CN105421307B - Rail type fish passing structure applied to medium and high-water-head barrage hubs - Google Patents
Rail type fish passing structure applied to medium and high-water-head barrage hubs Download PDFInfo
- Publication number
- CN105421307B CN105421307B CN201510991956.7A CN201510991956A CN105421307B CN 105421307 B CN105421307 B CN 105421307B CN 201510991956 A CN201510991956 A CN 201510991956A CN 105421307 B CN105421307 B CN 105421307B
- Authority
- CN
- China
- Prior art keywords
- fish
- barrage
- dam
- hopper
- track beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B8/00—Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
- E02B8/08—Fish passes or other means providing for migration of fish; Passages for rafts or boats
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B8/00—Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
- E02B8/08—Fish passes or other means providing for migration of fish; Passages for rafts or boats
- E02B8/085—Devices allowing fish migration, e.g. fish traps
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A40/00—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
- Y02A40/60—Ecological corridors or buffer zones
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Marine Sciences & Fisheries (AREA)
- Farming Of Fish And Shellfish (AREA)
Abstract
The invention discloses a rail type fish passing structure applied to medium and high-water-head barrage hubs. The rail type fish passing structure comprises a barrage body, a fish path, a fish collecting pond, a fish conveying hopper, a rotary crane, a fixed winching machine, an oblique track beam and a horizontal track beam, wherein the fish path and the fish collecting pond are arranged downstream the barrage body and are used for migration of fishes; the fish conveying hopper is positioned in the fish collecting pond; the rotary crane is arranged at the top of the barrage; the fixed winching machine is positioned on a platform at the top of the barrage; the oblique track beam is arranged along a downstream barrage bevel; the horizontal track beam is connected between the oblique track beam and the fish collecting pond; an electric block for capturing the fish conveying hopper is arranged on the horizontal track beam; a fish transporting truck frame supplied with power by the fixed winching machine is arranged on the oblique track beam; the fish conveying hopper can be lifted by the electric block and conveyed along the horizontal track beam to the fish transporting truck frame at the start end of the oblique track beam. The rail type fish passing structure disclosed by the invention is simple, practical, convenient to operate, capable of greatly lowering the construction cost, capable of saving nearly 80% of the construction cost in comparison with a traditional fish path, capable of saving about 50% of the construction cost in comparison with a fish lifter (a fish passing cable crane) and capable of effectively solving the problem about barrage passing of the fishes in the medium and high-water-head barrage hubs.
Description
Technical field
The present invention relates to fish structure crossed by a kind of dam, the rail mounted in particular for middle and high head barrage hinge crosses fish
Structure.
Background technology
The fish pass structure of prior art mainly has fish pass (also known as fishway), fish lock, cable machine formula fish lift, boat for collection and transportation of fish
Deng.Wherein fish pass is a kind of the more commonly used fish pass structure pattern, and its advantage is simple to operate, runs fraction height, can ditch
Logical upstream and downstream water system, continuous fish excessively under field conditions (factors), operational and administrative expenses is low, and under optimum conditions, other aquatic lifes
Thing can also pass through fish pass, preferably acts on to safeguarding that original ecological balance has, and its shortcoming is that fish pass is typically longer, in hinge
More difficult arrangement, cost is too high, general 80m about dam body, cross the investment of dam fish pass and be about 1.0 hundred million, construction and operational management difficulty
Increase.Increase with height of dam, investment increases more, construction and operational management is more difficult;Fish trace back migration to be needed to expend
Large energy, unfavorable for fish egg reproduction;The flow velocity of fish pass, fluidised form are affected relatively by the change of upstream and downstream water level and flow
Greatly, it is unsuitable for high dam and cross fish.Fish lock, cable machine formula fish lift and boat for collection and transportation of fish are manual operation and cross fish means it is adaptable to high dam
Cross fish.The operation principle of fish lock is similar to ship lock with the method for operation, and its advantage is to be suitable for the certain luffing of upper pond level, shortcoming
It is on major project, fish lock arranges that impact is larger, investment is big, and operates operation complicated, and later stage operational management and maintenance procedure are multiple
Miscellaneous.
