RU2012145629A - METHOD FOR CONSTRUCTING SEISMICALLY SAFE RIVERS AND ECOLOGY OF HYDRO POWER PLANTS - Google Patents

METHOD FOR CONSTRUCTING SEISMICALLY SAFE RIVERS AND ECOLOGY OF HYDRO POWER PLANTS Download PDF

Info

Publication number
RU2012145629A
RU2012145629A RU2012145629/13A RU2012145629A RU2012145629A RU 2012145629 A RU2012145629 A RU 2012145629A RU 2012145629/13 A RU2012145629/13 A RU 2012145629/13A RU 2012145629 A RU2012145629 A RU 2012145629A RU 2012145629 A RU2012145629 A RU 2012145629A
Authority
RU
Russia
Prior art keywords
cascade
rivers
reservoir
reservoirs
water
Prior art date
Application number
RU2012145629/13A
Other languages
Russian (ru)
Other versions
RU2514640C1 (en
Inventor
Григорий Германович Ушаков
Original Assignee
Григорий Германович Ушаков
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Григорий Германович Ушаков filed Critical Григорий Германович Ушаков
Priority to RU2012145629/13A priority Critical patent/RU2514640C1/en
Application granted granted Critical
Publication of RU2514640C1 publication Critical patent/RU2514640C1/en
Publication of RU2012145629A publication Critical patent/RU2012145629A/en

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)

Abstract

Способ строительства сейсмобезопасных, сберегающих реки и экологию, гидроэлектростанций, включающих каскад небольшой емкости водохранилищ, которые строятся на боковых притоках реки, складках местности или логах, в стороне от основного русла рек, отличающийся тем, что водохранилища и их плотины располагаются с одной или обеих сторон реки, на таком расстоянии друг от друга, чтобы горизонты воды каждого последующего, начиная от истока реки, водохранилища каскада, были ниже дна предыдущего и все водохранилища каскада соединяются между собой напорными водоводами, водозаборы которых располагаются, в самых низких точках плотины предыдущего водохранилища, а конец, с гидротурбиной или гидротурбинами, например, активными, конусными и генераторами, на плотине или берегах последующего водохранилища, с водосливом в него отработанной турбинами воды, причем первый водозабор каскада ГЭС выполняется, например, боковым из основного русла реки.A method for the construction of seismic-safe, saving rivers and the environment, hydroelectric power plants, including a cascade of small-capacity reservoirs, which are built on lateral river tributaries, terrain folds or logs, away from the main river bed, characterized in that reservoirs and their dams are located on one or both sides rivers, at such a distance from each other that the water horizons of each subsequent one, starting from the source of the river, the reservoir of the cascade, are below the bottom of the previous one and all the reservoirs of the cascade are interconnected by pressure conduits, the water intakes of which are located at the lowest points of the dam of the previous reservoir, and the end, with a hydraulic turbine or hydraulic turbines, for example, active, cone and generators, on the dam or the banks of the subsequent reservoir, with a spillway into it of the waste water by the turbines, and the first water intake of the HPP cascade is performed, for example, laterally from the main river channel.

Claims (1)

Способ строительства сейсмобезопасных, сберегающих реки и экологию, гидроэлектростанций, включающих каскад небольшой емкости водохранилищ, которые строятся на боковых притоках реки, складках местности или логах, в стороне от основного русла рек, отличающийся тем, что водохранилища и их плотины располагаются с одной или обеих сторон реки, на таком расстоянии друг от друга, чтобы горизонты воды каждого последующего, начиная от истока реки, водохранилища каскада, были ниже дна предыдущего и все водохранилища каскада соединяются между собой напорными водоводами, водозаборы которых располагаются, в самых низких точках плотины предыдущего водохранилища, а конец, с гидротурбиной или гидротурбинами, например, активными, конусными и генераторами, на плотине или берегах последующего водохранилища, с водосливом в него отработанной турбинами воды, причем первый водозабор каскада ГЭС выполняется, например, боковым из основного русла реки. The method of construction of seismic safe, saving rivers and ecology, hydroelectric power plants, including a cascade of small reservoirs that are built on the side tributaries of the river, folds of the terrain or ravines, away from the main river bed, characterized in that the reservoirs and their dams are located on one or both sides rivers, at such a distance from each other that the water horizons of each subsequent one, starting from the source of the river, the cascade reservoir, are lower than the bottom of the previous one and all cascade reservoirs are interconnected pressure pipelines, the water intakes of which are located at the lowest points of the dam of the previous reservoir, and the end, with a hydraulic turbine or hydraulic turbines, for example, active, conical and generators, on the dam or the banks of the subsequent reservoir, with a spillway of waste water turbines into it, and the first water intake of the cascade Hydroelectric power station is carried out, for example, lateral from the main river bed.
RU2012145629/13A 2012-10-25 2012-10-25 Method to construct seismic-safe hydraulic power plants that protect rivers and environment RU2514640C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2012145629/13A RU2514640C1 (en) 2012-10-25 2012-10-25 Method to construct seismic-safe hydraulic power plants that protect rivers and environment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2012145629/13A RU2514640C1 (en) 2012-10-25 2012-10-25 Method to construct seismic-safe hydraulic power plants that protect rivers and environment

Publications (2)

Publication Number Publication Date
RU2514640C1 RU2514640C1 (en) 2014-04-27
RU2012145629A true RU2012145629A (en) 2014-04-27

Family

ID=50515408

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2012145629/13A RU2514640C1 (en) 2012-10-25 2012-10-25 Method to construct seismic-safe hydraulic power plants that protect rivers and environment

Country Status (1)

Country Link
RU (1) RU2514640C1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111501693B (en) * 2020-04-03 2021-10-01 贵州乌江水电开发有限责任公司 Method and system for dynamically controlling minimum downward flow of cascade hydropower station
CN114737514B (en) * 2022-04-22 2023-06-06 长沙环境保护职业技术学院 Sewage purification treatment device for aquatic environment engineering and installation method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3422835A1 (en) * 1984-06-20 1986-01-02 Ludwig 7430 Metzingen Frohmüller Power station on river banks
SU1645359A1 (en) * 1988-09-29 1991-04-30 В.В.П тин Method for utilizing water resources of flatland rivers
RU2002888C1 (en) * 1991-06-18 1993-11-15 Потапов Сергей Александрович; Потапова Елена Исаевна; Ходырев Исай Ефремович Pressure derivation cascade for hydro-electric power station
US7866919B2 (en) * 2007-04-12 2011-01-11 Natural Energy Resources Company System and method for controlling water flow between multiple reservoirs of a renewable water and energy system
RU2448215C2 (en) * 2008-03-04 2012-04-20 Григорий Германович Ушаков Hydraulic power unit with discharge water conduit and side water intake

Also Published As

Publication number Publication date
RU2514640C1 (en) 2014-04-27

Similar Documents

Publication Publication Date Title
RU2012145629A (en) METHOD FOR CONSTRUCTING SEISMICALLY SAFE RIVERS AND ECOLOGY OF HYDRO POWER PLANTS
WO2019103634A3 (en) Cascading hydroelectric power plant
CN103850879A (en) Offshore wind power generation and shellfish culture integrated system
CN203977383U (en) Isosceles triangle water inlet structure
CN202645822U (en) Siphonage multistage hydraulic power generation system
RU101461U1 (en) HYDRAULIC POWER PLANT
RU2567509C1 (en) Construction of small hydroelectric stations
CN203904935U (en) Overflow dam and dam toe ground workshop arrangement structure
RU2575195C2 (en) Method to construct small hydraulic power plants
UA130189U (en) MODERNIZED HIGH ENVIRONMENTAL HYDRO POWER PLANT
UA124817U (en) HIGH ENVIRONMENTAL HYDRO POWER PLANT
WO2010071340A3 (en) Method for constructing tidal power generator
RU2636971C2 (en) River damless hydroelectric power plant with stepped concentrator and vertical bucket longline hydroturbine
CA2801990A1 (en) Under seashore hydro power plant
RU2020101837A (en) ELECTRICITY PRODUCTION METHOD
JP2014159801A (en) Wave power generation facility structure
RU2012108911A (en) SHORE-PROTECTING AND BEAST-BUILDING STRUCTURES, INCLUDING ENGINEERING STRUCTURES FOR REGULATING THE REFUGE OF RIVERS, ICE CUTTERS AND WATER POWER PLANTS
RU2020101779A (en) ELECTRICITY PRODUCTION METHOD
RU2020101826A (en) ELECTRICITY PRODUCTION METHOD
Brylev et al. Changes of natural processes in the Volga-Akhtuba floodplain and Balta Braila of Lower Danube
RU2013148926A (en) HYDRO POWER PLANT WITHOUT DIMENSIONAL AND MULTIFUNCTIONAL
RU2010105881A (en) FREE FLOW, HEAD-UP HYDRO POWER PLANT
RU2013104911A (en) METHOD FOR PREVENTING OCCURRENCE OF HYDROACOUSTIC OSCILLATIONS IN WATERS OF HYDROELECTRIC STATIONS AND VIBRATIONS IN HYDRAULIC TURBINES
RU2016122328A (en) METHOD FOR PRODUCING ELECTRIC POWER USING PLAIN DRAINAGE HYDROPOWER PLANTS OF RIVER BASING
RU2011122189A (en) HYDRAULIC ACCUMULATION WIND POWER PLANT

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20141026