CN105113470A - Fish pass method and device of water conservancy and hydropower dam - Google Patents

Fish pass method and device of water conservancy and hydropower dam Download PDF

Info

Publication number
CN105113470A
CN105113470A CN201510183196.7A CN201510183196A CN105113470A CN 105113470 A CN105113470 A CN 105113470A CN 201510183196 A CN201510183196 A CN 201510183196A CN 105113470 A CN105113470 A CN 105113470A
Authority
CN
China
Prior art keywords
fish
gathering
fish gathering
water
water conservancy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510183196.7A
Other languages
Chinese (zh)
Inventor
徐海洋
魏浪
张虎成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201510183196.7A priority Critical patent/CN105113470A/en
Publication of CN105113470A publication Critical patent/CN105113470A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/60Ecological corridors or buffer zones

Abstract

The present invention discloses a fish pass method and device of water conservancy and hydropower dams. An underwater track is laid at the bottom part of a riverway at the downstream of a tail water outlet of a power plant room, and a conventional water gathering ship is replaced by a water gathering platform disposed on the underwater track, thus to overcome fish gathering difficulties caused in river reaches without navigation conditions and when the fish gathering ship cannot approach a tail water zone of the power plant room. Pulleys and tracks are installed under the fish gathering platform, and the fish gathering platform can gather fishes with a certain range at the downstream of the tail water, thereby overcoming the problem that the fish gathering ship is difficult to gather fishes near the tail water, raising fish gathering effectiveness of a fish gathering system, and playing an active role in harmonizing conflicts between water conservancy and hydropower engineering and ecological environmental protection.

Description

A kind of fish method and device excessively of water conservancy and hydropower dam
Technical field
what the present invention relates to a kind of water conservancy and hydropower dam crosses fish method and device, belongs to Hydraulic and Hydro-Power Engineering technical field.
Background technology
the construction of Hydraulic and Hydro-Power Engineering dam, has blocked fish population interchange, fish pass structure be recover aquatile exchange critical facility, to fish trace back lay eggs and population exchange have important effect.
fish pass structure mainly contains several forms such as fish pass, fish lock, fish lift and transporting something containerized fish system.Wherein, transporting something containerized fish system is arranged hinge major project not to be affected substantially, be applicable to project playout condition difficulty and built dam carries out reconstructing the engineerings such as fish pass structure, wherein the quality of fish collection system operational effect is whether whole transporting something containerized fish system is effective crucial.
at present, fish collection system principal mode is fish gathering ship, and fish gathering ship has following weak point, as: Hydraulic and Hydro-Power Engineering dam generally only lets out ecological flow down, and downstream flow is less, and water is shallow, river surface is narrow, and riverbed is main mainly with stone riprap, and boat for collection and transportation of fish often can not safe operation; The place that the shoal of fish the most easily assembles in the main flow certain limit of tail water downstream, and it is more obvious the closer to power plant building tailrace outlet fish-gathering effect, but because factory building generating flow is unstable, consider safety problem, fish gathering ship can not carry out fish gathering near Daba Power Plant room tailrace outlet.
Summary of the invention
the object of the invention is to, what provide a kind of water conservancy and hydropower dam crosses fish method and device, and never having the section of navigation condition and factory building tail water district with solution can not the problem of fish gathering, thus overcomes the deficiencies in the prior art.
technical scheme of the present invention is achieved in that
the fish method of crossing of a kind of water conservancy and hydropower dam of the present invention is, the method is that the bottom of river channel in the tailrace outlet downstream of power plant building lays underwater rail, replace existing fish gathering ship by the fish gathering platform be located on underwater rail, never having the section of navigation condition and fish gathering ship with solution cannot near the problem of tail water district, power plant building fish gathering difficulty.
in preceding method, the starting point of described underwater rail is as far as possible close to power plant building tailrace outlet; Underwater rail adopts double track structure to arrange along river course water (flow) direction, and double track spacing so that fish gathering platform corresponding with the wheelspan of fish gathering mesa base can under water track run arbitrarily.
in preceding method, described fish gathering platform is provided with fish detector, the situation that fish gathering platform is assembled according to the fish detector observation shoal of fish, the position of adjustment fish gathering platform under water on track, thus completes fish gathering process.
in preceding method, after described fish gathering dock door, be provided with anti-escape device, fish-baiting instrument successively, cross fish gallery and storage fish box; Fish enters fish gathering platform from entrance through anti-escape device under the luring of fish-baiting instrument, then passed through fish gallery enter storage fish box complete fish gathering process.
in preceding method, described fish-baiting instrument utilizes power station generating tail water to form attraction current and the shoal of fish is drawn into fish gathering platform.
according to the fish device excessively of of the present invention a kind of water conservancy and hydropower dam that said method is formed, this device comprises the underwater rail being located at bottom of river channel, and track is provided with fish gathering platform under water.
in aforementioned means, the starting point of described underwater rail is positioned at tailrace outlet district, power plant building and arranges along river course water (flow) direction.
in aforementioned means, described fish gathering platform is provided with fish detector.
in aforementioned means, after described fish gathering dock door, be provided with anti-escape device, fish-baiting instrument successively, cross fish gallery and storage fish box.
owing to have employed technique scheme; the present invention compared with prior art; the present invention by being equipped with pulley and track under fish gathering platform; make fish gathering platform can carry out fish gathering in tail water downstream certain limit; overcome the problem that fish gathering ship is difficult to carry out fish gathering near tail water; improve the validity of the fish gathering of fish collection system, for the contradiction coordinated between Hydraulic and Hydro-Power Engineering and ecological environmental protection serves positive effect.
Accompanying drawing explanation
fig. 1 is structural representation of the present invention.
being labeled as in accompanying drawing: 1-river course, 2-underwater rail, 3-fish gathering platform, 4-power plant building tailrace outlet, 5-fish detector, 6-anti-escape device, 7-crosses fish gallery, 8-fish-baiting instrument, and 9-stores up fish box.
Detailed description of the invention
below in conjunction with drawings and Examples, the present invention is described in further detail, but not as any limitation of the invention.
the fish method of crossing of a kind of water conservancy and hydropower dam of the present invention is, as shown in Figure 1, the method is that the bottom of river channel in the tailrace outlet downstream of power plant building lays underwater rail, replace existing fish gathering ship by the fish gathering platform be located on underwater rail, never having the section of navigation condition and fish gathering ship with solution cannot near the problem of tail water district, power plant building fish gathering difficulty.The starting point of underwater rail is as far as possible close to power plant building tailrace outlet; Underwater rail adopts double track structure to arrange along river course water (flow) direction, and double track spacing so that fish gathering platform corresponding with the wheelspan of fish gathering mesa base can under water track run arbitrarily.Fish gathering platform is provided with fish detector, the situation that fish gathering platform is assembled according to the fish detector observation shoal of fish, the position of adjustment fish gathering platform under water on track.Be provided with anti-escape device, fish-baiting instrument after fish gathering dock door successively, cross fish gallery and storage fish box; Fish enters fish gathering platform from entrance through anti-escape device under the luring of fish-baiting instrument, then passed through fish gallery enter storage fish box complete fish gathering process.Fish-baiting instrument utilizes power station generating tail water to form attraction current and the shoal of fish is drawn into fish gathering platform.
according to the fish device excessively of of the present invention a kind of water conservancy and hydropower dam that said method is formed, as shown in Figure 1, this device comprises the underwater rail 2 be located at bottom river course 1, and underwater rail 2 is provided with fish gathering platform 3.The starting point of underwater rail 2 is positioned at power plant building tailrace outlet 4 district and arranges along river course 1 water (flow) direction.Fish gathering platform 3 is provided with fish detector 5.Be provided with anti-escape device 6, fish-baiting instrument 7 after fish gathering dock door successively, cross fish gallery 8 and storage fish box 9.
Embodiment
this comprises the fish gathering platform 3 that fish-baiting instrument 7 and pulley are housed and the underwater rail 2 be laid on bottom river course 1 such as shown in Fig. 1.Fish gathering platform 3 assembles situation according to fish detector 5 detecting fish school, carries out fish gathering in power plant building tailrace outlet 4 district and along the underwater rail 2 of river course 1 water (flow) direction laying slides.The starting point of underwater rail 2 is arranged in tail water district, power plant building along river course, and as far as possible near power plant building tailrace outlet 4, track is arranged under water along river course.Fish gathering platform is made up of corresponding detecting devices and pulleys etc. such as fish-baiting instrument, anti-escape devices, excessively fish gallery.Fish gathering platform can slide along track, is made up of the fish gathering platform 3 and underwater rail 2 that fish detector 5 and pulley are housed.The starting point of track is arranged in factory building generating tail water side along river course 1, and as far as possible near factory building tail water, track is arranged under water along river course 1, and gauge matches with the width of fish gathering platform 3.Fish gathering platform is primarily of fish-baiting instrument 7, excessively fish gallery 8 and corresponding detecting devices composition.Fish-baiting instrument mainly utilizes power station generating tail water to form attraction current.Anti-bell-mouthed anti-escape device 6 is set after import.Cross fish gallery 8 and be positioned at import back segment.Storage fish box 9 was positioned at the rear end of fish gallery 8.Fish gathering platform 3 has pulley, pulley and track supporting.Fish gathering platform 3 can according to the result of detection of fish detector 5, mobile position in orbit.

Claims (9)

1. the fish method excessively of a water conservancy and hydropower dam, it is characterized in that: the method is that the bottom of river channel in the tailrace outlet downstream of power plant building lays underwater rail, replace existing fish gathering ship by the fish gathering platform be located on underwater rail, never having the section of navigation condition and fish gathering ship with solution cannot near the problem of tail water district, power plant building fish gathering difficulty.
2. according to claim 1 water conservancy and hydropower dam cross fish method, it is characterized in that: the starting point of described underwater rail is as far as possible close to power plant building tailrace outlet; Underwater rail adopts double track structure to arrange along river course water (flow) direction, and double track spacing so that fish gathering platform corresponding with the wheelspan of fish gathering mesa base can under water track run arbitrarily.
3. according to claim 1 water conservancy and hydropower dam cross fish method, it is characterized in that: described fish gathering platform is provided with fish detector, fish gathering platform assembles situation according to fish detector detecting fish school, the position of adjustment fish gathering platform under water on track, thus completes fish gathering process.
4. according to claim 1 water conservancy and hydropower dam cross fish method, it is characterized in that: be provided with anti-escape device, fish-baiting instrument after described fish gathering dock door successively, cross fish gallery and storage fish box; Fish enters fish gathering platform from entrance through anti-escape device under the luring of fish-baiting instrument, then passed through fish gallery enter storage fish box complete fish gathering process.
5. according to claim 4 water conservancy and hydropower dam cross fish method, it is characterized in that: described fish-baiting instrument utilizes the power station tail water that generates electricity to be formed and attract current that the shoal of fish is drawn into fish gathering platform.
6. a fish device excessively for the water conservancy and hydropower dam that method is formed according to the arbitrary claim of Claims 1 to 5, comprises the underwater rail (2) being located at bottom, river course (1), it is characterized in that: track (2) is provided with fish gathering platform (3) under water.
7. according to claim 6 water conservancy and hydropower dam cross fish device, it is characterized in that: the starting point of described underwater rail (2) is positioned at power plant building tailrace outlet (4) district and arranges along river course (1) water (flow) direction.
8. according to claim 6 water conservancy and hydropower dam cross fish device, it is characterized in that: described fish gathering platform (3) is provided with fish detector (5).
9. according to claim 6 water conservancy and hydropower dam cross fish device, it is characterized in that: after the entrance of described fish gathering platform (3), be provided with anti-escape device (6), fish-baiting instrument (7) successively, cross fish gallery (8) and store up fish box (9).
CN201510183196.7A 2015-04-17 2015-04-17 Fish pass method and device of water conservancy and hydropower dam Pending CN105113470A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510183196.7A CN105113470A (en) 2015-04-17 2015-04-17 Fish pass method and device of water conservancy and hydropower dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510183196.7A CN105113470A (en) 2015-04-17 2015-04-17 Fish pass method and device of water conservancy and hydropower dam

Publications (1)

Publication Number Publication Date
CN105113470A true CN105113470A (en) 2015-12-02

Family

ID=54661563

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510183196.7A Pending CN105113470A (en) 2015-04-17 2015-04-17 Fish pass method and device of water conservancy and hydropower dam

Country Status (1)

Country Link
CN (1) CN105113470A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421307A (en) * 2015-12-25 2016-03-23 中水北方勘测设计研究有限责任公司 Rail type fish passing structure applied to medium and high-water-head barrage hubs
CN105454171A (en) * 2016-01-01 2016-04-06 三峡大学 Movable demersal fish trapping and collection device and method
CN107574798A (en) * 2017-10-10 2018-01-12 中国电建集团贵阳勘测设计研究院有限公司 A kind of independent fish box crosses fish formula ship lift
CN108775001A (en) * 2018-06-19 2018-11-09 利辛县风雅颂机电科技有限公司 A kind of fish device excessively of water conservancy and hydropower dam
CN109452235A (en) * 2018-12-06 2019-03-12 中国电建集团昆明勘测设计研究院有限公司 The method that flow velocity is fished in attracting channel is caught in control
CN109736254A (en) * 2019-02-22 2019-05-10 长江勘测规划设计研究有限责任公司 High dam integrates fish pass structure and its crosses fish method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000144697A (en) * 1998-11-17 2000-05-26 Kyusyu Regional Constr Bureau Ministry Of Constr Staircase type fish ladder facility
CN101638889A (en) * 2008-12-17 2010-02-03 中国水产科学研究院黄海水产研究所 Step-type fish passage facilities suitable for steep slope of high dam and control method
CN103321193A (en) * 2013-06-24 2013-09-25 中国水电顾问集团华东勘测设计研究院 Fish passing integrated system implemented by aid of underground shaft

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000144697A (en) * 1998-11-17 2000-05-26 Kyusyu Regional Constr Bureau Ministry Of Constr Staircase type fish ladder facility
CN101638889A (en) * 2008-12-17 2010-02-03 中国水产科学研究院黄海水产研究所 Step-type fish passage facilities suitable for steep slope of high dam and control method
CN103321193A (en) * 2013-06-24 2013-09-25 中国水电顾问集团华东勘测设计研究院 Fish passing integrated system implemented by aid of underground shaft

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
梁园园等: ""集运鱼船研究综述"", 《长江科学院院报》 *
金弈等: ""旬阳水电站的鱼道设计"", 《水力发电》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421307A (en) * 2015-12-25 2016-03-23 中水北方勘测设计研究有限责任公司 Rail type fish passing structure applied to medium and high-water-head barrage hubs
CN105421307B (en) * 2015-12-25 2017-02-22 中水北方勘测设计研究有限责任公司 Rail type fish passing structure applied to medium and high-water-head barrage hubs
CN105454171A (en) * 2016-01-01 2016-04-06 三峡大学 Movable demersal fish trapping and collection device and method
CN105454171B (en) * 2016-01-01 2018-09-11 三峡大学 Packaged type demersal fishes trap device and method
CN107574798A (en) * 2017-10-10 2018-01-12 中国电建集团贵阳勘测设计研究院有限公司 A kind of independent fish box crosses fish formula ship lift
CN107574798B (en) * 2017-10-10 2022-01-28 中国电建集团贵阳勘测设计研究院有限公司 Independent fish box fish-passing type ship lift
CN108775001A (en) * 2018-06-19 2018-11-09 利辛县风雅颂机电科技有限公司 A kind of fish device excessively of water conservancy and hydropower dam
CN109452235A (en) * 2018-12-06 2019-03-12 中国电建集团昆明勘测设计研究院有限公司 The method that flow velocity is fished in attracting channel is caught in control
CN109736254A (en) * 2019-02-22 2019-05-10 长江勘测规划设计研究有限责任公司 High dam integrates fish pass structure and its crosses fish method
CN109736254B (en) * 2019-02-22 2023-10-24 长江勘测规划设计研究有限责任公司 High dam comprehensive fish passing facility and fish passing method thereof

Similar Documents

Publication Publication Date Title
CN105113470A (en) Fish pass method and device of water conservancy and hydropower dam
US20200315144A1 (en) A reservoir tail reverse regulation method for native fish protection
CN204112294U (en) Dual channel formula flow velocity controlled ecological fish pass
CN103556610B (en) Device and implementation method thereof is rejected between fish pass and fish transportation vehicle
CN106447078A (en) Water conservancy project intelligent regulation control system and regulation control method for guaranteeing water supply safety of river mouth
CN104514215A (en) Fish blocking system and fish blocking method for fish pass type ship lock
CN205205791U (en) Fish device excessively of water conservancy water and electricity dam
CN104452692A (en) Dam passing system suitable for migratory fishes to pass hydro-junction and application method
CN106199054A (en) A kind of River Hydrology monitoring device
US20210207571A1 (en) Tidal power generating system
CN203768987U (en) Shoreside water intake device for nuclear power plant
CN203530940U (en) Flap gate
Binnie Tidal energy from the Severn estuary, UK
KR101395399B1 (en) Power system of tidal power generation
CN204326033U (en) That crosses fish formula ship lock blocks fish system
CN204738279U (en) Barranca section high dam fish lift device
CN203569544U (en) Dam crossing system suitable for migratory fishes to pass through key water control projects
CN208219580U (en) Power station fish pass system
JP2012145091A (en) Tidal difference power generation
Jie et al. Influence of near-shore marine structures in a beach nourishment project on tidal currents in Haitan Bay, facing the Taiwan Strait
Lata et al. Impact analysis of run-off–the river type hydroelectric power plants in Himachal Pradesh, India
Shao et al. Hydrodynamic investigation of combinations of double and triple Dynamic Tidal Power systems
Leech An experimental study of the hydrodynamic impact of turbine layout and design considerations in tidal range schemes
Mackinnon et al. Problems associated with 2-D modelling of coastal waters
RU2494193C1 (en) Complex of main hydraulic engineering structures of single-pond tidal power-plant (tpp)

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20151202

RJ01 Rejection of invention patent application after publication