As shown in figure 1, being the cable machine formula fish lift of prior art, 21- cable-support;22- reservoir;23- dam;25- cable
Rope;26- downstream fish gathering canal;27- dress hopper car fortune fish direction.Cable machine formula fish lift is to rise fish using machinery to help fish with transhipment facility
Cross dam, its advantage is that suitable high dam crosses fish, and adapts to the larger luffing of reservoir level it can also be used to relatively long distance transports fish
Class, shortcoming is to need the higher cable machine support of setting and larger bracket basis, difficult arrangement;Because itself transport power of cable machine has
Limit, fortune fish amount is less;Dam crest cable machine need to cross over two sides (or concave bank two ends) cable machine arrangement more complicated, length of warping winch is longer, transport fish
Speed is slow, and fish are in fortune fish equipment for a long time, are constantly in panic states, unfavorable to egg reproduction phase fish;Cable is
Flexible structure, during calm fortune fish produce rock larger, on fish affect bigger;It is subject to wind-force and inside even from weather in operation
Larger, upstream transfer operation is more complicated, runs and overhauls costly.Boat for collection and transportation of fish, by collecting fishing boat and fish-carrying boat forms, utilizes
Drive fish device and fish is driven in fish-carrying boat, then throw in fish into the suitable waters in upstream after dam is crossed in navigation structure, therefore it is only
Be limited to the multi-purpose project having navigation structure, and its climate ambient influnence be larger, be difficult to trap demersal fishes again it is difficult to
Ensured fish effect.Above-mentioned various fish pass structure has utilization in engineering, is shown by various engineering practices, crosses fish effect
Poor.
Content of the invention
The technical problem to be solved is to provide a kind of flexible arrangement, adapts to various landform, being used for of dam type
The rail mounted of middle and high head barrage hinge crosses fish structure.
The technical solution used in the present invention is:A kind of rail mounted for middle and high head barrage hinge crosses fish structure, bag
Include dam body, be arranged at the fish pass and the collection fishpond that make fish migration in dam body downstream, fortune hopper is located in collection fishpond, is arranged at dam crest
Rotary crane, the wire rope hoist on dam crest platform, along downstream dam slope arrangement oblique orbit beam, be connected to oblique orbit beam and
Horizontal rail beam between collection fishpond, is provided with the electric block for crawl fortune hopper, in oblique orbit on horizontal rail beam
The fish transportation vehicle frame that wire rope hoist is powered is provided with beam, fortune hopper can be lifted by electric block and along horizontal rail beam
It is transported on the fish transportation vehicle frame on oblique orbit beam.
Described horizontal rail beam and oblique orbit beam, away from supporting surface maximum height≤6m, transport hopper maximum fortune fish weight 0.5t.
The hauling speed of described wire rope hoist is 30m/min.
Described rotary crane maximum working radius are 50m, revolution boom tip minimum hoisting weight >=2.5t.
A kind of rail mounted for middle and high head barrage hinge crosses fish structure, including the dam body of arch dam, is arranged at dam body
The fish pass and the collection fishpond that make fish migration in downstream, fortune hopper is located in collection fishpond, is arranged at the rotary crane of dam crest, behind dam
Wire rope hoist on platform, is connected to the track girder between dam rear platform and collection fishpond, above track girder and collection fishpond
Rise fish frame, rise fish frame on be provided with for crawl fortune hopper electric block, in rail beam is provided with wire rope hoist
The fish transportation vehicle frame being powered, fortune hopper can be by electric block lifting, the fish transportation vehicle frame that is transported on track girder.
Described track girder, away from supporting surface maximum height≤6m, transports hopper maximum fortune fish weight 0.5t.
The hauling speed of described wire rope hoist is 30m/min.
Described rotary crane maximum working radius are 50m, revolution boom tip minimum hoisting weight >=2.5t.
Beneficial effects of the present invention:Avoid traditional fish pass structure, fish pass is longer, more difficult arrangement, cost in hinge
High disadvantage, avoid simultaneously traditional fish pass structure be typically only applicable in, the situation of low water head barrage hinge and biography
The disadvantages such as fish operational management is difficult, fish are afraid of one's shadow transported by system cableway.Rail mounted crosses fish structure during utilization, and fish pass through
The fish pass in dam downstream is braved against the current, and swims into collection fishpond, fishes for fish by the fortune hopper automatically fished for, will be transported using electric block
Hopper is lifted and is transported on the fish transportation vehicle frame at track top, faster along inclined plane by the wire rope hoist located at rail end
Speed, smoothly draw to dam crest platform nearby, finally by dam upstream rotary crane steadily, be efficiently hoisted to reservoir area bank and put
Raw, complete the demand that dam is crossed in fish migration.
Brief description
Fig. 1 is the cable machine formula fish lift profilograph of prior art.
Fig. 2 is that the rail mounted of the present invention crosses fish construction profile.
Fig. 3 is that the rail mounted of the present invention crosses fish structural plan layout drawing.
Fig. 4 is that arch dam rail mounted of the present invention crosses fish construction profile.
Fig. 5 is that earth and rockfill dam rail mounted of the present invention crosses fish structural plan layout drawing.
Specific embodiment
With reference to the accompanying drawings and detailed description the present invention is described in further detail:
As shown in Figure 2,3, the rail mounted for middle and high head barrage hinge of the present invention crosses fish structure, including dam body
1, it is arranged at the fish pass 2 and the collection fishpond 3 that make fish migration in dam body 1 downstream, fortune hopper 4 is located in collection fishpond 3, is arranged at dam crest
Rotary crane 10, the wire rope hoist 9 on dam crest platform, along the oblique orbit beam 7 of downstream dam slope arrangement, it is connected to oblique orbit
Horizontal rail beam 6 between beam 7 and collection fishpond 3, is provided with the electric block for crawl fortune hopper 4 on horizontal rail beam 6
5, the fish transportation vehicle frame 8 that wire rope hoist 9 is powered is provided with oblique orbit beam 7, fortune hopper 4 can be carried by electric block 5
Rise and be transported on the fish transportation vehicle frame 8 on oblique orbit beam 7 along horizontal rail beam 6.
Described horizontal rail beam 6 and oblique orbit beam 7, away from supporting surface maximum height≤6m, transport the maximum fortune fish weight of hopper 4
0.5t.
The hauling speed of described wire rope hoist 9 is 30m/min.
Described rotary crane 10 maximum working radius are 50m, revolution boom tip minimum hoisting weight >=2.5t.
Specifically, in the short fish pass in downstream inlet setting downstream 2, to induce fish to enter collection fishpond 3, then drive fish and enter
Fortune hopper 4, setting observation counting equipment in fortune hopper 4, after the fish in fortune hopper 4 reaches some, first with band
Fortune hopper 4 is lifted and is transported to the fish transportation vehicle frame 8 at oblique orbit beam 7 top along horizontal rail beam 6 by the electric block 5 of capture apparatus
On, drawn by the hoist engine 9 on dam upper mounting plate and be transported to dam crest platform, then the rotary crane 10 by dam upstream along oblique orbit beam 7
It is hoisted to reservoir area bank appropriate location to free, complete the demand that dam is crossed in fish migration.
When being applied to arch dam, as shown in figure 4, cancelling oblique orbit beam 7.Concrete structure is:Including the dam body 1 of arch dam, if
It is placed in the fish pass 2 and the collection fishpond 3 that make fish migration in dam body 1 downstream, fortune hopper 4 is located in collection fishpond 3, is arranged at the revolution of dam crest
Crane 10, the wire rope hoist 9 on dam rear platform, it is connected to the track girder 17 between dam rear platform and collection fishpond 3, be located at
Track girder 17 and the electric block 5 playing fish frame 16, being provided with for crawl fortune hopper 4 on playing fish frame 16 of collection fishpond 3 top,
The fish transportation vehicle frame 8 that wire rope hoist 9 is powered is provided with rail beam 17, fortune hopper 4 can be lifted by electric block 5,
It is transported on the fish transportation vehicle frame 8 on track girder 17.
