UA130189U - MODERNIZED HIGH ENVIRONMENTAL HYDRO POWER PLANT - Google Patents
MODERNIZED HIGH ENVIRONMENTAL HYDRO POWER PLANTInfo
- Publication number
- UA130189U UA130189U UAU201806453U UAU201806453U UA130189U UA 130189 U UA130189 U UA 130189U UA U201806453 U UAU201806453 U UA U201806453U UA U201806453 U UAU201806453 U UA U201806453U UA 130189 U UA130189 U UA 130189U
- Authority
- UA
- Ukraine
- Prior art keywords
- walls
- pressure
- specified value
- power plant
- spaces
- Prior art date
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Other Liquid Machine Or Engine Such As Wave Power Use (AREA)
- Hydraulic Turbines (AREA)
Abstract
Модернізована високоекологічна гідроелектростанція містить будівлю, яка знаходиться на заплаві біля русла або біля схилу долини, чи за дамбою обвалування, біля якої поруч розміщена акумулююча ємність, в яку надходить річкова вода через пропускну трубу або напірний трубопровід, з останньої вода за допомогою гідравлічного сифона надходить в урівноважувальну ємність, розміщену на опорах, з якої воду потім спрямовують в деривацію. Ківшева турбіна на опорі в кільцевому басейні, влаштована вертикально на одному валу з двома генераторами, має з двох боків подвійні обкладинки з просторами між стінками шириною 6 мм, які заповнені газом аргоном при тиску 0,18 Па або не більше указаної величини. Самі стінки з'єднані між собою за допомогою системи жорстких дірчастих перегородок. Напірний дериваційний трубопровід в кінцевій частині, на довжині 10 м, і конусна насадка мають чотиристінні обкладинки з просторами між стінками шириною 6 м, які по боках заповнені газом аргоном при тиску 0,18 Па або не більше указаної величини, а середній з повітрям при тиску 0,18 Па або не більше указаної величини, а стінки в них з'єднані між собою за допомогою системи жорстких дірчастих перегородок.Upgraded high-efficiency hydroelectric power plant contains a floodplain building near a river bed or near a valley slope, or behind a dike dam, near which a reservoir is placed, into which river water flows through a conduit or discharge pipeline, from the last water by means of hydropower. balancing tank placed on supports, from which water is then sent to the derivation. The bucket turbine on a support in the annular pool, arranged vertically on one shaft with two generators, has on both sides double covers with spaces between the walls 6 mm wide, which are filled with argon gas at a pressure of 0.18 PA or more than the specified value. The walls themselves are interconnected by a system of rigid holes. Pressure derivative pipeline in the end part, at a length of 10 m, and a conical nozzle have four-wall covers with spaces between the walls with a width of 6 m, which are filled on the sides with argon gas at a pressure of 0.18 PA or more than the specified value, and average with air at pressure 0,18 PA or more than the specified value, and the walls in them are interconnected by a system of rigid holes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
UAU201806453U UA130189U (en) | 2018-06-11 | 2018-06-11 | MODERNIZED HIGH ENVIRONMENTAL HYDRO POWER PLANT |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
UAU201806453U UA130189U (en) | 2018-06-11 | 2018-06-11 | MODERNIZED HIGH ENVIRONMENTAL HYDRO POWER PLANT |
Publications (1)
Publication Number | Publication Date |
---|---|
UA130189U true UA130189U (en) | 2018-11-26 |
Family
ID=65656787
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
UAU201806453U UA130189U (en) | 2018-06-11 | 2018-06-11 | MODERNIZED HIGH ENVIRONMENTAL HYDRO POWER PLANT |
Country Status (1)
Country | Link |
---|---|
UA (1) | UA130189U (en) |
-
2018
- 2018-06-11 UA UAU201806453U patent/UA130189U/en unknown
Similar Documents
Publication | Publication Date | Title |
---|---|---|
UA130189U (en) | MODERNIZED HIGH ENVIRONMENTAL HYDRO POWER PLANT | |
UA124817U (en) | HIGH ENVIRONMENTAL HYDRO POWER PLANT | |
RU101461U1 (en) | HYDRAULIC POWER PLANT | |
RU127827U1 (en) | HYDRO POWER PLANT | |
EA201370253A1 (en) | HYDROKINETIC UNIT | |
CN206986862U (en) | Hydroelectric engineering pipeline under pressure hole group arrangement structure | |
RU2657044C2 (en) | Damless hydroelectric power plant (dhepp) | |
CN203904935U (en) | Overflow dam and dam toe ground workshop arrangement structure | |
Novara et al. | Performance monitoring of two Pico-Hydropower Pumps as turbines over time | |
RU2019143224A (en) | DERIVATION HYDRO POWER PLANT | |
CN204401580U (en) | A kind of power station waterborne | |
RU2019143238A (en) | DERIVATION HYDRO POWER PLANT | |
RU2020101826A (en) | ELECTRICITY PRODUCTION METHOD | |
RU2019143223A (en) | DERIVATION HYDRO POWER PLANT | |
RU2020103010A (en) | ELECTRICITY PRODUCTION METHOD | |
RU2020101725A (en) | ELECTRICITY PRODUCTION METHOD | |
RU2020101837A (en) | ELECTRICITY PRODUCTION METHOD | |
UA108326C2 (en) | SELF-PRESSURED HYDROELECTRIC POWER PLANT | |
RU2008105785A (en) | UNLIMITED HYDRO POWER PLANT WITH INTERMEDIATE RESERVOIR | |
RU2016122334A (en) | METHOD FOR PRODUCING ELECTRIC POWER USING PLAIN DRAINAGE HYDROPOWER PLANTS OF RIVER BASING | |
RU2019138787A (en) | DERIVATION HYDRO POWER PLANT | |
RU2019138800A (en) | ELECTRIC POWER PRODUCTION METHOD | |
RU2019138789A (en) | DERIVATION HYDRO POWER PLANT | |
UA140972U (en) | DRAINLESS HYDROPOWER PLANT | |
RU2020101779A (en) | ELECTRICITY PRODUCTION METHOD |