CN105484791A - 一种隧道综合泄水、降水、减压施工方法 - Google Patents
一种隧道综合泄水、降水、减压施工方法 Download PDFInfo
- Publication number
- CN105484791A CN105484791A CN201610026423.XA CN201610026423A CN105484791A CN 105484791 A CN105484791 A CN 105484791A CN 201610026423 A CN201610026423 A CN 201610026423A CN 105484791 A CN105484791 A CN 105484791A
- Authority
- CN
- China
- Prior art keywords
- tunnel
- hole
- precipitation
- ground
- positive hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 26
- 238000001556 precipitation Methods 0.000 title claims abstract description 23
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 54
- 239000000758 substrate Substances 0.000 claims abstract description 12
- 230000006837 decompression Effects 0.000 claims description 12
- 239000004576 sand Substances 0.000 abstract description 14
- 238000000034 method Methods 0.000 abstract description 3
- 239000011435 rock Substances 0.000 description 13
- 238000005516 engineering process Methods 0.000 description 4
- 239000003673 groundwater Substances 0.000 description 3
- 239000002689 soil Substances 0.000 description 3
- 230000015572 biosynthetic process Effects 0.000 description 2
- 230000009172 bursting Effects 0.000 description 2
- 230000006378 damage Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000003628 erosive effect Effects 0.000 description 2
- 241000282985 Cervus Species 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 239000004927 clay Substances 0.000 description 1
- 239000002734 clay mineral Substances 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000018044 dehydration Effects 0.000 description 1
- 238000006297 dehydration reaction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000012851 eutrophication Methods 0.000 description 1
- 235000013312 flour Nutrition 0.000 description 1
- 230000008595 infiltration Effects 0.000 description 1
- 238000001764 infiltration Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000035772 mutation Effects 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 238000005381 potential energy Methods 0.000 description 1
- 229920006395 saturated elastomer Polymers 0.000 description 1
- 230000001932 seasonal effect Effects 0.000 description 1
- 239000002352 surface water Substances 0.000 description 1
- 238000004642 transportation engineering Methods 0.000 description 1
- 230000005641 tunneling Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F16/00—Drainage
- E21F16/02—Drainage of tunnels
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
隧道综合泄水、降水、减压施工方法涉及一种第三系砂泥岩隧道涌水涌泥段洞内泄水、地表降水、综合减压施工方法。主要是为解决目前当隧道在第三系砂泥岩施工中易出现变形、塌方,甚至涌水突泥等风险的问题而设计的。在地表向正洞距两侧边线各八米处分别打地表降水井,在地表向正洞附近设平导洞,由平导洞向地表向正洞斜上方打泄水孔,在地表向正洞基底及平导洞基底都打隧道基底降水井,地表向正洞拱顶斜向前上方打设若干道斜向泄水孔,地表向正洞的拱顶上方打设正洞竖直泄水孔,平导洞拱顶上方也打设平导洞竖直泄水孔。优点是避免了塌方、变形、涌水涌泥等地质灾害,能够保证隧道施工安全。
Description
技术领域:
本发明型涉及一种第三系砂泥岩隧道涌水涌泥段洞内泄水、地表降水、综合减压施工方法。
背景技术:
随着我国大规模、现代化、高标准的城市道路与交通运输工程建设,隧道工程的数量和建设规模不断扩大,并且通过的地质条件也越来越复杂,第三系砂泥岩就是一种复杂的地质围岩。第三系砂泥岩的特点:主要成分为粘土矿物,含少量粉砂质,其中粉砂含量为25%—50%、粘土含量为75%—50%,遇水易软化、冲蚀;围岩自稳能力差、破碎、膨胀、强度低;节理裂隙发育等。上述特点导致在第三系砂泥岩地层中修建隧道存在一定的技术难题,其中对隧道富集水区域泄水降压施工尤为显著,所以在第三系砂泥岩隧道修建中如何实施泄水降压方案变得甚为重要。
当隧道在第三系砂泥岩施工中,砂泥岩易被水软化、冲蚀,且岩石饱和抗压强度低(极软岩),失水易开裂崩解,遇水软化膨胀,强度急剧降低,节理裂隙发育,围岩软弱破碎,稳定性差,在地下水发育情况下极易出现变形、塌方,甚至涌水突泥等风险。
隧道发生涌水涌泥可导致以下灾害:
(1)造成工程灾害和人员伤亡。第三系砂泥岩地区具有富水、富泥砂特征,当隧道在修建过程中发生特大突水时,常伴随涌泥、涌砂,从而淹没隧道、冲毁机具,轻则中断施工,重则造成隧道废弃易址,更甚者会造成重大的人员伤亡,如宜万线铁路马鹿等隧道平导施工上覆溶腔水体压裂拱部围岩,发生特大突水灾害,最大突水量高达30×104m3/h,造成11人死亡。
(2)诱发地面附带地质灾害。隧道涌水造成地表塌陷、地表沉降,严重破坏了地表农田和居民生活、生产水资源的平衡,潜在的突水通道为强降雨地表水的渗入提供了条件,严重威胁隧道内施工期和建成后运营期的安全。
(3)破坏水资源系统的平衡。隧道涌水涌泥将不可避免地引起地下水循环系统的紊乱,短时间内大量动力势能的释放打破了水资源系统的原有平衡,主要表现在水资源枯竭和污染两个方面。
(4)其它潜在性危害。由于涌水涌泥地质灾害极大程度上改变了围岩应力状态和地下水动力循环系统,其危害性远远高于爆发初期的假象,潜在的灾害仍难以预料,诸如涌水通道二次涌水、季节性蓄水构造复活以及区域性应力突变等等。
由此可知,隧道发生涌水涌泥地质灾害时不仅会带来施工技术难题,也使得围岩和水体的自然平衡发生重大的破坏。
发明内容:
本发明所要解决的技术问题是提供一种当隧道在第三系砂泥岩施工中,可以有效的控制隧道变形、塌方,防止出现涌水突泥等灾害,同时降低施工难度,确保工程质量和安全的隧道综合泄水、降水、减压施工方法。
为实现上述目的,本发明采用的技术方案为:
在地表向正洞距两侧边线各八米处分别打地表降水井,在地表向正洞附近设平导洞,在增加掘进工作面的同时达到泄水降水减压,由平导洞向地表向正洞斜上方打泄水孔,在地表向正洞基底及平导洞基底都打隧道基底降水井,地表向正洞拱顶斜向前上方打设若干道斜向泄水孔,地表向正洞的拱顶上方打设正洞竖直泄水孔,平导洞拱顶上方也打设平导洞竖直泄水孔。
本发明的优点是:
1、地表在正洞距两侧边线各8米距离打设降水井,成功降低了隧道洞身拱顶水头水压,使围岩变形得到有效控制,防止了富水砂泥岩地层地下水向下渗漏。
2、增设平导洞不但增加了掘进工作掌子面而且对隧道洞身的水压起到了分压的效果,减小了外部水压对隧道衬砌支护的的挤压变形,很好的保护了工程质量和安全。
3、在地表向正洞基底及平导洞基底都打隧道基底降水井,将隧道周围岩体的渗流水系、裂隙水系汇集,使隧道环境处于一种干燥状态,有利于机械化施工。
4、地表向正洞和平导洞拱部泄水孔将洞身上部水系成功分流,避免了较大水流对拱顶围岩的冲击,减小了土体的湿度,有效提高地层物理力学性能指标,抑制支护体系的变形。
5、通过隧道综合泄水、降水、减压施工方法,避免了塌方、变形、涌水涌泥等地质灾害,提高了土体固结强度,增加了土体有效应力,能够保证隧道施工安全,加快隧道施工进度。
附图说明:
附图1为本发明的施工状态示意图。
具体实施方式:
参照附图1,在地表向正洞5距两侧边线各八米处分别打地表降水井1,在地表向正洞附近设平导洞2,在增加掘进工作面的同时达到泄水降水减压,由平导洞向地表向正洞斜上方打泄水孔3,在地表向正洞基底及平导洞基底都打隧道基底降水井4,地表向正洞拱顶斜向前上方打设若干道斜向泄水孔6,地表向正洞的拱顶上方打设正洞竖直泄水孔7,平导洞拱顶上方也打设平导洞竖直泄水孔8。
本发明是在第三系砂泥岩围岩条件下,通过采用地表降水井、隧道基底降水井降水减压,洞身拱部泄水孔、地表向正洞及平导洞拱部的泄水孔、平导向正洞拱部的泄水孔等综合泄水减压技术,进而达到泄水降压的目的。
在实际工程中的具体实现方法:隧道在建设或者通过富水泥岩地段时,最先施做洞身拱部泄水孔,通过泄水孔的作用,达到降水减压的目的。如果拱部泄水孔不足以达到降水减压的目的,也充分说明该地区围岩地下水丰富,施做地表降水井、平导向正洞打设泄水孔、由地表向正洞和平导拱顶上方打设泄水孔,最后打设隧道和平导基底降水井,用以排出隧道内渗流水系。
本发明所采用的技术方案,是根据以往的工程实践和隧道施工研究人员的现场勘探,通过实际操作和分析认为隧道综合泄水、降水、减压施工技术比较适合于第三系砂泥岩地段。
Claims (1)
1.一种隧道综合泄水、降水、减压施工方法,其特征是:在地表向正洞(5)距两侧边线各八米处分别打地表降水井(1),在地表向正洞附近设平导洞(2),在增加掘进工作面的同时达到泄水降水减压,由平导洞向地表向正洞斜上方打泄水孔(3),在地表向正洞基底及平导洞基底都打隧道基底降水井(4),地表向正洞拱顶斜向前上方打设若干道斜向泄水孔(6),地表向正洞的拱顶上方打设正洞竖直泄水孔(7),平导洞拱顶上方也打设平导洞竖直泄水孔(8)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610026423.XA CN105484791B (zh) | 2016-01-16 | 2016-01-16 | 一种隧道综合泄水、降水、减压施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610026423.XA CN105484791B (zh) | 2016-01-16 | 2016-01-16 | 一种隧道综合泄水、降水、减压施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105484791A true CN105484791A (zh) | 2016-04-13 |
CN105484791B CN105484791B (zh) | 2018-08-21 |
Family
ID=55672036
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610026423.XA Active CN105484791B (zh) | 2016-01-16 | 2016-01-16 | 一种隧道综合泄水、降水、减压施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105484791B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110043272A (zh) * | 2019-04-10 | 2019-07-23 | 中铁十二局集团有限公司 | 控制盾构机掘进过程中喷涌的方法 |
CN112145186A (zh) * | 2020-09-25 | 2020-12-29 | 中铁二十局集团有限公司 | 隧道泄水降压结构及施工方法 |
CN113137272A (zh) * | 2021-04-08 | 2021-07-20 | 苏州中车建设工程有限公司 | 一种大直径盾构隧道位移控制装置及其工作方法 |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1090893A1 (ru) * | 1981-12-18 | 1984-05-07 | Новосибирский филиал Всесоюзного научно-исследовательского института транспортного строительства | Дренажное устройство |
CN1766289A (zh) * | 2005-11-29 | 2006-05-03 | 长安大学 | 隧道工程的集中泄水装置及其泄水方法 |
FR2916473A1 (fr) * | 2007-05-22 | 2008-11-28 | Gilles Chatenoud | Systeme de parement et procede d'etanchement d'un ouvrage voute |
CN102278142A (zh) * | 2011-05-04 | 2011-12-14 | 中铁隧道集团二处有限公司 | 真空轻型井点降水方法 |
CN102720511A (zh) * | 2012-06-15 | 2012-10-10 | 中铁十二局集团第二工程有限公司 | 隧道泄水沉沙施工结构 |
CN202544925U (zh) * | 2012-04-13 | 2012-11-21 | 中国水电顾问集团华东勘测设计研究院 | 一种一孔两用的隧洞排水孔结构 |
CN202560319U (zh) * | 2012-04-01 | 2012-11-28 | 中铁十二局集团第二工程有限公司 | 一种隧道泄水减压结构 |
CN103032097A (zh) * | 2012-12-26 | 2013-04-10 | 湖南省交通规划勘察设计院 | 适用于偏压富水地层的隧道排水结构及其施工方法 |
CN103306683A (zh) * | 2013-06-18 | 2013-09-18 | 中铁隧道集团有限公司 | 一种开挖深埋隧道时洞内综合降水的施工方法 |
CN103742191A (zh) * | 2014-01-24 | 2014-04-23 | 中铁第一勘察设计院集团有限公司 | 富水隧洞超前长距离大口径降水通道及其施工方法 |
CN104454001A (zh) * | 2014-12-11 | 2015-03-25 | 中铁十九局集团有限公司 | 低渗透性粉细砂地层隧道内降水系统及降水方法 |
CN204716291U (zh) * | 2015-07-03 | 2015-10-21 | 招商局重庆交通科研设计院有限公司 | 隧道泄压引排水装置 |
-
2016
- 2016-01-16 CN CN201610026423.XA patent/CN105484791B/zh active Active
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1090893A1 (ru) * | 1981-12-18 | 1984-05-07 | Новосибирский филиал Всесоюзного научно-исследовательского института транспортного строительства | Дренажное устройство |
CN1766289A (zh) * | 2005-11-29 | 2006-05-03 | 长安大学 | 隧道工程的集中泄水装置及其泄水方法 |
FR2916473A1 (fr) * | 2007-05-22 | 2008-11-28 | Gilles Chatenoud | Systeme de parement et procede d'etanchement d'un ouvrage voute |
CN102278142A (zh) * | 2011-05-04 | 2011-12-14 | 中铁隧道集团二处有限公司 | 真空轻型井点降水方法 |
CN202560319U (zh) * | 2012-04-01 | 2012-11-28 | 中铁十二局集团第二工程有限公司 | 一种隧道泄水减压结构 |
CN202544925U (zh) * | 2012-04-13 | 2012-11-21 | 中国水电顾问集团华东勘测设计研究院 | 一种一孔两用的隧洞排水孔结构 |
CN102720511A (zh) * | 2012-06-15 | 2012-10-10 | 中铁十二局集团第二工程有限公司 | 隧道泄水沉沙施工结构 |
CN103032097A (zh) * | 2012-12-26 | 2013-04-10 | 湖南省交通规划勘察设计院 | 适用于偏压富水地层的隧道排水结构及其施工方法 |
CN103306683A (zh) * | 2013-06-18 | 2013-09-18 | 中铁隧道集团有限公司 | 一种开挖深埋隧道时洞内综合降水的施工方法 |
CN103742191A (zh) * | 2014-01-24 | 2014-04-23 | 中铁第一勘察设计院集团有限公司 | 富水隧洞超前长距离大口径降水通道及其施工方法 |
CN104454001A (zh) * | 2014-12-11 | 2015-03-25 | 中铁十九局集团有限公司 | 低渗透性粉细砂地层隧道内降水系统及降水方法 |
CN204716291U (zh) * | 2015-07-03 | 2015-10-21 | 招商局重庆交通科研设计院有限公司 | 隧道泄压引排水装置 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110043272A (zh) * | 2019-04-10 | 2019-07-23 | 中铁十二局集团有限公司 | 控制盾构机掘进过程中喷涌的方法 |
CN112145186A (zh) * | 2020-09-25 | 2020-12-29 | 中铁二十局集团有限公司 | 隧道泄水降压结构及施工方法 |
CN113137272A (zh) * | 2021-04-08 | 2021-07-20 | 苏州中车建设工程有限公司 | 一种大直径盾构隧道位移控制装置及其工作方法 |
Also Published As
Publication number | Publication date |
---|---|
CN105484791B (zh) | 2018-08-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102493822B (zh) | 一种通过富水断层影响带的隧道的帷幕注浆施工方法 | |
Cui et al. | Mitigation of geohazards during deep excavations in karst regions with caverns: a case study | |
CN103628894B (zh) | 一种基于变角伞状超前注浆的富水断层破碎带垮塌巷道巷修方法 | |
CN102705005B (zh) | 定向导流注浆封堵矿井突水技术 | |
Chen et al. | Recent advances in high slope reinforcement in China: Case studies | |
CN204253054U (zh) | 山岭隧道桩拱盖挖法综合支护结构 | |
CN103899323B (zh) | 一种盾构穿越铁路站场的施工方法 | |
CN103899329B (zh) | 一种大变形破碎围岩巷道的治理方法 | |
CN104863629A (zh) | 一种利用复合钻孔抽覆岩下离层瓦斯及排水注浆的方法 | |
CN104453913A (zh) | 一种竖井工作面超前预注浆方法 | |
WO2015021783A1 (zh) | 一种煤矿地下水库的人工挡水坝及其与煤柱坝体和围岩的连接方法 | |
CN105484753B (zh) | 高水压大流量破碎带的掘进支护方法 | |
CN102425155B (zh) | 一种采空区上覆岩体浅层加固方法 | |
CN104033160A (zh) | 一种适用于软土地层的浅埋暗挖隧道新型支护方法 | |
CN104989408A (zh) | 一种用于山区金属矿山安全高效的采矿方法 | |
CN106837382A (zh) | 一种地铁隧道围岩地面预注浆加固工艺 | |
CN105484791A (zh) | 一种隧道综合泄水、降水、减压施工方法 | |
Lin et al. | Overlying strata movement law of continuous mining and continuous backfilling cemented-fill mining | |
CN107448204A (zh) | 砂卵石堆积层浅埋暗挖法隧道近距离下穿深基坑施工方法 | |
CN110566271A (zh) | 一种用于市政道路下伏富水采空区的加固施工方法 | |
CN112302663B (zh) | 一种用于富水砂化白云岩地层隧道的铣爆结合施工方法 | |
CN207513614U (zh) | 浅埋隧道暗挖法超前支护结构及复合式超前小导管 | |
CN205330731U (zh) | 一种隧道综合泄水、降水、减压系统 | |
CN204899945U (zh) | 一种用于隧道支护的板凳梁超前管棚组合支护结构 | |
CN114991774A (zh) | 破碎安山质玄武岩地层地面分段下行式注浆方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |