CN105387989B - 在管道模型上设置金属丝模拟悬索管道桥抗风特性的方法 - Google Patents

在管道模型上设置金属丝模拟悬索管道桥抗风特性的方法 Download PDF

Info

Publication number
CN105387989B
CN105387989B CN201510827811.3A CN201510827811A CN105387989B CN 105387989 B CN105387989 B CN 105387989B CN 201510827811 A CN201510827811 A CN 201510827811A CN 105387989 B CN105387989 B CN 105387989B
Authority
CN
China
Prior art keywords
wire
pipeline
model
pipeline model
suspension bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510827811.3A
Other languages
English (en)
Other versions
CN105387989A (zh
Inventor
李国辉
王文进
左雷斌
马存明
马晓成
詹胜文
李明水
杨春玲
铁明亮
王丽
康坤坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Design Branch Of China Petroleum Pipeline Engineering Corp
China National Petroleum Corp
China Petroleum Pipeline Engineering Corp
Original Assignee
China National Petroleum Corp
China Petroleum Pipeline Engineering Corp
China Petroleum Pipeline Engineering Corp Design Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, China Petroleum Pipeline Engineering Corp, China Petroleum Pipeline Engineering Corp Design Branch filed Critical China National Petroleum Corp
Priority to CN201510827811.3A priority Critical patent/CN105387989B/zh
Publication of CN105387989A publication Critical patent/CN105387989A/zh
Application granted granted Critical
Publication of CN105387989B publication Critical patent/CN105387989B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M9/00Aerodynamic testing; Arrangements in or on wind tunnels
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M9/00Aerodynamic testing; Arrangements in or on wind tunnels
    • G01M9/08Aerodynamic models

Abstract

本发明涉及一种在管道模型上设置金属丝模拟悬索管道桥抗风特性的方法,属于悬索管道桥抗风技术领域。所述方法包括:根据管道模型的CFD分析模型的分析结果提取管道模型的阻力系数CD1,初步设定金属丝间距的范围;在管道模型外壁纵向设置金属丝,将设置金属丝的管道模型进行风洞试验,获取所述管道模型的阻力系数CD2;列出所述阻力系数CD2随所述金属丝间距的变化曲线,当所述阻力系数CD2随所述金属丝间距变化最小时,最终确定金属丝的标准间距;根据所述标准间距设置金属丝,并将所述设置金属丝的管道模型架设在悬索管道桥模型上进行风洞试验。本发明中金属丝的设置比较简单,便于试验操作,提高了悬索管道桥的风洞试验模拟精度。

Description

在管道模型上设置金属丝模拟悬索管道桥抗风特性的方法
技术领域
本发明涉及一种在管道模型上设置金属丝模拟悬索管道桥抗风特性的方法,属于悬索管道桥抗风技术领域。
背景技术
在油气管道的建设中,常用悬索管道桥来跨越河流和峡谷。与普通的公路悬索桥相比,悬索管道桥的窄柔特性明显,是典型的风敏结构。在悬索管道桥的工程设计中,抗风设计是其重要组成部分。目前的抗风设计均以悬索管道桥的风洞试验为支撑。受风洞实验室大小的限制,目前的多数试验均为缩尺的悬索管道桥节段模型风洞试验。大量的研究结果表明,风洞试验的结果存在很大的雷诺数效应。所谓雷诺数其定义为来流风速和特征尺寸的乘积与运动粘性系数的比值,反映的是空气团所受到的惯性力和粘性力的比值。雷诺数是桥梁风洞试验中的一个重要参数,雷诺数效应指的是随着雷诺数的变化,静力阻力系数等也随之变化。模型缩尺后,其进行风洞试验时的雷诺数与原型存在较大差距,缩尺后,雷诺数降低,试验得出的阻力系数随之变化。从而导致风洞试验的结果不能反映出真实的情况。
发明内容
为了解决这一问题,本发明的目的在于提供一种在管道模型上设置金属丝模拟悬索管道桥抗风特性的方法,通过设置金属丝,改变悬索管道桥模型中管道模型的表面流场,从而使试验得出的悬索管道桥气动参数更符合真实情况。本发明适用于悬索管道桥的风洞试验,为悬索管道桥的抗风设计提供有力的试验技术支撑。
本发明是通过以下技术方案实现的:
一种在管道模型上设置金属丝模拟悬索管道桥抗风特性的方法,包括以下步骤:
步骤1,建立一组单一管道模型的CFD分析模型,将管道模型外壁纵向设置金属丝,根据所述CFD分析模型的分析结果提取所述管道模型的阻力系数CD1,根据所述阻力系数CD1随所述金属丝间距的变化曲线,当所述阻力系数CD1的变化率随所述金属丝间距变化最小时,初步设定所述金属丝间距的范围;
步骤2,根据步骤1中初步设定的所述金属丝间距的范围,在所述管道模型外壁纵向设置金属丝,将所述设置金属丝的管道模型进行风洞试验的单一管道模型的静力试验,获取所述管道模型的阻力系数CD2
步骤3,列出所述阻力系数CD2随所述金属丝间距的变化曲线,当所述阻力系数CD2随所述金属丝间距变化最小时,最终确定金属丝的标准间距;
步骤4,根据步骤3所述的标准间距,在所述管道模型外壁纵向设置金属丝,并将所述设置金属丝的管道模型架设在悬索管道桥模型上进行风洞试验;
其中,所述管道模型架设在所述悬索管道桥模型的加劲梁横梁上的支座上;所述悬索管道桥模型包括两根主缆和两根风缆,若干条干扰缆将所述主缆和所述风缆连接起来,还有若干条干扰缆将两根主缆连接起来。
进一步的,步骤1中,所述金属丝的两端钩挂在所述管道模型的两端口处。
进一步的,所述金属丝为铜丝、铁丝、铝丝、镍丝、合金钢丝,优选的所述金属丝为铜丝。
进一步的,步骤1中初步设定的所述金属丝间距的范围为所述管道模型周长的1/4、1/6、1/8、1/10、1/12、1/14、1/16。
进一步的,所述金属丝的直径为所述管道模型直径的1/500~1/50。
进一步的,所述阻力系数CD1由CFD软件分析得到。
进一步的,所述阻力系数CD2由风洞试验得到。
本发明的有益效果为:
本发明提供了在管道模型上设置金属丝模拟悬索管道桥抗风特性的方法,在风洞试验中精确模拟悬索管道桥抗风特性。通过设置金属丝,使得悬索管道桥在风洞试验中气动参数的模拟精度得到了极大的提高,是悬索管道桥风洞试验技术的一次提升。本发明通过设置金属条纹,使风洞试验得出的悬索管道桥的气动参数更加符合真实的情况,为悬索管道桥的工程设计提供有力的支撑。另外,本发明中金属丝的设置比较简单,便于试验操作,能够取得较好的效果。
附图说明
图1为本发明所述设置金属丝的管道模型断面示意图;
图2为实施例中阻力系数CD1随金属丝间距的变化曲线图;
图3为实施例中阻力系数CD2随所述金属丝间距的变化曲线图;
图4为风洞试验得出的设置和未设置金属丝的管道模型的阻力系数对比曲线。
其中,1-管道模型,2-金属丝。
具体实施方式
为了使本发明的目的、技术方案及优点更加清楚明白,以下结合实例和附图,对本发明进行进一步详细说明。应当理解,此处所描述的具体实例仅仅用以解释本发明,并不用于限定本发明。
一种在管道模型上设置金属丝模拟悬索管道桥抗风特性的方法,包括以下步骤:
步骤1,建立一组单一管道模型的CFD分析模型,将管道模型外壁纵向设置金属丝,根据所述CFD分析模型的分析结果提取所述管道模型的阻力系数CD1,所述阻力系数CD1由CFD分析软件得到。
如图2,为阻力系数CD1随金属丝间距的变化曲线图,根据所述阻力系数CD1随所述金属丝间距的变化曲线,当所述阻力系数CD1的变化率随所述金属丝间距变化最小时,初步设定所述金属丝间距的范围,所述金属丝间距可为所述管道模型周长的1/4、1/5、1/6、1/7、1/8、1/9、1/10、1/11、1/12、1/13、1/14、1/15、1/16;其中,本实施例中,所述管道模型外径D为610mm。
所述金属丝可为铜丝、铁丝、铝丝、镍丝、合金钢丝,本实施例中所选用金属丝为铜丝。所述金属丝的直径为所述管道模型直径的1/500~1/50。
阻力系数是表征结构断面在平均风作用下受力大小的无量纲系数,反映了风对桥梁的定常气动作用。目前随着理论发展和计算机技术进步,很多时候采用CFD技术计算某些断面的阻力系数。但是计算结果往往与实际存在明显差距,因此必须进行风洞试验。
步骤2,根据步骤1中初步设定的所述金属丝间距的范围,在所述管道模型外壁纵向设置金属丝,将所述设置金属丝的管道模型进行风洞试验的单一管道模型的静力试验,获取所述管道模型的阻力系数CD2
步骤3,列出所述阻力系数CD2随所述金属丝间距的变化曲线,如图3,当所述阻力系数CD2随所述金属丝间距变化最小时,最终确定金属丝的标准间距。
图1为设置金属丝的管道模型断面示意图,如图中所示,1为管道模型,其外径为D,2为金属丝。本实施例中,确定所述金属丝的标准间距为D/12。
步骤4,根据步骤3所述的标准间距,在所述管道模型外壁纵向设置金属丝,并将所述设置金属丝的管道模型架设在悬索管道桥模型上进行风洞试验。其中,所述管道模型架设在所述悬索管道桥模型的加劲梁横梁上的支座上。
所述悬索管道桥模型包括两根主缆和两根风缆,若干条干扰缆将所述主缆和所述风缆连接起来,还有若干条干扰缆将两根主缆连接起来。
图4为风洞试验得出的设置和未设置金属丝的管道模型的阻力系数对比曲线。该管道模型的管径为610mm,金属丝的设置间距为管径的1/12。从图4可以看出,设置了金属丝之后,模型的阻力系数有了明显的下降。同时,之前的大量研究结果表明,在雷诺数相对较低的时候,随着雷诺数的增大,阻力系数会有一个急剧下降的过程。因此,从图4中可以看出设置了金属丝之后,阻力系数随雷诺数的变化趋势更加符合实际情况,图中Re为雷诺数。
本发明通过设置金属丝,使得悬索管道桥在风洞试验中气动参数的模拟精度得到了极大的提高,是悬索管道桥风洞试验技术的一次提升。本发明通过设置金属条纹,使风洞试验得出的悬索管道桥的气动参数更加符合真实的情况,为悬索管道桥的工程设计提供有力的支撑。
以上所述仅为本发明的较佳实例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。

Claims (6)

1.一种在管道模型上设置金属丝模拟悬索管道桥抗风特性的方法,其特征在于,包括以下步骤:
步骤1,建立一组单一管道模型的CFD分析模型,将管道模型外壁纵向设置金属丝,根据所述CFD分析模型的分析结果提取所述管道模型的阻力系数CD1,当所述阻力系数CD1的变化率随所述金属丝间距变化最小时,初步设定所述金属丝间距的范围;
步骤2,根据步骤1中初步设定的所述金属丝间距的范围,在所述管道模型外壁纵向设置金属丝,将设置金属丝的管道模型进行风洞试验的单一管道模型的静力试验,并获取所述管道模型的阻力系数CD2
步骤3,列出所述阻力系数CD2随所述金属丝间距的变化曲线,当所述阻力系数CD2的变化率随所述金属丝间距变化最小时,最终确定金属丝的标准间距;
步骤4,根据步骤3所述的标准间距,在管道模型外壁纵向设置金属丝,并将所述设置金属丝的管道模型架设在悬索管道桥模型上进行风洞试验;
其中,所述管道模型架设在所述悬索管道桥模型的加劲梁横梁上的支座上;所述悬索管道桥模型包括两根主缆和两根风缆,干扰缆将所述主缆和所述风缆连接起来,干扰缆还将两根主缆连接起来。
2.根据权利要求1所述的在管道模型上设置金属丝模拟悬索管道桥抗风特性的方法,其特征在于,步骤1中,所述金属丝的两端钩挂在所述管道模型的两端口处。
3.根据权利要求1所述的在管道模型上设置金属丝模拟悬索管道桥抗风特性的方法,其特征在于,所述金属丝为铜丝、铁丝、铝丝、镍丝或合金钢丝。
4.根据权利要求3所述的在管道模型上设置金属丝模拟悬索管道桥抗风特性的方法,其特征在于,所述金属丝为铜丝。
5.根据权利要求1所述的在管道模型上设置金属丝模拟悬索管道桥抗风特性的方法,其特征在于,步骤1中初步设定的所述金属丝间距的范围为所述管道模型周长的1/4、1/6、1/8、1/10、1/12、1/14、1/16。
6.根据权利要求1所述的在管道模型上设置金属丝模拟悬索管道桥抗风特性的方法,其特征在于,所述金属丝的直径为所述管道模型直径的1/500~1/50。
CN201510827811.3A 2015-11-24 2015-11-24 在管道模型上设置金属丝模拟悬索管道桥抗风特性的方法 Active CN105387989B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510827811.3A CN105387989B (zh) 2015-11-24 2015-11-24 在管道模型上设置金属丝模拟悬索管道桥抗风特性的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510827811.3A CN105387989B (zh) 2015-11-24 2015-11-24 在管道模型上设置金属丝模拟悬索管道桥抗风特性的方法

Publications (2)

Publication Number Publication Date
CN105387989A CN105387989A (zh) 2016-03-09
CN105387989B true CN105387989B (zh) 2017-09-01

Family

ID=55420531

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510827811.3A Active CN105387989B (zh) 2015-11-24 2015-11-24 在管道模型上设置金属丝模拟悬索管道桥抗风特性的方法

Country Status (1)

Country Link
CN (1) CN105387989B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106441784B (zh) * 2016-11-25 2018-08-31 中国石油天然气集团公司 测定悬索管道桥静力三分力系数的试验装置
CN106441783B (zh) * 2016-11-25 2018-07-24 中国石油天然气集团公司 测定悬索管道桥在紊流风场中气动力相关性的试验装置
CN106768787B (zh) * 2016-11-25 2018-11-02 中国石油天然气集团公司 测定悬索管道桥在紊流风场中气动力相关性的试验方法
CN116070333B (zh) * 2023-03-16 2023-06-06 石家庄铁道大学 考虑雷诺数效应的斜拉索气动力的分析方法、系统及终端

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101968399A (zh) * 2010-10-18 2011-02-09 西南交通大学 一种车辆、桥梁模型风洞试验系统
CN102944434A (zh) * 2012-11-30 2013-02-27 中南大学 一种u形风洞试验列车加速系统
CN103063401A (zh) * 2012-12-29 2013-04-24 重庆交通大学 一种钢桁架拱桥风洞试验模型的制备方法
CN103398834A (zh) * 2013-08-16 2013-11-20 中南大学 一种环形轨道、车辆、桥梁模型风洞试验系统
CN104535288A (zh) * 2014-12-19 2015-04-22 西南交通大学 一种测试斜风作用下桥梁气动力参数的风洞试验设备
CN104818665A (zh) * 2015-04-27 2015-08-05 中国石油天然气管道工程有限公司 一种用于大跨度悬索管道桥的抗风方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01240835A (ja) * 1988-03-23 1989-09-26 Sumitomo Heavy Ind Ltd 風洞模型実験方法および風洞実験用模型
JPH1060822A (ja) * 1996-08-12 1998-03-03 Tokai Supairaru:Kk 橋梁用排水管

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101968399A (zh) * 2010-10-18 2011-02-09 西南交通大学 一种车辆、桥梁模型风洞试验系统
CN102944434A (zh) * 2012-11-30 2013-02-27 中南大学 一种u形风洞试验列车加速系统
CN103063401A (zh) * 2012-12-29 2013-04-24 重庆交通大学 一种钢桁架拱桥风洞试验模型的制备方法
CN103398834A (zh) * 2013-08-16 2013-11-20 中南大学 一种环形轨道、车辆、桥梁模型风洞试验系统
CN104535288A (zh) * 2014-12-19 2015-04-22 西南交通大学 一种测试斜风作用下桥梁气动力参数的风洞试验设备
CN104818665A (zh) * 2015-04-27 2015-08-05 中国石油天然气管道工程有限公司 一种用于大跨度悬索管道桥的抗风方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
"山区峡谷大跨度管道桥风致响应";王凯 等;《石油学报》;20140531;第35卷(第3期);第564-569页 *
李友祥 等."悬索管道桥抗风性能的试验研究".《山西建筑》.2009,第35卷(第15期),第328-329页. *
铁明亮 等."管道悬索桥抗风理论".《CIPC2011中国国际石油天然气管道会议论文集》.2011,第221-226页. *

Also Published As

Publication number Publication date
CN105387989A (zh) 2016-03-09

Similar Documents

Publication Publication Date Title
CN105319048B (zh) 一种在风洞试验中模拟悬索管道桥抗风特性的方法
CN105387989B (zh) 在管道模型上设置金属丝模拟悬索管道桥抗风特性的方法
Yang et al. Wind tunnel tests on wind loads acting on an angled steel triangular transmission tower
WO2015149411A1 (zh) 覆冰导线脱冰跳跃仿真测试方法
Abd-Elaal et al. A review of transmission line systems under downburst wind loads
CN106096105A (zh) 输电线路风偏瞬态响应计算方法
CN105004504B (zh) 复合绝缘子的起振风速评估方法及选型方法
CN103683086B (zh) 运动雷暴风作用下输电线路风偏瞬态分析方法
Ma et al. Effect of the Reynolds number on the aerodynamic forces and galloping instability of a cylinder with semi-elliptical cross sections
CN112084560B (zh) 一种多幅桥面桥梁涡激振动数值模拟计算方法
Zhang et al. Modal parameters of a transmission tower considering the coupling effects between the tower and lines
CN105335569A (zh) 特高压输电线路多联v型绝缘子串力学特性仿真模拟方法
CN104794293A (zh) 风力机尾流计算方法
Fu et al. Gust response factor of a transmission tower under typhoon
CN111046570A (zh) 一种刚性圆柱体涡激振动数值模拟的湍流模型
Sham et al. Construction aerodynamics of cable-stayed bridges for record spans: Stonecutters Bridge
Flay Bluff body aerodynamics
Sarkar et al. Laboratory simulation of tornado and microburst to assess wind loads on buildings
CN108090263B (zh) 输电线脱冰振动缩尺试验气动阻尼的验证方法
JP7238979B2 (ja) 設備状態解析装置、設備状態解析方法、及びプログラム
CN116933602A (zh) 输电塔线耦联体系覆冰舞动响应的数值模拟方法及系统
CN104573365B (zh) 一种流动调整器性能评估方法
CN101672743B (zh) 内拉线悬浮抱杆分解组塔施工仿真试验评价系统及试验方法
CN111241682A (zh) 管道截面流动预测分析方法和装置
Poddaeva et al. Conducting experimental investigations of wind influence on high-rise constructions

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160422

Address after: 100007 Beijing, Dongzhimen, North Street, No. 9, No.

Applicant after: China National Petroleum Corp.

Applicant after: CHINA PETROLEUM PIPELINE BUREAU

Applicant after: CHINA PETROLEUM PIPELINE ENGINEERING Corp.

Address before: 065000 No. 146 Heping Road, Hebei, Langfang

Applicant before: CHINA PETROLEUM PIPELINE ENGINEERING Corp.

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170627

Address after: 100120 Beijing Xicheng District six laying Kang

Applicant after: China National Petroleum Corp.

Applicant after: China Petroleum Pipeline Engineering Co.,Ltd.

Applicant after: DESIGN BRANCH OF CHINA PETROLEUM PIPELINE ENGINEERING Corp.

Address before: 100007 Beijing, Dongzhimen, North Street, No. 9, No.

Applicant before: China National Petroleum Corp.

Applicant before: CHINA PETROLEUM PIPELINE BUREAU

Applicant before: CHINA PETROLEUM PIPELINE ENGINEERING Corp.

GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 100007 Beijing, Dongzhimen, North Street, No. 9, No.

Co-patentee after: China Petroleum Pipeline Engineering Co.,Ltd.

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Co-patentee after: DESIGN BRANCH OF CHINA PETROLEUM PIPELINE ENGINEERING Corp.

Address before: 100120 Liupu Kang, Xicheng District, Beijing

Co-patentee before: China Petroleum Pipeline Engineering Co.,Ltd.

Patentee before: China National Petroleum Corp.

Co-patentee before: DESIGN BRANCH OF CHINA PETROLEUM PIPELINE ENGINEERING Corp.

CP03 Change of name, title or address
TR01 Transfer of patent right

Effective date of registration: 20190802

Address after: 100007 Beijing, Dongzhimen, North Street, No. 9, No.

Co-patentee after: China Petroleum Pipeline Engineering Co.,Ltd.

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Co-patentee after: CHINA PETROLEUM PIPELINE ENGINEERING Corp.

Address before: 100007 Beijing, Dongzhimen, North Street, No. 9, No.

Co-patentee before: China Petroleum Pipeline Engineering Co.,Ltd.

Patentee before: CHINA NATIONAL PETROLEUM Corp.

Co-patentee before: DESIGN BRANCH OF CHINA PETROLEUM PIPELINE ENGINEERING Corp.

TR01 Transfer of patent right