When being applied to earth and rockfill dam, as shown in figure 5, structure is similar to Fig. 2.Concrete structure is:Including dam body 1, arrange
In the fish pass 2 and the collection fishpond 3 that make fish migration in dam body 1 downstream, fortune hopper 4 is located in collection fishpond 3, and the revolution being arranged at dam crest is hung
Car 10, the wire rope hoist 9 on dam crest platform, along the oblique orbit beam 7 of downstream dam slope arrangement, it is connected to oblique orbit beam 7 He
Horizontal rail beam 6 between collection fishpond 3, is provided with the electric block 5 for crawl fortune hopper 4, oblique on horizontal rail beam 6
The fish transportation vehicle frame 8 that wire rope hoist 9 is powered is provided with track girder 7, fortune hopper 4 can be by electric block 5 lifting simultaneously edge
Horizontal rail beam 6 is transported on the fish transportation vehicle frame 8 at oblique orbit beam 7 top.Wherein, 11 control room, 12 wire rope hoists for aqueduct.
The present invention, is connected with riverbed in downstream inlet arrangement fish pass, attracting to collection fishpond and enters fortune hopper, by electronic
Cucurbit is hung to transporting hopper on fish transportation vehicle frame, will transport hopper by the wire rope hoist near dam crest and draw to dam crest platform, then by
The rotary crane of dam crest (upstream) is hoisted to reservoir area bank and frees, and completes the demand that dam is crossed in fish migration.
The present invention crosses, with reference to short fish pass collection attracting, comprehensive rail mounted, the operation principle that fish construction machine lifted dam, both sends out
Wave the advantage of fish pass and fish lift, turn avoid that simple fish pass is long, cost is high, cannot adapt to SEA LEVEL VARIATION, and cable machine
The shortcomings of limitation dam type, fortune fish time are long, and fish are afraid of one's shadow arranged in hinge by formula fish lift.With traditional fish pass structure phase
Than, rail mounted crosses fish structure during practice, take up an area less, easily arrangement, reduced investment, design flexibility by force it is adaptable in,
High dam crosses fish, adapts to the larger luffing of reservoir level again, can excessively multiple fish simultaneously, a large amount of can cross fishes, be easy to long-distance transhipment, also may be used
Cross fish to meet the construction time., whole fish structure of crossing invests about 20,000,000 yuan, transports fish taking the high concrete gravity dam of 100m as a example
The each 0.5t of weight, whole fortune fish process time controlled at 30 minutes, and process of transporting is quiet steadily, and shipping conditions are good, fish
It is substantially unaffected, respond well.
Embodiment described above is merely to illustrate technological thought and the feature of the present invention, its object is to make in the art
Technical staff it will be appreciated that present disclosure and according to this implement it is impossible to only to limit the patent model of the present invention with the present embodiment
Enclose, equal change or modification that is, all disclosed spirit is made, still fall in the scope of the claims of the present invention.
Claims (8)
1. a kind of rail mounted for middle and high head barrage hinge crosses fish structure it is characterised in that including dam body (1), setting
In the fish pass (2) and collection fishpond (3) that make fish migration in dam body (1) downstream, the fortune hopper (4) in collection fishpond (3), it is arranged at
The rotary crane (10) of dam crest, the wire rope hoist (9) on dam crest platform, along the oblique orbit beam (7) of downstream dam slope arrangement,
It is connected to the horizontal rail beam (6) between oblique orbit beam (7) and collection fishpond (3), horizontal rail beam (6) is provided with for grabbing
Take the electric block (5) of fortune hopper (4), the fish transportation vehicle frame that wire rope hoist (9) is powered is provided with oblique orbit beam (7)
(8), fortune hopper (4) by electric block (5) lifting and can be transported to the fish transportation vehicle on oblique orbit beam (7) along horizontal rail beam (6)
On frame (8).
2. the rail mounted for middle and high head barrage hinge according to claim 1 cross fish structure it is characterised in that
Described horizontal rail beam (6) and oblique orbit beam (7), away from supporting surface maximum height≤6m, transport hopper (4) maximum fortune fish weight 0.5t.
3. the rail mounted for middle and high head barrage hinge according to claim 1 cross fish structure it is characterised in that
The hauling speed of described wire rope hoist (9) is 30m/min.
4. the rail mounted for middle and high head barrage hinge according to claim 1 cross fish structure it is characterised in that
Described rotary crane (10) maximum working radius are 50m, revolution boom tip minimum hoisting weight >=2.5t.
5. a kind of rail mounted for middle and high head barrage hinge crosses fish structure it is characterised in that including the dam body of arch dam
(1), it is arranged at the fish pass (2) and collection fishpond (3) that make fish migration in dam body (1) downstream, the fortune hopper in collection fishpond (3)
(4), it is arranged at the rotary crane (10) of dam crest, the wire rope hoist (9) on dam rear platform, it is connected to dam rear platform and collection
Track girder (17) between fishpond (3), the fish frame (16) above track girder (17) and collection fishpond (3), is playing a fish frame
(16) it is provided with the electric block (5) for crawl fortune hopper (4) on, in rail beam (17) is provided with wire rope hoist (9)
The fish transportation vehicle frame (8) being powered, the fish transportation vehicle that fortune hopper (4) can be lifted by electric block (5), be transported on track girder (17)
On frame (8).
6. the rail mounted for middle and high head barrage hinge according to claim 5 cross fish structure it is characterised in that
Described track girder (17), away from supporting surface maximum height≤6m, transports hopper (4) maximum fortune fish weight 0.5t.
7. the rail mounted for middle and high head barrage hinge according to claim 5 cross fish structure it is characterised in that
The hauling speed of described wire rope hoist (9) is 30m/min.
8. the rail mounted for middle and high head barrage hinge according to claim 5 cross fish structure it is characterised in that
Described rotary crane (10) maximum working radius are 50m, revolution boom tip minimum hoisting weight >=2.5t.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510991956.7A CN105421307B (en) | 2015-12-25 | 2015-12-25 | Rail type fish passing structure applied to medium and high-water-head barrage hubs |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510991956.7A CN105421307B (en) | 2015-12-25 | 2015-12-25 | Rail type fish passing structure applied to medium and high-water-head barrage hubs |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105421307A CN105421307A (en) | 2016-03-23 |
CN105421307B true CN105421307B (en) | 2017-02-22 |
Family
ID=55499819
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510991956.7A Active CN105421307B (en) | 2015-12-25 | 2015-12-25 | Rail type fish passing structure applied to medium and high-water-head barrage hubs |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105421307B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110273407A (en) * | 2019-07-19 | 2019-09-24 | 中水珠江规划勘测设计有限公司 | Transfer crosses fish system and crosses fish method |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107059760A (en) * | 2017-05-27 | 2017-08-18 | 华电郑州机械设计研究院有限公司 | The high dam length of Hydraulic and Hydro-Power Engineering is defeated to cross fish system |
CN107178062A (en) * | 2017-07-21 | 2017-09-19 | 中水北方勘测设计研究有限责任公司 | Suitable for the fish system excessively of the superelevation arch dam of the big luffing of reservoir level |
CN108086262B (en) * | 2017-11-27 | 2024-02-23 | 中国电建集团成都勘测设计研究院有限公司 | Fish passing system for hydraulic engineering of closure dam |
CN108005040A (en) * | 2017-11-27 | 2018-05-08 | 中国电建集团成都勘测设计研究院有限公司 | Minisize ecological natural flow station |
CN109371931A (en) * | 2018-11-23 | 2019-02-22 | 中国电建集团成都勘测设计研究院有限公司 | Hoisting type fish channel structure |
CN109736254B (en) * | 2019-02-22 | 2023-10-24 | 长江勘测规划设计研究有限责任公司 | High dam comprehensive fish passing facility and fish passing method thereof |
CN110396991B (en) * | 2019-07-08 | 2024-03-19 | 中国电建集团贵阳勘测设计研究院有限公司 | Small-sized dam with bottom grid barrier with fish passing function |
CN115162290B (en) * | 2022-07-08 | 2023-04-11 | 中国电建集团贵阳勘测设计研究院有限公司 | Sightseeing fish passing system and fish passing method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101638889A (en) * | 2008-12-17 | 2010-02-03 | 中国水产科学研究院黄海水产研究所 | Step-type fish passage facilities suitable for steep slope of high dam and control method |
CN104912041A (en) * | 2015-06-17 | 2015-09-16 | 中国电建集团贵阳勘测设计研究院有限公司 | Fish passing system for high dam of canyon reach |
CN105113470A (en) * | 2015-04-17 | 2015-12-02 | 中国电建集团贵阳勘测设计研究院有限公司 | Fish pass method and device of water conservancy and hydropower dam |
CN205242367U (en) * | 2015-12-25 | 2016-05-18 | 中水北方勘测设计研究有限责任公司 | A fish structure is crossed to rail mounted that is arranged in, high water head dam pivot |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3831826B2 (en) * | 1996-11-29 | 2006-10-11 | 財団法人ダム水源地環境整備センター | Dam Fish Transporter |
-
2015
- 2015-12-25 CN CN201510991956.7A patent/CN105421307B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101638889A (en) * | 2008-12-17 | 2010-02-03 | 中国水产科学研究院黄海水产研究所 | Step-type fish passage facilities suitable for steep slope of high dam and control method |
CN105113470A (en) * | 2015-04-17 | 2015-12-02 | 中国电建集团贵阳勘测设计研究院有限公司 | Fish pass method and device of water conservancy and hydropower dam |
CN104912041A (en) * | 2015-06-17 | 2015-09-16 | 中国电建集团贵阳勘测设计研究院有限公司 | Fish passing system for high dam of canyon reach |
CN205242367U (en) * | 2015-12-25 | 2016-05-18 | 中水北方勘测设计研究有限责任公司 | A fish structure is crossed to rail mounted that is arranged in, high water head dam pivot |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110273407A (en) * | 2019-07-19 | 2019-09-24 | 中水珠江规划勘测设计有限公司 | Transfer crosses fish system and crosses fish method |
CN110273407B (en) * | 2019-07-19 | 2024-04-19 | 中水珠江规划勘测设计有限公司 | Steering device, fish passing system and fish passing method |
Also Published As
Publication number | Publication date |
---|---|
CN105421307A (en) | 2016-03-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105421307B (en) | Rail type fish passing structure applied to medium and high-water-head barrage hubs | |
CN109736254B (en) | High dam comprehensive fish passing facility and fish passing method thereof | |
CN206800347U (en) | The transporting something containerized fish platform on dam is crossed for fish | |
CN104389297B (en) | A kind of device and method improving large reservoir layering water at low temperature | |
CN205653058U (en) | Harbour wind -force monitoring auto -lock protection type hoist | |
CN205320960U (en) | Movable demersal fish lures an album device | |
CN105337218B (en) | A kind of transmission line of electricity lowering or hoisting gear | |
CN107059760A (en) | The high dam length of Hydraulic and Hydro-Power Engineering is defeated to cross fish system | |
CN206090506U (en) | River bank is protected ecological river in river algae plant and is collected clean system | |
CN205242367U (en) | A fish structure is crossed to rail mounted that is arranged in, high water head dam pivot | |
CN107284610A (en) | Seedling collecting method and equipment are thrown in a kind of mechanization for being used for marine suspended longline farming oyster | |
CN202809580U (en) | Trash holding and clearing mechanism | |
CN110273407B (en) | Steering device, fish passing system and fish passing method | |
CN210395269U (en) | High-head dam fish passing system | |
CN105883324B (en) | A kind of fish-collecting box vertical-lift and horizontal movement system | |
CN212464559U (en) | Large-scale steel construction choked flow box with a net | |
CN206706714U (en) | A kind of river garbage salvages system | |
CN205999402U (en) | A kind of blast furnace granulated slag Full-automatic picking slag system | |
CN107178062A (en) | Suitable for the fish system excessively of the superelevation arch dam of the big luffing of reservoir level | |
CN105794708B (en) | A kind of collection fishpond electric fish screen structure | |
CN206784306U (en) | The high dam length of Hydraulic and Hydro-Power Engineering is defeated to cross fish system | |
CN210712779U (en) | Steering device and fish passing system | |
CN107245992A (en) | A kind of river garbage salvages system | |
CN204199254U (en) | A kind of device improving large reservoir layering water at low temperature | |
CN205668777U (en) | A kind of fish-collecting box vertical-lift and horizontal movement system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |