CN110240048A - An externally attached cargo lifting system for high-rise buildings - Google Patents
An externally attached cargo lifting system for high-rise buildings Download PDFInfo
- Publication number
- CN110240048A CN110240048A CN201910560612.9A CN201910560612A CN110240048A CN 110240048 A CN110240048 A CN 110240048A CN 201910560612 A CN201910560612 A CN 201910560612A CN 110240048 A CN110240048 A CN 110240048A
- Authority
- CN
- China
- Prior art keywords
- frame
- fixed
- hoisting
- lifting
- track
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 24
- 239000010959 steel Substances 0.000 claims description 24
- 238000000034 method Methods 0.000 claims description 10
- 238000005096 rolling process Methods 0.000 claims description 3
- 239000000725 suspension Substances 0.000 claims 3
- 239000000203 mixture Substances 0.000 claims 1
- 239000007787 solid Substances 0.000 claims 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims 1
- 230000000246 remedial effect Effects 0.000 abstract description 2
- 238000009434 installation Methods 0.000 description 6
- 238000010276 construction Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000002360 preparation method Methods 0.000 description 2
- 230000002159 abnormal effect Effects 0.000 description 1
- 230000009916 joint effect Effects 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 238000009418 renovation Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G35/00—Mechanical conveyors not otherwise provided for
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B11/00—Main component parts of lifts in, or associated with, buildings or other structures
- B66B11/0035—Arrangement of driving gear, e.g. location or support
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B11/00—Main component parts of lifts in, or associated with, buildings or other structures
- B66B11/04—Driving gear ; Details thereof, e.g. seals
- B66B11/043—Driving gear ; Details thereof, e.g. seals actuated by rotating motor; Details, e.g. ventilation
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B11/00—Main component parts of lifts in, or associated with, buildings or other structures
- B66B11/04—Driving gear ; Details thereof, e.g. seals
- B66B11/08—Driving gear ; Details thereof, e.g. seals with hoisting rope or cable operated by frictional engagement with a winding drum or sheave
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B5/00—Applications of checking, fault-correcting, or safety devices in elevators
- B66B5/02—Applications of checking, fault-correcting, or safety devices in elevators responsive to abnormal operating conditions
- B66B5/12—Applications of checking, fault-correcting, or safety devices in elevators responsive to abnormal operating conditions in case of rope or cable slack
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B5/00—Applications of checking, fault-correcting, or safety devices in elevators
- B66B5/02—Applications of checking, fault-correcting, or safety devices in elevators responsive to abnormal operating conditions
- B66B5/16—Braking or catch devices operating between cars, cages, or skips and fixed guide elements or surfaces in hoistway or well
- B66B5/26—Positively-acting devices, e.g. latches, knives
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B7/00—Other common features of elevators
- B66B7/02—Guideways; Guides
- B66B7/022—Guideways; Guides with a special shape
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B7/00—Other common features of elevators
- B66B7/02—Guideways; Guides
- B66B7/023—Mounting means therefor
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B9/00—Kinds or types of lifts in, or associated with, buildings or other structures
- B66B9/16—Mobile or transportable lifts specially adapted to be shifted from one part of a building or other structure to another part or to another building or structure
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Transportation (AREA)
- Automation & Control Theory (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明提供一种外附式高层建筑用货物起重系统,包括设于建筑顶部的卷扬机起升系统、设于建筑外墙的起升轨道系统、用于装载货物的吊运框架系统、设于起吊楼层和目标楼层的移动平台系统,所述吊运小车系统包括吊运框架、设于吊运框架一侧的与起升轨道系统配的导向轮组,吊运框架与卷扬机起升系统连接,所述卷扬机起升系统用于拉动吊运框架系统沿着起升轨道系统上下移动,所述移动平台系统用于将吊运框架移动至建筑外墙外与起升轨道系统连接,以及将吊运框架由建筑外墙外移回至起吊楼层或目标楼层。本发明安装方便,既可与高层建筑同时施工,也可作为已建成高层建筑层间运输超重、超限物件的补救措施,具有简单、安全、经济、高效的特点。
The invention provides an externally attached high-rise building cargo lifting system, which includes a hoist hoisting system installed on the top of the building, a lifting track system installed on the outer wall of the building, a lifting frame system for loading cargo, and a The mobile platform system for the hoisting floor and the target floor, the hoisting trolley system includes a hoisting frame, a set of guide wheels arranged on one side of the hoisting frame and matched with the hoisting track system, the hoisting frame is connected with the hoisting system of the hoist, The winch hoisting system is used to pull the hoisting frame system to move up and down along the hoisting track system, and the mobile platform system is used to move the hoisting frame to the exterior wall of the building to connect with the hoisting track system, and to lift the hoisting frame system The frame is moved back from the exterior wall of the building to the lifting floor or the target floor. The invention is easy to install, can be constructed simultaneously with high-rise buildings, and can also be used as a remedial measure for transporting overweight and out-of-limit objects between layers of completed high-rise buildings, and has the characteristics of simplicity, safety, economy and high efficiency.
Description
技术领域technical field
本发明涉及高层建筑起重技术领域,具体是一种外附式高层建筑用货物起重系统。The invention relates to the technical field of high-rise building lifting, in particular to an externally attached cargo lifting system for high-rise buildings.
背景技术Background technique
高层建筑建成以后通常使用货物专用电梯来运输通用物料。当碰到需要运输超重、超限物件的情况时,只能采用地面起重机起吊的方法。使用地面起重机起重事先需要制定精细的施工方案,做好施工规划,施工时间受限,同时也会产生大量的费用,浪费大量的时间。若高层建筑达到一定的高度,则需要超大型起重机方可完成任务,非常不经济,不可作为常规的起重手段。After high-rise buildings are built, special elevators for goods are usually used to transport general materials. When it comes to the need to transport overweight and oversized objects, only ground cranes can be used to lift them. The use of ground cranes for lifting needs to formulate a detailed construction plan in advance and make a good construction plan. The construction time is limited, and it will also generate a lot of costs and waste a lot of time. If high-rise buildings reach a certain height, super-large cranes are needed to complete the task, which is very uneconomical and cannot be used as a conventional lifting means.
在已建成的高层建筑的改造项目中需要进行地面和层间超重、超限物件的运输时,也没有很好的解决方案。There is no good solution when it is necessary to transport overweight and out-of-limit objects on the ground and between floors in the reconstruction project of a high-rise building that has been completed.
发明内容Contents of the invention
本发明针对上述问题,提供了一种外附式高层建筑用起重系统,可实现高层建筑的楼层间超重、超限物件的提升,本发明安装方便,既可与高层建筑同时施工,也可作为已建成高层建筑层间运输超重、超限物件的补救措施,具有简单、安全、经济、高效的特点。In view of the above problems, the present invention provides a lifting system for an external high-rise building, which can realize the lifting of overweight and overrun objects between floors of high-rise buildings. The invention is easy to install, and can be constructed simultaneously with high-rise buildings or As a remedial measure for transporting overweight and out-of-limit objects between floors of completed high-rise buildings, it has the characteristics of simplicity, safety, economy and efficiency.
本发明采用的技术解决方案是:The technical solution adopted in the present invention is:
一种外附式高层建筑用货物起重系统,包括设于建筑顶部的卷扬机起升系统、设于建筑外墙的起升轨道系统、用于装载货物的吊运框架系统、设于起吊楼层和目标楼层的移动平台系统,所述吊运小车系统包括吊运框架、设于吊运框架一侧的导向轮组,吊运框架与卷扬机起升系统连接,导向轮组在起吊过程中与安装在建筑外墙的起升轨道系统配合进行导向和防止货物在起吊过程中晃动,所述卷扬机起升系统用于拉动吊运框架系统沿着起升轨道系统上下移动,所述移动平台系统用于将吊运框架沿着起吊楼层或目标楼层移动至建筑外墙外与起升轨道系统连接,以及将吊运框架由建筑外墙外移回至起吊楼层或目标楼层。An externally attached high-rise building cargo hoisting system, including a winch hoisting system arranged on the top of the building, a hoisting track system arranged on the outer wall of the building, a hoisting frame system for loading goods, and a hoisting system arranged on the lifting floor and The mobile platform system on the target floor, the lifting trolley system includes a lifting frame, a guide wheel set on one side of the lifting frame, the lifting frame is connected to the hoisting system of the hoist, and the guide wheel set is installed on the hoist during the lifting process. The hoisting track system on the exterior wall of the building cooperates to guide and prevent the goods from shaking during the hoisting process. The winch hoisting system is used to pull the hoisting frame system to move up and down along the hoisting track system, and the mobile platform system is used to move the The hoisting frame moves along the hoisting floor or the target floor to the exterior of the building to connect with the hoisting track system, and the hoisting frame is moved back from the exterior of the building to the hoisting floor or the target floor.
进一步的,所述卷扬机起升系统包括卷扬机、钢丝绳、滑轮架、导向滑轮、定滑轮、动滑轮、吊钩组、钢丝绳固定端,所述卷扬机固定在建筑顶部的楼板上,滑轮架固定在楼层承重结构上,定滑轮、动滑轮固定在滑轮架的两端,钢丝绳固定端设于滑轮架底面,且靠近定滑轮,吊钩组连接在动滑轮下方,钢丝绳从卷扬机伸出,通过导向滑轮、定滑轮、动滑轮后到钢丝绳固定端固定,定滑轮、动滑轮以及吊钩组组成吊装系统以对吊运小车系统进行起吊。Further, the winch lifting system includes a winch, a steel wire rope, a pulley frame, a guide pulley, a fixed pulley, a movable pulley, a hook set, and a fixed end of a wire rope. The hoist is fixed on the floor at the top of the building, and the pulley frame is fixed on the load-bearing floor Structurally, the fixed pulley and movable pulley are fixed at both ends of the pulley frame, the fixed end of the steel wire rope is set on the bottom surface of the pulley frame, and is close to the fixed pulley, the hook group is connected under the movable pulley, and the steel wire rope extends from the winch and passes through the guide pulley, fixed pulley, The movable pulley is fixed to the fixed end of the wire rope, and the fixed pulley, movable pulley and hook group form a hoisting system to lift the trolley system.
进一步的,所述起升轨道系统包括两个平行设置的槽型轨道、棘齿条和钢管轨道,槽型轨道为半封闭C型结构,竖直固定在建筑外墙上,棘齿条焊接在槽型轨道的内侧面,钢管轨道固定在建筑外墙上,位于两个槽型轨道中间。Further, the lifting rail system includes two grooved rails, ratchet racks and steel pipe rails arranged in parallel, the grooved rails are semi-closed C-shaped structures, vertically fixed on the outer wall of the building, and the ratchet racks are welded on On the inner side of the grooved track, the steel pipe track is fixed on the outer wall of the building, and is located in the middle of the two grooved tracks.
进一步的,所述吊运小车系统还包括SAS型防坠器和棘齿条型防坠落装置,导向轮组在起吊过程中与安装在建筑外墙的半封闭性C形槽钢轨道配合;SAS型防坠器安装在导向轮组一侧的框架中间,与安装在建筑外墙的钢管轨道配合,防止钢丝绳断裂极端情况下货物掉落;棘齿条型防坠落装置安装在吊运框架的靠近建筑外墙一侧,与棘齿条配合,防止钢丝绳断裂极端情况下货物掉落。Further, the lifting trolley system also includes a SAS type fall arrester and a ratchet rack type fall arrester, and the guide wheel set cooperates with the semi-closed C-shaped channel steel track installed on the outer wall of the building during the lifting process; the SAS The type anti-drop device is installed in the middle of the frame on one side of the guide wheel group, and cooperates with the steel pipe track installed on the outer wall of the building to prevent the cargo from falling in extreme cases when the wire rope breaks; the ratchet type anti-fall device is installed near the hoisting frame. On one side of the building's outer wall, it cooperates with the ratchet rack to prevent the goods from falling in the extreme case of wire rope breakage.
进一步的,所述移动平台系统包括固定框架和可在固定框架上滑移的移动框架,所述移动框架用于承接所述吊运小车系统中的吊运框架。Further, the mobile platform system includes a fixed frame and a mobile frame that can slide on the fixed frame, and the mobile frame is used to accept the lifting frame in the lifting trolley system.
进一步的,所述固定框架包括支腿、轨道梁、纵向支撑梁、横向连接梁、纵向连接梁,支腿下部固定在目标楼层和起吊楼层的楼板上,轨道梁设置在固定框架的两侧,为半封闭的C型槽结构,固定于支腿上部,用于移动框架的支撑、滑移和导向作用;纵向支撑梁设置在固定框架的中间位置;横向连接梁和纵向连接梁与支腿连接形成框架结构。Further, the fixed frame includes outriggers, track beams, longitudinal support beams, transverse connecting beams, and longitudinal connecting beams, the lower part of the outriggers is fixed on the floor of the target floor and the lifting floor, and the track beams are arranged on both sides of the fixed frame, It is a semi-closed C-shaped groove structure, which is fixed on the upper part of the outrigger, and is used for the support, sliding and guiding of the mobile frame; the longitudinal support beam is set in the middle of the fixed frame; the horizontal connecting beam and the longitudinal connecting beam are connected with the outrigger form a frame structure.
进一步的,所述固定框架还包括设于轨道梁端部的止挡,用于限制移动框架的极限位置。Further, the fixed frame also includes a stopper arranged at the end of the track beam, which is used to limit the limit position of the movable frame.
进一步的,所述移动框架包括移动平台框架、轮组和护栏,移动平台框架包括纵梁、横向连接梁,纵梁上表面间隔焊接钢圆球,钢圆球与轨道梁上部凹槽接触,用于移动平台框架在固定框架的轨道梁内进行导向和滑移;轮组置于轨道梁下部凹槽内。Further, the mobile frame includes a mobile platform frame, a wheel set and a guardrail. The mobile platform frame includes a longitudinal beam and a transverse connecting beam. The upper surface of the longitudinal beam is welded with steel balls at intervals, and the steel balls are in contact with the upper groove of the track beam. The mobile platform frame guides and slides in the track beam of the fixed frame; the wheel set is placed in the lower groove of the track beam.
进一步的,轮组包括端板、轮轴和车轮,轮组通过端板焊接在纵梁下表面,轮轴穿过车轮和位于车轮两侧的端板,车轮为相应承载能力的滚动轴承。Further, the wheel set includes an end plate, a wheel axle and a wheel, the wheel set is welded to the lower surface of the longitudinal beam through the end plate, the wheel axle passes through the wheel and the end plates located on both sides of the wheel, and the wheel is a rolling bearing with a corresponding bearing capacity.
进一步的,所述移动框架还包括设置于移动平台框架端部的护栏,用于工人工作时的安全防护。Further, the mobile frame also includes guardrails arranged at the end of the mobile platform frame for safety protection of workers during work.
本发明通过在建筑顶部设置卷扬机起升系统、在建筑外墙设置起升轨道系统、在目标楼层和起吊楼层设置移动平台系统和用于装载货物的吊运小车系统即可实现高层建筑的楼层间超重、超限物件的提升,相较于现有的货物起重系统安装简单,准备工作少,工作程序简单;可用于已建成的高层建筑的改造工程,安装简便,安装完成后可用于各楼层超限、超重件的吊装,并可作为高层建筑起重系统的组成部分永久使用;相较于使用吊车等起重设备起升货物可节省大量的人力物力,经济实用。In the present invention, a winch hoist system is set on the top of the building, a hoisting track system is set on the outer wall of the building, a mobile platform system and a hoisting trolley system for loading goods are set on the target floor and the hoisting floor, and the inter-floor system of high-rise buildings can be realized. Compared with the existing cargo lifting system, the lifting of overweight and out-of-limit objects is simple to install, less preparation work, and simple working procedures; it can be used in the renovation project of high-rise buildings that have been built, and the installation is simple. After the installation is completed, it can be used on all floors It can be used permanently as a part of the lifting system of high-rise buildings for hoisting of oversized and overweight parts; compared with using cranes and other lifting equipment to lift goods, it can save a lot of manpower and material resources, and is economical and practical.
附图说明Description of drawings
图1是本发明外附式高层建筑用起重系统其中一个实施例的总体结构示意图;Fig. 1 is the overall structural representation of one embodiment of the hoisting system for an external high-rise building of the present invention;
图2是本发明卷扬机起升系统的结构示意图;Fig. 2 is the structural representation of hoisting system of winch of the present invention;
图3(a)是本发明起升轨道系统的结构示意图,图3(b)是图3(a)中A-A向视图;Fig. 3 (a) is the structural representation of lifting track system of the present invention, and Fig. 3 (b) is A-A direction view among Fig. 3 (a);
图4(a)是本发明吊运小车系统的结构示意图,图4(b)是吊运小车系统与起升轨道系统的安装示意图;Fig. 4 (a) is the structural representation of the lifting trolley system of the present invention, and Fig. 4 (b) is the installation schematic diagram of the lifting trolley system and the lifting track system;
图5(a)是本发明移动平台系统的结构示意图,图5(b)是图5(a)中B-B向视图;图5(c)是图5(a)中M部分的细节图;Fig. 5 (a) is a schematic structural view of the mobile platform system of the present invention, and Fig. 5 (b) is a view from B-B in Fig. 5 (a); Fig. 5 (c) is a detailed view of part M in Fig. 5 (a);
图6(a)是本发明中SAS型防坠器的主视图,图6(b)是本发明中SAS型防坠器的立体结构图;Fig. 6 (a) is the front view of SAS type fall arrester among the present invention, and Fig. 6 (b) is the three-dimensional structure diagram of SAS type fall arrester among the present invention;
图7是本发明中棘齿条型防坠落装置的结构示意图。Fig. 7 is a schematic structural view of the ratchet-type fall arresting device in the present invention.
图中:1-卷扬机起升系统、2-起升轨道系统、3-吊运小车系统、4-移动平台系统、11-卷扬机、12-钢丝绳、13-滑轮架、14-导向滑轮、15-定滑轮、16-动滑轮、17-吊钩组、18-钢丝绳固定端、21-槽型轨道、22-棘齿条、23-钢管轨道、31-吊运框架、32-导向轮组、33-SAS型防坠器、34-棘齿条型防坠落装置、41-固定框架、42-移动框架、411-支腿、412-轨道梁、413-纵向支撑梁、414-横向连接梁、415-纵向连接梁、416-止挡、421-移动平台框架、422-轮组、423-护栏。In the figure: 1-hoisting machine lifting system, 2-hoisting track system, 3-lifting trolley system, 4-mobile platform system, 11-hoisting machine, 12-wire rope, 13-pulley frame, 14-guide pulley, 15- Fixed pulley, 16-moving pulley, 17-hook group, 18-wire rope fixed end, 21-groove track, 22-ratchet rack, 23-steel pipe track, 31-lifting frame, 32-guide wheel group, 33- SAS type fall arrester, 34-ratchet type fall arrester, 41-fixed frame, 42-movable frame, 411-outrigger, 412-track beam, 413-longitudinal support beam, 414-transverse connection beam, 415- Longitudinal connecting beam, 416-stopper, 421-mobile platform frame, 422-wheel set, 423-guardrail.
具体实施方式Detailed ways
下面将结合本发明中的附图,对本发明中的技术方案进行清楚、完整地描述。The technical solutions in the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the present invention.
请参阅图1,本发明外附式高层建筑用起重系统其中一个实施例包括卷扬机起升系统1、起升轨道系统2、吊运框架系统3和移动平台系统4。Please refer to FIG. 1 , one embodiment of the externally attached high-rise building lifting system of the present invention includes a winch lifting system 1 , a lifting track system 2 , a lifting frame system 3 and a mobile platform system 4 .
如图2所示,所述卷扬机起升系统1包括卷扬机11、钢丝绳12、滑轮架13、导向滑轮14、定滑轮15、动滑轮16、吊钩组17、钢丝绳固定端18。所述卷扬机11通过膨胀螺栓固定在建筑顶部的楼板上;所述卷扬机11上设置双重制动,及制动电机和卷筒的钳式制动;所述卷扬机11上设置失速保护传感器以确保在卷扬机速度出现异常时立即制动。定滑轮15、动滑轮16固定在滑轮架13的两端,钢丝绳固定端18设于滑轮架13底面,且靠近定滑轮15;吊钩组17连接在动滑轮16下方。As shown in FIG. 2 , the winch hoisting system 1 includes a winch 11 , a wire rope 12 , a pulley frame 13 , a guide pulley 14 , a fixed pulley 15 , a movable pulley 16 , a hook set 17 , and a wire rope fixed end 18 . The hoist 11 is fixed on the floor at the top of the building by expansion bolts; the hoist 11 is provided with double brakes, and the clamp brake of the brake motor and the reel; the hoist 11 is provided with a stall protection sensor to ensure that Brake immediately when the hoist speed is abnormal. Fixed pulley 15, movable pulley 16 are fixed on the two ends of pulley frame 13, and wire rope fixed end 18 is located at pulley frame 13 bottom surfaces, and near fixed pulley 15;
钢丝绳12从卷扬机11伸出,通过导向滑轮14、定滑轮15、动滑轮16后到钢丝绳固定端18固定。滑轮架13根据各建筑顶部的结构形式来设置,可以设置在楼层承重结构的上方,也可以根据需要设置在楼层承重结构的中间或者下方,如图2所示,若空间允许,宜设计成龙门式,滑轮架13通过地脚螺栓固定在楼层承重结构上。导向滑轮14安装在卷扬机11正上方,用以改变钢丝绳方向,起导向作用,将钢丝绳的方向从竖向导为水平方向;定滑轮15安装在滑轮架13的悬挑侧,动滑轮16通过吊链与吊运小车系统3连接,用以起吊重物。定滑轮15、动滑轮16以及吊钩组17组成吊装系统,对图1所示吊运小车系统3进行起吊。Wire rope 12 stretches out from winch 11, and fixes to wire rope fixed end 18 after guide pulley 14, fixed pulley 15, movable pulley 16. The pulley frame 13 is arranged according to the structural form of the top of each building, and can be arranged above the load-bearing structure of the floor, and can also be arranged in the middle or below the load-bearing structure of the floor as required, as shown in Figure 2, if space permits, it should be designed as a gantry Type, the pulley frame 13 is fixed on the load-bearing structure of the floor by anchor bolts. The guide pulley 14 is installed directly above the hoist 11 to change the direction of the wire rope and play a guiding role, and guide the direction of the wire rope from the vertical to the horizontal direction; The hoisting trolley system 3 is connected to lift heavy objects. The fixed pulley 15, the movable pulley 16 and the hook group 17 form a hoisting system, and the hoisting trolley system 3 shown in Fig. 1 is hoisted.
如图3(a)及图3(b)所示,所述起升轨道系统2包括两个平行设置的槽型轨道21、棘齿条22和钢管轨道23。槽型轨道21为半封闭C型结构,通过预埋螺栓或者后植螺栓竖直固定在建筑外墙上;棘齿条22焊接在槽型轨道21的内侧面;钢管轨道23设置在两个槽型轨道21中间,通过预埋螺栓或者后植螺栓固定在建筑外墙上。As shown in FIG. 3( a ) and FIG. 3( b ), the lifting rail system 2 includes two parallel grooved rails 21 , ratchet racks 22 and steel pipe rails 23 . The trough track 21 is a semi-closed C-shaped structure, which is vertically fixed on the outer wall of the building through embedded bolts or post-planted bolts; the ratchet rack 22 is welded on the inner side of the trough track 21; the steel pipe track 23 is set on two grooves In the middle of the type track 21, it is fixed on the building exterior wall by pre-embedded bolts or post-planted bolts.
如图4(a)及图4(b)所示,所述吊运小车系统3包括吊运框架31、导向轮组32、SAS型防坠器33和棘齿条型防坠落装置34。吊运框架31由矩形钢管焊接而成,在吊运框架31顶部设置四个吊耳,用于与卷扬机起升系统1连接。在吊运框架32一侧设置四个导向轮组32,安装在吊运框架31侧面,导向轮组32在起吊过程中与安装在建筑外墙的半封闭性C形槽钢轨道21配合进行导向和防止货物在起吊过程中晃动。SAS型防坠器33安装在导向轮组32一侧的框架中间,与安装在建筑外墙的钢管轨道23配合,防止钢丝绳断裂极端情况下货物掉落,造成事故。棘齿条型防坠落装置34(如图7所示)安装在吊运框架31的靠近建筑外墙一侧,与起升轨道系统2中的棘齿条22配合,防止钢丝绳断裂极端情况下货物掉落,造成事故。As shown in FIG. 4( a ) and FIG. 4( b ), the lifting trolley system 3 includes a lifting frame 31 , a guide wheel set 32 , a SAS type fall arrester 33 and a ratchet type fall arrester 34 . The hoisting frame 31 is welded by rectangular steel pipes, and four lifting lugs are arranged on the top of the hoisting frame 31 for connecting with the hoisting system 1 of the hoist. Four guide wheel sets 32 are arranged on one side of the lifting frame 32, installed on the side of the lifting frame 31, and the guide wheel sets 32 cooperate with the semi-closed C-shaped channel steel track 21 installed on the outer wall of the building for guidance during the lifting process And prevent the goods from shaking during lifting. The SAS type fall arrester 33 is installed in the middle of the frame on one side of the guide wheel group 32, and cooperates with the steel pipe track 23 installed on the outer wall of the building to prevent the goods from falling under the extreme situation of wire rope fracture, causing an accident. The ratchet bar type fall prevention device 34 (as shown in Figure 7) is installed on the side of the lifting frame 31 close to the building exterior wall, and cooperates with the ratchet bar 22 in the lifting rail system 2 to prevent the wire rope from breaking in extreme cases. fall and cause an accident.
如图5(a)及图5(b)所示,所述移动平台系统4包括固定框架41和可在固定框架41上滑移的移动框架42。As shown in FIG. 5( a ) and FIG. 5( b ), the mobile platform system 4 includes a fixed frame 41 and a mobile frame 42 that can slide on the fixed frame 41 .
所述固定框架41包括支腿411、轨道梁412、纵向支撑梁413、横向连接梁414、纵向连接梁415和止挡416,支腿411下部通过膨胀螺栓固定在目标楼层和起吊楼层的楼板上;轨道梁412设置在固定框架41的两侧,为半封闭的C型槽结构,固定于支腿411上部,用于移动框架42的支撑、滑移和导向作用。纵向支撑梁413设置在固定框架41的中间位置,为工字型结构,用于移动框架42的支撑和滑移。横向连接梁414和纵向连接梁413与支腿411连接形成框架结构,提高了固定框架41的稳定性。轨道梁412端部设置止挡416,用于限制移动框架42的极限位置,防止移动框架42脱离固定框架41造成事故。固定框架41各主要构件采用焊接连接。The fixed frame 41 includes outriggers 411, track beams 412, longitudinal support beams 413, transverse connecting beams 414, longitudinal connecting beams 415 and stops 416, and the lower part of the outriggers 411 is fixed on the floor of the target floor and the hoisting floor by expansion bolts The track beam 412 is arranged on both sides of the fixed frame 41, which is a semi-closed C-shaped groove structure, fixed on the upper part of the leg 411, and used for the support, sliding and guiding of the moving frame 42. The longitudinal support beam 413 is arranged in the middle of the fixed frame 41 and is an I-shaped structure for supporting and sliding of the moving frame 42 . The transverse connecting beam 414 and the longitudinal connecting beam 413 are connected with the legs 411 to form a frame structure, which improves the stability of the fixed frame 41 . A stopper 416 is provided at the end of the track beam 412 to limit the limit position of the movable frame 42 and prevent the movable frame 42 from breaking away from the fixed frame 41 to cause an accident. The main components of the fixed frame 41 are connected by welding.
所述移动框架42包括移动平台框架421、轮组422和护栏423。移动平台框架421包括纵梁424、横向连接梁425,纵梁424上表面间隔焊接直径15mm的钢圆球424-1(如图5(c)所示),钢圆球424-1与轨道梁412上部凹槽接触,用于移动平台框架421在固定框架41的轨道梁412内进行导向和滑移。移动平台框架421上铺设花纹钢板,用于工作和承重。轮组422包括端板422-1、轮轴422-2和车轮422-3,共设置6个,通过端板422-1焊接在纵梁424下表面,轮轴422-2穿过车轮422-3和位于车轮422-3两侧的端板422-1,轮组422置于轨道梁412下部凹槽内,固定框架上41的槽型轨道里移动车轮422-3为相应承载能力的滚动轴承,以减少摩擦利于滑动。护栏423设置于移动平台框架421的端部,用于工人工作时的安全防护。The mobile frame 42 includes a mobile platform frame 421 , a wheel set 422 and a guardrail 423 . The mobile platform frame 421 includes a longitudinal beam 424 and a transverse connecting beam 425. The upper surface of the longitudinal beam 424 is welded with steel balls 424-1 with a diameter of 15mm at intervals (as shown in FIG. 412 is in contact with the upper groove, and is used for guiding and sliding the mobile platform frame 421 in the track beam 412 of the fixed frame 41 . Patterned steel plates are laid on the mobile platform frame 421 for work and load bearing. The wheel set 422 includes an end plate 422-1, a wheel shaft 422-2 and a wheel 422-3, and there are 6 pieces in total, which are welded to the lower surface of the longitudinal beam 424 through the end plate 422-1, and the wheel shaft 422-2 passes through the wheel 422-3 and the wheel 422-3. The end plate 422-1 located on both sides of the wheel 422-3, the wheel set 422 is placed in the groove of the lower part of the track beam 412, and the moving wheel 422-3 in the groove track of the fixed frame 41 is a rolling bearing with a corresponding load capacity, so as to reduce Friction facilitates sliding. The guardrail 423 is arranged at the end of the mobile platform frame 421, and is used for the safety protection of workers when working.
前述SAS型防坠装置33为成型产品,可根据起吊重物载荷直接选型、购买安装即可,其结构如图6(a)和图6(b)所示。The aforementioned SAS type anti-falling device 33 is a molded product, which can be directly selected, purchased and installed according to the load of the hoisted heavy object. Its structure is shown in Figure 6(a) and Figure 6(b).
本发明工作程序如下:The working procedure of the present invention is as follows:
(1)使用人工叉车将需要提升的货物安装到吊运框架31中,并放在移动框架42上;(1) Use a manual forklift to install the goods that need to be lifted into the lifting frame 31 and put them on the mobile frame 42;
(2)推动起吊楼层上移动平台系统4的移动框架42至建筑外墙外,将导向轮组32安装在起升轨道系统2中的槽型轨道21;(2) Promote the mobile frame 42 of the mobile platform system 4 on the lifting floor to the outside of the building exterior wall, and install the guide wheel group 32 on the grooved track 21 in the lifting track system 2;
(3)将吊运框架31与卷扬机起升系统1进行连接;(3) The hoisting frame 31 is connected with the hoisting system 1 of the hoist;
(4)调整棘齿条型防坠落装置34至工作状态,并连接SAS型防坠落装置33;(4) Adjust the ratchet bar type anti-fall device 34 to the working state, and connect the SAS type anti-fall device 33;
(5)启动卷扬机11,将吊运框架31提升到目标的楼层上方;(5) Start hoist 11, lift frame 31 to the top of the target floor;
(6)伸出目标楼层的移动平台系统4的移动框架42,迎接吊运框架31;(6) stretch out the mobile frame 42 of the mobile platform system 4 of target floor, meet lifting frame 31;
(7)将吊运框架31落到目标楼层的移动平台系统4的移动框架42上。(7) Drop the hoisting frame 31 onto the mobile frame 42 of the mobile platform system 4 on the target floor.
(8)回收移动平台系统4,完成整个货物起升流程。(8) Recycling the mobile platform system 4 to complete the entire cargo lifting process.
本发明具有如下特点:The present invention has following characteristics:
1、本发明相较于现有的货物起重系统安装简单,准备工作少,工作程序简单;可用于已建成的高层建筑的改造工程,安装简便,安装完成后可用于各楼层超限、超重件的吊装,并可作为高层建筑起重系统的组成部分永久使用。1. Compared with the existing cargo lifting system, the present invention has simple installation, less preparation work, and simple working procedures; it can be used in the reconstruction project of high-rise buildings that have been built, and the installation is simple. It can be used as a part of the lifting system of high-rise buildings for permanent use.
2、本发明相较于使用吊车等起重设备起升货物可节省大量的人力物力,经济实用。2. Compared with using lifting equipment such as cranes to lift goods, the present invention can save a lot of manpower and material resources, and is economical and practical.
3、本发明的技术方案中各组成部件均采用轻量化设计,所有的部件均可采用高层建筑内的货梯进行垂直运输,使用手动叉车和人工即可进行水平运输,无需使用大型设备,采用简单的工机具和现有设施即可进行整个系统安装;3. In the technical solution of the present invention, each component part adopts a lightweight design, and all parts can be transported vertically by freight elevators in high-rise buildings, and can be transported horizontally by using manual forklifts and labor without using large-scale equipment. The entire system installation can be carried out with only the latest tools and existing facilities;
4、本发明的技术方案着重关注货物垂直运输中的安全问题。在卷扬机上设置了双重制动器和防失速传感器以防止卷扬机失速;在垂直运输中设置了棘齿条防坠落系统和SAS型防坠落系统,以确保在钢丝绳断裂的极限情况下,运输的货物不会坠落。4. The technical solution of the present invention focuses on the safety issues in the vertical transportation of goods. Double brakes and anti-stall sensors are set on the hoist to prevent the hoist from stalling; ratchet rack anti-fall systems and SAS-type anti-fall systems are set up in vertical transportation to ensure that the goods being transported will not come down.
5、本发明还可设置防风装置,即在楼顶安装风速仪并接入控制系统,在风速达到设定值时,起重系统将停止工作,所起吊货物将在起升轨道系统和防坠落系统的共同作用下处于安全状态。5. The present invention can also be equipped with a windproof device, that is, an anemometer is installed on the roof and connected to the control system. When the wind speed reaches the set value, the lifting system will stop working, and the lifted goods will be on the lifting track system and the anti-falling system. The system is in a safe state under the joint action of the system.
6、本发明的货物起升基本不受极端天气以外的其他环境限制,适用范围广。6. The cargo lifting of the present invention is basically not restricted by environments other than extreme weather, and has a wide range of applications.
以上所述,仅为本发明的具体实施方式,但本发明的保护范围并不局限于此,任何属于本技术领域的技术人员在本发明揭露的技术范围内,可轻易想到的变化或替换,都应涵盖在本发明的保护范围之内。The above is only a specific embodiment of the present invention, but the scope of protection of the present invention is not limited thereto, any changes or substitutions that can be easily imagined by those skilled in the art within the technical scope disclosed in the present invention, All should be covered within the protection scope of the present invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910560612.9A CN110240048A (en) | 2019-06-26 | 2019-06-26 | An externally attached cargo lifting system for high-rise buildings |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910560612.9A CN110240048A (en) | 2019-06-26 | 2019-06-26 | An externally attached cargo lifting system for high-rise buildings |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN110240048A true CN110240048A (en) | 2019-09-17 |
Family
ID=67889685
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910560612.9A Pending CN110240048A (en) | 2019-06-26 | 2019-06-26 | An externally attached cargo lifting system for high-rise buildings |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110240048A (en) |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110775204A (en) * | 2019-10-30 | 2020-02-11 | 广船国际有限公司 | Cargo lifting device for ship and mounting method |
| CN111119436A (en) * | 2020-01-18 | 2020-05-08 | 北京建工集团有限责任公司 | Steel frame prefabricated structure ultra-low energy consumption building exterior wall installation structure and installation method |
| CN111747299A (en) * | 2019-10-22 | 2020-10-09 | 中国人民解放军63653部队 | Pipe rail crane |
| CN111839011A (en) * | 2020-08-27 | 2020-10-30 | 代永金 | Anti-falling traditional Chinese medicine cabinet |
| CN112357749A (en) * | 2020-12-09 | 2021-02-12 | 商丘市天宇电力工程有限公司 | Hoisting accessory is used in construction transport of electric power electric appliance cabinet |
| CN114165061A (en) * | 2021-12-07 | 2022-03-11 | 北京城建集团有限责任公司 | Construction method of vertical transportation system |
| CN114380185A (en) * | 2021-12-13 | 2022-04-22 | 中建八局浙江建设有限公司 | Construction hanging basket system with built-in truck and hoisting construction method thereof |
| CN116768078A (en) * | 2023-06-17 | 2023-09-19 | 广州市房屋开发建设有限公司 | Layered lifting equipment and lifting method for high-rise building roof power supply container |
| CN117886229A (en) * | 2024-03-13 | 2024-04-16 | 河南省第二建设集团有限公司 | Multifunctional integrated rail type lifting mechanism |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000110359A (en) * | 1998-10-01 | 2000-04-18 | Ohbayashi Corp | Device for vertical weight lifting transport |
| JP3158320U (en) * | 2010-01-13 | 2010-03-25 | 宗英 ▲鄭▼ | crane |
| CN102747841A (en) * | 2012-06-27 | 2012-10-24 | 浙江宝业幕墙装饰有限公司 | Curtain wall assembly, turnover and hoisting equipment and construction method thereof |
| CN208814562U (en) * | 2018-07-11 | 2019-05-03 | 中国建筑装饰集团有限公司 | A kind of visualization formula glass curtain wall plate vertical transit system |
| CN208948635U (en) * | 2018-08-31 | 2019-06-07 | 中昇建机(南京)重工有限公司 | A kind of rack-and-pinion elevating mechanism and derrick crane |
| CN210655744U (en) * | 2019-06-26 | 2020-06-02 | 中铁十一局集团有限公司 | External attached type cargo hoisting system for high-rise building |
-
2019
- 2019-06-26 CN CN201910560612.9A patent/CN110240048A/en active Pending
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000110359A (en) * | 1998-10-01 | 2000-04-18 | Ohbayashi Corp | Device for vertical weight lifting transport |
| JP3158320U (en) * | 2010-01-13 | 2010-03-25 | 宗英 ▲鄭▼ | crane |
| CN102747841A (en) * | 2012-06-27 | 2012-10-24 | 浙江宝业幕墙装饰有限公司 | Curtain wall assembly, turnover and hoisting equipment and construction method thereof |
| CN208814562U (en) * | 2018-07-11 | 2019-05-03 | 中国建筑装饰集团有限公司 | A kind of visualization formula glass curtain wall plate vertical transit system |
| CN208948635U (en) * | 2018-08-31 | 2019-06-07 | 中昇建机(南京)重工有限公司 | A kind of rack-and-pinion elevating mechanism and derrick crane |
| CN210655744U (en) * | 2019-06-26 | 2020-06-02 | 中铁十一局集团有限公司 | External attached type cargo hoisting system for high-rise building |
Cited By (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111747299A (en) * | 2019-10-22 | 2020-10-09 | 中国人民解放军63653部队 | Pipe rail crane |
| CN110775204A (en) * | 2019-10-30 | 2020-02-11 | 广船国际有限公司 | Cargo lifting device for ship and mounting method |
| CN111119436A (en) * | 2020-01-18 | 2020-05-08 | 北京建工集团有限责任公司 | Steel frame prefabricated structure ultra-low energy consumption building exterior wall installation structure and installation method |
| CN111839011A (en) * | 2020-08-27 | 2020-10-30 | 代永金 | Anti-falling traditional Chinese medicine cabinet |
| CN112357749A (en) * | 2020-12-09 | 2021-02-12 | 商丘市天宇电力工程有限公司 | Hoisting accessory is used in construction transport of electric power electric appliance cabinet |
| CN112357749B (en) * | 2020-12-09 | 2022-12-09 | 商丘市天宇电力工程有限公司 | A lifting device for construction and handling of electrical cabinets |
| CN114165061A (en) * | 2021-12-07 | 2022-03-11 | 北京城建集团有限责任公司 | Construction method of vertical transportation system |
| CN114380185A (en) * | 2021-12-13 | 2022-04-22 | 中建八局浙江建设有限公司 | Construction hanging basket system with built-in truck and hoisting construction method thereof |
| CN116768078A (en) * | 2023-06-17 | 2023-09-19 | 广州市房屋开发建设有限公司 | Layered lifting equipment and lifting method for high-rise building roof power supply container |
| CN117886229A (en) * | 2024-03-13 | 2024-04-16 | 河南省第二建设集团有限公司 | Multifunctional integrated rail type lifting mechanism |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206427933U (en) | A kind of bridge crane | |
| CN204980144U (en) | Be used for narrow space conveyor system of basement | |
| CN210655744U (en) | External attached type cargo hoisting system for high-rise building | |
| CN203173644U (en) | Multifunctional lifting shaft working platform system | |
| CN208814562U (en) | A kind of visualization formula glass curtain wall plate vertical transit system | |
| CN102190249B (en) | Method for hoisting equipment positioned at bottom of multilayer frame platform | |
| CN107083843A (en) | It is a kind of to be used for the mobile platform of high-rise building equipment and material fast transportation | |
| CN112252741A (en) | Full-rail crane for super high-rise unit curtain wall and installation and use method thereof | |
| CN103086276B (en) | A construction method for hoisting a bridge crane in a high-rise well-tower-type building | |
| CN106948604A (en) | The irregular alien invasion glass curtain wall positioning apparatus of high-rise building and construction method | |
| CN216361015U (en) | Inclined shaft inclined straight section expands digs transportation system for construction | |
| CN205294665U (en) | Jack -up tower crane based on engineering mechanics | |
| CN215055466U (en) | Discharging platform for high-rise building | |
| CN211498471U (en) | Hanging basket device for bridge diaphragm beam construction | |
| CN208500144U (en) | Bridge crane | |
| CN208200188U (en) | A kind of unmanned overhead traveling crane applied to concrete prefabricated element stockyard | |
| CN213446116U (en) | Gate well sharing binary channels maintenance system | |
| CN223255842U (en) | A mounted arch bridge main arch ring maintenance operation platform | |
| CN220011043U (en) | Conveyer that hoist and mount were used | |
| CN203257106U (en) | Multifunctional power-driven walking type walking system | |
| JP4187445B2 (en) | crane | |
| CN111285229A (en) | Super high-rise power distribution room equipment hoisting engineering construction structure | |
| KR100449498B1 (en) | Heavy truss building method | |
| CN214934083U (en) | automatic stacker | |
| CN110593582A (en) | High-rise curtain wall installation auxiliary assembly with safety facility |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190917 |
|
| WD01 | Invention patent application deemed withdrawn after publication |