CN105460645A - House type bag bundling and shipping device - Google Patents

House type bag bundling and shipping device Download PDF

Info

Publication number
CN105460645A
CN105460645A CN201610064461.4A CN201610064461A CN105460645A CN 105460645 A CN105460645 A CN 105460645A CN 201610064461 A CN201610064461 A CN 201610064461A CN 105460645 A CN105460645 A CN 105460645A
Authority
CN
China
Prior art keywords
vertical beam
assembly
beam assembly
column
right vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610064461.4A
Other languages
Chinese (zh)
Other versions
CN105460645B (en
Inventor
盛文理
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WENLING SHENGKAI LOGISTIC EQUIPMENT TECHNOLOGY Co Ltd
Original Assignee
WENLING SHENGKAI LOGISTIC EQUIPMENT TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WENLING SHENGKAI LOGISTIC EQUIPMENT TECHNOLOGY Co Ltd filed Critical WENLING SHENGKAI LOGISTIC EQUIPMENT TECHNOLOGY Co Ltd
Priority to CN201610064461.4A priority Critical patent/CN105460645B/en
Publication of CN105460645A publication Critical patent/CN105460645A/en
Application granted granted Critical
Publication of CN105460645B publication Critical patent/CN105460645B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G67/00Loading or unloading vehicles
    • B65G67/60Loading or unloading ships
    • B65G67/603Loading or unloading ships using devices specially adapted for articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G2814/00Indexing codes relating to loading or unloading articles or bulk materials
    • B65G2814/03Loading or unloading means
    • B65G2814/0397Loading or unloading means for ships

Landscapes

  • Engineering & Computer Science (AREA)
  • Ocean & Marine Engineering (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Packaging Of Machine Parts And Wound Products (AREA)

Abstract

The invention belongs to the technical field of shipping devices, and particularly relates to a house type bag bundling and shipping device. A left vertical beam assembly and a right vertical beam assembly are arranged on a left side vertical column leg assembly and a right side vertical column leg assembly respectively. The front end of the left vertical beam assembly and the front end of the right vertical beam assembly are suspended. A ceiling is arranged between the upper plane of the left vertical beam assembly and the upper plane of the right vertical beam assembly. The front ends of the left vertical beam assembly and the right vertical beam assembly are connected through a front connection beam. The rear ends of the left vertical beam assembly and the right vertical beam assembly are connected through a rear connection beam. Two upper joist barrow bearing beams with joist barrow rails are arranged on the portion, between the front connection beam and the rear connection beam, of the left vertical beam assembly and the right vertical beam assembly in a front-back spaced mode. A left bag bundling joist barrow device and a right bag bundling joist barrow device are arranged between the two joist barrow rails. Lower joist barrow bearing beams with joist barrow rails are arranged on the inner side faces of the left vertical beam assembly and the right vertical beam assembly respectively. One or more suites of bag bundling, combining and hoisting large joist barrow hanging devices are arranged between the two joist barrow rails. The house type bag bundling and shipping device is provided with ceiling and wall bodies, a certain wind and rail shielding effect is achieved, and the working environment of workers and the conditions of all-weather shipping operation are greatly improved.

Description

A kind of room formula bag package bundle dress shipment equipment
Technical field:
The invention belongs to shipment equipment technical field, refer in particular to a kind of room formula bag package bundle dress shipment equipment integrating bag bag collection dress and tie up, combine shipment, protect from the wind and rain.
Background technology:
At present, bag cargo is all generally the pattern of being transported by Bales Off.This transhipment pattern also exists following defect: the outbound in Material Transportation process, transfer and enter in the middle of the links such as storehouse, substantially all adopt original manpower in units of Bales Off, coordinate certain machinery to carry by hand, like this, not only to consume a lot of man power and materials, and working strength is high, inefficiency, meanwhile, also easily causes the breakage of Bales Off material packing and the loss of goods and materials.Moreover, this transporting mode is work post the most arduous in logistic industry, especially the handling of shipping of goods, the breakage of packaging is very large, if dress is powdery goods and materials in packaging, a large amount of airborne dusts can be produced in carrying, not only to environment, meanwhile, also the healthy of workman in serious threat.Particularly between the altithermal period; because considering the running of loop wheel machine; workman generally carries out operation under burning sun; not lower the temperature the measure of dedusting yet; the operating environment very severe of workman; frequent can Yin Gaowen and heatstroke phenomenon occurs, also can occur allergic because of dust, the work of this severe working environment and overload seriously have impact on the physical and mental health of workman.
Along with the progress of technical merit, bag cargo Bales Off transhipment will become history.Collection dress bale packing transhipment pattern begins to take shape, and certainly will move towards to popularize in an all-round way.The transhipment of bag bag containerization is a kind of logistic pattern of innovation, adopts conventional logistics equipment to be the operation that cannot complete overall process.
Summary of the invention:
The object of this invention is to provide a kind of simple, convenient, load and unload effective room formula bag package bundle dress shipment equipment.
The present invention is achieved in that
A kind of room formula bag package bundle dress shipment equipment, include a left side, the column pin assembly that right septum is arranged, every edge-on suspension column assembly is provided with two or more, left side column pin assembly is provided with left vertical beam assembly, right side uprights pin assembly is provided with right vertical beam assembly, left vertical beam assembly, the unsettled setting in front end of right vertical beam assembly, at left vertical beam assembly, ceiling is provided with between the upper plane of right vertical beam assembly, at left vertical beam assembly, before right vertical beam assembly, rear two ends are respectively by front connecting cross beam, rear connecting cross beam connects, at front connecting cross beam, left vertical beam assembly between rear connecting cross beam, right vertical beam assembly is gone forward, after be arranged at intervals with car bearing beam in purlin on two, on two, the upper plane of purlin car bearing beam is provided with Crane Rail, be provided with left bale packing purlin car between two Crane Rails and hang equipment and right bale packing purlin car hangs equipment, the medial surface of left and right vertical beam assembly is respectively arranged with lower purlin car bearing beam, twice purlin car bearing beams are provided with Crane Rail, the large purlin car being provided with a set of above one-tenth bagging package bundle dress combination lifting between two Crane Rails hangs equipment, and the action that left bale packing purlin car hangs equipment, right bale packing purlin car hangs equipment, large purlin car hangs equipment is controlled by electric controller.
In technique scheme, described twice purlin car bearing beam mount pads and corresponding Crane Rail extend to the back-end, and the elongated end of twice purlin car bearing beam mount pads is connected with column pin assembly, and is supported by column pin assembly.
In technique scheme, described left vertical beam assembly, right vertical beam assembly includes the A-pillar that time interval is arranged, central post and rear column, the height of central post is higher than A-pillar, rear column, between A-pillar and central post, the unsettled post of more than one is arranged at intervals with between central post and rear column, in each column and each unsettled post, connected by linking beam between bottom, the top of each column and each unsettled post is connected by herringbone beam, at A-pillar, rear column and each unsettled post are provided with and hold cable regulating device, hold between cable regulating device and the top of central post and be connected by bearing rope.
In technique scheme, upper and lowerly between two described central posts be arranged at intervals with more than one connecting cross beam, lower connecting cross beam is positioned at the middle part of central post, and higher than front connecting cross beam, rear connecting cross beam, the back of the herringbone beam of described left vertical beam assembly, right vertical beam assembly is provided with horizontal trusses, and ceiling is covered in the upper plane on horizontal trusses.
In technique scheme, the ladder that personnel that described central post is provided with overhaul up and down.
In technique scheme, described every edge-on suspension column assembly is respectively arranged with two, and rear end being positioned at left and right vertical beam assembly, another is positioned at the middle part of left and right vertical beam assembly.
In technique scheme, described column pin assembly is made up of the bearing column pin vertically arranged and the column pin that bears that is obliquely installed, bearing column pin is connected with the upper end and adapter plate bearing column pin, adapter plate is connected with the left and right central post of vertical beam assembly and the baseplane of rear column, at bearing column pin and bear the deep beam being provided with more than between column pin, bearing column pin and the bottom that bears column pin are provided with the end adapter plate for being connected with ground.
In technique scheme, between two bearing column pin of described every edge-on suspension column assembly, be provided with the reinforcement structure of the X-shaped that diagonal angle is connected to form.
In technique scheme, described in bear on column pin and be provided with ladder.
In technique scheme, described left and right vertical beam assembly, between forward and backward connecting cross beam and ground, be provided with body of wall, be interconnected between adjacent body of wall, and be connected to form house with ceiling.
The advantage that the present invention gives prominence to compared to existing technology is:
1, the present invention has ceiling and body of wall, has certain effect protected from the wind and rain, and substantially increases the working environment of workman and the condition of round-the-clock ship-loading operation;
2, unsettled of the front end of left vertical beam assembly of the present invention, right vertical beam assembly is chosen on the water surface of wharf apron, carrying vessel can be freighted by access arrangement scope of work, conveniently bag bag is delivered to cabin inside, simultaneously, operating personal can operate on freighter deck, improves the safety factor of the speed of loading, quality and operation;
3, twice purlin car bearing beam mount pads of the present invention extend to the back-end, and large purlin car disposed thereon hangs equipment and can move to extending part, and can carry out car loading operation, range of use is wide;
4, column of the present invention is higher than ceiling, adopts the left and right vertical beam assembly oblique pull bearing Suo Xiangqian rear, and employing is held cable regulating device and tightened, and realizes suspension frame heavy burden effect;
5, in the present invention, purlin car bearing beam mount pad, lower purlin car bearing beam mount pad are upper and lower two-layer setting, realize upper and lower, vertical, horizontal cross-operation coordinates automatic bag stacking machine to realize automatic stacked package, lift by crane, tie up, combine, load streamlined seamless link operation onto ship;
6, the present invention can operate when loading onto ship on freighter deck, and sight line is very good, therefore improves shipment quality and safe operation;
7, the present invention can improve the transport efficiency of bag bag greatly, the transport scope of enlarged pockets bag;
8, present invention achieves and increased substantially operating speed and quality, bag bag cargo handing running zero is damaged completely, has broken away from bag cargo up hill and dale in handling transfer operation process, has produced the atmospheric contamination that airborne dust causes; Decrease transfer handling labour's more than 80 percent; Heavy dirty manual labor is all cancelled; Reduce logistics cost significantly; Effectively improve the quality of life of practitioner; Eliminate the potential safety hazard of bag cargo loading and unloading operation field labor intensity.
Accompanying drawing illustrates:
Fig. 1 is schematic perspective view of the present invention;
Fig. 2 is the schematic perspective view that the present invention does not install ceiling, body of wall;
Fig. 3 is the schematic perspective view not installing ceiling, body of wall, column pin assembly of the present invention;
Fig. 4 is the three-dimensional simplified schematic diagram in side of the present invention;
Fig. 5 is the simplified schematic diagram of column pin assembly of the present invention.
Detailed description of the invention:
With specific embodiment, the invention will be further described below, see Fig. 1-5:
A kind of room formula bag package bundle dress shipment equipment, include a left side, the column pin assembly 1 that right septum is arranged, every edge-on suspension column assembly 1 is provided with two or more, left side column pin assembly 1 is provided with left vertical beam assembly 2, right side uprights pin assembly 1 is provided with right vertical beam assembly 3, left vertical beam assembly 2, the unsettled setting in front end of right vertical beam assembly 3, at left vertical beam assembly 2, ceiling 4 is provided with between the upper plane of right vertical beam assembly 3, what the present embodiment adopted is iron sheet watt ceiling, at left vertical beam assembly 2, before right vertical beam assembly 3, rear two ends are respectively by front connecting cross beam 5, rear connecting cross beam 6 connects, at front connecting cross beam 5, left vertical beam assembly 2 between rear connecting cross beam 6, right vertical beam assembly 3 is gone forward, after be arranged at intervals with purlin car bearing beam mount pad on two groups, often group upper purlin car bearing beam mount pad is provided with purlin car bearing beam 7, on two, the upper plane of purlin car bearing beam 7 is provided with Crane Rail, be provided with left bale packing purlin car between two Crane Rails and hang equipment 8 and right bale packing purlin car hangs equipment 9, left bale packing purlin car hangs two ends that equipment 8 and right bale packing purlin car hang equipment 9 and to be separately positioned on two on purlin car bearing beam 7 and to move back and forth along the Crane Rail on purlin car bearing beam 7 on two, on a left side, right vertical beam assembly 2, the medial surface of 3 is respectively arranged with lower purlin car bearing beam mount pad, the baseplane of lower purlin car bearing beam 10 is fixedly connected with the upper plane of lower purlin car bearing beam mount pad 17, the upper plane of lower purlin car bearing beam 10 is provided with Crane Rail, the large purlin car being provided with a set of above one-tenth bagging package bundle dress combination lifting between two Crane Rails hangs equipment 11, as arranged a set of or two covers, the present embodiment is provided with two covers, the two ends that large purlin car hangs equipment 11 can move back and forth along the Crane Rail on twice purlin car bearing beams 10, left bale packing purlin car hangs equipment 8, right bale packing purlin car hangs equipment 9, the action that large purlin car hangs equipment 11 is controlled by electric controller.
In technique scheme, described twice purlin car bearing beam mount pads 10 extend to the back-end, and development length is arranged according to actual needs.The elongated end of twice purlin car bearing beam mount pads 10 is connected with column pin assembly 1, and is supported by column pin assembly 1.Now, occasion can use in entrucking, warehouse entry storehouse etc.
In technique scheme, described left vertical beam assembly 2, right vertical beam assembly 3 includes the A-pillar 12 that time interval is arranged, central post 13 and rear column 14, the height of central post 13 is higher than A-pillar 12, rear column 14, between A-pillar 12 and central post 13, the unsettled post 15 of more than one is arranged at intervals with between central post 13 and rear column 14, at each column 12, 13, 14 and each unsettled post 15 in, connected by linking beam between bottom, each column 12, 13, 14 and the top of each unsettled post 15 connected by herringbone beam 16, at A-pillar 12, the outer side elevation of rear column 14 and each unsettled post 15 is provided with and holds cable regulating device 18, inner side facade is provided with lower purlin car bearing beam mount pad 17, hold between cable regulating device 18 and the top of central post 13 and be connected by bearing rope 19, the suspension ring connected are provided with at the top of central post 13.The degree of tension bearing rope 19 is regulated by holding cable regulating device 18.
The two ends facade of front connecting cross beam 5 is fixedly connected with the medial surface of two A-pillars 12, and the two ends facade of rear connecting cross beam 6 is fixedly connected with the medial surface of two rear columns 14.
Upper purlin car bearing beam mount pad to be fixed on left vertical beam assembly 2, right vertical beam assembly on corresponding unsettled post 15.The two ends facade of twice purlin car bearing beams 10 is fixedly connected with inside the facade of corresponding unsettled post 15.
In technique scheme, upper and lowerly between two described central posts 13 be arranged at intervals with more than one connecting cross beam, the present embodiment is provided with two, upper connecting cross beam connects the top that 20 connect two central posts 13, lower connecting cross beam 21 is positioned at the middle part of central post 13, and higher than front connecting cross beam 5, rear connecting cross beam 6, the back of the herringbone beam 16 of described left vertical beam assembly 2, right vertical beam assembly 3 is provided with horizontal trusses, and ceiling 4 is covered in the upper plane on horizontal trusses.Upper connecting cross beam connects 20, the two ends of lower connecting cross beam 21 are fixedly connected with respectively with inside the inner side on 13 central posts 13.
In technique scheme, the ladder 22 that personnel that described central post 13 is provided with overhaul up and down, is convenient to the upper and lower of staff.
Ceiling after herringbone beam 16 enables installation discharges rainwater, prevents pressure to collapse ceiling.
In technique scheme, described every edge-on suspension column assembly 1 is respectively arranged with two, and rear end being positioned at left and right vertical beam assembly 2,3, another is positioned at the middle part of left and right vertical beam assembly 2,3.
In technique scheme, described column pin assembly 1 is made up of the bearing column pin 23 vertically arranged and the column pin 24 that bears that is obliquely installed, bearing column pin 23 is connected with the upper end and adapter plate 25 bearing column pin 24, central post 13 and rear column 14 baseplane of adapter plate 25 and left and right vertical beam assembly 2,3 are connected, and mount pad is positioned on the lower linking beam 17 of left and right vertical beam assembly 2,3.At bearing column pin 23 and bear the deep beam 26 being provided with more than between column pin 24, bearing column pin 23 and the bottom that bears column pin 24 are provided with the end adapter plate 27 for being connected with ground.
In technique scheme, between two bearing column pin 23 of described every edge-on suspension column assembly 1, be provided with the reinforcement structure 28 of the X-shaped that diagonal angle is connected to form.
In technique scheme, described in bear on column pin 24 and be provided with ladder 29, facilitate staff to overhaul up and down.
In technique scheme, described left and right vertical beam assembly 2,3, forward and backward connecting cross beam 5, between 6 and ground, be provided with body of wall 30, be interconnected between adjacent body of wall 30.Body of wall 30 and ceiling 4 form a room.Body of wall 30 generally adopts iron sheet wall or cement wall or brick wall.
Principle of work of the present invention:
The present invention in use, controls by electric controller that left bale packing purlin car hangs equipment 8, right bale packing purlin car hangs the position of equipment 9 on upper purlin car bearing beam erecting frame 6, realizes tying up;
Control large purlin car by electric controller and hang the position of equipment 11 on lower purlin car bearing beam erecting frame 10, realize shipment;
By operation that is upper and lower, vertical, horizontal crossover location, full automaticity bag stacking machine is coordinated to realize automatic stacked package, lift by crane, tie up, combine, load streamlined seamless connection operation onto ship.
Above-described embodiment is only one of preferred embodiment of the present invention, not limits practical range of the present invention with this, therefore: all equivalence changes done according to shape of the present invention, structure, principle, all should be covered by within protection scope of the present invention.

Claims (10)

1. a room formula bag package bundle dress shipment equipment, it is characterized in that: include a left side, the column pin assembly that right septum is arranged, every edge-on suspension column assembly is provided with two or more, left side column pin assembly is provided with left vertical beam assembly, right side uprights pin assembly is provided with right vertical beam assembly, left vertical beam assembly, the unsettled setting in front end of right vertical beam assembly, at left vertical beam assembly, ceiling is provided with between the upper plane of right vertical beam assembly, at left vertical beam assembly, before right vertical beam assembly, rear two ends are respectively by front connecting cross beam, rear connecting cross beam connects, at front connecting cross beam, left vertical beam assembly between rear connecting cross beam, right vertical beam assembly is gone forward, after be arranged at intervals with car bearing beam in purlin on two, on two, the upper plane of purlin car bearing beam is provided with Crane Rail, be provided with left bale packing purlin car between two Crane Rails and hang equipment and right bale packing purlin car hangs equipment, the medial surface of left and right vertical beam assembly is respectively arranged with lower purlin car bearing beam, twice purlin car bearing beams are provided with Crane Rail, the large purlin car being provided with a set of above one-tenth bagging package bundle dress combination lifting between two Crane Rails hangs equipment, and the action that left bale packing purlin car hangs equipment, right bale packing purlin car hangs equipment, large purlin car hangs equipment is controlled by electric controller.
2. a kind of room according to claim 1 formula bag package bundle dress shipment equipment, it is characterized in that: described twice purlin car bearing beam mount pads and corresponding Crane Rail extend to the back-end, the elongated end of twice purlin car bearing beam mount pads is connected with column pin assembly, and is supported by column pin assembly.
3. a kind of room according to claim 1 formula bag package bundle dress shipment equipment, it is characterized in that: described left vertical beam assembly, right vertical beam assembly includes the A-pillar that time interval is arranged, central post and rear column, the height of central post is higher than A-pillar, rear column, between A-pillar and central post, the unsettled post of more than one is arranged at intervals with between central post and rear column, in each column and each unsettled post, connected by linking beam between bottom, the top of each column and each unsettled post is connected by herringbone beam, at A-pillar, rear column and each unsettled post are provided with and hold cable regulating device, hold between cable regulating device and the top of central post and be connected by bearing rope.
4. a kind of room according to claim 3 formula bag package bundle dress shipment equipment, it is characterized in that: upper and lowerly between two described central posts be arranged at intervals with more than one connecting cross beam, lower connecting cross beam is positioned at the middle part of central post, and higher than front connecting cross beam, rear connecting cross beam, the back of the herringbone beam of described left vertical beam assembly, right vertical beam assembly is provided with horizontal trusses, and ceiling is covered in the upper plane on horizontal trusses.
5. a kind of room according to claim 3 formula bag package bundle dress shipment equipment, is characterized in that: the ladder that personnel that described central post is provided with overhaul up and down.
6. a kind of room according to claim 1 formula bag package bundle dress shipment equipment, is characterized in that: described every edge-on suspension column assembly is respectively arranged with two, and rear end being positioned at left and right vertical beam assembly, another is positioned at the middle part of left and right vertical beam assembly.
7. a kind of room formula bag package bundle dress shipment equipment according to claim 1 or 6, it is characterized in that: described column pin assembly is made up of the bearing column pin vertically arranged and the column pin that bears that is obliquely installed, bearing column pin is connected with the upper end and adapter plate bearing column pin, adapter plate is connected with the left and right central post of vertical beam assembly and the baseplane of rear column, at bearing column pin and bear the deep beam being provided with more than between column pin, bearing column pin and the bottom that bears column pin are provided with the end adapter plate for being connected with ground.
8. a kind of room according to claim 7 formula bag package bundle dress shipment equipment, is characterized in that: the reinforcement structure being provided with the X-shaped that diagonal angle is connected to form between two bearing column pin of described every edge-on suspension column assembly.
9. a kind of room according to claim 7 formula bag package bundle dress shipment equipment, is characterized in that: described in bear on column pin and be provided with ladder.
10. a kind of room according to claim 1 formula bag package bundle dress shipment equipment, it is characterized in that: described left and right vertical beam assembly, between forward and backward connecting cross beam and ground, be provided with body of wall, be interconnected between adjacent body of wall, and be connected to form house with ceiling.
CN201610064461.4A 2016-01-29 2016-01-29 A kind of room formula bag package bundle fills shipment equipment Active CN105460645B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610064461.4A CN105460645B (en) 2016-01-29 2016-01-29 A kind of room formula bag package bundle fills shipment equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610064461.4A CN105460645B (en) 2016-01-29 2016-01-29 A kind of room formula bag package bundle fills shipment equipment

Publications (2)

Publication Number Publication Date
CN105460645A true CN105460645A (en) 2016-04-06
CN105460645B CN105460645B (en) 2018-05-22

Family

ID=55598892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610064461.4A Active CN105460645B (en) 2016-01-29 2016-01-29 A kind of room formula bag package bundle fills shipment equipment

Country Status (1)

Country Link
CN (1) CN105460645B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4417841A1 (en) * 1993-03-08 1995-11-23 Tax Ingenieurgesellschaft Mbh Crane adapted for loading cargo
CN101327892A (en) * 2008-02-28 2008-12-24 徐西元 Double girder overhead viaduct type crane
CN101472816A (en) * 2006-11-17 2009-07-01 Apm终端管理有限公司 Plant for transporting cargo to and/or from a ship
CN201567158U (en) * 2009-11-30 2010-09-01 盛文理 House type crane capable of all-direction movement
CN201990403U (en) * 2011-01-31 2011-09-28 上海振华重工(集团)股份有限公司 Double-upper trolley gantry crane
CN203269391U (en) * 2013-04-16 2013-11-06 天津港集装箱码头有限公司 Dual-beam quay crane device
CN103523681A (en) * 2013-10-29 2014-01-22 上海公茂起重设备有限公司 Dual-beam movable container loading bridge
CN205346400U (en) * 2016-01-29 2016-06-29 温岭市盛开物流设备科技有限公司 Room formula bag package shipment equipment of in bundling

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4417841A1 (en) * 1993-03-08 1995-11-23 Tax Ingenieurgesellschaft Mbh Crane adapted for loading cargo
CN101472816A (en) * 2006-11-17 2009-07-01 Apm终端管理有限公司 Plant for transporting cargo to and/or from a ship
CN101327892A (en) * 2008-02-28 2008-12-24 徐西元 Double girder overhead viaduct type crane
CN201567158U (en) * 2009-11-30 2010-09-01 盛文理 House type crane capable of all-direction movement
CN201990403U (en) * 2011-01-31 2011-09-28 上海振华重工(集团)股份有限公司 Double-upper trolley gantry crane
CN203269391U (en) * 2013-04-16 2013-11-06 天津港集装箱码头有限公司 Dual-beam quay crane device
CN103523681A (en) * 2013-10-29 2014-01-22 上海公茂起重设备有限公司 Dual-beam movable container loading bridge
CN205346400U (en) * 2016-01-29 2016-06-29 温岭市盛开物流设备科技有限公司 Room formula bag package shipment equipment of in bundling

Also Published As

Publication number Publication date
CN105460645B (en) 2018-05-22

Similar Documents

Publication Publication Date Title
CN202687760U (en) Engineering lifting hoisting cage
CN110240048A (en) A kind of external attached type skyscraper goods jack system
CN107697846A (en) A kind of intelligent elevated platform for aiding in unloading
CN106639287B (en) Stone Vertical transportation resources in exterior wall scaffold
CN205346400U (en) Room formula bag package shipment equipment of in bundling
CN206554524U (en) A kind of construction discharging platform
US20030077154A1 (en) Empty container storage for the intermediate storage of empty iso containers
CN210598083U (en) Elevator shaft construction platform
CN105173787A (en) Material tip discharger of open-top container
CN105460645A (en) House type bag bundling and shipping device
CN106586907B (en) The installation and application of Stone Vertical transport hanging basket in exterior wall scaffold
CN110593582A (en) High-rise curtain wall installation auxiliary assembly with safety facility
CN109205482A (en) The hanging apparatus of curtain wall lighting roof
CN206267514U (en) Stone Vertical shipping platform in exterior wall scaffold
CN209009113U (en) A kind of irony turnover pallet
CN206309001U (en) Stone Vertical transportation system in exterior wall scaffold
CN209210243U (en) The hanging apparatus of curtain wall lighting roof
CN206521216U (en) A kind of across floor handling goods overhead traveling crane
CN106586908B (en) Stone Vertical transports hanging basket in exterior wall scaffold
CN206266182U (en) Stone Vertical transport hanging basket in exterior wall scaffold
CN201932676U (en) Composite belt frame
CN214399682U (en) Hoisting device for building
CN106639288B (en) Method for installing and using vertical transport platform for stone in outer wall scaffold
CN106522537B (en) Stone Vertical transportation system in exterior wall scaffold
CN106592955A (en) Platform for vertically conveying stone material in exterior wall scaffolding

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A room style bag bundling and shipping equipment

Effective date of registration: 20231128

Granted publication date: 20180522

Pledgee: Zhejiang Tyrone commercial bank Limited by Share Ltd. Taizhou Wenling branch

Pledgor: WENLING SHENGKAI LOGISTICS EQUIPMENT TECHNOLOGY Co.,Ltd.

Registration number: Y2023980067932

PE01 Entry into force of the registration of the contract for pledge of patent right