach, be provided with positioning hydraulic cylinders at the second vaporium internal fixtion corresponding with groove, the piston of positioning hydraulic cylinders passes groove and is fixed together with the bottom of locating piece.
3. building element steam curing system according to claim 2, is characterized in that, the top of locating piece is arc.
4. the building element steam curing system according to Claims 2 or 3, it is characterized in that, groove is 4 to 20.
5. the building element steam curing system according to claim 1 or 2 or 3, it is characterized in that, door is the door that hydraulic control moves up and down.
6. building element steam curing system according to claim 4, it is characterized in that, door is the door that hydraulic control moves up and down.
7. the building element steam curing system according to claim 1 or 2 or 3, is characterized in that, the left end of discharging seat is provided with the electric guard board that can block building pipe fitting.
8. building element steam curing system according to claim 4, is characterized in that, the left end of discharging seat is provided with the electric guard board that can block building pipe fitting.
9. building element steam curing system according to claim 5, is characterized in that, the left end of discharging seat is provided with the electric guard board that can block building pipe fitting.
10. building element steam curing system according to claim 6, is characterized in that, the left end of discharging seat is provided with the electric guard board that can block building pipe fitting.
CN201610024057.4A 2016-01-08 2016-01-08 Building element steam curing system Active CN105500510B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610024057.4A CN105500510B (en) 2016-01-08 2016-01-08 Building element steam curing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610024057.4A CN105500510B (en) 2016-01-08 2016-01-08 Building element steam curing system

Publications (2)

Publication Number Publication Date
CN105500510A true CN105500510A (en) 2016-04-20
CN105500510B CN105500510B (en) 2017-10-27

Family

ID=55708996

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610024057.4A Active CN105500510B (en) 2016-01-08 2016-01-08 Building element steam curing system

Country Status (1)

Country Link
CN (1) CN105500510B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106042162A (en) * 2016-07-22 2016-10-26 国新德 Prefabricated part maintenance system with movable maintenance bin
CN108748637A (en) * 2018-05-31 2018-11-06 山东大学 A kind of steam-cured cabin in underground and its application method
CN109747026A (en) * 2019-03-14 2019-05-14 杭州渔森农业技术开发有限公司 A kind of pig house floor drain plate process units
CN111940227A (en) * 2020-08-17 2020-11-17 哈尔滨学院 Assembly type building element curing means based on BIM
CN112659343A (en) * 2020-12-24 2021-04-16 池州华通杆塔有限公司 Steam curing device for concrete pole

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1994007100A1 (en) * 1992-09-11 1994-03-31 Swindell Dressler International Company Low profile kiln apparatus
CN1509861A (en) * 2002-12-24 2004-07-07 Lg化学株式会社 Method and apparatus for continuous producing manu-marble
CN2640717Y (en) * 2003-08-12 2004-09-15 重庆钢铁(集团)有限责任公司 Continuous steam maintenance insulation room for movable concrete prefabricated part
CN201720928U (en) * 2010-08-04 2011-01-26 舟山市宇锦新型墙体材料有限公司 Maintenance device for aerated concrete building block green bodies
CN104032112A (en) * 2014-06-17 2014-09-10 东北大学 Multifunctional heat treatment system for steel pipe
CN204869195U (en) * 2015-08-05 2015-12-16 新疆海福电力器材有限公司 Cement pole, tubular pile, culvert pipe are from formula circulation steam maintenance cellar for storing things that falls

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1994007100A1 (en) * 1992-09-11 1994-03-31 Swindell Dressler International Company Low profile kiln apparatus
CN1509861A (en) * 2002-12-24 2004-07-07 Lg化学株式会社 Method and apparatus for continuous producing manu-marble
CN2640717Y (en) * 2003-08-12 2004-09-15 重庆钢铁(集团)有限责任公司 Continuous steam maintenance insulation room for movable concrete prefabricated part
CN201720928U (en) * 2010-08-04 2011-01-26 舟山市宇锦新型墙体材料有限公司 Maintenance device for aerated concrete building block green bodies
CN104032112A (en) * 2014-06-17 2014-09-10 东北大学 Multifunctional heat treatment system for steel pipe
CN204869195U (en) * 2015-08-05 2015-12-16 新疆海福电力器材有限公司 Cement pole, tubular pile, culvert pipe are from formula circulation steam maintenance cellar for storing things that falls

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106042162A (en) * 2016-07-22 2016-10-26 国新德 Prefabricated part maintenance system with movable maintenance bin
CN108748637A (en) * 2018-05-31 2018-11-06 山东大学 A kind of steam-cured cabin in underground and its application method
CN108748637B (en) * 2018-05-31 2023-06-06 山东大学 Underground steam curing cabin and application method thereof
CN109747026A (en) * 2019-03-14 2019-05-14 杭州渔森农业技术开发有限公司 A kind of pig house floor drain plate process units
CN111940227A (en) * 2020-08-17 2020-11-17 哈尔滨学院 Assembly type building element curing means based on BIM
CN112659343A (en) * 2020-12-24 2021-04-16 池州华通杆塔有限公司 Steam curing device for concrete pole

Also Published As

Publication number Publication date
CN105500510B (en) 2017-10-27

Similar Documents

Publication Publication Date Title
CN105500510A (en) Steam curing system for building elements
CN106142325B (en) A kind of sanitary ceramics injection forming production system and its production method
CN104385438B (en) Toilet seat automatic grouting machine
CN109129837B (en) Cement brick preparation and shedder
CN203919320U (en) A kind of concrete equating plucking all-in-one
CN204869195U (en) Cement pole, tubular pile, culvert pipe are from formula circulation steam maintenance cellar for storing things that falls
CN204456428U (en) A kind of entirety being installed on composite wallboard is waftd window
CN203045962U (en) Track hoisting three-dimensional space sunlight thermal insulation curing kiln for building blocks
CN205889476U (en) Full -automatic high -pressure forming machine
CN207224204U (en) A kind of porous shale brick molding machine
CN201566041U (en) Inside and outside die immediate discharging concrete tube machine
CN203346950U (en) Hidden laying structure for temporary water supply pipes of high-rise building
CN103114718A (en) Collecting and separating machine of sliding form formwork and construction method of variable cross-section cylinder silo sliding form
CN204414321U (en) The box assembling die curing system of concrete
CN205552846U (en) Cement pipe apparatus for producing
CN105773828B (en) A kind of circle body robot is bonded Full-automatic closet high-pressure forming machine
CN204525753U (en) A kind of cement pipe molding mould
CN210599012U (en) Automatic setting mechanism for secondary lining end mold of tunnel
CN203371623U (en) Light wallboard vertical mould forming machine with movable modules
CN202781376U (en) Square cement flue molding equipment
CN203438384U (en) Vertical demolding overhang roller die with one open side
CN203730003U (en) Integral hydraulic template for use in wall casing of vertical well
CN105479588A (en) Production technology and device for energy-saving wall module
CN204019709U (en) A kind of concrete segment maintenance mould
CN202357246U (en) Pneumatic pouring mould-opening/closing device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
DD01 Delivery of document by public notice

Addressee: Chen Dongqiang

Document name: Notification of Passing Examination on Formalities

DD01 Delivery of document by public notice
CB03 Change of inventor or designer information

Inventor after: Tian Qingxi

Inventor after: Su Juanjuan

Inventor after: Jiang Mingxi

Inventor after: Yang Guangjun

Inventor before: Chen Dongqiang

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20170921

Address after: 450000 Zhengzhou City, Jinshui District, Henan, No. seven, No. 4 attached to the hospital, unit 5, No. 1, layer 522

Applicant after: Zhengzhou warm tree Industrial Co., Ltd.

Address before: 362121 Xitang, Fujian, Taiwan investment zone, Luoyang Town, Xitang village, No. 73,

Applicant before: Chen Dongqiang

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant