CN105460735A - 自带平台构件的升降机标准节模块 - Google Patents
自带平台构件的升降机标准节模块 Download PDFInfo
- Publication number
- CN105460735A CN105460735A CN201511019613.0A CN201511019613A CN105460735A CN 105460735 A CN105460735 A CN 105460735A CN 201511019613 A CN201511019613 A CN 201511019613A CN 105460735 A CN105460735 A CN 105460735A
- Authority
- CN
- China
- Prior art keywords
- frame
- clamping
- platform part
- clamping frame
- platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B7/00—Other common features of elevators
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
- Cage And Drive Apparatuses For Elevators (AREA)
Abstract
本发明提供自带平台构件的升降机标准节模块,包括卡接架、平台部与支撑架,所述卡接架与平台部和支撑架均采用焊接连接,卡接架具有两条平行设置的卡接轨道,由轨道上端的平衡框连接,平台部安装于卡接架其卡接轨道的靠上一侧,支撑架安装于平台部下方,与平台部、卡接架连接。本发明通过创新设计,将需要在施工现场焊接安装的部件重新设计,使其可以在生产车间通过治具定位快速焊接,提高了产品精度,使升降机可以更快速地交付使用,具有显著的实用意义。
Description
技术领域
本发明涉及施工用升降机领域,具体而言,涉及自带平台构件的升降机标准节模块。
背景技术
施工电梯通常称为施工升降机,但施工升降机包括的定义更宽广,施工平台也属于施工升降机系列。单纯的施工电梯是由轿厢、驱动机构、标准节、附墙、底盘、围栏、电气系统等几部分组成,是建筑中经常使用的载人载货施工机械,由于其独特的箱体结构使其乘坐起来既舒适又安全,施工电梯在工地上通常是配合塔吊使用,一般载重量在1-3吨,运行速度为1-60M/min。我国生产的施工升降机越来越成熟,逐步走向国际。
由于我国房地产的蓬勃发展,施工升降机的市场需求量不断加大,传统的施工升降机标准节长达3米,无法在生产车间组装直接发货,必须运输到工地后继续组装工序才能交付建筑商使用,效率较低且十分耗费人力物力,不符合市场发展的需求。为了提升生产生产效率,降低组装难度,出现了1.5米长的标准节,可方便地运输与组装。但升降机平台仍需要按照传统做法经工人在建筑工地现场焊接,且由于焊接的精度要求较高,需要耗费较长的时间完成,生产效率受到了制约。
因此研发一种可以进一步提高生产效率,可在工地快速安装的,已自带平台的升降机构件具有创新意义。
发明内容
本发明提供自带平台构件的升降机标准节模块,解决现有技术中施工升降机的安装必须在建筑工地完成,无法在车间进行更多工序,组装较慢影响生产效率等问题。
自带平台构件的升降机标准节模块,包括卡接架、平台部与支撑架,所述卡接架与平台部和支撑架均采用焊接连接。
进一步地,所述卡接架具有两条平行设置的卡接轨道,由轨道上端的平衡框连接。
进一步地,所述平台部安装于卡接架其卡接轨道的靠上一侧。
进一步地,所述支撑架安装于平台部下方,与平台部、卡接架连接。
进一步地,所述卡接架、平台部与支撑架均设置有治具连接孔,所述治具连接孔其尺寸均相等。
本发明的有益效果:本发明通过优化结构设计,使需要直接在施工现场进行的平台安装工序简化,通过在生产车间使用定位治具固定各组件,将各组件的位置精确对位,提高了升降机构件的生产速度,且由于本构件自带平台,在施工场地中无需焊接平台,直接将构件安装于标准节上即可,大大降低了施工现场的器材搭建难度,提高了工作效率。
附图说明
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。
图1为本发明的结构图;
图2为本发明的卡接架结构图;
图3为本发明的平台部结构图;
图4为本发明的支撑架结构图。
具体实施方式
下面将结合本发明中的附图,对发明中的技术方案进行清楚、完整地描述,显然,所描述的仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动的前提下所获得的所有其他实施例,都属于本发明保护的范围。
如图1所示,自带平台构件的升降机标准节模块,包括卡接架1、平台部2与支撑架3,所述卡接架1与平台部2和支撑架3均采用焊接连接,卡接架1具有两条平行设置的卡接轨道,由轨道上端的平衡框连接,平台部2安装于卡接架1其卡接轨道的靠上一侧,支撑架3安装于平台部2下方,与平台部2、卡接架1连接。所述卡接架1、平台部2与支撑架3均设置有治具连接孔,所述治具连接孔其尺寸均相等。
本发明在组装时,首先将通过治具连接孔固定在外部定位治具上的卡接架1的卡接轨道与平衡框焊接固定,然后将平台部2与支撑架3依次与焊接好的卡接架1焊接固定,整个构件焊接完毕后,将外部定位治具卸下,然后即可将整个升降机标准节模块装车运送到目的地进行对接安装。由于升降机标准节模块已通过外部定位治具精确组装,无需在现场对构件进行制作工序,可直接投入使用。
本发明通过创新设计,将需要在施工现场焊接安装的部件重新设计,使其可以在生产车间通过治具定位快速焊接,提高了产品精度,使升降机可以更快速地交付使用,可提高生产效率,节省人力成本与安装成本。
以上所述,本发明的内容不限于实施例所列举,本领域普通技术人员通过阅读本发明说明书而对本发明方案采取任何等价的变换,均为本发明的权利要求所涵盖。
Claims (5)
1.自带平台构件的升降机标准节模块,其特征在于,包括卡接架、平台部与支撑架,所述卡接架与平台部和支撑架均采用焊接连接。
2.根据权利要求1中所述的自带平台构件的升降机标准节模块,其特征在于,所述卡接架具有两条平行设置的卡接轨道,由轨道上端的平衡框连接。
3.根据权利要求1中所述的自带平台构件的升降机标准节模块,其特征在于,所述平台部安装于卡接架其卡接轨道的靠上一侧。
4.根据权利要求1中所述的自带平台构件的升降机标准节模块,其特征在于,所述支撑架安装于平台部下方,与平台部、卡接架连接。
5.根据权利要求1中所述的自带平台构件的升降机标准节模块,其特征在于,所述卡接架、平台部与支撑架均设置有治具连接孔,所述治具连接孔其尺寸均相等。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511019613.0A CN105460735A (zh) | 2015-12-28 | 2015-12-28 | 自带平台构件的升降机标准节模块 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511019613.0A CN105460735A (zh) | 2015-12-28 | 2015-12-28 | 自带平台构件的升降机标准节模块 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105460735A true CN105460735A (zh) | 2016-04-06 |
Family
ID=55598975
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201511019613.0A Pending CN105460735A (zh) | 2015-12-28 | 2015-12-28 | 自带平台构件的升降机标准节模块 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105460735A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107881860A (zh) * | 2017-11-27 | 2018-04-06 | 苏州惠琪特电子科技有限公司 | 一种钣金卡接轨道 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101148945A (zh) * | 2007-03-02 | 2008-03-26 | 顾粉兵 | 建筑物外墙装修自动升降式工作台 |
US20080190706A1 (en) * | 2004-01-20 | 2008-08-14 | Franklin Samuel H | Elevator Climbing System |
CN201679222U (zh) * | 2010-05-25 | 2010-12-22 | 中国建筑科学研究院建筑机械化研究分院 | 双桅柱爬升工作平台 |
CN102797346A (zh) * | 2012-07-16 | 2012-11-28 | 北京卓良模板有限公司 | 建筑防护架 |
CN104847098A (zh) * | 2015-04-09 | 2015-08-19 | 杨济刚 | 多导轨附着式电动升降脚手架 |
-
2015
- 2015-12-28 CN CN201511019613.0A patent/CN105460735A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080190706A1 (en) * | 2004-01-20 | 2008-08-14 | Franklin Samuel H | Elevator Climbing System |
CN101148945A (zh) * | 2007-03-02 | 2008-03-26 | 顾粉兵 | 建筑物外墙装修自动升降式工作台 |
CN201679222U (zh) * | 2010-05-25 | 2010-12-22 | 中国建筑科学研究院建筑机械化研究分院 | 双桅柱爬升工作平台 |
CN102797346A (zh) * | 2012-07-16 | 2012-11-28 | 北京卓良模板有限公司 | 建筑防护架 |
CN104847098A (zh) * | 2015-04-09 | 2015-08-19 | 杨济刚 | 多导轨附着式电动升降脚手架 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107881860A (zh) * | 2017-11-27 | 2018-04-06 | 苏州惠琪特电子科技有限公司 | 一种钣金卡接轨道 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204151692U (zh) | 一种模块化装配式脚手架系统 | |
CN103015536B (zh) | 一种多高层装配式钢结构体系的梁柱节点连接装置 | |
CN103015537A (zh) | 一种装配式钢结构体系的梁柱节点连接装置 | |
CN102979185A (zh) | H型钢梁与方钢管柱可变梁高装配式节点及其施工方法 | |
CN104453248A (zh) | 分层模块化拼装工艺的复杂异形多层网架施工方法 | |
CN103173582A (zh) | 高炉五通球及其导出管高空整体就位安装方法 | |
CN102134932B (zh) | 用于直升机组立输电线路铁塔中单肢主材塔段的导轨系统 | |
CN203820287U (zh) | 钢结构厂房屋面瓦吊装组合钢扁担 | |
CN105781210A (zh) | 一种锥形塔架及其工具节辅助穿心式整体提升施工方法 | |
CN104863407B (zh) | 一种输电线路的抢修塔 | |
CN105460735A (zh) | 自带平台构件的升降机标准节模块 | |
CN104775363A (zh) | 上塔柱钢筋节段的组拼方法 | |
CN205257792U (zh) | 带有三角形支撑主梁的桥式起重机 | |
CN102587287B (zh) | 单跨槽形梁桥单片钢槽梁整体吊装的施工方法 | |
CN203656365U (zh) | 基于电缆下桥引缆的组合式过渡引缆笼 | |
CN101967903A (zh) | 一种直升机组立输电线路铁塔塔腿段用基础导轨 | |
CN204369358U (zh) | 一种杂物梯用快搭井架 | |
CN104100002A (zh) | 一种楼板与柱的连接结构 | |
CN205602927U (zh) | 一体式曳引机及导向轮固定装置 | |
CN205222516U (zh) | 组装式维修间的立柱和轨道横梁连接结构 | |
CN104060838A (zh) | 一种通廊分组空中组对安装法 | |
CN203946777U (zh) | 一种天窗架吊件 | |
CN203568647U (zh) | 新型无机房电梯承重结构 | |
CN208650553U (zh) | 一种门式钢架加固结构 | |
CN104652833A (zh) | 钢结构厂房檩条安装提升滑轮的固定装置制作方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160406 |
|
RJ01 | Rejection of invention patent application after publication |