CN105460645B - A kind of room formula bag package bundle fills shipment equipment - Google Patents
A kind of room formula bag package bundle fills shipment equipment Download PDFInfo
- Publication number
- CN105460645B CN105460645B CN201610064461.4A CN201610064461A CN105460645B CN 105460645 B CN105460645 B CN 105460645B CN 201610064461 A CN201610064461 A CN 201610064461A CN 105460645 B CN105460645 B CN 105460645B
- Authority
- CN
- China
- Prior art keywords
- column
- vertical beam
- beam assembly
- assembly
- right vertical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012856 packing Methods 0.000 claims abstract description 18
- 239000000725 suspension Substances 0.000 claims description 10
- 230000001105 regulatory effect Effects 0.000 claims description 8
- 230000002787 reinforcement Effects 0.000 claims description 4
- 230000000694 effects Effects 0.000 abstract description 4
- 238000010586 diagram Methods 0.000 description 5
- 239000000463 material Substances 0.000 description 5
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 4
- 238000004806 packaging method and process Methods 0.000 description 4
- 239000000428 dust Substances 0.000 description 3
- 229910052742 iron Inorganic materials 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 201000004624 Dermatitis Diseases 0.000 description 1
- 206010019345 Heat stroke Diseases 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000011449 brick Substances 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000036541 health Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000004630 mental health Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G67/00—Loading or unloading vehicles
- B65G67/60—Loading or unloading ships
- B65G67/603—Loading or unloading ships using devices specially adapted for articles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G2814/00—Indexing codes relating to loading or unloading articles or bulk materials
- B65G2814/03—Loading or unloading means
- B65G2814/0397—Loading or unloading means for ships
Landscapes
- Engineering & Computer Science (AREA)
- Ocean & Marine Engineering (AREA)
- Aviation & Aerospace Engineering (AREA)
- Mechanical Engineering (AREA)
- Packaging Of Machine Parts And Wound Products (AREA)
Abstract
The invention belongs to shipment equipment technical fields, refer in particular to a kind of room formula bag package bundle dress shipment equipment, a left side is respectively arranged on the heel post foot assembly of left and right, right vertical beam assembly, it is left, the front end of right vertical beam assembly is vacantly set, on a left side, ceiling is provided between the upper plane of right vertical beam assembly, on a left side, before right vertical beam assembly, both ends are respectively by preceding afterwards, connecting cross beam connects afterwards, preceding, a left side between connecting cross beam afterwards, right vertical beam assembly is gone forward, purlin vehicle spandrel girder on two with Crane Rail is arranged at intervals with afterwards, a left side is provided between two Crane Rails, right bale packing purlin vehicle hangs equipment;The lower purlin vehicle spandrel girder with Crane Rail is respectively arranged on the medial surface of left and right vertical beam assembly, a set of above big purlin vehicle that combination lifting is filled into bagging package bundle is provided between two Crane Rails and hangs equipment;The present invention has ceiling and wall, has certain effect to protect from the wind and rain, substantially increases the working environment of worker and the condition of round-the-clock ship-loading operation.
Description
Technical field:
The invention belongs to shipment equipment technical field, refer in particular to a kind of collection bag bag packaging tie up, combine shipment, protect from the wind and rain for
The room formula bag package bundle dress shipment equipment of one.
Background technology:
At present, bag cargo is typically all the pattern transported by Bales Off.There is following defects for this transportation mode:
Outbound, transfer during Material Transportation and among the links such as storehouse, be substantially all use original manpower by hand with
Bales Off coordinates certain machinery to be carried for unit, in this way, many man power and materials are not only consumed, but also working strength
Height, work efficiency is low, meanwhile, also it be easy to cause the breakage of Bales Off material packing and the loss of goods and materials.Furthermore this transporting mode
It is the handling of work post most arduous in logistic industry, especially shipping of goods, the breakage of packaging is very big, if filled in packaging
It is powdery goods and materials, substantial amounts of airborne dust can be generated in carrying, is not only polluted the environment, meanwhile, also serious threat worker
Health.Particularly during high temperature, because of the operating in view of loop wheel machine, worker generally carries out operation under burning sun, does not also have
There is the measure of cooling dedusting, heatstroke often occurs due to high temperature for the operating environment very severe of worker, also can be because of dust
The work of generation skin allergy, this severe working environment and excess load has severely impacted the physical and mental health of worker.
With the progress of technical merit, bag cargo Bales Off transhipment will become history.Packaging bale packing transportation mode is
It preliminarily forms, certainly will move towards to popularize in an all-round way.The containerization transhipment of bag bag is a kind of logistic pattern of innovation, is set using conventional logistics
Standby is the operation that can not complete overall process.
The content of the invention:
The object of the present invention is to provide a kind of simple, convenient, the good room formula bag package bundle dress shipment equipments of handling effect.
What the present invention was realized in:
A kind of room formula bag package bundle fills shipment equipment, includes left and right spaced column foot assembly, total per edge-on suspension column
Into two or more is provided with, left vertical beam assembly is provided on the column foot assembly of left side, is provided with the right side on right side uprights foot assembly
Vertical beam assembly, left vertical beam assembly, the front end of right vertical beam assembly are vacantly set, in the upper plane of left vertical beam assembly, right vertical beam assembly
Between be provided with ceiling, it is horizontal to pass through preceding connecting cross beam, rear connection respectively in the front and rear ends of left vertical beam assembly, right vertical beam assembly
Beam connects, forward and backward on the left vertical beam assembly, right vertical beam assembly between preceding connecting cross beam, rear connecting cross beam to be arranged at intervals with two
Upper purlin vehicle spandrel girder, the upper plane of purlin vehicle spandrel girder is provided with Crane Rail on two, and left bundle is provided between two Crane Rails
Bag purlin vehicle hangs equipment and right bale packing purlin vehicle hangs equipment;Lower purlin vehicle load-bearing is respectively arranged on the medial surface of left and right vertical beam assembly
Beam is provided with Crane Rail on twice purlin vehicle spandrel girders, is provided between two Crane Rails a set of above into bagging package bundle
The big purlin vehicle of dress combination lifting hangs equipment, and left bale packing purlin vehicle hangs equipment, purlin vehicle hangs equipment to right bale packing, big purlin vehicle hangs the action of equipment
It is controlled by electric controller.
In the above-mentioned technical solutions, twice purlins vehicle spandrel girder mounting base and corresponding Crane Rail extend to the back-end,
The elongated end of twice purlin vehicle spandrel girder mounting bases is connected with column foot assembly, and is supported by column foot assembly.
In the above-mentioned technical solutions, the left vertical beam assembly, right vertical beam assembly include the preceding vertical of time interval setting
Column, central post and rear column, the height of central post higher than front column, rear column, between front column and central post, central post with
The hanging column of one or more is arranged at intervals between rear column, in each column and each hanging column, between lower part by linking
Beam connects, and the top of each column and each hanging column is connected by herringbone beam, is provided on front column, rear column and each hanging column
Cable regulating device is held, holds and is connected between cable regulating device and the top of central post by bearing rope.
In the above-mentioned technical solutions, more than one connecting cross beam is arranged at intervals with above and below between two central posts,
Lower connecting cross beam is located at the middle part of central post, and higher than preceding connecting cross beam, rear connecting cross beam, the left vertical beam assembly, right vertical beam
The back of the herringbone beam of assembly is provided with horizontal trusses, and ceiling is covered in the upper plane on horizontal trusses.
In the above-mentioned technical solutions, the ladder that personnel overhaul up and down is provided on the central post.
In the above-mentioned technical solutions, described that two are respectively arranged with per edge-on suspension column assembly, one total positioned at left and right vertical beam
Into rear end, another be located at the middle part of left and right vertical beam assembly.
In the above-mentioned technical solutions, the column foot assembly is by the bearing column foot being vertically arranged and what is be obliquely installed bear
Column foot forms, and bearing column foot is connected with bearing the upper end of column foot with installing plate, in installing plate and left and right vertical beam assembly
The baseplane of column and rear column connects, and it is horizontal to be provided with the reinforcement of one or more between column foot in bearing column foot and bearing
Beam is provided with the bottom installing plate being connected with ground in bearing column foot and the bottom for bearing column foot.
In the above-mentioned technical solutions, it is provided with diagonal connection between two bearing column feet per edge-on suspension column assembly
The reinforcement structure of the X-shaped of formation.
In the above-mentioned technical solutions, described bear is provided with ladder on column foot.
In the above-mentioned technical solutions, it is both provided with wall between the left and right vertical beam assembly, forward and backward connecting cross beam and ground
Body is connected with each other between adjacent wall, and is connected to form house with ceiling.
The present invention compared with prior art protrude the advantages of be:
1st, the present invention has ceiling and wall, has certain effect to protect from the wind and rain, substantially increases the work of worker
The condition of environment and round-the-clock ship-loading operation;
2nd, left vertical beam assembly of the invention, the front end of right vertical beam assembly are vacantly sent out and are chosen to the water surface of wharf apron, make loading
Ship can enter equipment availability scope and freight, and facilitate and send bag bag to cabin, meanwhile, operating personnel can be in freighter first
It is operated on plate, improves the speed, quality and the safety coefficient of operation of loading;
3rd, twice purlin vehicle spandrel girder mounting bases extensions to the back-end of the invention, the big purlin vehicle being disposed thereon hangs equipment can be with
Extending part is moved to, car loading operation can be carried out, use scope is wide;
4th, column of the invention is higher than ceiling, using the left and right vertical beam assembly oblique pull for bearing Suo Xiangqian rears, using bearing
Rope regulating device is tightened, and realizes suspension frame heavy burden effect;
5th, purlin vehicle spandrel girder mounting base, lower purlin vehicle spandrel girder mounting base are set for upper and lower two layers in the present invention, in realization,
Under, vertical, horizontal cross-operation automatic bag stacking machine is coordinated to realize from fold bag, lift by crane, tie up, combine, load streamlined seamless company
Connect operation;
6th, the present invention shipment when can be operated on freighter deck, sight is very good, thus improve shipment quality and
Safety work;
7th, the present invention is greatly improved the transport efficiency of bag bag, the transport scope of enlarged pockets bag;
8th, the present invention, which realizes, is greatly improved running speed and quality, and all fronts bag bag cargo handling operating zero is damaged,
It has thoroughly broken away from bag cargo and atmosphere pollution caused by airborne dust is generated in transfer operation process is loaded and unloaded;Reduce transfer handling
More than 80 the percent of labour;The dirty manual labor of weight is all cancelled;Logistics cost is greatly reduced;It effectively improves
The quality of life of practitioner;Eliminate the security risk of bag cargo handling operation field labor intensity.
Description of the drawings:
Fig. 1 is the stereoscopic schematic diagram of the present invention;
Fig. 2 is the stereoscopic schematic diagram that the present invention does not install ceiling, wall;
Fig. 3 be the present invention ceiling, wall, the stereoscopic schematic diagram of column foot assembly are not installed;
Fig. 4 is the side solid simplified schematic diagram of the present invention;
Fig. 5 is the simplified schematic diagram of the column foot assembly of the present invention.
Specific embodiment:
With specific embodiment, the invention will be further described below, referring to Fig. 1-5:
A kind of room formula bag package bundle fills shipment equipment, includes left and right spaced column foot assembly 1, per edge-on suspension column
Assembly 1 is provided with two or more, and left vertical beam assembly 2 is provided on left side column foot assembly 1, is set on right side uprights foot assembly 1
Right vertical beam assembly 3 is equipped with, left vertical beam assembly 2, the front end of right vertical beam assembly 3 are vacantly set, total in left vertical beam assembly 2, right vertical beam
Into ceiling 4 is provided between 3 upper plane, the present embodiment is total in left vertical beam assembly 2, right vertical beam using iron sheet watt ceiling
Front and rear ends into 3 is connected respectively by preceding connecting cross beam 5, rear connecting cross beam 6, preceding connecting cross beam 5, rear connecting cross beam 6 it
Between left vertical beam assembly 2, it is forward and backward on right vertical beam assembly 3 be arranged at intervals with vehicle spandrel girder mounting base in purlin on two groups, purlin vehicle on every group
Purlin vehicle spandrel girder 7 is provided in spandrel girder mounting base, the upper plane of purlin vehicle spandrel girder 7 is provided with Crane Rail on two, and two
It is provided with that left bale packing purlin vehicle hangs equipment 8 and right bale packing purlin vehicle hangs equipment 9 between Crane Rail, left bale packing purlin vehicle hangs equipment 8 and the right side
The both ends that bale packing purlin vehicle hangs equipment 9 be separately positioned on two on purlin vehicle spandrel girder 7 and can be along two on purlin vehicle spandrel girder 7 driving
Track moves back and forth;Lower purlin vehicle spandrel girder mounting base, lower purlin vehicle are respectively arranged on the medial surface of left and right vertical beam assembly 2,3
The baseplane of spandrel girder 10 is fixedly connected with the upper plane of lower purlin vehicle spandrel girder mounting base 17, the upper plane of lower purlin vehicle spandrel girder 10
On be provided with Crane Rail, a set of above big purlin vehicle that combination lifting is filled into bagging package bundle is provided between two Crane Rails and is hung
Equipment 11, such as sets a set of or two sets, and the present embodiment is provided with two sets, and the both ends that big purlin vehicle hangs equipment 11 can be held along twice purlin vehicles
Crane Rail on weight beam 10 moves back and forth, and left bale packing purlin vehicle hangs equipment 8, purlin vehicle hangs equipment 9 to right bale packing, big purlin vehicle hangs equipment 11
Action controlled by electric controller.
In the above-mentioned technical solutions, twice purlins vehicle spandrel girder mounting base 10 extends to the back-end, and development length is according to reality
Border needs to set.The elongated end of twice purlin vehicle spandrel girder mounting bases 10 is connected with column foot assembly 1, and by column foot assembly 1
Support.At this point it is possible to it is used in entrucking, into occasions such as warehouses.
In the above-mentioned technical solutions, before the left vertical beam assembly 2, right vertical beam assembly 3 include time interval setting
Column 12, central post 13 and rear column 14, the height of central post 13 is higher than front column 12, rear column 14, in front column 12 in
The hanging column 15 of one or more is arranged at intervals between column 13, between central post 13 and rear column 14, each column 12,13,
14 and each hanging column 15 in, connected by linking beam between lower part, the top of each column 12,13,14 and each hanging column 15 leads to
It crosses herringbone beam 16 to connect, is provided in the outer side elevation of front column 12, rear column 14 and each hanging column 15 and holds cable regulating device
18th, interior side elevation is provided with lower purlin vehicle spandrel girder mounting base 17, holds and leads between the top of cable regulating device 18 and central post 13
It crosses and bears rope 19 and connect, the top of central post 13 is provided with the hanging ring of connection.It is born by holding the adjusting of cable regulating device 18
The rate of tension of rope 19.
The both ends facade of preceding connecting cross beam 5 is fixedly connected with the medial surface of two front columns 12, and the both ends of rear connecting cross beam 6 are stood
Face is fixedly connected with the medial surface of two rear columns 14.
Upper purlin vehicle spandrel girder mounting base is fixed on left vertical beam assembly 2, on right vertical beam assembly on corresponding hanging column 15.Under two
The both ends facade of purlin vehicle spandrel girder 10 on the inside of the facade of corresponding hanging column 15 with being fixedly connected.
In the above-mentioned technical solutions, it is horizontal that more than one connection is arranged at intervals between two central posts 13 above and below
Beam, there are two the present embodiment settings, and upper connecting cross beam connects 20 tops for connecing two central posts 13, and lower connecting cross beam 21 is located at central post
13 middle part, and higher than preceding connecting cross beam 5, rear connecting cross beam 6, the left vertical beam assembly 2, the herringbone beam 16 of right vertical beam assembly 3
Back be provided with horizontal trusses, ceiling 4 is covered in the upper plane on horizontal trusses.It is horizontal that upper connecting cross beam connects 20, lower connection
The both ends of beam 21 are fixedly connected respectively with inside the inside on 13 central posts 13.
In the above-mentioned technical solutions, the ladder 22 that personnel overhaul up and down is provided on the central post 13, convenient for work people
Above and below member.
Herringbone beam 16 enables the ceiling after installation to discharge rainwater, prevents be collapsed ceiling.
In the above-mentioned technical solutions, described that two are respectively arranged with per edge-on suspension column assembly 1, one is located at left and right vertical beam
The rear end of assembly 2,3, another be located at the middle part of left and right vertical beam assembly 2,3.
In the above-mentioned technical solutions, the column foot assembly 1 by the bearing column foot 23 being vertically arranged and is obliquely installed
Bear column foot 24 to form, bearing column foot 23 and bear the upper end of column foot 24 and be connected with installing plate 25, installing plate 25 with it is left,
The central post 13 of right vertical beam assembly 2,3 and the connection of 14 baseplane of rear column, in bearing column foot 23 and bear between column foot 24
The web beam 26 of one or more is provided with, is provided with and is used for and ground in bearing column foot 23 and the bottom for bearing column foot 24
The bottom installing plate 27 of connection.
In the above-mentioned technical solutions, it is provided between two bearing column feet 23 per edge-on suspension column assembly 1 diagonal
Connect the reinforcement structure 28 of the X-shaped formed.
In the above-mentioned technical solutions, described bear is provided with ladder 29 on column foot 24, and staff is facilitated to overhaul up and down.
In the above-mentioned technical solutions, it is all provided between the left and right vertical beam assembly 2,3, forward and backward connecting cross beam 5,6 and ground
Wall 30 is equipped with, is connected with each other between adjacent wall 30.Wall 30 forms a room with ceiling 4.Wall 30 generally uses
Iron sheet wall or cement wall or brick wall.
The operation principle of the present invention:
In the use of the present invention, being controlled by electric controller, left bale packing purlin vehicle hangs equipment 8, right bale packing purlin vehicle hangs equipment 9
Position on upper purlin vehicle spandrel girder mounting bracket 6, realization are tied up;
By electric controller big purlin vehicle is controlled to hang position of the equipment 11 on lower purlin vehicle spandrel girder mounting bracket 10, realize dress
Ship;
By the operation of upper and lower vertical, horizontal crossover location, full-automatic bag stacking machine is coordinated to realize from fold bag, lifting, bundle
It pricks, combine, the streamlined seamless connection operation of shipment.
Above-described embodiment is only one of presently preferred embodiments of the present invention, and but not intended to limit the scope of the present invention, therefore:
The equivalence changes that all shapes under this invention, structure, principle are done, should all be covered by within protection scope of the present invention.
Claims (9)
1. a kind of room formula bag package bundle fills shipment equipment, it is characterised in that:Include the column foot that left and right interval is fixed on harbour
Assembly is provided with two or more per edge-on suspension column assembly, left vertical beam assembly, right side uprights is provided on the column foot assembly of left side
Right vertical beam assembly is provided on foot assembly, left vertical beam assembly, the front end of right vertical beam assembly are vacantly set, on left vertical beam assembly, the right side
Ceiling is provided between the upper plane of vertical beam assembly, passes through preceding company respectively in the front and rear ends of left vertical beam assembly, right vertical beam assembly
Crossbeam, the connection of rear connecting cross beam are connect, left vertical beam assembly, right vertical beam assembly between preceding connecting cross beam, rear connecting cross beam go forward,
After be arranged at intervals with vehicle spandrel girder in purlin on two, the upper plane of purlin vehicle spandrel girder is provided with Crane Rail, two Crane Rails on two
Between be provided with it is left bale packing purlin vehicle hang equipment and it is right bale packing purlin vehicle hang equipment;It is set respectively on the medial surface of left and right vertical beam assembly
Be equipped with lower purlin vehicle spandrel girder, Crane Rail be provided on twice purlin vehicle spandrel girders, be provided between two Crane Rails it is a set of with
On the big purlin vehicle that combination lifting is filled into bagging package bundle hang equipment, left bale packing purlin vehicle hangs equipment, right bale packing purlin vehicle hangs equipment, big purlin
The action that vehicle hangs equipment is controlled by electric controller;The left vertical beam assembly, right vertical beam assembly include time interval setting
Front column, central post and rear column, the height of central post higher than front column, rear column, between front column and central post, in
The hanging column of one or more is arranged at intervals between column and rear column, is led in each column and each hanging column, between lower part
It crosses linking beam to connect, the top of each column and each hanging column is connected by herringbone beam, on front column, rear column and each hanging column
It is provided with and holds cable regulating device, hold and connected between cable regulating device and the top of central post by bearing rope;The neutrality
Pillar height is in ceiling.
2. a kind of room formula bag package bundle dress shipment equipment according to claim 1, it is characterised in that:Twice purlin vehicle spandrel girder peaces
It filling seat and corresponding Crane Rail extends to the back-end, the elongated end of twice purlin vehicle spandrel girder mounting bases is connected with column foot assembly,
And it is supported by column foot assembly.
3. a kind of room formula bag package bundle dress shipment equipment according to claim 1, it is characterised in that:Two central posts it
Between be arranged at intervals with more than one connecting cross beam above and below, lower connecting cross beam is located at the middle part of central post, and horizontal higher than preceding connection
Beam, rear connecting cross beam, the left vertical beam assembly, the back of herringbone beam of right vertical beam assembly are provided with horizontal trusses, ceiling covering
In in the upper plane on horizontal trusses.
4. a kind of room formula bag package bundle dress shipment equipment according to claim 1, it is characterised in that:It is set on the central post
There is the ladder that personnel overhaul up and down.
5. a kind of room formula bag package bundle dress shipment equipment according to claim 1, it is characterised in that:It is described total per edge-on suspension column
Into being respectively arranged with two, a rear end for being located at left and right vertical beam assembly, another be located at the middle part of left and right vertical beam assembly.
6. a kind of room formula bag package bundle dress shipment equipment according to claim 1 or 5, it is characterised in that:The column foot is total
It is formed by the bearing column foot being vertically arranged and the column foot that bears being obliquely installed, bearing column foot is with bearing the upper of column foot
End is connected with installing plate, and installing plate is connected with the central post of left and right vertical beam assembly and the baseplane of rear column, in bearing column foot
And bear and the web beam of one or more is provided between column foot, it is provided in bearing column foot and the bottom for bearing column foot
For the bottom installing plate being connected with ground.
7. a kind of room formula bag package bundle dress shipment equipment according to claim 6, it is characterised in that:It is described total per edge-on suspension column
Into two bearing column feet between be provided with the reinforcement structure of the X-shaped that diagonal connection is formed.
8. a kind of room formula bag package bundle dress shipment equipment according to claim 6, it is characterised in that:It is described to bear on column foot
It is provided with ladder.
9. a kind of room formula bag package bundle dress shipment equipment according to claim 1, it is characterised in that:The left and right vertical beam is total
Wall is both provided between, forward and backward connecting cross beam and ground, is connected with each other between adjacent wall, and shape is connected with ceiling
Into house.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610064461.4A CN105460645B (en) | 2016-01-29 | 2016-01-29 | A kind of room formula bag package bundle fills shipment equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610064461.4A CN105460645B (en) | 2016-01-29 | 2016-01-29 | A kind of room formula bag package bundle fills shipment equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105460645A CN105460645A (en) | 2016-04-06 |
CN105460645B true CN105460645B (en) | 2018-05-22 |
Family
ID=55598892
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610064461.4A Active CN105460645B (en) | 2016-01-29 | 2016-01-29 | A kind of room formula bag package bundle fills shipment equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105460645B (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4417841A1 (en) * | 1993-03-08 | 1995-11-23 | Tax Ingenieurgesellschaft Mbh | Crane adapted for loading cargo |
CN101327892A (en) * | 2008-02-28 | 2008-12-24 | 徐西元 | Double girder overhead viaduct type crane |
CN101472816A (en) * | 2006-11-17 | 2009-07-01 | Apm终端管理有限公司 | Plant for transporting cargo to and/or from a ship |
CN201567158U (en) * | 2009-11-30 | 2010-09-01 | 盛文理 | House type crane capable of all-direction movement |
CN201990403U (en) * | 2011-01-31 | 2011-09-28 | 上海振华重工(集团)股份有限公司 | Double-upper trolley gantry crane |
CN203269391U (en) * | 2013-04-16 | 2013-11-06 | 天津港集装箱码头有限公司 | Dual-beam quay crane device |
CN103523681A (en) * | 2013-10-29 | 2014-01-22 | 上海公茂起重设备有限公司 | Dual-beam movable container loading bridge |
CN205346400U (en) * | 2016-01-29 | 2016-06-29 | 温岭市盛开物流设备科技有限公司 | Room formula bag package shipment equipment of in bundling |
-
2016
- 2016-01-29 CN CN201610064461.4A patent/CN105460645B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4417841A1 (en) * | 1993-03-08 | 1995-11-23 | Tax Ingenieurgesellschaft Mbh | Crane adapted for loading cargo |
CN101472816A (en) * | 2006-11-17 | 2009-07-01 | Apm终端管理有限公司 | Plant for transporting cargo to and/or from a ship |
CN101327892A (en) * | 2008-02-28 | 2008-12-24 | 徐西元 | Double girder overhead viaduct type crane |
CN201567158U (en) * | 2009-11-30 | 2010-09-01 | 盛文理 | House type crane capable of all-direction movement |
CN201990403U (en) * | 2011-01-31 | 2011-09-28 | 上海振华重工(集团)股份有限公司 | Double-upper trolley gantry crane |
CN203269391U (en) * | 2013-04-16 | 2013-11-06 | 天津港集装箱码头有限公司 | Dual-beam quay crane device |
CN103523681A (en) * | 2013-10-29 | 2014-01-22 | 上海公茂起重设备有限公司 | Dual-beam movable container loading bridge |
CN205346400U (en) * | 2016-01-29 | 2016-06-29 | 温岭市盛开物流设备科技有限公司 | Room formula bag package shipment equipment of in bundling |
Also Published As
Publication number | Publication date |
---|---|
CN105460645A (en) | 2016-04-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9845227B2 (en) | Mobile crane | |
CN206986744U (en) | Steel box-girder flange area slidably construction operation platform | |
US20170015532A1 (en) | Moving crane | |
CN104847098A (en) | Multi-guide-rail attachment type electric ascending and descending scaffold | |
CN205973518U (en) | Track portal jib crane | |
CN105460645B (en) | A kind of room formula bag package bundle fills shipment equipment | |
CN205346400U (en) | Room formula bag package shipment equipment of in bundling | |
CN103407900A (en) | Efficient loading and unloading system and process for harbor containers | |
CN201649654U (en) | Discharging platform for high-rise building construction | |
CN105731268B (en) | A kind of cargo transport lifts transporter | |
CN106639287B (en) | Stone Vertical transportation resources in exterior wall scaffold | |
CN206346500U (en) | Compact simplified arm extending type straddle truck | |
CN209635810U (en) | Big stroke hydraulic goes up and down rack device | |
CN113213315A (en) | Transfer method for building partition board | |
CN207016421U (en) | Conveying arrangement and goods transport systems | |
FI90273C (en) | Device for transferring and distributing materials and / or aids to the outer perimeter of a building | |
CN202575428U (en) | Ceramic tile stack and ceramic tile stacking equipment | |
CN206267514U (en) | Stone Vertical shipping platform in exterior wall scaffold | |
CN211396564U (en) | Peripheral type operation frame for building steel platform construction | |
CN106639288B (en) | Method for installing and using vertical transport platform for stone in outer wall scaffold | |
CN206521216U (en) | A kind of across floor handling goods overhead traveling crane | |
CN206309001U (en) | Stone Vertical transportation system in exterior wall scaffold | |
CN214399682U (en) | Hoisting device for building | |
CN109823983A (en) | Big stroke hydraulic goes up and down rack device | |
CN107188093A (en) | Conveying arrangement and goods transport systems |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A room style bag bundling and shipping equipment Effective date of registration: 20231128 Granted publication date: 20180522 Pledgee: Zhejiang Tyrone commercial bank Limited by Share Ltd. Taizhou Wenling branch Pledgor: WENLING SHENGKAI LOGISTICS EQUIPMENT TECHNOLOGY Co.,Ltd. Registration number: Y2023980067932 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |